This document is an Abstract of Offers for a federal construction contract solicitation. The solicitation is for the Dyke Marsh Restoration and Stabilization, Phase I Rehabilitation project in Alexandria, VA. The overall goal is to protect and stabilize the tidal freshwater marsh and other associated wetland habitats that have been lost or impacted in the Dyke Marsh Wildlife Preserve. The contract includes mobilization, pre-placement survey, relocation of existing stone, and placement of new VA Class III stone along specified sections of the shoreline. The government estimate for the base bid is $1,198,340.00, and option items are included. Three offerors submitted bids, with the lowest responsive bid being $949,100.00 for the base bid and options. The contract will be awarded to the responsible offeror whose bid, conforming to the solicitation, will be most advantageous to the government, considering only price and price-related factors.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED PAGE

9/4/2024 1 of 2

4. ISSUING OFFICE Name and title of Certifying Official (Type) Gary Faykes - Contracting Officer I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed 9-4-2024 received in response to this solicitation.

Contracting Officer: Gary A. Faykes

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

X B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

C. REASONABLE CONTRACT C. Amendments Acknowledged C. Amendments Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

All costs in connection with mobilization and demobilization for Phase 3 of the Dyke Marsh project.

1 JOB LS 195,925.30$ LS 820,000.00$ LS 280,288.00$

0002 Pre-Placement Survey and Sections, complete as shown on the drawings and specified. 1 JOB LS 14,459.05$ LS 168,500.00$ LS 99,100.00$

All costs in connection with relocation of Existing Stone from Sta 15+58 to Sta 14+02. Refers to Specs section 1.7 bid item 0003a.

394 CY 74.23$ 29,246.62$ 200.00$ 78,800.00$ 200.00$ 78,800.00$

All costs in connection with the VA Class III stone, quarried, shipped, and placed from Sta 15+58 to Sta 14+02. Refers to Specs section 1.7 bid item 0003b.

364 Ton 309.08$ 112,505.12$ 360.00$ 131,040.00$ 300.00$ 109,200.00$

TOTAL ESTIMATED BASE BID 352,136.09$ 1,198,340.00$ 567,388.00$

OPTION 1

All costs in connection with the relocation of Existing Stone from Sta 13+62 to Sta 11+79. Refers to Specs section 1.7 bid item 0004a.

79 CY 74.04$ 5,849.16$ 200.00$ 15,800.00$ 100.00$ 7,900.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 13+62 to Sta 11+79. Refers to Specs section 1.7 bid item 0004b.

427 Ton 309.08$ 131,977.16$ 360.00$ 153,720.00$ 127.00$ 54,229.00$

OPTION 2

All costs in connection with the relocation of Existing Stone from Sta 11+39 to Sta 9+87. Refers to Specs section 1.7 bid item 0004c.

102 CY 74.19$ 7,567.38$ 200.00$ 20,400.00$ 100.00$ 10,200.00$

Yes

Bid Bond 20%

6/6/2024W912DR24B0007

Dyke Marsh Restoration and Stabilization, Phase I Rehabilitation

No. 1

BALTIMORE DISTRICT, CORPS OF ENIGNEERS

2 HOPKINS PLAZA

9. OFFERS

Bid Bond 20%

Coastal Design and Construction, Inc.

PO Box 650

Gloucester, VA 23061

Yes

6. NUMBER OF AMENDMENTS ISSUED: One (1)

Shoreline Design, LLC 637 Shore Drive

Edgewater, MD 21037

No. 2

BALTIMORE, MD 21201

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

Alexandria, VA

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 11+39 to Sta 9+87. Refers to Specs section 1.7 bid item 0004d.

355 Ton 309.08$ 109,723.40$ 360.00$ 127,800.00$ 127.00$ 45,085.00$

OPTION 3

All costs in connection with the relocation of Existing Stone from Sta 9+47 to Sta 5+95. Refers to Specs section 1.7 bid item 0004e.

415 CY 74.28$ 30,826.20$ 200.00$ 83,000.00$ 100.00$ 41,500.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 9+47 to Sta 5+95. Refers to Specs section 1.7 bid item 0004f.

