This is an Abstract of Offers for Construction document issued by the Baltimore District, Corps of Engineers, for the Mid-Bay James Island Phase 1 Restoration project located in Dorchester County, Maryland. The solicitation number is W912DR26BA001, issued on November 12, 2025, with offers opened on February 19, 2026. The Contracting Officer is Tamara Bonomolo. One amendment was issued to the solicitation.

Five contractors submitted bids: C AND C Joint Venture LLC (No. 1), Trade West Construction Inc. (No. 2), Michels Construction Inc. (No. 3), H&L Contracting LLC (No. 4), and Agate Construction Company, Inc. (No. 5). All bidders submitted bid bonds of $3.0 million and acknowledged the amendment. The project involves comprehensive coastal restoration work including mobilization, turbidity curtain management, pre-placement surveys, and placement of various armor stone sizes (ranging from 50-lb to 3300-lb), quarry run stone, graded aggregate base, dike fill, geotextile materials, settlement pads, and sand stockpile. The Independent Government Estimate totals $122,185,770.06 for the base work. Bidders' total estimated amounts range from $141,581,394.87 (Trade West Construction) to $170,672,200.00 (Agate Construction Company, Inc.). The contract includes an option for seeding the stockpile area (Item 0018), with total base plus options amounts ranging from approximately $122.2 million to $170.7 million depending on the contractor.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED

2/19/2026

4. ISSUING OFFICE Name and title of Certifying Official (Type) Tamara Bonomolo - Contracting Officer

I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed received in response to this solicitation.

Contracting Officer: Tamara Bonomolo

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

X B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) B. Bid Security (Type and Amount)

(Without Profit)

C. REASONABLE CONTRACT C. Amendments Acknowledged C. Amendments Acknowledged C. Amendments Acknowledged

(Including Profit)

7A. 7B. 7C. D. E. F. G. H. I. J. K. L. M. N. O. P.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with mobilization, turbidity curtain, and demobilization for Contract 1 of the James Island Restoration Project

JOB 3,841,782.03$ 10,780,750.00$ 16,000,000.00$ 21,936,218.00$ 20,000,000.00$ 66,501,967.65$

Pre-placement Survey and Sections, complete as shown on the drawings and specified

JOB 27,434.26$ 748,403.00$ 900,000.00$ 2,030,000.00$ 2,100,000.00$ 10,000,000.00$

0003AA

All costs in connection with the 750-lb armor stone, quarried, shipped and placed

7,426 TON 178.46$ 1,325,243.96$ 130.40$ 968,350.40$ 160.00$ 1,188,160.00$ 144.00$ 1,069,344.00$ 141.00$ 1,047,066.00$ 67.00$ 497,542.00$

0003AB

All costs in connection with the 450-lb armor stone, quarried, shipped and placed

78,144 TON 174.52$ 13,637,690.88$ 129.00$ 10,080,576.00$ 160.00$ 12,503,040.00$ 143.00$ 11,174,592.00$ 155.00$ 12,112,320.00$ 71.00$ 5,548,224.00$

0003AC

All costs in connection with the 50-lb armor stone, quarried, shipped and placed

963 TON 166.79$ 160,618.77$ 126.00$ 121,338.00$ 150.00$ 144,450.00$ 169.00$ 162,747.00$ 200.00$ 192,600.00$ 80.00$ 77,040.00$

0003AD

All costs in connection with the quarry run, quarried, shipped and placed

5,787 TON 214.11$ 1,239,054.57$ 118.70$ 686,916.90$ 150.00$ 868,050.00$ 101.00$ 584,487.00$ 160.00$ 925,920.00$ 57.00$ 329,859.00$

0003AE

All costs in connection with the #1 stone, quarried, shipped and placed

27,156 TON 192.98$ 5,240,564.88$ 107.72$ 2,925,244.32$ 150.00$ 4,073,400.00$ 113.00$ 3,068,628.00$ 126.00$ 3,421,656.00$ 300.00$ 8,146,800.00$

