OPS-ALBANY FIELD OFFICE
USACE NEW YORK DISTRICT ATTN: CENAN-OP-A
TROY NY
W16ROE91006327
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Revise the Wage Rates to General Decision Number: NY080002 08/21/2009 NY2
2. Replace the Note in Detail 5 / Sheet E-105 of the Plans
The Bid Opening Date of 18 September 2009 at 2:00 p.m. EST remains unchanged.
NOTE: Offerors must acknow ledge receipt of this amendment by the date specif ied in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, by telegram, or by signing Block 15 of SF 30. FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH LATE
BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 51
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0020
X 9B. DATED (SEE ITEM 11)
18-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2009
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE E3R0150
FACILITY CODECODE
EMAIL:TEL:
W912DS-09-B-0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 0001
PLANS: DETAIL 5, SHEET E-105
Revise note in Detail 5, Sheet E-105 as follows: replace "Existing Concrete Pad Remove Top 6" Concrete, Provide New Concrete, Slope to Drains" with "Remove Existing 10" Concrete Pad, Provide New 10" Concrete Pad, Slope to Drains."
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
REVISED WAGE RATES
General Decision Number: NY080002 08/21/2009 NY2
Superseded General Decision Number: NY20070002
State: New York JR 28 August 2009
Construction Types: Building, Heavy and Highway
Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington
Counties in New York.
BUILDING CONSTRUCTION PROJECTS (For all counties except FULTON)
(does not include single family homes and apartments up to a including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/08/2008
1 04/04/2008
2 05/02/2008
3 05/16/2008
4 05/30/2008
5 06/06/2008
6 06/13/2008
7 06/20/2008
8 06/27/2008
9 07/04/2008
10 08/08/2008
11 08/22/2008
12 10/03/2008
13 01/02/2009
14 01/23/2009
15 03/20/2009
16 03/27/2009
17 04/17/2009
18 05/01/2009
19 06/05/2009
20 06/12/2009
21 06/19/2009
22 06/26/2009
23 07/03/2009
24 07/10/2009
25 07/17/2009
26 07/24/2009
27 08/21/2009
ASBE0040-002 05/01/2009
Rates Fringes
Asbestos/Insulator Worker
SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 27.14 16.88
HAZARDOUS MATERIAL HANDLER
Duties limited to preparation wetting;
stripping; removal;
scrapping; vacuuming;
bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 17.37 9.95
BOIL0197-002 10/01/2006
BOILERMAKER......................$ 27.45 18.76
BRNY0002-019 06/01/2009
BRICKLAYER
BRICKLAYERS, STONE MASONS,
CEMENT MASONS, PLASTERERS,
POINTERS, CAULKERS &
CLEANERS....................$ 26.91 15.78
HEAVY & HIGHWAY
CONSTRUCTION
CEMENT MASONS..............$ 27.23 13.98
MARBLE, TILE & TERRAZZO
FINISHERS...................$ 21.05 12.32
MARBLE, TILE & TERRAZZO
WORKERS.....................$ 26.81 14.30
CARP0019-002 07/01/2009
Carpenters:
BUILDING CONSTRUCTION
(COLUMBIA COUNTY)
Carpenters, Millwrights, Pile Drivers...............$ 26.86 21.20
BUILDING CONSTRUCTION
(GREENE COUNTY)
Carpenters, Millwrights, Pile Drivers...............$ 26.61 21.20
HEAVY AND HIGHWAY
CONSTRUCTION (COLUMBIA AND
GREENE COUNTIES)
Carpenters, Millwrights, Pile Drivers...............$ 24.40 15.59
CARP0229-003 07/01/2009
SARATOGA COUNTY
HEAVY & HIGHWAY
CONSTRUCTION:
Carpenters.................$ 27.54 13.80
WASHINGTON COUNTY
CONSTRUCTION:
Carpenters.................$ 27.04 13.80
PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.
