Questions and Responses for HVAC Maintenance Services at the Armed Forces Recruiting Stations
Question 1: Power Constructions LLC is very interesting in this job. We would appreciate it if you could send us more job details. Currently, Power Constructions LLC has applied for WOSB and is waiting for the certificate. Thank you very much.
Answer 1: The detailed description of the duties to be performed are listed in the Performance Work
Statement (PWS).
Question 2: Where will we be meeting at? Also, what is the previous contract number of this solicitation? (I am assuming a 2017 contract)
Answer 2: There is no need for a meeting. The work was previously performed under Contract Nos.
W912DR19P0073 and W912DR19P0091
Question 3: We registered for a site walk tomorrow but have not been given any instructions on where to meet. I assume this is being rescheduled now, please confirm.
Answer 3: A site visit is scheduled for 13 April 22 between 10:00am and 12N.
Question 4: Unfortunately, we are not able to make the scheduled site visit today however we were wondering if it would be possible to schedule another visit next week? Thank you.
Answer 4: Refer to answer to Question 3 above.
Question 5: If another site visit cannot be scheduled, would we be able to receive a list of the HVAC units at these three locations? Thank you.
Answer 5: We do not have a list of the HVAC units. They are rooftop units. However, you are encouraged to obtain the make, model and serial numbers from the units during your site visit which will require you providing a ladder to access the roof.
Question 6: Just want to know the process we need to follow in getting access to the units to check on the types of equipment of the sites and who are contacts would be along with what are the site hours.
Answer 6: You will need to conduct the site visit on the aforementioned date and times.