0003AF

All costs in connection with the #3 stone, quarried, shipped and placed

385 TON 182.01$ 70,073.85$ 106.60$ 41,041.00$ 150.00$ 57,750.00$ 154.00$ 59,290.00$ 200.00$ 77,000.00$ 63.00$ 24,255.00$

0003AG

All costs in connection with the #10 stone, quarried, shipped and placed

3,294 CY 274.69$ 904,828.86$ 174.00$ 573,156.00$ 190.00$ 625,860.00$ 144.00$ 474,336.00$ 165.00$ 543,510.00$ 98.00$ 322,812.00$

0003AH

All costs in connection with the Graded Aggregate Base, quarried, shipped and placed

22,610 SY 193.90$ 4,384,079.00$ 50.21$ 1,135,248.10$ 250.00$ 5,652,500.00$ 57.00$ 1,288,770.00$ 50.00$ 1,130,500.00$ 23.00$ 520,030.00$

0003AJ

All costs in connection with the Dike Fill, dredged, shipped and mechanically placed in Zone A

470,381 CY 20.11$ 9,459,361.91$ 17.92$ 8,429,227.52$ 25.00$ 11,759,525.00$ 38.00$ 17,874,487.00$ 22.00$ 10,348,382.00$ 17.00$ 7,996,477.00$

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

Dorchester County, Maryland

Trade West Construction Inc

No. 4

H&L Contracting LLC

Yes

Bid Bond: $3.0M

W912DR26BA001

Mid-Bay James Island Phase 1 Restoration

No. 1

BALTIMORE DISTRICT, CORPS OF ENIGNEERS

2 HOPKINS PLAZA

9. OFFERS

6. NUMBER OF AMENDMENTS ISSUED: One (1)

C And C Joint Ventures LLC

BALTIMORE, MD 21201

B. Bid Security (Type and Amount)

Bid Bond: 20%

C. Amendments Acknowledged

Yes

No. 3

Michels Construction Inc

B. Bid Security (Type and Amount)

Bid Bond: $3.0M

C. Amendments Acknowledged

Yes

No. 2

Bid Bond: $3.0M

Yes

No. 5

Agate Construction Company, Inc

Bid Bond: $3.0M

Yes

23 February 2026

11/12/2025

0003AK

All costs in connection with Type A geotextile, complete as shown on drawings and specified

10,026 SY 28.03$ 281,028.78$ 19.77$ 198,214.02$ 32.00$ 320,832.00$ 66.00$ 661,716.00$ 32.00$ 320,832.00$ 3.75$ 37,597.50$

0003AL

All costs in connection with Type B geotextile, complete as shown on drawings and specified

87,102 SY 8.46$ 736,882.92$ 16.60$ 1,445,893.20$ 32.00$ 2,787,264.00$ 55.00$ 4,790,610.00$ 20.00$ 1,742,040.00$ 4.00$ 348,408.00$

0003AM All costs in connection with seeding the sand dikes 14,470 SY 5.58$ 80,742.60$ 5.00$ 72,350.00$ 10.00$ 144,700.00$ 7.00$ 101,290.00$ 12.00$ 173,640.00$ 7.65$ 110,695.50$

Weir Boxes, all costs in conneciton with the transportation, construction, installation, grading foundation preparation of the weir boxes, pipes and appurtenances as shown on drawings and specified

1 JOB 131,179.93$ 500,000.00$ 500,000.00$ 100,000.00$ 100,000.00$ 600,000.00$ 600,000.00$ ########## 650,000.00$ 300,000.00$ 300,000.00$

All costs in connection with the Settlement Pads specified

7 EA 2,954.48$ 20,681.36$ 3,000.00$ 21,000.00$ 40,000.00$ 280,000.00$ 50,000.00$ 50,000.00$ 25,000.00$ 175,000.00$ 1,550.00$ 10,850.00$

Sand Stockpile, all costs in connection with the sand dredged, shipped and stockpied to elevation 10.0 ft NAVD88 elevation as shown on the drawings and as specified

1,787,201 CY 10.09$ 18,032,858.09$ 8.20$ 14,655,048.20$ 16.87$ 30,150,080.87$ 12.00$ 21,446,412.00$ 7.15$ 12,778,487.15$ 16.50$ 29,488,816.50$