CARP0370-001 06/01/2009
ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND
SCHOHARIE COUNTIES
Carpenters & Soft Floor
Layers.....................$ 26.20 14.95
Piledriver.................$ 23.60 8.685
HEAVY & HIGHWAY
CONSTRUCTION
Carpenters.................$ 26.39 14.95
CARP0370-003 07/01/2009
CARPENTERS..................$ 26.39 14.95
DIVER TENDERS...............$ 25.49 14.95
DIVERS (Dry Day)............$ 25.49 14.95
DIVERS......................$ 60.00 14.95
PILEDRIVERS.................$ 24.49 14.95
ELEC0236-001 06/01/2009
ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);
MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;
WASHINGTON
ELECTRICIAN......................$ 30.50 17.09
ELEC0363-004 04/01/2009
GREENE COUNTY (Portion of)
ELECTRICIAN......................$ 37.00 23.12
ELEC1249-003 05/04/2009
LINE CONSTRUCTION: Lineman
(LIGHTING AND TRAFFIC SIGNAL
Including any and all Fiber
Optic Cable necessary for
Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems)
Flagman.....................$ 22.25 13.50+6.5%+a
Groundman Digging Machine
Operator....................$ 32.74 11.75+6.5%+a
Groundman Truck Driver
(tractor trailer unit)......$ 31.52 13.50+6.5%+a
Groundman Truck Driver......$ 29.66 13.50+6.5%+a
Lineman & Technician........$ 37.08 13.50+6.5%+a
Mechanic....................$ 29.66 13.50+6.5%+a
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor
Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249-004 05/04/2009
Line Construction:
Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):
Cable Splicer..............$ 44.67 13.50+7%+a
Flagman....................$ 24.37 13.50+7%+a
Groundman digging machine operator...................$ 36.55 13.50+7%+a
Groundman truck driver
(tractor trailer unit).....$ 34.52 13.50+7%+a
Groundman Truck driver.....$ 32.49 13.50+7%+a
Lineman and Technician.....$ 40.61 13.50+7%+a
Mechanic...................$ 32.49 13.50+7%+a
Overhead transmission line work (where 40.09other trades are or have been involved):
Cable Splicer..............$ 46.41 12.00+7%+a
Overhead transmission line work (where other trades are or have been involved):
Cable Splicer..............$ 47.44 13.50+7%+a
Flagman....................$ 25.88 13.50+7%+a
Groundman digging machine operator...................$ 38.82 13.50+7%+a
Groundman truck driver
(tractor trailer unit).....$ 36.66 13.50+7%+a
Groundman truck driver.....$ 34.50 13.50+7%+a
Lineman and Technician.....$ 43.13 13.50+7%+a
Mechanic...................$ 34.50 13.50+7%+a
Substation:
Cable Splicer..............$ 44.67 13.50+7%+a
Flagman....................$ 24.37 13.50+7%+a
Ground man truck driver....$ 32.49 13.50+7%+a
Groundman digging machine operator...................$ 36.55 13.50+7%+a
Groundman truck driver
(tractor trailer unit).....$ 34.52 13.50+7%+a
Lineman & Technician.......$ 40.61 13.50+7%+a
Mechanic...................$ 32.49 13.50+7%+a
Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation
Cable Splicer..............$ 46.10 13.50+7%+a
Flagman....................$ 25.15 13.50+7%+a
Groundman Digging Machine
Operator...................$ 37.72 13.50+7%+a
Groundman Truck Driver
(tractor-trailer unit).....$ 35.62 13.50+7%+a
Groundman Truck Driver.....$ 33.53 13.50+7%+a
Lineman & Technician.......$ 38.87 11.75+7%+a
Mechanic...................$ 33.53 13.50+7%+a
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer/Central
Office Person..............$ 23.07 3.05+3%
Groundman..................$ 11.61 3.05+3%
Installer Repairman-
Teledata
Lineman/Tecnician-
Equipment Operator.........$ 21.91 3.05+3%
TREE TRIMMER................$ 18.92 4.05+3%+b
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial
Day, Good Friday, Independence Day, Labor Day, Thanksgiving
Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New
York State, provided the employee works two days before or two days after the holiday.
b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas
Day.
