Chemical Testing of Dredged Material Project
Solicitation number
W912DS-17-B-0001
Issued by

About this file

W912DS-17-B-0001 - Solicitation

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 12 Apr 2017

A X B X C

D

EX

G F 48 - 60

X H 62 orlando.nieves@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 62

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912DS 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ORLANDO NIEVES 917-790-8078

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 17

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

18 - 37 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 39 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

40 - 47

PART II - CONTRACT CLAUSES

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

(917)790-8173

212 -264-3013FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

W16ROE63499409

5. DATE ISSUED

13 Mar 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912DS-17-B-0001

Section A - Solicitation/Contract Form

INTRODUCTION

1. The U.S. Army Corps of Engineers, New York District (NYD) intends to award one Indefinite Delivery Indefinite Quantity (IDIQ) contract for its Operations Division off of this Invitation for Bid (IFB). The contract will be UNRESTRICTED. The duration of the contract is one year plus four (4) optional years.

2. The contract will be awarded to the lowest bidder who has currently (within the last 18 months) demonstrated to NYD and EPA Region 2, through submission of actual data, that they are capable of performing work in our program. A bidder will be considered to have demonstrated they are capable if there is documentation in the NYD/EPA, Region 2 dredged material testing program (within the last 18 months) stating that the laboratory has submitted data that is fully acceptable or acceptable with qualification, or that they have satisfied Demonstration of Capability (DOC) requirements (see attached, DOC Guidelines – Chemical Testing) for the NYD/EPA Region 2 dredged material testing program. This contract will be up to $2,000,000 for the base year and up to $1,500,000 for each of the four option years. The minimum guarantee for the base year is $30,000.00. The minimum guarantee for each option year is $10,000.00.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Base Year

FFP

Sampling and Testing of Dredged Material Proposed for Ocean Disposal (Physical, Chemical and Biological Analyses) 25 September 2017 through 24 September 2018.

FOB: Destination

MILSTRIP: W16ROE63499409

PURCHASE REQUEST NUMBER: W16ROE63499409

NET AMT

0002 1 Each OPTION 1st Option Year

FFP

Sampling and Testing of Dredged Material Proposed for Ocean Disposal (Physical, Chemical and Biological Analyses) 25 September 2018 through 24 September 2019.

FOB: Destination

0003 1 Each OPTION 2nd Option Year

FFP

Sampling and Testing of Dredged Material Proposed for Ocean Disposal (Physical, Chemical and Biological Analyses) 25 September 2019 through 24 September 2020.

0004 1 Each OPTION 3rd Option Year

FFP

Sampling and Testing of Dredged Material Proposed for Ocean Disposal (Physical, Chemical and Biological Analyses) 25 September 2020 through 24 September 2021.

0005 1 Each OPTION 4th Option Year

FFP

Sampling and Testing of Dredged Material Proposed for Ocean Disposal (Physical, Chemical and Biological Analyses) 25 September 2021 through 24 September 2022.

PRICE SCHEDULE

ITEM Description Est Qty

Unit of Issue

Price Base Unit Price

Base Ext Price

0001AA Sampling-Mob/Demob - Vibracore 1 Unit 0001AB Sampling-Mob/Demob - Split Spoon 1 Unit 0001AC Sampling-Vibracore, per sample 1 Unit 0001AD Sampling-Split Spoon, per sample 1 Unit 0001AE Sampling-Grab, per sample 1 Unit 0001AF Sampling-Vibracore, per 5 gals 1 Unit 0001AG Sampling-Grab, per 5 gals 1 Unit 0001AH Sampling-Compositing 1 Unit 0001AJ Grain Size Analysis 1 Unit 0001AL % Moisture & Moisture Content 1 Unit 0001AM Specific Gravity 1 Unit 0001AN Bulk Density-wet 1 Unit 0001AP Plasticity Indices 1 Unit 0001AS Consolidation 1 Unit 0001AT TSS 1 Unit 0001AU %TOC 1 Unit 0001AV Sediment-Hg 150 Unit 0001AW Sediment-Metals (8) 150 Unit 0001AX Sediment-Addtl Metal 1 Unit 0001AY Sediment-TBT 1 Unit 0001AZ Sediment-PAHs/Semi-volatiles 150 Unit 0001BA Sediment-Addtl PAH/Semi-volatile 1 Unit 0001BB Sediment-Pesticides 10 Unit 0001BC Sediment-Addtl Pesticide 1 Unit 0001BD Sediment-PCBs congeners 10 Unit 0001BE Sediment-PCBs & Pesticides 150 Unit 0001BF Sediment-Addtl PCB congener 1 Unit

0001BG Sediment-PCB coplanars (4) 1 Unit 0001BH Sediment-Addtl PCB coplanar 1 Unit 0001BJ Sediment-Total PCBs (with) 1 Unit 0001BK Sediment-Total PCBs (without) 1 Unit 0001BL Sediment-Dioxins/Furans 150 Unit 0001BM Water-Hg 150 Unit 0001BN Water-Metals (7) 150 Unit 0001BP Water-Addtl Metal 1 Unit 0001BQ Water-TBT 1 Unit 0001BR Water-Pesticides 10 Unit 0001BS Water-Addtl Pesticide 1 Unit 0001BT Water-PCBs (congeners) 10 Unit 0001BU Water-Addtl PCB congener 1 Unit 0001BV Water-PCB coplanars (4) 1 Unit 0001BW Water-Addtl PCB coplanar 1 Unit 0001BX Water-PCBs & Pesticides 150 Unit 0001BY Water-Total PCBs, with 1 Unit 0001BZ Water-Total PCBs, without 1 Unit 0001CA Water-Dioxins/Furans 150 Unit 0001CB Water-Coliforms 1 Unit 0001CC Water-BOD 1 Unit 0001CD Water-Prepare Elutriate 10 Unit 0001CE Tissue-Hg 150 Unit 0001CF Tissue-Metals (7) 150 Unit 0001CG Tissue-Addtl Metal 1 Unit 0001CH Tissue-TBT 1 Unit 0001CJ Tissue-PAHs/Semi-volatiles 150 Unit 0001CK Tissue-Addtl PAH/Semi-volatile 1 Unit 0001CL Tissue-Pesticides 10 Unit 0001CM Tissue-Addtl Pesticide 1 Unit 0001CN Tissue-PCBs (congeners) 10 Unit 0001CP Tissue-Addtl PCB congener 1 Unit 0001CQ Tissue-PCBs/Pesticides 150 Unit 0001CR Tissue-Total PCBs (with) 1 Unit 0001CS Tissue-Total PCBs (without) 1 Unit 0001CT Tissue-PCB coplanars (4) 1 Unit 0001CU Tissue-Addtl PCB coplanar 1 Unit 0001CV Tissue-Dioxins/Furans 150 Unit 0001CW Water-Total Lipid, Bligh and Dyer 10 Unit 0001CX Statistics 10 Unit 0001CY PN Tables 5 Unit 0001CZ SPLP Prep-Volatiles 50 Unit 0001DA SPLP Prep-Other 50 Unit 0001DB Modified Elutriate Test Prep 5 Unit 0001DC TCLP 1 Unit 0001DD Sediment-NJDEP Inorganics/Metals 150 Unit 0001DE Sediment-NJDEP Hg 150 Unit 0001DF Sediment-NJDEP Cyanide 150 Unit

