Abstract of Bids W912DR24B0013 DLA Site Improvements.pdf

PDF 211 KB Posted

Attached to
Defense Logistics Agency (DLA) Disposition Services Site Improvements, Fort Meade, MD
Solicitation number
W912DR24B0013
Issued by

About this file

This document is an Abstract of Offers for a construction project solicited by the U.S. Army Corps of Engineers for the Defense Logistics Agency (DLA) Disposition Services site improvements at Fort Meade, MD. The project includes civil, architectural, structural, mechanical, plumbing, fire protection, and electrical work. The Government Estimate for the base bid is $2,762,118, with several optional bid items totaling over $11.9 million. The solicitation received 5 offers, with bid amounts ranging from $14,151,786 to $17,205,418 including the base bid and optional items. All offerors provided the required 20% bid bond. One amendment was issued to the solicitation. The contract will be awarded to the responsible offeror whose proposal, conforming to the solicitation, is most advantageous to the Government, price and other factors considered.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED PAGE

9/5/2024 1 of 2

4. ISSUING OFFICE Name and title of Certifying Official (Type) Gary Faykes - Contracting Officer I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed 9-5-2024 received in response to this solicitation.

Contracting Officer: Gary A. Faykes

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

X C. REASONABLE CONTRACT C. Amendments Acknowledged C. Amendments Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the scrapyard concrete and installation of the oil water separator, complete as shown on drawings and specified, but exclusive of worked covered under optional bid items below.

1 JOB LS 152,547.01$ LS BLANK LS 2,762,118.00$

TOTAL BASE BID AMOUNT 152,547.01$ BLANK 2,762,118.00$

OPTIONAL BID ITEMS

All costs in connection with testing, removal, and packaging of contaminated soils in the vicinity of the scrapyard concrete and the oil water separator, complete as shown on drawings and specified.

1 JOB LS 6,082,110.97$ LS BLANK LS 101,844.00$

All costs in connection with construction of Building 77 SRM Renovations, Building 77 furniture, Building 78 SRM Renovations, and Building 78 furniture, complete as shown on drawings and specified.

1 JOB LS 3,048,591.71$ LS BLANK LS 4,759,117.00$

All costs in connection with construction of the West Side Exit Truck Scale, West Side Exit Radiation Monitor, West Side Exit Asphalt work, West Side Exit Fence/Gate work, POV Entrance Change and retaining wall for West Exit Traffic, complete as shown on drawings and specified.

1 JOB LS 946,640.00$ LS BLANK LS 1,011,597.00$

All costs in connection with construction of East Side Exit Truck Scale, East Side Exit Radiation Monitor, East Side Exit Asphalt work, East Side Exit Fence/Gate work, complete as shown on drawings and specified.

1 JOB LS 506,911.80$ LS BLANK LS 829,605.00$

Yes

Bid Bond 20%/$3.0M

7/29/2024W912DR24B0013

Defense Logistics Agency (DLA) Disposition Services Site Improvements

No. 1

BALTIMORE DISTRICT, CORPS OF ENIGNEERS

2 HOPKINS PLAZA

9. OFFERS

Bid Bond 20%/$3.0M

PEM Construction, LLC 6161 Busch Boulevard, Suite 255

Columbus, OH 43229

Yes

6. NUMBER OF AMENDMENTS ISSUED: One (1)

Chugach Intelligence Solutions, LLC 3800 Centerpoint Drive, Suite 1200

Anchorage, AK 99503

No. 2

BALTIMORE, MD 21201

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

Fort Meade, MD

All costs in connection with construction of East Side Truck Staging and retention pond repairs, complete as shown on drawings and specified.

1 JOB LS 433,259.67$ LS BLANK LS 538,815.00$

All costs in connection with the testing, removal, and packaging of contaminated soils of the East Side Truck Staging and retention pond, complete as shown on drawings and specified.

1 JOB LS 563,880.68$ LS BLANK LS 101,844.00$

All costs in connection with construction of the new loading docks on the south side of building 77 and new loading dock equipment, complete as shown on drawings and specified.

1 JOB LS 1,346,981.16$ LS BLANK LS 1,470,425.00$

All costs in connection with construction of the roll off bin loading area retaining wall, complete as shown on drawings and specified.

1 JOB LS 491,065.45$ LS BLANK LS 784,852.00$

All costs in connection with construction of the new upper west storage loading dock and demolition of the old loading dock, complete as shown on drawings and specified.

1 JOB LS 108,566.89$ LS BLANK LS 246,781.00$

All costs in connection with construction of resurfacing the asphalt, complete as shown on drawings and specified.

1 JOB LS 634,060.17$ LS BLANK LS 1,054,548.00$

All costs in connection with construction of the three sided storage facility, complete as shown on drawings and specified.

