About this file

Amendment No. 0001

View the file

Other files

File Type Posted
Preliminary_Bid_Abstract.pdf PDF
Amendment_4.pdf PDF
GB_Seg_U_-_Upper_Repair_Plans-Amend__3.pdf PDF
W912DS-13-B-0031_Amendment_0003.pdf PDF
Specs-_Amend_3.pdf PDF
W912DS-13-B-0031_Amendment_0002.pdf PDF
Amend_2_Plans.pdf PDF
W912DS-13-B-0031_Amendment_0001.pdf PDF
GB_Seg_U_-_Upper_Repair_Plans.pdf PDF
Amend_1_specs.pdf PDF
Green_Brook_Seg_U-T_100.pdf PDF
Specs.pdf PDF
Solicitation.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE32135319

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a. Provide Revised Bid Schedule and Notes pertaining to Bid Schedule.

b. Provide Revised Plans and Specifications.

c. Provide Revisions to Section 00800.

d. To incorporate FAR Clause 52.217-5 “Evaluation of Options” Bid Due Date Remains 24 Sep at 2:00 PM EST.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-13-B-0031

X 9B. DATED (SEE ITEM 11)

23-Aug-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Sep-2013

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-13-B-0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMEDMENT 0001

Green Brook Sub-Basin of the Raritan River Segment U Emergency Streambank Restoration and Segment T East Street Closure Gate Block and Tackle

AMENDMENT #0001

Revised Bid Schedule:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Bid

FFP

All work to construct bendway weirs, placement of additional fill and riprap revetment, and channel realignment involving excavating shoaling areas and channel bottom widening along Middle Brook, disposal of materials off site, and modification to an existing closure gate at East Street to add a block and tackle system, in accordance with the drawings and specifications.

FOB: Destination

NET AMT

0002 1 EA

Base Bid

FFP

New Jersey Department of Environmental Protection (NJDEP), Somerset County, and Borough of Bound Brook Liability Insurance.

The amount bid will be the maximum amount payable. Actual payment will be based on actual costs.

0003 1 Job Option 1

FFP

All work to construct erosion control along the upstream portion of the Segment U levee consisting of placement of additional fill and riprap revetment, in accordance with the plans and specifications

TOTAL AMOUNT

TOTAL BASE BID (CLINS 0001 AND 0002) $________________________

TOTAL OPTION (CLIN 0003) $________________________

TOTAL BASE PLUS OPTIONS (CLIN 0001, 0002 AND

0003) $________________________

Notes:

1. Low bidder for the purpose of award will be the conforming bidder offering the lowest amount for the Total Base Bid and Optional Bid Amount for all items. The Government is under no obligation to award the Optional Item.

2. Any bid which is materially unbalanced as to prices for the Base Bid and Optional Items may be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

3. Bidders are required to bid on all items or their bids will be rejected.

4. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidder himself thereto may render the bid non-responsive and may be caused for its rejection.

5. If awarded, Option #1, Bid Item 0003, shall be awarded within 120 calendar days from issuance of the Base Bid NTP. If the option is awarded within 90 calendar days from the issuance of the Base Bid NTP, an additional 30 calendar days will be added to the contract and work shall be completed within 180 calendar days of the Base Bid NTP date. If the option is awarded within 91 to 120 calendar days from the issuance of the Base Bid NTP, an additional 60 calendar days will be added to the contract and work shall be completed within 210 calendar days of the Base Bid NTP date. The Government is under no obligation to award the Optional Item.

1. The following changes are made to the plans:

a. Revise and reissue Sheet G-001.

b. Add Sheets C-106, C-107, C-108, C-109, C-110, C-111, C-112, C-113, C-203, C-

204, C-304, C-305, C-306, C-307, B-603, VF-101, and VF-102.

2. The following changes are made to the specifications:

a. Add the following specification: Section 32 93 00, Exterior Plants, and update the Table of Contents accordingly.

b. Revise and reissue the following specifications in their entirety:

Section 00010, Bid Schedule

Section 31 05 19, Geotextile

c. Replace paragraphs 1 and 29 of Section 00800 with the following:

1. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. The Contractor shall be required to (i) commence work under this contract within 5 calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete work in the ready for use, not later than 150 calendar days for the work specified, after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises except in case the Contracting Officer determines that seeding and planting is not feasible during the construction period (FAR 52.211-10). The Contractor shall accomplish such seeding and planting in the first planting period as specified in Paragraph 3.1.1 of Section 32 92 19 following the contract completion date.