0001DG Sediment-NJDEP Volatiles 150 Unit 0001DH Sediment-NJDEP PAHs & Semi-volatiles 150 Unit 0001DJ Sediment-NJDEP Pesticides 150 Unit 0001DK Sediment-NJDEP Aroclors 150 Unit 0001DL Water-NJDEP Inorganics/Metals 150 Unit 0001DM Water-NJDEP Hg 150 Unit 0001DN Water-NJDEP Cyanide 150 Unit 0001DP Water-NJDEP Volatiles 150 Unit 0001DQ Water-NJDEP PAHs & Semi-volatiles 150 Unit 0001DR Water-NJDEP Pesticides 150 Unit 0001DS Water-NJDEP Aroclors 150 Unit 0001DT Sediment-Hexavalent/Trivalent Chromium 150 Unit 0001DU Sediment-NJDEP Herbicides 150 Unit 0001DV Water-Hexavalent/Trivalent Chromium 150 Unit 0001DW Water-NJDEP Herbicides 150 Unit

Total Base Ext

Price

Est Qty

Unit of Issue

Price 1st

Option Unit Price

1st Option

Ext Price 0002AA Sampling-Mob/Demob - Vibracore 1 Unit 0002AB Sampling-Mob/Demob - Split Spoon 1 Unit 0002AC Sampling-Vibracore, per sample 1 Unit 0002AD Sampling-Split Spoon, per sample 1 Unit 0002AE Sampling-Grab, per sample 1 Unit 0002AF Sampling-Vibracore, per 5 gals 1 Unit 0002AG Sampling-Grab, per 5 gals 1 Unit 0002AH Sampling-Compositing 1 Unit 0002AJ Grain Size Analysis 1 Unit 0002AL % Moisture & moisture content 1 Unit 0002AM Specific Gravity 1 Unit 0002AN Bulk Density-wet 1 Unit 0002AP Plasticity Indices 1 Unit 0002AS Consolidation 1 Unit 0002AT TSS 1 Unit 0002AU %TOC 1 Unit 0002AV Sediment-Hg 110 Unit 0002AW Sediment-Metals (8) 110 Unit 0002AX Sediment-Addtl Metal 1 Unit 0002AY Sediment-TBT 1 Unit 0002AZ Sediment-PAHs/Semi-volatiles 110 Unit 0002BA Sediment-Addtl PAH/Semi-volatile 1 Unit

0002BB Sediment-Pesticides 5 Unit 0002BC Sediment-Addtl Pesticide 1 Unit 0002BD Sediment-PCBs congeners 5 Unit 0002BE Sediment-PCBs & Pesticides 110 Unit 0002BF Sediment-Addtl PCB congener 1 Unit 0002BG Sediment-PCB coplanars (4) 1 Unit 0002BH Sediment-Addtl PCB coplanar 1 Unit 0002BJ Sediment-Total PCBs (with) 1 Unit 0002BK Sediment-Total PCBs (without) 1 Unit 0002BL Sediment-Dioxins/Furans 110 Unit 0002BM Water-Hg 110 Unit 0002BN Water-Metals (7) 110 Unit 0002BP Water-Addtl Metal 1 Unit 0002BQ Water-TBT 1 Unit 0002BR Water-Pesticides 5 Unit 0002BS Water-Addtl Pesticide 1 Unit 0002BT Water-PCBs (congeners) 5 Unit 0002BU Water-Addtl PCB congener 1 Unit 0002BV Water-PCB coplanars (4) 1 Unit 0002BW Water-Addtl PCB coplanar 1 Unit 0002BX Water-PCBs & Pesticides 110 Unit 0002BY Water-Total PCBs, with 1 Unit 0002BZ Water-Total PCBs, without 1 Unit 0002CA Water-Dioxins/Furans 110 Unit 0002CB Water-Coliforms 1 Unit 0002CC Water-BOD 1 Unit 0002CD Water-Prepare Elutriate 5 Unit 0002CE Tissue-Hg 110 Unit 0002CF Tissue-Metals (7) 110 Unit 0002CG Tissue-Addtl Metal 1 Unit 0002CH Tissue-TBT 1 Unit 0002CJ Tissue-PAHs/Semi-volatiles 110 Unit 0002CK Tissue-Addtl PAH/Semi-volatile 1 Unit 0002CL Tissue-Pesticides 5 Unit 0002CM Tissue-Addtl Pesticide 1 Unit 0002CN Tissue-PCBs (congeners) 5 Unit 0002CP Tissue-Addtl PCB congener 1 Unit 0002CQ Tissue-PCBs/Pesticides 110 Unit 0002CR Tissue-Total PCBs (with) 1 Unit 0002CS Tissue-Total PCBs (without) 1 Unit 0002CT Tissue-PCB coplanars (4) 1 Unit 0002CU Tissue-Addtl PCB coplanar 1 Unit 0002CV Tissue-Dioxins/Furans 110 Unit 0002CW Water-Total Lipid, Bligh and Dyer 8 Unit 0002CX Statistics 8 Unit 0002CY PN Tables 4 Unit 0002CZ SPLP Prep-Volatiles 35 Unit 0002DA SPLP Prep-Other 35 Unit

0002DB Modified Elutriate Test Prep 3 Unit 0002DC TCLP 1 Unit 0002DD Sediment-NJDEP Inorganics/Metals 110 Unit 0002DE Sediment-NJDEP Hg 110 Unit 0002DF Sediment-NJDEP Cyanide 110 Unit 0002DG Sediment-NJDEP Volatiles 110 Unit 0002DH Sediment-NJDEP PAHs & Semi-volatiles 110 Unit 0002DJ Sediment-NJDEP Pesticides 110 Unit 0002DK Sediment-NJDEP Aroclors 110 Unit 0002DL Water-NJDEP Inorganics/Metals 110 Unit 0002DM Water-NJDEP Hg 110 Unit 0002DN Water-NJDEP Cyanide 110 Unit 0002DP Water-NJDEP Volatiles 110 Unit 0002DQ Water-NJDEP PAHs & Semi-volatiles 110 Unit 0002DR Water-NJDEP Pesticides 110 Unit 0002DS Water-NJDEP Aroclors 110 Unit 0002DT Sediment-Hexavalent/Trivalent Chromium 110 Unit 0002DU Sediment-NJDEP Herbicides 110 Unit 0002DV Water-Hexavalent/Trivalent Chromium 110 Unit 0002DW Water-NJDEP Herbicides 110 Unit Total 1st