ELEC1249-007 05/04/2009
LINE CONSTRUCTION (LINEMAN) LIGHTING AND TRAFFIC SIGNAL
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD
WEATHER INFORMATION SYSTEMS
COLUMBIA COUNTY
LINE CONSTRUCTION: Lineman
Flagman.....................$ 23.00 13.50+6.5%+a
Groundman Digging Machine
Operator....................$ 34.51 13.50+6.5%+a
Groundman Truck Driver
(Tractor-trailer unit)......$ 32.59 13.50+6.5%+a
Groundman Truck Driver......$ 30.67 13.50+6.5%+a
Lineman and Technician......$ 38.34 13.50+6.5%+a
Mechanic....................$ 30.67 13.50+6.5%+a
PAID HOLIDAYS:
a. Memorial Day, New Year's Day, President's Day, Good
Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the
President of the United States and Election Day for the
Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEV0035-001 01/01/2009
ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of
Durham, Greenville, New Baltimore, Coxcsackie and Athens);
MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND
WASHINGTON COUNTIES
Elevator Constructor.............$ 36.46 18.285
FOOTNOTES:
a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving
Day, and the day after Thanksgiving Day, Christmas Day.
b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ELEV0138-004 01/01/2009
COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,
GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY
(THE TOWNS OF HUNTER AND CATSKILL)
Elevator Constructor.............$ 46.48 18.285+a+b
a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving
Day, the Friday after Thanksgiving Day and Christmas Day.
b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0106-001 07/01/2009
Power equipment operators:
GROUP 1.....................$ 32.73 18.75+a
GROUP 2.....................$ 32.30 18.75+a
GROUP 3.....................$ 31.39 18.75+a
GROUP 4.....................$ 28.81 18.75+a
GROUP 5.....................$ 33.91 18.75+a
GROUP 6.....................$ 33.23 18.75+a
GROUP 7.....................$ 33.73 18.75+a
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Boom Truck (over 5 tons), Crane, Cherry Picker (over
5 ton capacity), Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane
GROUP 2: Automated Concrete Spreader (CMI), Automatic Fine
Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Belt Placer (CMI type), Black Top Plant (Automated), Boom
Truck (5 tons and under), Cableway, Caisson Auger, Central
Mix Concrete Plant (Automated), Concrete Pump (8" or over), Dredge, Dual Drum Paver, Excavator (All Purpose-Hydraulicly
Operated) (Gradall or similar), Fork Lift (Factory Rated 15
ft. and over), Front End Loader (4 c.y. and over), Head
Tower (Sauerman or equal), Hoist (2 or 3 Drum), Holland
Loader, Mine Hoist, Mucking Machine or Mole, Pavement
Breaker (SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P), Quad 9, Quarry Master (or equivalent), Scraper, Shovel, Side Boom, Slip Form Paver, Tractor Drawn Belt-Type Truck Crane, Truck or Trailer
Mounted Log Chipper (Self-Feeder), Tug Operator (Except
Manned Rented Equipment), Tunnel Shovel
GROUP 3: Asphalt Paver, Backhoe (Tractor Mounted, Rubber
Tired), Bituminous Spreader and Mixer, Blacktop Plant
(Non-Automated), Blast or Rotary Drill (Truck or Tractor
Mounted), Boring Machine, Cage-Hoist, Central Mix Plant
(Non-Automated) and All Concrete Batching Plants, Cherry
Picker (5 Tons Capacity and Under), Compressors (4 or less)
Exceeding 2000 C.F.M. Combined Capacity, Concrete Paver
(over 16S), Concrete Pump (Under 8"), Crusher, Diesel Power
Unit, Drill Rigs (Tractor Mounted), Front End Loader (under
4 c.y.), Hi-Pressure - Boiler (15 lbs. and over), Hoist
(One Drum), Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive, Maintenance
Engineer/Greaseman/ Welder, Mixer (For Stabilized Base
Self-Propelled), Monorail Machine, Plant Engineer, Profiler
(105 H.P. and under), Pug Mill, Pump Crete, Ready Mix
Concrete Plant, Refrigeration Equipment (For Soil
Stabilization), Road Widener, Roller (All Above Subgrade), Sea Mule, Self-contained Ride-on-Rock Drill, excluding
Air-Track Type Drill, Skidder, Tractor with Dozer and/or pusher, Trencher, Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat
GROUP 4: A-Frame Winch Hoist on Truck, Ballast Regulator
(Ride- On), Compressors (4 not to exceed 2000 C.F.M.
