W912DS-10-B-0013-Amendment3.pdf
PDF 36 KB Posted
- Solicitation number
- W912DS-10-B-0013
About this file
Amendment 0003
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE01801350
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Extend the bid opening date from 21SEP2010 to 23SEP2010 at 2:00PM EST.
2. Revise the Bid Schedule.
3. Revise specif ications section 00800 paragraphs 1.a (iV) and (v), and 40.a to reflect the revised bid schedule.
Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE
LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Sep-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0013
X 9B. DATED (SEE ITEM 11)
11-Aug-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Sep-2010
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-10-B-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
Revised Bid Schedule:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum
BASE BID WORK
FFP
All work complete in accordance with the drawings and specifications but not including without limitation the work indicated or specified under Option 1, Option 2, Option 3, Option 4, Option 5, Option 6, Option 7 or Option 8. Under the Base Bid, the Contractor shall include all work for the complete construction of the boulder toe stabilization and vegetated revetment upstream of the designated wetland, including but not limited to mechanical clearing and grubbing, seeding, live stake planting and catch basin work.
FOB: Destination
MILSTRIP: W16ROE01801350
PURCHASE REQUEST NUMBER: W16ROE01801350
NET AMT
0002 1 Lump Sum BASE - Underground Utilities
FFP
All work for costs associated for the protection of the existing underground utilities in contract reach specified in CLIN 0001.
FOB: Destination
0003 1 Lump Sum BASE - Test Pits
FFP
All work for costs associated for the test pits.
0004 1 Lump Sum
OPTION OPTION 1
FFP
Provision of all work for costs associated with the boulder toe stabilization and vegetated revetment downstream of the designated wetland, including but not limited to mechanical clearing and grubbing, seeding, live stake planting and catch basin work.
0005 1 Lump Sum
OPTION OPTION 2
FFP
All work for costs associated for the protection of the existing underground utilities in contract reach specified in CLIN 0004.
0006 1 Lump Sum
OPTION OPTION 3
FFP
Provision of all work for costs associated with the complete construction associated with the wetland invasive removal and seeding.
0007 1 Lump Sum
OPTION OPTION 4
FFP
All work for costs associated for the protection of the existing underground utilities in contract reach specified in CLIN 0006.
0008 1 Lump Sum
OPTION OPTION 5
FFP
Provision of all work for costs associated with any tree, shrub or plant installation, not including live stake planting and seeding as included in the base.
0009 1 Lump Sum
OPTION OPTION 6
FFP
Provision of all work associated with the purchase, supply and installation of the specified guide rail.
0010 1 Lump Sum
OPTION OPTION 7
FFP
Provision of all work associated with herbicide application to be applied during the Spring/Summer of 2011, followed by seeding.
0011 1 Lump Sum
OPTION OPTION 8
FFP
Westchester County and Con Edison Liability Insurance. The amount bid will be the maximum amount payable. Actual payment will be based on actual costs.
Totals:
TOTAL BASE BID AMOUNT (CLINs 0001 - 0003) $______ _ _____
TOTAL OPTIONS BID AMOUNT (CLINS 0004 - 0011) $_____ _____
TOTAL BASE BID PLUS OPTIONS $
Notes for Bidders:
1. The low bidder for purposes of award will be the lowest conforming responsible bidder offering the lowest Total Base Bid Amount and the Optional Bid Amount for all Items.
2. Any bid price for items indicated above which are materially unbalanced as to price for the Base Bid Item and the Optional Items may be rejected. An unbalanced bid is one, which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
3. Bidders are required to bid on all items or their bid will be rejected.
4. Bidders are reminded that they must bid on the issued plans and specifications as amended.
Any deviations, conditions, or amendments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.
5. Optional bid items, if awarded will be as follows:
6. Option 1 - Bid Item 0004, construction associated with the boulder toe stabilization and vegetated revetment downstream of the designated wetland may be awarded, at the Government’s discretion, within 180 calendar days from issuance of the Notice to Proceed. No additional time shall be added to the contract.
7. Option 2 - Bid Item 0005, protection of the existing underground utilities in contract reach specified in CLIN 0004 may be awarded, at the Government’s discretion, within 180 calendar days from issuance of the Notice to Proceed. No additional time shall be added to the contract.
8. Option 3 - Bid Item 0006, construction associated with the wetland invasive removal and seeding may be awarded, at the Government’s discretion, within 180 calendar days from issuance of the Notice to Proceed. No additional time shall be added to the contract.
7. Option 4 - Bid Item 0007, protection of the existing underground utilities in contract reach specified in CLIN 0006 may be awarded, at the Government’s discretion, within 180 calendar days from issuance of the Notice to Proceed. No additional time shall be added to the contract.