Option Ext Price

Qty

Unit of Issue

Price 2nd

Option Unit Price

2nd Option

Ext Price 0003AA Sampling-Mob/Demob - Vibracore 1 Unit 0003AB Sampling-Mob/Demob - Split Spoon 1 Unit 0003AC Sampling-Vibracore, per sample 1 Unit 0003AD Sampling-Split Spoon, per sample 1 Unit 0003AE Sampling-Grab, per sample 1 Unit 0003AF Sampling-Vibracore, per 5 gals 1 Unit 0003AG Sampling-Grab, per 5 gals 1 Unit 0003AH Sampling-Compositing 1 Unit 0003AJ Grain Size Analysis 1 Unit 0003AL % Moisture & Moisture Content 1 Unit 0003AM Specific Gravity 1 Unit 0003AN Bulk Density-wet 1 Unit 0003AP Plasticity Indices 1 Unit 0003AS Consolidation 1 Unit 0003AT TSS 1 Unit 0003AU %TOC 1 Unit

0003AV Sediment-Hg 110 Unit 0003AW Sediment-Metals (8) 110 Unit 0003AX Sediment-Addtl Metal 1 Unit 0003AY Sediment-TBT 1 Unit 0003AZ Sediment-PAHs/Semi-volatiles 110 Unit 0003BA Sediment-Addtl PAH/Semi-volatile 1 Unit 0003BB Sediment-Pesticides 5 Unit 0003BC Sediment-Addtl Pesticide 1 Unit 0003BD Sediment-PCBs congeners 5 Unit 0003BE Sediment-PCBs & Pesticides 110 Unit 0003BF Sediment-Addtl PCB congener 1 Unit 0003BG Sediment-PCB coplanars (4) 1 Unit 0003BH Sediment-Addtl PCB coplanar 1 Unit 0003BJ Sediment-Total PCBs (with) 1 Unit 0003BK Sediment-Total PCBs (without) 1 Unit 0003BL Sediment-Dioxins/Furans 110 Unit 0003BM Water-Hg 110 Unit 0003BN Water-Metals (7) 110 Unit 0003BP Water-Addtl Metal 1 Unit 0003BQ Water-TBT 1 Unit 0003BR Water-Pesticides 5 Unit 0003BS Water-Addtl Pesticide 1 Unit 0003BT Water-PCBs (congeners) 5 Unit 0003BU Water-Addtl PCB congener 1 Unit 0003BV Water-PCB coplanars (4) 1 Unit 0003BW Water-Addtl PCB coplanar 1 Unit 0003BX Water-PCBs & Pesticides 110 Unit 0003BY Water-Total PCBs, with 1 Unit 0003BZ Water-Total PCBs, without 1 Unit 0003CA Water-Dioxins/Furans 110 Unit 0003CB Water-Coliforms 1 Unit 0003CC Water-BOD 1 Unit 0003CD Water-Prepare Elutriate 5 Unit 0003CE Tissue-Hg 110 Unit 0003CF Tissue-Metals (7) 110 Unit 0003CG Tissue-Addtl Metal 1 Unit 0003CH Tissue-TBT 1 Unit 0003CJ Tissue-PAHs/Semi-volatiles 110 Unit 0003CK Tissue-Addtl PAH/Semi-volatile 1 Unit 0003CL Tissue-Pesticides 5 Unit 0003CM Tissue-Addtl Pesticide 1 Unit 0003CN Tissue-PCBs (congeners) 5 Unit 0003CP Tissue-Addtl PCB congener 1 Unit 0003CQ Tissue-PCBs/Pesticides 110 Unit 0003CR Tissue-Total PCBs (with) 1 Unit 0003CS Tissue-Total PCBs (without) 1 Unit 0003CT Tissue-PCB coplanars (4) 1 Unit 0003CU Tissue-Addtl PCB coplanar 1 Unit

0003CV Tissue-Dioxins/Furans 110 Unit 0003CW Water-Total Lipid, Bligh and Dyer 8 Unit 0003CX Statistics 8 Unit 0003CY PN Tables 4 Unit 0003CZ SPLP Prep-Volatiles 35 Unit 0003DA SPLP Prep-Other 35 Unit 0003DB Modified Elutriate Test Prep 3 Unit 0003DC TCLP 1 Unit 0003DD Sediment-NJDEP Inorganics/Metals 110 Unit 0003DE Sediment-NJDEP Hg 110 Unit 0003DF Sediment-NJDEP Cyanide 110 Unit 0003DG Sediment-NJDEP Volatiles 110 Unit 0003DH Sediment-NJDEP PAHs & Semi-volatiles 110 Unit 0003DJ Sediment-NJDEP Pesticides 110 Unit 0003DK Sediment-NJDEP Aroclors 110 Unit 0003DL Water-NJDEP Inorganics/Metals 110 Unit 0003DM Water-NJDEP Hg 110 Unit 0003DN Water-NJDEP Cyanide 110 Unit 0003DP Water-NJDEP Volatiles 110 Unit 0003DQ Water-NJDEP PAHs & Semi-volatiles 110 Unit 0003DR Water-NJDEP Pesticides 110 Unit 0003DS Water-NJDEP Aroclors 110 Unit 0003DT Sediment-Hexavalent/Trivalent Chromium 110 Unit 0003DU Sediment-NJDEP Herbicides 110 Unit 0003DV Water-Hexavalent/Trivalent Chromium 110 Unit 0003DW Water-NJDEP Herbicides 110 Unit Total 2nd

Qty

Unit of Issue

Price 3rd

Option Unit Price

3rd Option

Ext Price 0004AA Sampling-Mob/Demob - Vibracore 1 Unit 0004AB Sampling-Mob/Demob - Split Spoon 1 Unit 0004AC Sampling-Vibracore, per sample 1 Unit 0004AD Sampling-Split Spoon, per sample 1 Unit 0004AE Sampling-Grab, per sample 1 Unit 0004AF Sampling-Vibracore, per 5 gals 1 Unit 0004AG Sampling-Grab, per 5 gals 1 Unit 0004AH Sampling-Compositing 1 Unit 0004AJ Grain Size Analysis 1 Unit 0004AL % Moisture & Moisture Content 1 Unit 0004AM Specific Gravity 1 Unit 0004AN Bulk Density-wet 1 Unit