1 JOB LS 361,748.86$ LS BLANK LS 560,796.00$

0013 All costs in connection with the replacement of interior insulation that is damaged. 1,200 SF 10.16$ 12,192.00$ BLANK BLANK 16.05$ 19,260.00$

TOTAL ESTIMATED BASE AND OPTIONAL

BID AMOUNTS 14,688,556.37$ BLANK 14,241,602.00$

NSN 7540Cell 6 and Ramps NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

1. SOLICITATION NUMBER PAGE

ABSTRACT OF OFFERS W912DR24B0013 2 of 2 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED 7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the scrapyard concrete and installation of the oil water separator, complete as shown on drawings and specified, but exclusive of worked covered under optional bid items below.

1 JOB LS 6,922,000.00$ LS 3,320,270.00$ LS 5,306,786.00$ LS 4,701,207.00$

TOTAL BASE BID AMOUNT 6,922,000.00$ 3,320,270.00$ 5,306,786.00$ 4,701,207.00$

OPTIONAL BID ITEMS

All costs in connection with testing, removal, and packaging of contaminated soils in the vicinity of the scrapyard concrete and the oil water separator, complete as shown on drawings and specified.

1 JOB LS 133,000.00$ LS 58,430.00$ LS 43,000.00$ LS 135,728.00$

All costs in connection with construction of Building 77 SRM Renovations, Building 77 furniture, Building 78 SRM Renovations, and Building 78 furniture, complete as shown on drawings and specified.

1 JOB LS 3,357,000.00$ LS 8,013,850.00$ LS 3,727,000.00$ LS 5,306,631.00$

All costs in connection with construction of the West Side Exit Truck Scale, West Side Exit Radiation Monitor, West Side Exit Asphalt work, West Side Exit Fence/Gate work, POV Entrance Change and retaining wall for West Exit Traffic, complete as shown on drawings and specified.

1 JOB LS 763,000.00$ LS 846,220.00$ LS 1,028,000.00$ LS 655,084.00$

All costs in connection with construction of East Side Exit Truck Scale, East Side Exit Radiation Monitor, East Side Exit Asphalt work, East Side Exit Fence/Gate work, complete as shown on drawings and specified.

1 JOB LS 638,000.00$ LS 698,930.00$ LS 511,000.00$ LS 650,102.00$

Yes Yes Yes

No.6No. 3 No. 4

NTVI Meltech JV, LLC 141000 Parke Long Court, Suite H

Chantilly, VA 20151

AMVET Schlosser JV, LLC 1005 N. Point Blvd., Ste 706

Baltimore, MD 21224

COHO Construction Management, LLC 1577 C Street, Suite 300 Anchorage, AK 99501

EVCON-CWC JV, LLC

3716 1/2 Bladensburg, Road, NE

Suite 1 Washington, DC 20018

Bid Bond 20%/$3.0M Bid Bond 20%/$3.0M Bid Bond 20%/$3.0M

No. 5

Yes

OFFERS (Continued)

Bid Bond $3.0M

Fort Meade, MD Defense Logistics Agency (DLA) Disposition Services Site Improvements

All costs in connection with construction of East Side Truck Staging and retention pond repairs, complete as shown on drawings and specified.

1 JOB LS 283,000.00$ LS 612,540.00$ LS 783,000.00$ LS 975,590.00$

All costs in connection with the testing, removal, and packaging of contaminated soils of the East Side Truck Staging and retention pond, complete as shown on drawings and specified.

1 JOB LS 425,000.00$ LS 58,430.00$ LS 88,000.00$ LS 193,047.00$

All costs in connection with construction of the new loading docks on the south side of building 77 and new loading dock equipment, complete as shown on drawings and specified.

1 JOB LS 1,364,000.00$ LS 591,270.00$ LS 923,000.00$ LS 937,756.00$

All costs in connection with construction of the roll off bin loading area retaining wall, complete as shown on drawings and specified.

1 JOB LS 600,000.00$ LS 835,110.00$ LS 653,000.00$ LS 1,828,600.00$

All costs in connection with construction of the new upper west storage loading dock and demolition of the old loading dock, complete as shown on drawings and specified.

1 JOB LS 59,000.00$ LS 136,760.00$ LS 100,000.00$ LS 68,844.00$

All costs in connection with construction of resurfacing the asphalt, complete as shown on drawings and specified.

1 JOB LS 738,000.00$ LS 934,230.00$ LS 610,000.00$ LS 1,589,248.00$

All costs in connection with construction of the three sided storage facility, complete as shown on drawings and specified.

1 JOB LS 383,000.00$ LS 442,330.00$ LS 367,000.00$ LS 158,781.00$

0013 All costs in connection with the replacement of interior insulation that is damaged. 1,200 SF 10.00$ 12,000.00$ 15.21$ 18,252.00$ 12,000.00$ 4.00$ 4,800.00$

TOTAL BASE AND OPTIONAL BID

AMOUNTS 15,677,000.00$ 16,566,622.00$ 14,151,786.00$ $17,200,618.00

Correct Amount should be

$17,205,418.00

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

File details come from the government source that posted it. Updated .