TOTAL ESTIMATED BID AMOUNT 59,574,106.65$ 53,382,756.66$ 87,555,611.87$ 87,672,918.00$ 67,738,953.15$ 130,261,374.15$

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED G. UNIT H. ESTIMATED I. UNIT J. ESTIMATED K. UNIT L. ESTIMATED M. UNIT N. ESTIMATED O. UNIT P. ESTIMATED NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0013AA

All costs in connection with the 3300-lb armor stone, quarried, shipped and placed from sta 90+00 to 110+00

24,293 TON 183.09$ 4,447,805.37$ 146.59$ 3,561,110.87$ 95.50$ 2,319,981.50$ 140.00$ 3,401,020.00$ 168.00$ 4,081,224.00$ 85.00$ 2,064,905.00$

0013AB

All costs in conneciton with the 250-lb armor stone, quarried, shipped and placed from sta 90+00 to 110+00

9,840 TON 178.95$ 1,760,868.00$ 117.10$ 1,152,264.00$ 105.50$ 1,038,120.00$ 130.00$ 1,279,200.00$ 138.00$ 1,357,920.00$ 62.00$ 610,080.00$

0013AC

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 90+00 to 110+00

16,151 TON 219.66$ 3,547,728.66$ 110.99$ 1,792,599.49$ 95.50$ 1,542,420.50$ 109.00$ 1,760,459.00$ 125.00$ 2,018,875.00$ 68.00$ 1,098,268.00$

0013AD

All costs in connection with the #10 stone, quarried, shipped and placed from sta 90+00 to 110+00

5,422 CY 281.83$ 1,528,082.26$ 154.26$ 836,397.72$ 115.50$ 626,241.00$ 185.00$ 1,003,070.00$ 165.00$ 894,630.00$ 150.00$ 813,300.00$

0013AE

All costs in connection with Type A geotextile, complete as shown on drawings and specified, from sta 90+00 to 110+00

19,036 SY 28.51$ 542,716.36$ 19.77$ 376,341.72$ 20.00$ 380,720.00$ 46.00$ 875,656.00$ 26.00$ 494,936.00$ 3.65$ 69,481.40$

0014AA

All costs in connection with the 3300-lb armor stone, quarried, shipped and placed from sta 110+00 to 130+00

26,098 TON 183.08$ 4,778,021.84$ 146.59$ 3,825,705.82$ 105.50$ 2,753,339.00$ 140.00$ 3,653,720.00$ 168.00$ 4,384,464.00$ 85.00$ 2,218,330.00$

0014AB

All costs in connection with the 250-lb armor stone, quarried, shipped, and placed from sta 110+00 to 130+00

10,656 TON 178.95$ 1,906,891.20$ 117.10$ 1,247,817.60$ 95.50$ 1,017,648.00$ 130.00$ 1,385,280.00$ 138.00$ 1,470,528.00$ 58.00$ 618,048.00$

0014AC

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 110+00 to 130+00

21,477 TON 219.65$ 4,717,423.05$ 110.99$ 2,383,732.23$ 85.50$ 1,836,283.50$ 109.00$ 2,340,993.00$ 125.00$ 2,684,625.00$ 54.00$ 1,159,758.00$

0014AD

All costs in connection with the #10 stone, quarried, shipped and placed from sta 110+00 to 130+00

5,791 CY 281.82$ 1,632,019.62$ 154.26$ 893,319.66$ 105.50$ 610,950.50$ 185.00$ 1,071,335.00$ 165.00$ 955,515.00$ 150.00$ 868,650.00$

0014AE

All costs in connection with the Type A geotextile, complete as shown on drawings and specified, from sta 110+00 to 130+00

20,156 SY 28.51$ 574,647.56$ 19.77$ 398,484.12$ 20.00$ 403,120.00$ 46.00$ 927,176.00$ 26.00$ 524,056.00$ 3.00$ 60,468.00$

Independent Government Estimate C AND C Joint Venture LLC H&L Contracting LLC

No. 4

Dorchester County, Maryland Mid Bay James Island Phase 1 Restoration

No. 2 No. 3

Trade West Construction Michels Construction Inc

No. 5IGE No. 1

Agate Construction Company, Inc

2. PROJECT TITLE

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED G. UNIT H. ESTIMATED I. UNIT J. ESTIMATED K. UNIT L. ESTIMATED M. UNIT N. ESTIMATED O. UNIT P. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0007AA