0004AP Plasticity Indices 1 Unit 0004AS Consolidation 1 Unit 0004AT TSS 1 Unit 0004AU %TOC 1 Unit 0004AV Sediment-Hg 100 Unit 0004AW Sediment-Metals (8) 100 Unit 0004AX Sediment-Addtl Metal 1 Unit 0004AY Sediment-TBT 1 Unit 0004AZ Sediment-PAHs/Semi-volatiles 100 Unit 0004BA Sediment-Addtl PAH/Semi-volatile 1 Unit 0004BB Sediment-Pesticides 5 Unit 0004BC Sediment-Addtl Pesticide 1 Unit 0004BD Sediment-PCBs congeners 5 Unit 0004BE Sediment-PCBs & Pesticides 100 Unit 0004BF Sediment-Addtl PCB congener 1 Unit 0004BG Sediment-PCB coplanars (4) 1 Unit 0004BH Sediment-Addtl PCB coplanar 1 Unit 0004BJ Sediment-Total PCBs (with) 1 Unit 0004BK Sediment-Total PCBs (without) 1 Unit 0004BL Sediment-Dioxins/Furans 100 Unit 0004BM Water-Hg 100 Unit 0004BN Water-Metals (7) 100 Unit 0004BP Water-Addtl Metal 1 Unit 0004BQ Water-TBT 1 Unit 0004BR Water-Pesticides 5 Unit 0004BS Water-Addtl Pesticide 1 Unit 0004BT Water-PCBs (congeners) 5 Unit 0004BU Water-Addtl PCB congener 1 Unit 0004BV Water-PCB coplanars (4) 1 Unit 0004BW Water-Addtl PCB coplanar 1 Unit 0004BX Water-PCBs & Pesticides 100 Unit 0004BY Water-Total PCBs, with 1 Unit 0004BZ Water-Total PCBs, without 1 Unit 0004CA Water-Dioxins/Furans 100 Unit 0004CB Water-Coliforms 1 Unit 0004CC Water-BOD 1 Unit 0004CD Water-Prepare Elutriate 5 Unit 0004CE Tissue-Hg 100 Unit 0004CF Tissue-Metals (7) 100 Unit 0004CG Tissue-Addtl Metal 1 Unit 0004CH Tissue-TBT 1 Unit 0004CJ Tissue-PAHs/Semi-volatiles 100 Unit 0004CK Tissue-Addtl PAH/Semi-volatile 1 Unit 0004CL Tissue-Pesticides 5 Unit 0004CM Tissue-Addtl Pesticide 1 Unit 0004CN Tissue-PCBs (congeners) 5 Unit 0004CP Tissue-Addtl PCB congener 1 Unit 0004CQ Tissue-PCBs/Pesticides 100 Unit

0004CR Tissue-Total PCBs (with) 1 Unit 0004CS Tissue-Total PCBs (without) 1 Unit 0004CT Tissue-PCB coplanars (4) 1 Unit 0004CU Tissue-Addtl PCB coplanar 1 Unit 0004CV Tissue-Dioxins/Furans 100 Unit 0004CW Water-Total Lipid, Bligh and Dyer 8 Unit 0004CX Statistics 8 Unit 0004CY PN Tables 4 Unit 0004CZ SPLP Prep-Volatiles 35 Unit 0004DA SPLP Prep-Other 35 Unit 0004DB Modified Elutriate Test Prep 3 Unit 0004DC TCLP 1 Unit 0004DD Sediment-NJDEP Inorganics/Metals 110 Unit 0004DE Sediment-NJDEP Hg 110 Unit 0004DF Sediment-NJDEP Cyanide 110 Unit 0004DG Sediment-NJDEP Volatiles 110 Unit 0004DH Sediment-NJDEP PAHs & Semi-volatiles 110 Unit 0004DJ Sediment-NJDEP Pesticides 110 Unit 0004DK Sediment-NJDEP Aroclors 110 Unit 0004DL Water-NJDEP Inorganics/Metals 110 Unit 0004DM Water-NJDEP Hg 110 Unit 0004DN Water-NJDEP Cyanide 110 Unit 0004DP Water-NJDEP Volatiles 110 Unit 0004DQ Water-NJDEP PAHs & Semi-volatiles 110 Unit 0004DR Water-NJDEP Pesticides 110 Unit 0004DS Water-NJDEP Aroclors 110 Unit 0004DT Sediment-Hexavalent/Trivalent Chromium 110 Unit 0004DU Sediment-NJDEP Herbicides 110 Unit 0004DV Water-Hexavalent/Trivalent Chromium 110 Unit 0004DW Water-NJDEP Herbicides 110 Unit

Total 3rd

Qty

Unit of Issue

Price 4th

Option Unit Price

4th Option

Ext Price 0005AA Sampling-Mob/Demob - Vibracore 1 Unit 0005AB Sampling-Mob/Demob - Split Spoon 1 Unit 0005AC Sampling-Vibracore, per sample 1 Unit 0005AD Sampling-Split Spoon, per sample 1 Unit 0005AE Sampling-Grab, per sample 1 Unit 0005AF Sampling-Vibracore, per 5 gals 1 Unit 0005AG Sampling-Grab, per 5 gals 1 Unit

0005AH Sampling-Compositing 1 Unit 0005AJ Grain Size Analysis 1 Unit 0005AL % Moisture & Moisture Content 1 Unit 0005AM Specific Gravity 1 Unit 0005AN Bulk Density-wet 1 Unit 0005AP Plasticity Indices 1 Unit 0005AS Consolidation 1 Unit 0005AT TSS 1 Unit 0005AU %TOC 1 Unit 0005AV Sediment-Hg 100 Unit 0005AW Sediment-Metals (8) 100 Unit 0005AX Sediment-Addtl Metal 1 Unit 0005AY Sediment-TBT 1 Unit 0005AZ Sediment-PAHs/Semi-volatiles 100 Unit 0005BA Sediment-Addtl PAH/Semi-volatile 1 Unit 0005BB Sediment-Pesticides 5 Unit 0005BC Sediment-Addtl Pesticide 1 Unit 0005BD Sediment-PCBs congeners 5 Unit 0005BE Sediment-PCBs & Pesticides 100 Unit 0005BF Sediment-Addtl PCB congener 1 Unit 0005BG Sediment-PCB coplanars (4) 1 Unit 0005BH Sediment-Addtl PCB coplanar 1 Unit 0005BJ Sediment-Total PCBs (with) 1 Unit 0005BK Sediment-Total PCBs (without) 1 Unit 0005BL Sediment-Dioxins/Furans 100 Unit 0005BM Water-Hg 100 Unit 0005BN Water-Metals (7) 100 Unit 0005BP Water-Addtl Metal 1 Unit 0005BQ Water-TBT 1 Unit 0005BR Water-Pesticides 5 Unit 0005BS Water-Addtl Pesticide 1 Unit 0005BT Water-PCBs (congeners) 5 Unit 0005BU Water-Addtl PCB congener 1 Unit 0005BV Water-PCB coplanars (4) 1 Unit 0005BW Water-Addtl PCB coplanar 1 Unit 0005BX Water-PCBs & Pesticides 100 Unit 0005BY Water-Total PCBs, with 1 Unit 0005BZ Water-Total PCBs, without 1 Unit 0005CA Water-Dioxins/Furans 100 Unit 0005CB Water-Coliforms 1 Unit 0005CC Water-BOD 1 Unit 0005CD Water-Prepare Elutriate 5 Unit 0005CE Tissue-Hg 100 Unit 0005CF Tissue-Metals (7) 100 Unit 0005CG Tissue-Addtl Metal 1 Unit 0005CH Tissue-TBT 1 Unit 0005CJ Tissue-PAHs/Semi-volatiles 100 Unit 0005CK Tissue-Addtl PAH/Semi-volatile 1 Unit