If awarded, Option #1, Bid Item 0003, shall be awarded within 120 calendar days from issuance of the Base Bid NTP. If the option is awarded within 90 calendar days from the issuance of the Base Bid NTP, an additional 30 calendar days will be added to the contract and work shall be completed within 180 calendar days of the Base Bid NTP date. If the option is awarded within 91 to 120 calendar days from the issuance of the Base Bid NTP, an additional 60 calendar days will be added to the contract and work shall be completed within 210 calendar days of the Base Bid NTP date.

b. Location: The site of work is located in the Borough of Bound Brook, Somerset County, New Jersey.

c. The Contractor shall furnish all labor, materials, equipment and services (except those furnished by the Government) for the following:

Base Bid

- construction of emergency streambank restoration measures including bendway weirs, stone revetment blanket, bedding material, shoal removal and placement of fill material along Middle Brook at the Segment U area.

- construction of a block and tackle system at the East Street closure gate of the Segment T area.

Option #1

- All work to construct erosion control along the upstream portion of the Segment U levee consisting of placement of additional fill and riprap revetment, in accordance with the plans and specifications.

d. All work shall be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject in every detail to his supervision, direction, and instructions.

e. Magnitude of Construction Project: The estimated value of the proposed work is between $1,000,000 and $5,000,000.

29. INSURANCE PROCURED BY CONTRACTOR

a. The Contractor shall procure and maintain during the entire period of this performance under this contract the attached insurance policies:

(1) Commercial General Liability Insurance in limits of not less than Five Million Dollars ($5,000,000) combined single limit per occurrence for bodily injury, death, personal injury and property damage, including but not limited to coverage for Broad Form Property Damage. Such coverage shall not contain any environmental exclusion clause and there shall be no exclusions for property damage arising out of explosion, collapse or underground property damage hazards and no exclusion for waterfront activities.

(2) The policies described above shall be endorsed (i) to include the State of New Jersey, the Borough of Bound Brook, Somerset County, Carriage Park, LLC, and Middle Brook Center, LLC as additional insured and (ii) to provide that notice of an occurrence to the insurance company from any insured shall serve as notice from all insured.

(3) Comprehensive Automobile Liability Insurance in limits of not less than five million dollars combined single limit per occurrence for bodily injury, death, and property damage covering all owned, non-owned and hired vehicles in connection with the work to be performed in connection with this permit.

(4) Certificates of Insurance evidencing the issuance of all insurance required hereby, and guaranteeing at least thirty (30) days prior notice to the Government of cancellation or non-renewal, shall be delivered to the State of New Jersey Department of Environmental Protection, Borough of Bound Brook, Somerset County, Carriage Park, LLC, and Middle Brook Center, LLC prior to entry of the Government's contractors upon the project area, or, in the case of new or renewal policies replacing any policies expiring during the period, no later than thirty (30) days before the expiration dates of such expiring policies.

b. Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such a period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.

c. The Contractor agrees to insert the substances of this clause, including paragraph c., in all subcontracts hereunder.

3. This amendment shall be attached to the specifications and plans and shall be a part thereof.

SECTION 00010 - SOLICITATION CONTRACT FORM

Global Changes

CLIN 0001 -- CLIN 0002

The FSC code Y1KA has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

The SIC code 1629 has been added.

The MDAP/MAIS Code 000 has been added.

The NAICS code 237990 has been added.

CLIN 0003 is added as follows:

0003 1 Job OPTION Option 1

FFP

All work to construct erosion control along the upstream portion of the Segment U levee consisting of placement of additional fill and riprap revetment, in accordance with the plans and specifications

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0003:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

SECTION 00700 - CONTRACT CLAUSES

The following have been added by reference:

52.217-5 Evaluation Of Options JUL 1990

(End of Summary of Changes)