All costs in connection with the 2300-lb armor stone, quarried, shipped and placed from Sta 410+00 to 430+00

17,309 TON 183.09$ 3,169,104.81$ 134.70$ 2,331,522.30$ 105.50$ 1,826,099.50$ 139.00$ 2,405,951.00$ 160.00$ 2,769,440.00$ 80.00$ 1,384,720.00$

0007AB

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 410+00 to 430+00

13,986 TON 219.66$ 3,072,164.76$ 107.54$ 1,504,054.44$ 95.50$ 1,335,663.00$ 109.00$ 1,524,474.00$ 125.00$ 1,748,250.00$ 60.00$ 839,160.00$

0007AC

All costs in connection with the #10 stone, quarried, shipped and placed from Sta 410+00 to 430+00

4,538 CY 281.85$ 1,279,035.30$ 150.57$ 683,286.66$ 155.60$ 705,659.00$ 185.00$ 839,530.00$ 165.00$ 748,770.00$ 150.00$ 680,700.00$

0007AD

All costs in connection with Type A geotextile, complete as shown on drawings and specified, from Sta 410+00 to 430+00

16,393 SY 28.51$ 467,364.43$ 19.77$ 324,089.61$ 24.00$ 393,432.00$ 46.00$ 754,078.00$ 28.00$ 459,004.00$ 3.00$ 49,179.00$

0008AA

All costs in connection with the 2300-lb armor stone, quarried, shipped and placed from Sta 430+00 to 452+35

17,723 TON 183.09$ 3,244,904.07$ 134.70$ 2,387,288.10$ 105.50$ 1,869,776.50$ 139.00$ 2,463,497.00$ 160.00$ 2,835,680.00$ 80.00$ 1,417,840.00$

0008AB

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 430+00 to 452+35

15,654 TON 219.66$ 3,438,557.64$ 107.54$ 1,638,431.16$ 90.50$ 1,416,687.00$ 109.00$ 1,706,286.00$ 125.00$ 1,956,750.00$ 60.00$ 939,240.00$

0008AC

All costs in connection with the #10 stone, quarried, shipped and placed from sta 430+00 to 452+35

5,052 CY 281.83$ 1,423,805.16$ 150.57$ 760,679.64$ 95.50$ 482,466.00$ 185.00$ 934,620.00$ 165.00$ 833,580.00$ 110.00$ 555,720.00$

0008AD

All costs in conneciton with Type A geotextile, complete as shown on drawings and specified, from sta 430+00 to 452+35

18,240 SY 28.51$ 520,022.40$ 19.77$ 360,604.80$ 20.00$ 364,800.00$ 46.00$ 839,040.00$ 28.00$ 510,720.00$ 3.65$ 66,576.00$

Trade West Construction

No. 2

Dorchester County, Maryland Mid Bay James Island Phase 1 Restoration

No. 3 No. 4

Michels Construction Inc H&L Contracting LLC

No. 5IGE No. 1

Agate Construction Company, IncIndependent Government Estimate C AND C Joint Venture LLC

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED G. UNIT H. ESTIMATED I. UNIT J. ESTIMATED K. UNIT L. ESTIMATED M. UNIT N. ESTIMATED O. UNIT P. ESTIMATED

0009AA

All costs in connection with the 3300-lb armor stone, quarried, shipped and placed from sta 0+00 to 22+50

21,498 TON 183.08$ 3,935,853.84$ 141.28$ 3,037,237.44$ 95.50$ ########### 140.00$ 3,009,720.00$ 168.00$ 3,611,664.00$ 85.00$ 1,827,330.00$

0009AB

All costs in conneciton with the 250-lb armor stone, quarried, shipped and placed from sta 0+00 to 22+50

8,393 TON 178.96$ 1,502,011.28$ 113.35$ 951,346.55$ 95.50$ 801,531.00$ 130.00$ 1,091,090.00$ 138.00$ 1,158,234.00$ 62.00$ 520,366.00$