0005CL Tissue-Pesticides 5 Unit 0005CM Tissue-Addtl Pesticide 1 Unit 0005CN Tissue-PCBs (congeners) 5 Unit 0005CP Tissue-Addtl PCB congener 1 Unit 0005CQ Tissue-PCBs/Pesticides 100 Unit 0005CR Tissue-Total PCBs (with) 1 Unit 0005CS Tissue-Total PCBs (without) 1 Unit 0005CT Tissue-PCB coplanars (4) 1 Unit 0005CU Tissue-Addtl PCB coplanar 1 Unit

0005CV Tissue-Dioxins/Furans

Unit 0005CW Water-Total Lipid, Bligh and Dyer 8 Unit 0005CX Statistics 8 Unit 0005CY PN Tables 4 Unit 0005CZ SPLP Prep-Volatiles 35 Unit 0005DA SPLP Prep-Other 35 Unit 0005DB Modified Elutriate Test Prep 3 Unit 0005DC TCLP 1 Unit 0005DD Sediment-NJDEP Inorganics/Metals 110 Unit 0005DE Sediment-NJDEP Hg 110 Unit 0005DF Sediment-NJDEP Cyanide 110 Unit 0005DG Sediment-NJDEP Volatiles 110 Unit 0005DH Sediment-NJDEP PAHs & Semi-volatiles 110 Unit 0005DJ Sediment-NJDEP Pesticides 110 Unit 0005DK Sediment-NJDEP Aroclors 110 Unit 0005DL Water-NJDEP Inorganics/Metals 110 Unit 0005DM Water-NJDEP Hg 110 Unit 0005DN Water-NJDEP Cyanide 110 Unit 0005DP Water-NJDEP Volatiles 110 Unit 0005DQ Water-NJDEP PAHs & Semi-volatiles 110 Unit 0005DR Water-NJDEP Pesticides 110 Unit 0005DS Water-NJDEP Aroclors 110 Unit 0005DT Sediment-Hexavalent/Trivalent Chromium 110 Unit 0005DU Sediment-NJDEP Herbicides 110 Unit 0005DV Water-Hexavalent/Trivalent Chromium 110 Unit 0005DW Water-NJDEP Herbicides 110 Unit Total 4th

Total Base Year Extended Price $______________________________________________________

Total 1st Option Year Extended Price $__________________________________________________

Total 2nd Option Year Extended Price $__________________________________________________

Total 3rd Option Year Extended Price $__________________________________________________

Total 4th Option Year Extended Price $__________________________________________________

Total Base Plus All Option Years Extended Price $________________________________________

NOTES TO BIDDERS

1. There are five tables in the “Price Schedule” in Section B. The Price Schedule has a listing of requirements that will be part of the basic IDIQ contracts. All Bidders must fill in prices for each item for the Base Year, 1st Option Year, 2nd Option Year, 3rd Option Year, and 4th Option Year for Unit Price and Ext (Extended) Price. The estimated quantity is the government’s estimate as to the usage of each item for each year of the contract. All bidders must fill in the Total for each year’s Extended Price as well as the Total Base Plus Option Years Extended Price.

2. Prices will be evaluated according to the Price Schedule provided in Section B.

For the purpose of evaluating price, the lowest bidder will be the bidder with the lowest price for “Total Base Plus All Option Years Extended Price”.

3. While estimated quantities are the government’s best estimate of anticipated usage for each year of the contract, the actual usage may be more or less for each item.

4. A Laboratory will need to obtain an EPA approved Demonstration of Capability unless we have documentation from EPA, Region 2 (within the last 18 months) stating that the laboratory has submitted data that is fully acceptable or acceptable with qualifications, or they have already satisfied Demonstration of Capability (DOC) requirements.

5. An acceptable Work/QA plan and Accident Prevent Plan are required prior to performing actual sampling and testing.

6. If there are any questions about the solicitation’s requirements, bidders should inquire prior to bidding on the work. All questions should be submitted to the Contract Specialist, Orlando.Nieves@usace.army.mil

CPARS

The Federal Acquisition Regulation (FAR) requires that Past Performance Information (PPI) be collected on DoD Contracts. The Contractor Performance Assessment Reporting System (CPARS) is a web-enabled application the Supports the completion, distribution and retrieval of all contract performance evaluations. Contractor Representatives are responsible for reviewing and commenting on evaluations submitted on the Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.gov/index.htm.

Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts

In addition to complying with the requirements outlined in FAR Part 22 .13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in the outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs-VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation-Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans-Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_guide_to_hiring_veterans_0.pdf

GENERAL INSTRUCTIONS

Electronic Submission: In addition to the hard copies required in block 13 of the Standard Form 33, the offeror shall submit his proposal on a CD-ROM. Written portions of the proposal shall be in MS Word or Adobe Acrobat PDF format. The electronic version shall be either a single file tabbed in the same order as the hard copy or multiple files hyperlinked to a single table of contents. Any portion of the proposal not available in electronic format i.e. cut sheets, if applicable should be scanned in Adobe Acrobat format, thus making it available electronically. The CDROM must be clearly labeled by solicitation number, project name, installation, and offeror’s name. The CD-ROM shall be marked with a label stating “Unclassified/Controlled Unclassified Info.:

In the event of any conflict between the electronic submission and the hard copy submission, the hard copy submission will govern and will be the material upon which the Government bases its evaluation and ultimately, its decision. Electronic media may be submitted in an un-editable format.