Combined Capacity, or 3 or less with more than 1200 C.F.M.
but not to exceed 2000 C.F.M.), Directional Drill Machine
Locator Dust Collectors, Generators, Pumps, Welding
Machines, Light Plants (4 of Any Type Of Combination), Concrete Pavement Spreaders and Finishers, Conveyor, Drill
Core, Drill Well, Electric Pump Used In Conjunction with
Well Point System, Farm Tractor with Accessories, Fine
Grade Machine, Fork Lift (under 15 ft.), Grout Pump, Gunite
Machine, Hammers (Hydraulic-Self-Propelled), Hydra- Spiker
(Ride-On), Hydro-Blaster Water, Post Hole Digger and Post
Driver, Power Sweeper, Roller (Grade and Fill), Scarifier
(Ride-On Spansaw (Ride-On), Skid Steer loader (Bobcat or similar), Submersible Electric Pump (When Used In Lieu Of
Well Point System), Tamper (Ride-On), Tie Extractor
(Ride-On), Tie Handler, Tie Inserter (Ride-On), Tie Spacer
(Ride-On), Tire Repair, Track Liner, Tractor With Towed
Accessories, Vibrator Compactor, Vibro Tamp, Well Point, Aggregate Plant, Boiler (Used In Conjunction With
Production), Cement and Bin Operator, Compressors (3 or less not to Exceed 1200 C.F.M. Combined Capacity), Dust
Collectors, Generators, Pumps, Welding Machines, Light
Plants (3 or less of Any Type or Combination), Concrete or
Mixer (16S and under), Concrete Saw (Self-Propelled), Fireman, Form Tamper, Hydraulic Pump (Jacking System), Light Plants, Mulching Machine, Oiler, Parapet-Concrete or
Pavement Grinder, Power Broom (Towed), Power Heaterman, Revinius Widener, Shell Winder, Steam cleaner, Tractor
GROUP 5: Master Mechanic
GROUP 6: Crane Premium with Boom Length and Jib 150 Ft.- 199
Ft.
GROUP 7: Crane Premium with Boom Length and Jib 200 Ft. and over
Tower Crane Premium .50
Hazmat Work Premium 2.50
Hydrographic .50
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day, Lincoln's
Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day and Veteran's Day
ENGI0106-002 07/01/2009
BUILDING
Power equipment operators:
GROUP 1.....................$ 32.74 18.88+a
GROUP 2.....................$ 32.30 18.88+a
GROUP 3.....................$ 31.39 18.88+a
GROUP 4.....................$ 28.82 18.88+a
GROUP 5
1..........................$ 33.24 18.88+a
2..........................$ 33.74 18.88+a
GROUP 6.....................$ 33.24 18.88+a
GROUP 7.....................$ 34.29 18.88+a
GROUP 8.....................$ 36.79 18.88+a
Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.
a. Paid Holidays: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING)
GROUP 1: Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)
GROUP 2: Shovel, All backhoe (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under)
GROUP 3: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model
CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller
GROUP 4: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack
(belcrete system), seeding, and mulching machines, pumps
GROUP 5: Crane Premiums:
1 over 150'
2 over 200'
GROUP 6: Tower Crane
GROUP 7: Master mechanic (other than nuclear work)
GROUP 8: Master mechanic on nuclear work
IRON0012-011 05/01/2009
ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY
(Amsterdam, Charleston, Florida, Glen, Mohawk and Root);
RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON
COUNTIES:
Ironworkers:
Sheeter, Bucker-up..........$ 25.78 17.96
Sheeter.....................$ 26.50 17.39
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone
Derrickmen..................$ 26.25 17.39
IRON0440-007 05/01/2009
FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);
MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.