0009AC

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 0+00 to 22+50

2,985 TON 219.71$ 655,834.35$ 107.54$ 321,006.90$ 85.50$ 255,217.50$ 109.00$ 325,365.00$ 125.00$ 373,125.00$ 58.00$ 173,130.00$

0009AD

All costs in connection with the #10 stone, quarried, shipped and placed from sta 0+00 to 22+50

4,947 CY 281.83$ 1,394,213.01$ 150.57$ 744,869.79$ 125.50$ 620,848.50$ 185.00$ 915,195.00$ 165.00$ 816,255.00$ 110.00$ 544,170.00$

0009AE

All costs in connection with Type A geotextile, complete as shown on drawings and specified, from sta 0+00 to 22+50

17,959 SY 28.51$ 512,011.09$ 19.77$ 355,049.43$ 20.00$ 359,180.00$ 46.00$ 826,114.00$ 28.00$ 502,852.00$ 3.65 65,550.35$

0010AA

All costs in connection with the 3300-lb armor stone, quarried, shipped and placed from sta 27+50 to 50+00

24,965 TON 183.09$ 4,570,841.85$ 141.28$ 3,527,055.20$ 95.50$ ########### 140.00$ 3,495,100.00$ 168.00$ 4,194,120.00$ 85.00$ 2,122,025.00$

0010AB

All costs in connection with the 250-lb armor stone, quarried, shipped, and placed from sta 27+50 to 50+00

9,930 TON 178.96$ 1,777,072.80$ 113.35$ 1,125,565.50$ 105.50$ ########### 130.00$ 1,290,900.00$ 138.00$ 1,370,340.00$ 62.00$ 615,660.00$

0010AC

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 27+50 to 50+00

9,901 TON 219.67$ 2,174,952.67$ 107.54$ 1,064,753.54$ 85.50$ 846,535.50$ 109.00$ 1,079,209.00$ 125.00$ 1,237,625.00$ 58.00$ 574,258.00$

0010AD

All costs in connection with the #10 stone, quarried, shipped and placed from sta 27+50 to 50+00

5,644 CY 281.84$ 1,590,704.96$ 150.57$ 849,817.08$ 105.50$ 595,442.00$ 185.00$ 1,044,140.00$ 165.00$ 931,260.00$ 110.00$ 620,840.00$

0010AE

All costs in connection with the Type A geotextile, complete as shown on drawings and specified, from sta 27+50 to 50+00

20,077 SY 28.51$ 572,395.27$ 19.77$ 396,922.29$ 20.00$ 401,540.00$ 46.00$ 923,542.00$ 28.00$ 562,156.00$ 3.00$ 60,231.00$

Dorchester County, Maryland Mid Bay James Island Phase 1 Restoration

No. 4

Michels Construction Inc H&L Contracting LLC

IGE No. 1

Independent Government Estimate C AND C Joint Venture LLC Trade West Construction

No. 2 No. 3 No. 5

Agate Construction Company, Inc

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED G. UNIT H. ESTIMATED I. UNIT J. ESTIMATED K. UNIT L. ESTIMATED M. UNIT N. ESTIMATED O. UNIT P. ESTIMATED

0011AA

All costs in connection with the 3300-lb armor stone, quarried, shipped and placed from sta 50+00 to 70+00

24,229 TON 183.09$ 4,436,087.61$ 141.28$ 3,423,073.12$ 95.50$ 2,313,869.50$ 140.00$ 3,392,060.00$ 168.00$ 4,070,472.00$ 85.00$ 2,059,465.00$

0011AB

All costs in conneciton with the 250-lb armor stone, quarried, shipped and placed from sta 50+00 to 70+00

9,788 TON 178.96$ 1,751,660.48$ 113.35$ 1,109,469.80$ 95.50$ 934,754.00$ 130.00$ 1,272,440.00$ 138.00$ 1,350,744.00$ 62.00$ 606,856.00$

0011AC

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 50+00 to 70+00

15,300 TON 219.67$ 3,360,951.00$ 107.54$ 1,645,362.00$ 85.50$ 1,308,150.00$ 109.00$ 1,667,700.00$ 125.00$ 1,912,500.00$ 58.00$ 887,400.00$