Section C - Descriptions and Specifications

STATEMENT OF WORK

1 STATEMENT OF WORK

1.1 CHEMISTRY

Sampling and Testing of Dredged Material Proposed for Ocean Disposal

(Physical and Chemical Analyses)

1. DESCRIPTION OF SERVICES TO BE PERFORMED: The work to be performed under this contract consists of sampling and testing of dredged material following procedures described in the 2016 US Army Corps of Engineers New York District/EPA Region 2 Guidance for Performing Tests on Dredged Material Proposed for Ocean Disposal (http://www.nan.usace.army.mil/Portals/37/docs/regulatory/Formdoc/FINAL_NYD- R2_REGIONAL_TESTINGMANUAL-APRIL%202016.pdf) and the 1991 EPA/USACE, Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual) (https://www.epa.gov/sites/production/files/2015-10/documents/green_book.pdf) , and subsequent updates to these two documents. Sampling and testing of dredged material proposed for upland placement will be performed following the procedures described in the October 1997, New Jersey Department of Environmental Protection (NJDEP) technical manual entitled “THE MANAGEMENT AND

REGULATION OF DREDGING ACTIVITIES AND DREDGED MATERIAL IN NEW JERSEY’S TIDAL

WATERS” (http://www.nj.gov/dep/passaicdocs/docs/NJDOTSupportingCosts/DREDGING- NJ%20MANUAL-1997.pdf). Work orders would include all or some of the following: sediment and water collection (on contractor-supplied ship); sample handling, processing and shipping; physical and chemical analyses; QA/QC procedures and necessary corrective actions. Reports containing the sampling logs, all testing results and QA/QC information in a format required by the New York District Corps of Engineers (NYD) and/or NJDEP/NYSDEC (New York State Department of Environmental Conservation) would have to be provided by the contractor for each task order. A Work/QA Plan and an Accident Prevention Plan (APP) prepared by the contractor and approved by NYD would be required prior to any sampling or testing. A Work/QA Plan must include: descriptions of all technical procedures for field sampling, laboratory analyses (eg. chemical, physical) data reduction and validation, and reporting; clearly written standard operating procedures (SOP) for all field, experimental and analytical procedures; clearly defined QA objectives that are consistent with the regulations, the1991 EPA/USACE, Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual), a permit application; mechanisms for conducting performance and systems audits during the course of the field laboratory work; and procedures for detecting problems with the sampling and analytical work, and implementing corrective actions in a timely manner. All sampling would be performed within the Port of New York & New Jersey, the length of the Hudson River, in the Atlantic Ocean at the Historic Area Remediation Site and its Reference Site, and in Long Island Sound at the Western and/or Central Disposal Sites.

2. STATEMENT OF CONTRACTOR SERVICES: The contractor shall provide services which will be detailed on each specific delivery order. It will include any combination of the following items:

2.1 SAMPLING: Generally, a project will consist of approximately 8-20 sample collection sites. Average core lengths are 6 feet, very rarely up to 18 feet. One sediment core and one site water sample per collection site is assumed for items 2.1.c and 2.1.e. However, depending on actual core lengths, additional samples may need to be collected at each location in order to obtain a total of 40-50 gallons of sediment. The exact number of samples to be collected will be specified by NYD for each project in the task order after coordinating with the Contractor. A single mobilization/demobilization price per project will be paid; this will be a single price for all project conditions. Item 2.1.f is a one-time cost and will only be awarded when both NYD and the Contractor agree before initiation of work that the compositing will be substantial and more time-consuming than usual. Item 2.1.f will not be applied to routine compositing required to fulfill the testing needs outlined in the 1991 EPA/USACE, Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual) or the 2016 (or latest) version of US Army Corps of Engineers New York District/EPA Region 2 Guidance for Performing Tests on Dredged Material Proposed for Ocean Disposal.

a. Sediment & Water Sampling - Vibracore - Mobilization/Demobilization (Contractor supplies ship, crew and equipment. Price includes travel from lab to and from sampling sites and sample shipment to lab.)

b. Sediment & Water Sampling - Split Spoon - Mobilization/Demobilization (Contractor supplies ship, crew and equipment. Price includes travel from lab to and from sampling sites and sample shipment to lab.)

c. Sediment & Water Sampling - Vibracore (per sample)

d. Sediment & Water Sampling - Split Spoon (per sample)

e. Sediment & Water Sampling - Grab sample (per sample)

f. Sediment & Water Sampling – Compositing

2.2 SEDIMENT PHYSICAL ANALYSIS: (Items 2.2.a – 2.2.f per single or composited sediment sample;

item 2.2.g is per water sample)

a. Grain Size Analysis (% sand, % silt, & % clay, using ASTM D-422)

b. % Moisture (must also be reported as Moisture Content, using ASTM D2216)

c. Specific Gravity (ASTM – D854)

d. Bulk Density (expressed as wet)

e. Plasticity Indices (Atterberg Limits) (ASTM D4318)

f. Consolidation - (per sediment sample). Use a modified ASTM 2435 (oedometer) test procedure outlined in EM 1110-2-5027, Appendix D in combination with the selfweight consolidation test described by Poindexter (1987,1988). Calculate permeability from the consolidation properties using the equation provided.

g. Total Suspended Solids - TSS (Performed using EM-1110-2-5027 or equivalent method.

Filter type (e.g. GFF, Millipore, Nuclepore) will be at discretion of NYD.

h. % Total Organic Carbon (per single or composited sediment sample; see NYD Guidance Manual for required method and MDL.)

2.3 SEDIMENT CHEMICAL ANALYSIS: (per single or composited sediment sample; see NYD Guidance Manual for required methods and required MDL.)

a. Sediment - Metals (Hg)

b. Sediment - Metals (Ag, As, Cd, Cr, Cu, Ni, Pb, Zn)

c. Sediment - Additional Metal (same method as Item 2.3.b)

d. Sediment - Total Butyl Tin

e. Sediment - PAHs and Semi-volatiles (LMWs: acenapthene, acenaphthylene, anthracene, fluorene, naphthalene, phenanthrene; HMWs: benzo(a)anthracene, benzo(a)pyrene, benzo (g,h,i)perylene, benzo(b)fluoranthene, benzo(k)fluoranthene, chrysene, dibenzo(a,h)anthracene, fluoranthrene, indeno(1,2,3-c,d)pyrene, pyrene; Semi-volatiles:

1,4 dichlorobenzene)

f. Sediment - Additional PAH or Semi-volatile (same method as Item 2.3.e)

g. Sediment - Pesticides (aldrin, alpha chlordane, trans-nonachlor, dieldrin, p,p' and o,p'