Johnsville):
Ironworkers:
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone
Derrickman..................$ 23.63 19.16
* LABO0017-001 06/01/2009
COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
Laborers:
COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) BUILDING
CONSTRUCTION:
GROUP 1....................$ 28.75 17.90
GROUP 2:...................$ 33.30 17.90
COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson)
(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY
GROUP 2:...................$ 31.60 17.65+a
GROUP 3:...................$ 35.50 17.65+a
GREENE (Township of
Catskill) LABORERS
BUILDING:
GROUP 1....................$ 28.75 17.90
GROUP 2....................$ 30.55 17.90
GROUP 3....................$ 33.30 17.90
GREENE COUNTY (Township of
Catskill) HEAVY & HIGHWAY:
GROUP 1:...................$ 27.25 17.65+a
GROUP 2:...................$ 31.60 17.65+a
GROUP 3:...................$ 35.50 17.65+a
GROUP 4:...................$ 37.50 17.65+a
TUNNEL, SHAFT & CAISSON
WORK
GROUP 1....................$ 37.50 17.65+a
For BUILDING CONSTRUCTION CLASSIFICATIONS in GREENE COUNTY
(Township of Catskill)
GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer, acoustic pump and mixer, carpenter tender, concrete, concrete curb and sidewalk form setter, concrete form stripping, concrete sealing, concrete curing, concrete finisher, concrete vibrator, compressor, clean up after trades, dismantling, demolition, excavation, fireproofing, foundation and building piping, pump and mixer, gunite, general clean up, grade checker, grading and backfilling, hoists, hod carrier, landscaping, mason tender, multi building trades tender, jackhammer, pavement breaker, poured gypsum roof work, power tampers, power walk behind roller, pressure blasting, power mixer, scaffolding, snow removal, signal person, sandblasting, styrofoam and similar installation, radio control equipment including but not limited to radio control tampers and rollers, radio control excavator, all erecting and dismantling of scaffold for masonry regardless of height, walking and riding power buggies, temporary weather protection, wrecking waterproofing, stone and tile setter, radio controlled hammers and breakers, unloading of trucks, air track, assembling and placing gabion baskets, asphalt, blaster, bob cat type machine for demo and clean up, chain link fence, chain saw, chipping hammer, concrete conveyor belt, saw, core drill, corrugated pipe, construction specialist, cleaning machine, concrete form setter, conduit layer, cutting torch, discharge pipe, drill chuck tender, duct bank layer, explosive handler, hydraulic splitter, granite or stone curbing, handler, joy and jib drill, Ingersoll
Rand heavy duty crawler master type HCMZ drill machines or equivalent, laser level, nonmetallic pipe layer, metalic pipe layer, LeRoi hydraulic drill or similar, mega mixer, power fork lift, pre-stressed and precast concrete, power brush cutter, pump crete machine, retaining walls, rip rap, retention and hazardous waste liners, setting of block, setting of brick, setting of stone, sound barriers, transit under laborers jurisdiction, tow behind concrete or grout pump, traffic and pedestrian striping, surface planer, manufactured curb, walk behind surface planer, wagon drill, welding; *asbestos abatement work, lead abatement work, toxic and hazardous waste related work; when protective equipment and clothing are not required.
GROUP 2: Forklift for masonry purposes
GROUP 3: Asbestos Abatement work, toxic and hazardous abatement, lead abatement work, environmental work
For BUILDING CONSTRUCTION CLASSIFICATIONS in COLUMBIA COUNTY
(Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
GROUP 1: Asbestos abatement work, lead abatement work, toxic and hazardous waste related work; when protective equipment and clothing are not required
GROUP 2: Asbestos abatement work, toxic and hazardous abatement, lead abatement work, environmental work
For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY
(Township of Catskill)
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial
Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas
Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.