0011AD

All costs in connection with the #10 stone, quarried, shipped and placed from sta 50+00 to 70+00

5,408 CY 281.84$ 1,524,190.72$ 150.57$ 814,282.56$ 105.50$ 570,544.00$ 185.00$ 1,000,480.00$ 165.00$ 892,320.00$ 110.00$ 594,880.00$

0011AE

All costs in connection with Type A geotextile, complete as shown on drawings and specified, from sta 50+00 to 70+00

19,001 SY 28.51$ 541,718.51$ 19.77$ 375,649.77$ 20.00$ 380,020.00$ 46.00$ 874,046.00$ 26.00$ 494,026.00$ 3.00$ 57,003.00$

0012AA

All costs in connection with the 3300-lb armor stone, quarried, shipped and placed from sta 70+00 to 90+00

23,262 TON 183.09$ 4,259,039.58$ 146.59$ 3,409,976.58$ 95.50$ 2,221,521.00$ 140.00$ 3,256,680.00$ 168.00$ 3,908,016.00$ 85.00$ 1,977,270.00$

0012AB

All costs in connection with the 250-lb armor stone, quarried, shipped, and placed from sta 70+00 to 90+00

9,357 TON 178.95$ 1,674,435.15$ 117.10$ 1,095,704.70$ 85.50$ 800,023.50$ 130.00$ 1,216,410.00$ 138.00$ 1,291,266.00$ 62.00$ 580,134.00$

0012AC

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 70+00 to 90+00

12,818 TON 219.65$ 2,815,473.70$ 110.99$ 1,422,669.82$ 75.50$ 967,759.00$ 109.00$ 1,397,162.00$ 125.00$ 1,602,250.00$ 72.50$ 929,305.00$

0012AD

All costs in connection with the #10 stone, quarried, shipped and placed from sta 70+00 to 90+00

5,211 CY 281.85$ 1,468,720.35$ 154.26$ 803,848.86$ 115.50$ 601,870.50$ 185.00$ 964,035.00$ 165.00$ 859,815.00$ 150.00$ 781,650.00$

0012AE

All costs in connection with the Type A geotextile, complete as shown on drawings and specified, from sta 70+00 to 90+00

18,405 SY 28.51$ 524,726.55$ 19.77$ 363,866.85$ 20.00$ 368,100.00$ 46.00$ 846,630.00$ 26.00$ 478,530.00$ 3.65$ 67,178.25$

Agate Construction Company, IncIndependent Government Estimate C AND C Joint Venture LLC Dorchester County, Maryland

Mid Bay James Island Phase 1 Restoration Trade West Construction Michels Construction Inc H&L Contracting LLC

2. PROJECT TITLE

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED G. UNIT H. ESTIMATED I. UNIT J. ESTIMATED K. UNIT L. ESTIMATED M. UNIT N. ESTIMATED O. UNIT P. ESTIMATED NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0015AA

All costs in connection with the 2300-lb armor stone, quarried, shipped and placed from sta 130+00 to 150+00

21,204 TON 183.09$ 3,882,240.36$ 139.70$ 2,962,198.80$ 95.50$ 2,024,982.00$ 139.00$ 2,947,356.00$ 160.00$ 3,392,640.00$ 80.00$ ###########

0015AB

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 130+00 to 150+00

26,483 TON 219.66$ 5,817,255.78$ 110.99$ 2,939,348.17$ 95.50$ 2,529,126.50$ 109.00$ 2,886,647.00$ 125.00$ 3,310,375.00$ 54.00$ ###########

0015AC All costs in connection with the #10 stone, quarried, shipped and placed, from sta 130+00 to 150+00

5,426 CY 281.83$ 1,529,209.58$ 154.26$ 837,014.76$ 95.50$ 518,183.00$ 185.00$ 1,003,810.00$ 165.00$ 895,290.00$ 150.00$ 813,900.00$

0015AD

All costs in connection with Type A geotextile, complete as shown on drawings and specified, from sta 130+00 to 150+00

19,083 SY 28.51$ 544,056.33$ 19.77$ 377,270.91$ 20.00$ 381,660.00$ 46.00$ 877,818.00$ 28.00$ 534,324.00$ 3.00$ 57,249.00$