DDT/DDD/DDE, endosulfans (I, II, and sulfate), heptachlor, heptachlor epoxide)

h. Sediment - Additional Pesticide (same method as Item 2.3.g)

i. Sediment - PCBs (#8,18, 28, 44, 49, 52, 66, 87,101,105,118,128,138, 153,170,180,183,184,187,195, 206, 209)

j. Sediment - PCBs & Pesticides, simultaneously: See items 2.3.g and 2.3.i for analyte list

k. Sediment - Additional PCB congener (same method as Item 2.3.i)

l. Sediment - PCB coplanar (#77,126, 156, 169)

m. Sediment - Additional PCB coplanar congener (same method as Item 2.3.l)

n. Sediment - Total PCBs (Aroclor-based Quantitation, with Item 2.3.i. or 2.3.j)

o. Sediment - Total PCBs (Aroclor-based Quantitation, without Item 2.3.i or 2.3.j)

p. Sediment - Dioxins/Furans (2,3,7,8-TCDD & 2,3,7,8-TCDF and 2,3,7,8 Cl-substituted;

listed in NYD Guidance Manual)

2.4 CHEMICAL ANALYSIS OF DREDGING/DISPOSAL SITE WATER OR ELUTRIATE: (per individual water or elutriate sample; see NYD Guidance Manual for required methods and MDLs). Items 2.4.a through 2.4.n are usually analyzed in triplicate (unit cost times three).

a. Water- Metals (Hg)

b. Water - Metals (Ag, Cd, Cr, Cu, Ni, Pb, Zn)

c. Water - Additional Metal (same method as Item 2.4.b)

d. Water - Total Butyl Tin

e. Water - Pesticides (see Item 2.3.g for list)

f. Water - Additional Pesticide (same method as Item 2.4.e)

g. Water - PCBs (see Item 2.3.i for list)

h. Water - Additional PCB congener (same method as Item 2.4.g)

i. Water - PCB coplanar (see Item 2.3.l for list)

j. Water - Additional PCB coplanar congener (same method as Item 2.4.i)

k. Water - PCBs & Pesticides, simultaneously (see items 2.3.g & 2.3.i)

l. Water - Total PCBs (Aroclor-based Quantitation with Item 2.4.g or 2.4.k)

m. Water - Total PCBs (Aroclor-based Quantitation without Item 2.4.g or 2.4.k)

n. Water - Dioxins/Furans (see Item 2.3.p for list)

o. Water - Coliforms Analyze sample for fecal and total coliform levels using membrane filtration and MPN method as per Standard Methods.

p. Water - 5 Day BOD: Follow Standard Methods.

q. Water - Preparation of Elutriate Sample

2.5 BIOACCUMULATION TISSUE ANALYSIS: (per tissue sample; see Appendix B – Required Analytes and Reporting Limits of NYD Guidance Manual for required analytes and reporting limits)

a. Tissue - Metals (Hg)

b. Tissue - Metals (see Item 2.3.b for list)

c. Tissue - Additional Metal (same method as Item 2.5.b)

d. Tissue - Total Butyl Tin

e. Tissue - PAHs & Semi-volatiles (see Item 2.3.e for list)

f. Tissue - Additional PAH or Semi-volatile (same method as Item 2.5.e)

g. Tissue - Pesticides (see Item 2.3.g for list)

h. Tissue - Additional Pesticide (same method as Item 2.5.g)

i. Tissue - PCBs (see Item 2.3.i for list)

j. Tissue - Additional PCB congener (same method as Item 2.5.i)

k. Tissue - PCBs/Pesticides, simultaneously: This item reflects price for conducting item 2.5.g and item 2.5.i simultaneously.

l. Tissue - Total PCBs (using Aroclor Quantitation, with Items 2.5.i or 2.5.k)

m. Tissue - Total PCBs (using Aroclor Quantitation, without Items 2.5.i or 2.5.k)

n. Tissue - PCB coplanar (see Item 2.3.l for list)

o. Tissue - Additional PCB coplanar congener (same method as Item 2.5.n)

p. Tissue - Dioxins/Furans (see Item 2.3.p for list)

q. Tissue - Total Lipid Analysis (Bligh and Dyer method)

r. Statistical Analysis - Perform Statistical Analysis comparing bioaccumulation results for full set of analytes. Price is per species and comparison for one reach (e.g. test vs. reference, or test

vs. control). Statistical method used will conform to regional guidance.

s. Prepare Public Notice Table Summaries and Testing Memorandum Table - Reporting format is per the Government’s requirements. Price assumes two species used for bioaccumulation and site water and elutriate results.

2.6 UPLAND SEDIMENT AND WATER ANALYSES: (per single or composited sediment or water sample; see NJDEP technical manual for required detection limits.)

a. Synthetic Precipitation Leaching Procedure (SPLP) Prep: Perform this extraction procedure per sediment sample for all NJDEP Volatiles listed in Appendix B, Attachment 1 of the

NJDEP technical manual using EPA Method 1312.

b. Synthetic Precipitation Leaching Procedure (SPLP) Prep: Perform this extraction procedure per sediment sample for all NJDEP analytes, except Volatiles, listed in Appendix B, Attachment 1 of the NJDEP technical manual using EPA Method 1312.

c. Modified Elutriate Test Prep: Perform this test per sediment sample following the test procedure found in the June 1985, US Army Engineer Waterways Experiment Station, Environmental Effects of Dredging Technical Note, EEDP-04-2, using a 24-hour field retention time (www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA292625).

d. Sediment - Toxicity Characteristic Leaching Procedure (TCLP)

e. Sediment - NJDEP Inorganics/Metals: Perform sediment chemical analyses for all

NJDEP inorganics/metals, except Cyanide and Hg.

f. Sediment - NJDEP Hg: Perform sediment chemical analysis for Hg.

g. Sediment - NJDEP Cyanide: Perform sediment chemical analysis for Cyanide.

h. Sediment - NJDEP Volatile Organics: Perform sediment chemical analyses for all

NJDEP volatile organic analytes.

i. Sediment - NJDEP PAHs & Semi-Volatile Organics: Perform sediment chemical anlayses for NJDEP PAHs & semi-volatile organics.

j. Sediment - NJDEP Pesticides: Perform sediment chemical analyses for NJDEP pesticides.

k. Sediment - NJDEP Aroclors: Perform sediment chemical analyses for NJDEP Aroclors.

l. Water - NJDEP Inorganics/Metals: Perform water analysis for all NJDEP inorganics/metals, except Cyanide and Hg.

m. Water - NJDEP Hg: Perform water analysis for Hg.

n. Water - NJDEP Cyanide: Perform water analysis for Cyanide.

o. Water - NJDEP Volatile Organics: Perform water analysis for all NJDEP volatile organic analytes.

p. Water - NJDEP PAHs & Semi-Volatile Organics: Perform water analysis for all NJDEP PAHs

& semi-volatile organics.

q. Water - NJDEP Pesticides: Perform water analysis for all NJDEP pesticides.

r. Water - NJDEP Aroclors: Perform water analysis for all NJDEP Aroclors.

s. Sediment – Hexavalent/Trivalent Chromium: Perform sediment chemical analyses for Hexavalent/Trivalent Chromium as per NJDEP requirements.

t. Sediment - NJDEP Herbicides: Perform sediment chemical analyses for NJDEP

Herbicides.

u. Water – Hexavalent/Trivalent Chromium: Perform water analysis for

Hexavalent/Trivalent Chromium as per NJDEP requirements.

v. Water – NJDEP Herbicides: Perform water analysis for NJDEP Herbicides.