822 Ton 309.08$ 254,063.76$ 360.00$ 295,920.00$ 127.00$ 104,394.00$

OPTION 4

All costs in connection with the relocation of Existing Stone from Sta 5+40 to Sta 3+98. Refers to Specs section 1.7 bid item 0004g.

194 CY 74.18$ 14,390.92$ 200.00$ 38,800.00$ 100.00$ 19,400.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 5+40 to Sta 3+98. Refers to Specs section 1.7 bid item 0004h.

332 Ton 309.08$ 102,614.56$ 360.00$ 119,520.00$ 127.00$ 42,164.00$

OPTION 5

All costs in connection with the relocation of Existing Stone from Sta 3+42 to Sta 2+05. Refers to Specs section 1.7 bid item 0004fi.

162 CY 74.22$ 12,023.64$ 200.00$ 32,400.00$ 100.00$ 16,200.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 3+42 to Sta 2+05. Refers to Specs section 1.7 bid item 0004j.

320 Ton 309.08$ 98,905.60$ 360.00$ 115,200.00$ 127.00$ 40,640.00$

TOTAL ESTIMATED BASE AND OPTIONS

BID AMOUNT 1,120,077.87$ 2,200,900.00$ 949,100.00$

NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

1. SOLICITATION NUMBER PAGE

ABSTRACT OF OFFERS W912DR24B0007 2 of 2 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional

Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with mobilization and demobilization for Phase 3 of the Dyke Marsh project.

1 JOB LS 1,169,469.00$

0002 Pre-Placement Survey and Sections, complete as shown on the drawings and specified. 1 JOB LS 40,833.00$

All costs in connection with relocation of Existing Stone from Sta 15+58 to Sta 14+02. Refers to Specs section 1.7 bid item 0003a.

394 CY 227.00$ 89,438.00$

All costs in connection with the VA Class III stone, quarried, shipped, and placed from Sta 15+58 to Sta 14+02. Refers to Specs section 1.7 bid item 0003b.

364 Ton 715.00$ 260,260.00$

TOTAL ESTIMATED BASE BID $ 1,560,000.00

OPTION 1

All costs in connection with the relocation of Existing Stone from Sta 13+62 to Sta 11+79. Refers to Specs section 1.7 bid item 0004a.

79 CY 174.00$ 13,746.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 13+62 to Sta 11+79. Refers to Specs section 1.7 bid item 0004b.

427 Ton 549.00$ 234,423.00$

OPTION 2

All costs in connection with the relocation of Existing Stone from Sta 11+39 to Sta 9+87. Refers to Specs section 1.7 bid item 0004c.

102 CY 174.00$ 17,748.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 11+39 to Sta 9+87. Refers to Specs section 1.7 bid item 0004d.

355 Ton 549.00$ 194,895.00$

OFFERS (Continued)

Bid Bond 20%

Alexandria, VA Dyke Marsh Restoration and Stabilization, Phase I Rehabilitation

Yes Yes

No.6No. 3 No. 4

Coho Construction Mangement, LLC 1577 C Street, Suite 300 Anchorage, AK 99501

Bid Bond 20%

No. 5

OPTION 3

All costs in connection with the relocation of Existing Stone from Sta 9+47 to Sta 5+95. Refers to Specs section 1.7 bid item 0004e.

415 CY 174.00$ 72,210.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 9+47 to Sta 5+95. Refers to Specs section 1.7 bid item 0004f.

822 Ton 549.00$ 451,278.00$

OPTION 4

All costs in connection with the relocation of Existing Stone from Sta 5+40 to Sta 3+98. Refers to Specs section 1.7 bid item 0004g.

194 CY 174.00$ 33,756.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 5+40 to Sta 3+98. Refers to Specs section 1.7 bid item 0004h.

332 Ton 549.00$ 182,268.00$

OPTION 5

All costs in connection with the relocation of Existing Stone from Sta 3+42 to Sta 2+05. Refers to Specs section 1.7 bid item 0004fi.

162 CY 174.00$ 28,188.00$

All costs in connection with the VA Class III quarried, shipped, and placed from Sta 3+42 to Sta 2+05. Refers to Specs section 1.7 bid item 0004j.

320 Ton 549.00$ 175,680.00$

TOTAL BASE BID AMOUNT 2,964,192.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

File details come from the government source that posted it. Updated .