Amendment 0003.pdf

PDF 38 KB Posted

Attached to
Guthrie Medical Clinic Add/Alt Fort Drum, New York
Solicitation number
W912DS-08-R-0015
Issued by

About this file

Amendment 0003

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE80956131

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

a. Include Site Visit scheduled for 10th June 2008 at 10:30 am at Building 4884 Jones Street, Fort Drum, New York. Point of contact is James Valianos, Telephone 917-790-6135 OR Cheryl Mesa, Telephone 315-772-4107.

b. Include draw ings; Include the Geotech report and boring information; Include legend for JSN Equipment and Case w ork Schedule.

c. IInclude responses to contractor's questions for information only.

The proposal due date of 23rd June2008 remains unchanged.

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on the SF 1442, by separate letter, or by telegram by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Jun-2008

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-08-R-0015

X 9B. DATED (SEE ITEM 11)

15-May-2008

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Jun-2008

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-08-R-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 3

Amendment #3 for W912DS-08-R-0015, Guthrie Medical Clinic Add/Alt, Fort Drum, NY.

The purpose of this amendment is to:

- Include providing Site Visit Location and Time o Date – June 10th 2008 o Time – 10:30 am o Location – Building 4884 Jones St., Fort Drum, NY o Contact – James Valianos – 917 790 6135

Cheryl Mesa – 315 772 4107

- Include issuing drawings

- Include issuing the Geotech report and boring information

- Include legend for JSN Equipment and Casework Schedule

- Include responses to contractor’s questions (for information only)

1. RESPONSES TO QUESTIONS SUBMITTED BY PROSPECTIVE OFFERORS:

1. Can further description be developed to clarify the bid options 0002, 0006 & 0008 as listed on the bid form.

Please advise if the following is correct. All ductwork, equipment, demolition, etc. for the renovation of the existing clinic is included in Bid Item 0002. The same work is then deducted as part of Bid item 0006.

Is piping and controls associated with the new VAV boxes to be deducted as well? Or is Bid Item 0006 to be return duct only? Bid Item 0008 reads as if the contractor is to add return duct to all areas of the existing facility that is not part of the base bid, do drawings exist for this additional ductwork?

ANSWER: The ductwork included in the renovation for Bid Item 2 is for the major renovation areas only such as having walls painted and/or new flooring. Bid Item 6 is to delete the work indicated above. This is for return ductwork only. There are no drawings for the additional ductwork.

2. It does not appear that Bid Item 0008 can be added to Line items 0001 thru 0007 to give a total base bid price. Bid Item 0008 adds return duct for supply duct that is deleted in bid item 0006. Please clarify.

ANSWER: No. See response to question 1 above.

3. Will the entire existing duct systems and existing equipment require cleaning per section 23 0000.3.7 when in most locations the contractor will be installing new taps in existing systems only. Please advise.

ANSWER: Yes, as per the specification section identified.

4. C5 Keynotes – The (down left/up right) cross hatch area description is not clear. Is this area a complete removal of ceiling tiles, grid and hangers?

ANSWER: Follow the description provided on the drawings.

5. There appears to be areas where existing ceiling grid remains and existing walls are removed making two or more rooms into one. What is the contractor to do if the ceiling grid that is to remain does not match once the walls are removed?

ANSWER: Follow the description provided on the drawings

6. Is the manufacturer and size of the existing ceiling grid known?

ANSWER: Unknown, contractor shall be responsible to field verify.

7. Details A1 and A3 on drawing AD101A reference a Tectonic Geotechnical Report dated 06-14-07. This report is not part of the solicitation, can this report along with associated boring logs be provided to the bidding contractors?

ANSWER: To be provided under this amendment.

8. Our proposed Commissioning Agent would be provided through one of our Subcontractors. Please confirm whether or not the Commissioning Agent would then be considered a Key Subcontractor and as such would have to complete Attachment 4, Letter of Commitment of Key Subcontractors.

ANSWER: Yes.

9. There is no mention of Attachment 7 Letter of Commitment for Key Personnel in the RFP documents.

a. If key personnel are already employed by the prime contractor, do we still have to fill out this attachment?

ANSWER: Yes

b. If so, is it sufficient to complete one attachment for all the key personnel of the prime contractor?

ANSWER: No. Need for each key individual.

10. What is the due date for the past performance questionnaires?

ANSWER: The same as the due date of the proposal.

11. Amendment # 1 dated 05-24-08 added the site visit for 05-27-08. We received notification of this amendment on Saturday 05-24-08 but did not ultimately receive it until 05-27-08 due to the holiday weekend. We would like to request another site visit/walk-thru before the bid date.

ANSWER: Another site visit is scheduled, see information provide with this amendment.

12. Section 00 22 11 has seven attachments. The proposal submission requirements state where attachments 1,2,3,6 & 8 are to be used. However it does not state where attachments 4, 5 and 7 are to be used, are these attachments required for this proposal?

ANSWER: All attachments need to be completed and provide with the proposals.

13. Section 00 22 11 5.4 TAB D, states that the construction Quality Control Manager and Safety Manager may be the same person. However, specification sections 01 35 29.00 and 01 45 04 state that these individuals shall have no other duties. Please clarify.

ANSWER: Specification Section 01 45 04 revised by this amendment to clarify.

14. We are missing plan sheets IF101 A.1 and IF101 E.3.

ANSWER: Missing sheets IF101 A.1 and IF101 E.3 are provide with this amendment.

15. Sheet Q-601 and Q-602 are labeled as JSN Equipment and Casework Schedule. Are all the items included on these sheets to be included within our scope? On same sheets, there are Utilities noted as 1 through 6, what are these utilities? Same sheets, under the Utility categories there are demarcations labeled as A through D, what do these letters represent?

ANSWER: Specification Section 22 04 00.00 Plumbing, Hospital references MIL STD 1691which provides the information pertaining to the JSN Equipment and Casework Schedule.

16. Amendment #1 indicates to delete 18 parking spaces and relocate the stormwater pond #3. The sketch indicates to move the pond to a new location and coordinate with the WIT project. With this project being 100% designed with plans and specification is the government going to provide updated drawings showing new grades for this pond and parking area? Who is responsible for this additional design work?

ANSWER: No. The government is not going to provide the design for relocating the retention pond; it shall be the responsibility of the contractor to provide for the design work in conjunction with submitting their SWPPP for approval.

17. In Clearing Notes on drawing G-102 it states the contractor is responsible for all utility relocation/removals in accordance with Fort Drum Shop requirements. Please provide these requirements if different than the details as shown in the plans and specifications for this project.

ANSWER: Use standard industry details typical for the utilities being considered that are germane to this area.

2. SPECIFICATION CHANGES:

The following specifications have been revised but NOT reissued.

a. Specification Section 00 22 11 paragraph 5.1.1.1, Delete the 2nd sentence in its entirety and add the following sentence:

“The Government will allow submissions of the Offeror’s key subcontractors (key subcontractors defined as mechanical and electrical) past experience, however experiences by the prime will be given greater weight in the evaluation.”

b. Specification Section 00 73 00 paragraph 44 QUALIFICATIONS FOR PERFORMANCE OF ELECTRICAL WORK issued with amendment # 1, delete paragraph in its entirety.

c. Specification Section 01 45 04 paragraph 3.4.2 CQC System Manager, delete last sentence in its entirety and add the following:

“The CQC System Manager shall be assigned no duties other than Quality Control, except Site Safety.”

3. DRAWING CHANGES:

The following drawings have been REISSUED:

• IF101 A.1 – Inserted drawing number in title block.

• IF101 E.3 – Drawing was left out of package.

(End of Summary of Changes)