3. GOVERNMENT-FURNISHED DATA: The Government will furnish necessary data, survey maps, and sampling locations for each delivery order relating to the particular work or site under investigation.

4. AUTHORIZED CONTRACTING OFFICER REPRESENTATIVE (COR): The Government will designate a COR who will provide all liaison, supply Government-furnished data and services, and forward other necessary documents. Contractor interpretation and associated guidance/direction by the Government shall not be official unless specifically made by the COR. The COR will seek the timely progress of the work and its satisfactory completion.

5. PROJECT MANAGER: Promptly following award of contract, the contractor shall designate a project manager who shall be the point of contact with the Government COR.

6. CONFERENCES: The contractor may need to attend meetings at NYD offices to discuss test results if requested by the Government. No additional payment will be made for conference attendance.

7. REPORTING REQUIREMENTS: Contractor is required to report all analytical results in a bound report that includes full documentation of chain of custody. Results must be reported in a format that maximizes ease of interpretation and data must be fully qualified (A QA/QC summary that identifies non-attainment and potential introduced bias must accompany submissions). Initial reporting requirements will be specified at time of the first delivery item under this contract. Specific reporting format requirements may be changed through the life of the contract to accommodate the changing needs of the Government.

Samples must be identified clearly for the Government, not merely by laboratory ID but by verbal descriptors. District reserves right to require electronic submission of results in specific formats to be determined by the Government at no additional cost.

8. CORRECTION OF FINAL DOCUMENTS: Following review of draft reports and approval by the Government, the contractor will make all changes and corrections required and resubmit corrected originals and reproducible copies within the time schedule stipulated by the contracting officer or in the delivery order.

9. RESPONSIBILITY FOR CORRECT DOCUMENTS: The contractor is expected to review their work.

Corrections and clarifications shall be made by the contractor if found necessary by the Government during review. Work required for correction or clarification shall be completed and resubmitted within seven calendar days after request for such service is made by the COR, unless otherwise specified by the COR.

10. TERMS AND CONDITIONS

10.1. If water and sediment samples are being collected by NYD personnel for testing by the contractor, the contractor must provide appropriate clean sampling containers to NYD prior to start of sampling.

Sampling containers must be shipped within 5 days of notification by NYD personnel to the following address:

US Army Engineer District, New York Att: Thomas Wyche (Laboratory) Caven Point Terminal Three Chapel Avenue Jersey City, NJ 07305 Ph. 917-790-6101

The COR will notify the contractor when water or sediment sample collection has been completed. The samples must be picked up by the contractor within one business day following notification by the COR.

Samples must be picked up at the address provided in paragraph 10.1, above, or at another mutually agreed upon location.

10.2. If sampling is being performed by the contractor, the following requirements must be met:

a. Sampling crew must have at least one marine geologist onboard who is qualified to identify sediment type at the time of collection.

b. Ships used for sampling must have a DGPS navigation system onboard to pinpoint sample locations. Locations must be recorded in Lat/Long coordinates. Onboard fathometer must be capable of reporting depth to 0.1 foot and can be calibrated to counteract the confounding effects of temperature and salinity differences.

c. Corrections for stand of the tide at time of sampling using tidal projections will be permissible in most waterways and under most conditions, however, the government reserves the right to require real time correction using a local elevation datum (i.e. employing a tide board to correct for tide).

d. Sediment samples must be collected by coring to a depth specified by NYD. Boring logs describing sample collection must be provided and must include at a minimum the following information: date and time of collection, tidal information, sampling location in Lat/Long coordinates, and a physical description of cores by depth including odor, color, sediment type and degree of stratification. A clear, in focus, color photograph of each core with depths marked off must be included in the log. Also, note any abiotic or biotic material collected, as well as any problems encountered during sampling.

e. The core material must be composited and collected into labeled buckets and glass jars and stored in the dark at 2o-4o C immediately upon collection. Records must be kept identifying the number of samples taken per site, which cores were mixed together, and the amount of sediment pooled per site to make the composited sample. If stratification has been observed, the strata must be collected separately in labeled buckets and jars for each stratum. Each of the buckets and jars are to be filled to capacity. Enough sediment must be collected to accomplish all of the tasks prescribed.

f. Water must be collected from about 1 meter below the surface prior to coring at the same site where sediment cores are being taken, and containers must be stored in the dark at 2o-4o C immediately upon collection. A physical description of the collected water must be provided, including temperature and salinity of water at time of collection. Observations, such as visible oil sheens, floating debris, odors, etc., must be included in sampling log. All containers must be properly labeled. Enough water must be collected to accomplish all of the required tasks.

g. A government representative may choose to be present on the ship at the time of sampling. The

Contractor must notify the government at least 4 business days prior to sample collection in order to allow for scheduling.

10.3. Samples must be shipped to the contractor's laboratory facility immediately upon completion of sampling. Proper temperatures must be maintained at all times.

10.4. Sediment and water samples must be maintained in the dark at 4o+2o C immediately after collection (on ice or refrigerate), but may not be frozen prior to bioassay testing or elutriate preparation.

10.5. The contractor or subcontractors must supply all SRMs, calibrations standards, internal standards, matrix spikes, reagents, analytical instrumentation, laboratory supplies and equipment, sampling equipment and supplies required for all applicable tests identified in the most recent 2016 US Army Corps of Engineers New York District/ EPA Region 2 Guidance for Performing Tests on Dredged Material Proposed for Ocean Disposal.

10.6. If a laboratory chooses to substitute test methods listed in this Scope of Work, the contractor must contact the COR to get approval. The laboratory must provide NYD with SOPs and proof that the lab can meet target MDLs. If testing is initiated without COR approval of test methods, the COR may require retesting using methods of its choice at no cost to the Government.

10.7 Prior to initiation of the first sampling and testing effort, the contractor must submit the following:

10.7.1 A Sampling Work Plan/Laboratory Quality Assurance Plan (Work/QA Plan) prepared as specified in the most recent 2016 US Army Corps of Engineers New York District/ EPA Region 2 Guidance for Performing Tests on Dredged Material Proposed for Ocean Disposal (unless formally instructed otherwise by the COR). Subsequent efforts will require identification of any anticipated changes to the initially submitted Work Plan.

10.7.2. An Accident Prevention Plan (APP) specific to the work being performed. It shall include an Activity Hazard Analysis (AHA) for each major phase of work. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, 30 Nov 2014) and all federal, state, and local safety and health requirements.