GROUP 1: Flagperson, gateperson
GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.
Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.
Ground man on milling machine
GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman
GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman
For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY
(Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
HEAVY & HIGHWAY CLASSIFICATIONS
GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required
GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required
For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial
Day, Independence Day, Labor Day, Election Day, Veterans
Day, Thanksgiving Day, Christmas Day
GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and
Powderman;
Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air
LABO0035-001 07/01/2004
FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND
ST. JOHNSVILLE)
Laborers Building Construction
Asbestos Removal............$ 18.50 6.19
Blasters, Form Setters, MotorBuggy Operator (Rider
Type)......................$ 17.50 6.19
Hazardous Waste Removal
Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 19.00 6.19
HEAVY & HIGHWAY:
GROUP 1:...................$ 20.40 10.14+a
GROUP 2:...................$ 20.60 10.14+a
GROUP 3:...................$ 20.80 10.14+a
GROUP 4:...................$ 21.00 10.14+a
GROUP 5:...................$ 22.40 10.14+a
Laborers....................$ 17.00 6.19
Pipelayers, Motor Mixers, Motor Buggy Operator
(Walk Behind) Power Lift
(Walk Behind)...............$ 17.15 6.19
Wagon Drill Operator........$ 17.40 6.19
Day, Labor Day, Thanksgiving Day and Christmas Day.
GROUP 1: Common Laborers, Flagman, Outboard and Hand boats
GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw
Operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers
GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman
GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters
GROUP 5: Hazardous waste removal
LABO0157-001 07/01/2009
FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton
Park); SCHENECTADY and SCHOHARIE COUNTIES.
LABORER
BUILDING:
GROUP 1....................$ 22.88 13.65
GROUP 2....................$ 24.23 13.65
HEAVY & HIGHWAY:
GROUP 1:...................$ 24.34 14.40+a
GROUP 2:...................$ 24.54 14.40+a
GROUP 3:...................$ 24.74 14.40+a
GROUP 4:...................$ 24.94 14.40+a
GROUP 5:...................$ 26.34 14.40+a
LABORER CLASSIFICATIONS
Group 1: Common Laborers
Group 2: Asbestos and Toxic Materials
Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply
a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, and Christmas Day
LABORER CLASSIFICATIONS
GROUP 1: Common laborers, flagman, outboard & hand boats
GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking
GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb
LABO0190-001 07/01/2009
ALBANY; RENSSELAER COUNTY, WASHINGTON COUNTY, GREENE COUNTY
(except Catskill Township); COLUMBIA (Twps. of Styvesant, Stockport, Kinderhook, New Lebanon, Canaan, Ghent, Chatham and
Austerlitz). SARATOGA COUNTY (Townships of Stillwater, Halfmoon, Saratoga)
BUILDING:
GROUP 1....................$ 21.81 14.72
GROUP 2....................$ 23.16 14.72
LABORERS CLASSIFICATIONS
GROUP 1: Common Laborers
GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at
$100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply
LABO0190-002 07/01/2009
ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).
GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO
COUNTY (Townships of Stillwater, Halfmoon Saratoga)
HEAVY & HIGHWAY:
GROUP 1:...................$ 23.89 14.85
GROUP 2:...................$ 24.09 14.85
GROUP 3:...................$ 24.29 14.85
GROUP 4:...................$ 24.49 14.85
GROUP 5:...................$ 25.89 14.85
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
LABORERS CLASSIFICATIONS
GROUP 1: Common laborers, flagmen, outboard and hand boats
GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking
GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb
LABO1000-002 06/01/2006
COLUMBIA (Twps. of Ancram, Claverack, Clermont, Copake, Galtin, Germantown, Greenport, Hillsdale, Hudson, Livingston, Philmont, Taconic)
BUILDING
GROUP 1....................$ 25.10 16.10+a
GROUP 2....................$ 25.60 16.10+a
GROUP 3....................$ 27.45 16.10+a
a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day and Christmas Day
LABORERS CLASSIFICATIONS (BUILDING)
GROUP 1 - All Laborers except those listed in Groups 2, 3 and
GROUP 2 - Shop Stewards
GROUP 3 - Forklift Operator, Drillers, Blasters, Rakers, Laserbeam
* LABO1000-005 05/01/2009
COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):
GROUP 1....................$ 24.20 18.75+a
GROUP 2....................$ 27.96 18.75+a
GROUP 3....................$ 28.96 18.75+a
LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;
tool rooms
GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;
Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;
wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2" or under; Nipper; Chucker;
Asphalt Workers
GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);
Laser Beam Operator; Form Setter/Aligners; Blasters
a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and
Christmas Day
* PAIN0009-005 05/01/2009
Painters:
Lead Abatement Workers, Structural Steel
Zone 1.....................$ 25.34 6.30
Zone 2.....................$ 24.29 8.70
Painters, Drywall
Finishers, Spray
Zone 1.....................$ 24.34 6.30
Zone 2.....................$ 23.29 8.70
Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA
ZONE #2 All of WASHINGTON County
* PAIN0009-013 07/01/2009
GLAZIER..........................$ 22.50 13.46
PAIN0009-017 05/01/2009
COLUMBIA AND GREENE COUNTIES
Drywall Finisher............$ 26.39 15.11
Lead Abatement Work.........$ 26.39 15.11
Painter/Paperhanger.........$ 26.39 15.11
Spray Rate..................$ 27.39 15.11
PAIN0806-002 10/01/2008
ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,
SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON
Structural Steel and Bridge.$ 45.25 27.58
PLUM0007-001 05/01/2008
ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;
SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway, Halfmoon, Milton, Stillwater and Waterford)
PLUMBER/PIPEFITTER...............$ 30.31 17.18
PLUM0773-002 05/01/2009
SARATOGA (Remainder of County); WASHINGTON COUNTY:
PLUMBER/PIPEFITTER...............$ 27.80 18.03
ROOF0203-003 06/01/2007
SCHOHARIE COUNTY:
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 21.20 10.34
ROOF0241-001 06/01/2006
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 21.65 9.42
SFNY0669-001 04/01/2008
SPRINKLER FITTER.................$ 29.90 16.30
SHEE0083-001 06/01/2009
Sheet metal worker...............$ 27.81 20.11+a
Day, Labor Day, Thanksgiving Day, Christmas Day. If any of these holidays fall on a Saturday or Sunday, either the preceding Friday or following Monday will be observed as the holiday.
TEAM0294-002 05/01/2006
Truck drivers:
GROUP 1.....................$ 22.27 9.84+a
GROUP 2.....................$ 22.57 9.84+a
a. One week vacation after 1 year; 2 weeks vacation after 5 years.
TRUCK DRIVERS BUILDING CLASSIFICATIONS
GROUP 1: Straight, winch, transit mix on job site, road oilers, dump, panel, pick-up, water and fuel trucks on site
(including nozzle)
GROUP 2: Euclid or similar equipment, lowboy or lowboy trailers
TEAM0294-003 07/01/2009
Truck drivers:
GROUP 1....................$ 25.07 13.95+a
GROUP 2....................$ 25.12 13.95+a
GROUP 3....................$ 25.17 13.95+a
GROUP 4....................$ 25.32 13.95+a
GROUP 5....................$ 25.47 13.95+a
TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Pick-ups, panel trucks, flatboy material trucks
(straight jobs), single axle dump trucks, dumpsters, receivers, greasers, truck tireman
GROUP 2: Tandems, batch trucks, mechanics
GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck
GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded, straddle (ross) carrier, self-contained concrete unit
GROUP 5: Off-highway tandem back dump, twin engine equipment and double hitched equipment where not self-loaded
Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
The following have been deleted:
WAGE RATES
(End of Summary of Changes)