0016AA

All costs in connection with 2300-lb armor stone, quarried, shipped and placed from sta 150+00 to 170+00

15,274 TON 183.09$ 2,796,516.66$ 139.70$ 2,133,777.80$ 105.50$ 1,611,407.00$ 139.00$ 2,123,086.00$ 160.00$ 2,443,840.00$ 80.00$ ###########

0016AB

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 150+00 to 170+00

11,441 TON 219.67$ 2,513,244.47$ 110.99$ 1,269,836.59$ 95.50$ 1,092,615.50$ 109.00$ 1,247,069.00$ 125.00$ 1,430,125.00$ 68.00$ 777,988.00$

0016AC All costs in connection with the #10 stone, quarried, shipped and placed from sta 150+00 to 170+00

4,305 CY 281.84$ 1,213,321.20$ 154.26$ 664,089.30$ 95.50$ 411,127.50$ 185.00$ 796,425.00$ 165.00$ 710,325.00$ 150.00$ 645,750.00$

0016AD

All costs in connection with Type A geotextile, complete as shown on drawings and specified, from sta 150+00 to 170+00

15,711 SY 28.51$ 447,920.61$ 19.77$ 310,606.47$ 20.00$ 314,220.00$ 46.00$ 722,706.00$ 28.00$ 439,908.00$ 3.65$ 57,345.15$

No. 4No. 2 OFFERS (Continued)

Dorchester County, Maryland Mid Bay James Island Phase 1 Restoration

No. 3

Trade West Construction Michels Construction Inc

No. 5IGE No. 1

Agate Construction Company, IncIndependent Government Estimate C AND C Joint Venture LLC H&L Contracting LLC

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED G. UNIT H. ESTIMATED I. UNIT J. ESTIMATED K. UNIT L. ESTIMATED M. UNIT N. ESTIMATED O. UNIT P. ESTIMATED

0017AA

All costs in connection with the 2300-lb armor stone, quarried, shipped, and placed from sta 170+00 to 185+00

11,231 TON 183.09$ 2,056,283.79$ 139.70$ 1,568,970.70$ 115.50$ 1,297,180.50$ 139.00$ 1,561,109.00$ 160.00$ 1,796,960.00$ 80.00$ 898,480.00$

0017AB

All costs in connection with the quarry run stone, quarried, shipped and placed from sta 170+00 to 185+00

8,412 TON 219.66$ 1,847,779.92$ 110.99$ 933,647.88$ 95.50$ 803,346.00$ 109.00$ 916,908.00$ 125.00$ 1,051,500.00$ 54.00$ 454,248.00$

0017AC

All costs in connection with the connection with the #10 stone, quarried, shipped and placed from sta 170+00 to 185+00

3,144 CY 281.82$ 886,042.08$ 154.26$ 484,993.44$ 125.50$ 394,572.00$ 185.00$ 581,640.00$ 165.00$ 518,760.00$ 150.00$ 471,600.00$

0017AD

All costs in connection with Type A geotextile, complete as shown on drawings and specified, from sta 170+00 to 185+00

11,510 SY 28.51$ 328,150.10$ 19.77$ 227,552.70$ 20.00$ 230,200.00$ 46.00$ 529,460.00$ 28.00$ 322,280.00$ 3.65$ 42,011.50$

Option 12. All costs in connection with seeding the stockpile area.

277,003 SY 5.43$ 1,504,126.29$ 2.72$ 753,448.16$ 6.00$ 1,662,018.00$ 2.00$ 554,006.00$ 5.00$ 1,385,015.00$ 2.40$ 664,807.20$

168,034,311.08$ 122,185,770.06$ 141,581,394.87$ 163,474,361.00$ 148,316,832.15$ 170,672,200.00$

Dorchester County, Maryland Mid Bay James Island Phase 1 Restoration

No. 5IGE No. 1

Agate Construction Company, Inc

No. 4

Independent Government Estimate C AND C Joint Venture LLC H&L Contracting LLC

No. 2 No. 3

Trade West Construction Michels Construction Inc

Total Base Plus Options Amount

2026-02-23T14:50:41-0500
BONOMOLO.TAMARA.C.1405091751