8. Option 5 - Bid Item 0008, tree, shrub and plantings may be awarded, at the Government’s discretion, within 180 calendar days from issuance of the Notice to Proceed. No additional time shall be added to the contract.
9. Option 6 - Bid Item 0009, of all work associated with the purchase, supply and installation of the specified guide rail may be awarded, at the Government’s discretion, within 180 calendar days from issuance of the Notice to Proceed. No additional time shall be added to the contract.
10. Option 7 - Bid Item 0010, all work associated with herbicide application may be awarded, at the Government’s discretion, within 180 calendar days from issuance of the Notice to Proceed.
No additional time shall be added to the contract.
11. Option 8 - Bid Item 0011, Westchester County and Con Edison Liability Insurance may be awarded, at the Government’s discretion, within 180 calendar days from issuance of the Notice to Proceed. No additional time shall be added to the contract.\
Amendment No. 3
USACE, NYD Corps of Engineers New York, NY 10278
AMENDMENT NO.3 FOR IDC NO. W912DS-10-B-0013
1. The following changes shall be made to the specifications:
Section 00 80 00
A-Delete in its entirety paragraph 1.a (iv) and replace in its entirety with the following:
“ If Option #1, Option #2, Option #3, Option #4, Option #5, Option #6, Option #7 and Option #8 are to be awarded, they shall be awarded within 180 calendar days from issuance of the Base Bid NTP date and no additional time shall be added to contract”.
B-Delete in its entirety paragraph 1.a (v).
C-Revise paragraph 40.a by deleting “(CLIN 0009)” and replacing with
“(CLIN 0011)”.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 21-Sep-2010 02:00 PM to 23-Sep-2010 02:00 PM.
CLIN 0001
The CLIN extended description has changed from All work complete in accordance with the drawings and specifications but not including without limitation the work indicated or specified under Option 1, Option 2, Option 3, Option 4, Option 5 or Option 6. Under the Base Bid, the Contractor shall include all work for the complete construction of the boulder toe stabilization and vegetated revetment upstream of the designated wetland, including but not limited to mechanical clearing and grubbing, seeding, live stake planting and catch basin work. to All work complete in accordance with the drawings and specifications but not including without limitation the work indicated or specified under Option 1, Option 2, Option 3, Option 4, Option 5, Option 6, Option 7 or Option 8. Under the Base Bid, the Contractor shall include all work for the complete construction of the boulder toe stabilization and vegetated revetment upstream of the designated wetland, including but not limited to mechanical clearing and grubbing, seeding, live stake planting and catch basin work..
CLIN 0002
The CLIN extended description has changed from All work for costs associated for the protection of the existing underground utilities. to All work for costs associated for the protection of the existing underground utilities in contract reach specified in CLIN 0001..
The pricing detail quantity 1.00 has been added.
CLIN 0003
The pricing detail quantity 1.00 has been added.
CLIN 0005
The CLIN extended description has changed from Provision of all work for costs associated with the complete construction associated with the wetland invasive removal and seeding. to All work for costs associated for the protection of the existing underground utilities in contract reach specified in CLIN 0004..
CLIN 0006
The CLIN extended description has changed from Provision of all work for costs associated with any tree, shrub or plant installation, not including live stake planting and seeding as included in the base. to Provision of all work for costs associated with the complete construction associated with the wetland invasive removal and seeding..
CLIN 0007
The CLIN extended description has changed from Provision of all work associated with the purchase, supply and installation of the specified guide rail. to All work for costs associated for the protection of the existing underground utilities in contract reach specified in CLIN 0006..
CLIN 0008
The CLIN extended description has changed from Provision of all work associated with herbicide application to be applied during the Spring/Summer of 2011, followed by seeding. to Provision of all work for costs associated with any tree, shrub or plant installation, not including live stake planting and seeding as included in the base..
CLIN 0009
The CLIN extended description has changed from Westchester County Liability Insurance. The amount bid will be the maximum amount payable. Actual payment will be based on actual costs. to Provision of all work associated with the purchase, supply and installation of the specified guide rail..
CLIN 0010 is added as follows:
0010 1 Lump Sum
OPTION OPTION 7
FFP
Provision of all work associated with herbicide application to be applied during the Spring/Summer of 2011, followed by seeding.
CLIN 0011 is added as follows:
0011 1 Lump Sum
OPTION OPTION 8
FFP
Westchester County and Con Edison Liability Insurance. The amount bid will be the maximum amount payable. Actual payment will be based on actual costs.
(End of Summary of Changes)