11_FHR_Design Analysis_IFC.pdf

PDF 41 MB Posted

Attached to
Building 51450 & 51451 Renovation, Fort Huachuca
Solicitation number
W912DR22B0019
Issued by

About this file

This solicitation is for a competitive, firm-fixed price construction contract to renovate Buildings 51450 and 51451 at Fort Huachuca in Arizona. The U.S. Army Corps of Engineers, Baltimore District is seeking to award a contract to renovate the buildings, including repairing and replacing HVAC, electrical, and plumbing systems. The solicitation includes the full details of the requirement and offers are due by February 15, 2022. The agency, the Department of the Army Corps of Engineers Engineering District Baltimore, will award the contract at a future unspecified date.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES ARMY CORPS OF ENGINEERS

REAL PROPERTY SERVICES FIELD OFFICE

RENOVATION OF

BUILDINGS 51450 & 51451

DESIGN ANALYSIS

W912DR-18-D-0001-19F0586

Issue for Construction March 11, 2021

CONTACT:

John E. Wittmann 703.647.8288 jwittmann@wileywilson.com

UNCLASSIFIED // FOR OFFICIAL USE ONLY

Buildings 51450 & 51451 – IFC Submission 11 March 2021 Wiley|Wilson UNCLASSIFIED // FOR OFFICIAL USE ONLY TOC - i

TABLE OF CONTENTS

Design Narratives .......................................................................................................................................Tab 1

1.0 Executive Summary................................................................................. Page 1

1.1 Civil Narrative .......................................................................................... Page 4

1.2 Structural Narrative ............................................................................... Page 7

1.3 Architectural Narrative ....................................................................... Page 11

1.4 Mechanical Narrative........................................................................... Page 19

1.5 Plumbing Narrative .............................................................................. Page 24

1.6 Electrical Narrative .............................................................................. Page 26

1.7 Fire Protection Narrative .................................................................... Page 30

1.8 Telecom Narrative ................................................................................ Page 38

1.9 Security Narrative................................................................................. Page 41

1.10 Cybersecurity Narrative .................................................................... Page 43

1.11 Audio Visual Narrative ...................................................................... Page 48

1.12 ATFP Narrative ................................................................................... Page 49

Calculations ....................................................................................................................................................Tab 2 Stormwater Calculations Structural Calculations Fire Protection Calculations Plumbing Calculations Mechanical Calculations Electrical Calculations

Appendix ..........................................................................................................................................................Tab 3 Cybersecurity Lists

Buildings 51450 & 51451 – IFC Submission

11 March 2021

Wiley|Wilson

TAB 1

DESIGN NARRATIVES

Buildings 51450 & 51451 Renovation 11 March 2021 USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 1

UNCLASSIFIED // FOR OFFICIAL USE ONLY

1.0 EXECUTIVE SUMMARY

OVERVIEW

The U.S. Army Corps of Engineers (USACE) Baltimore District, Reality Services Field Office (CENAB-RE) plans to renovate two buildings at Fort Huachuca to consolidate individual INSCOM activities that are currently scattered around the base. Building 51450 will house the INSCOM Det 52 Detachment (DET 52), INSCOM G2X Program Management Offices (G2X PMOs), an Army Operations Group (AOG) element, and Army Field Support Center (AFSC) matrixed support. Building 51451 will house elements of the 308th and 310th Military Intelligence Battalions (MI BNs)of the 902nd Military Intelligence Brigade (MI BDE), the INSCOM G2 Security Operations Center (ISOC) Response Branch West Fort Huachuca Office, and AFSC matrixed support. The scope of work is based on the conclusions of the January 2019 Jacobs Space Planning Report and the Wiley|Wilson Field Investigation and Charrette Report, dated January 3, 2020.

EXISTING CONDITIONS

Buildings 51450 and 51451 were both built in 1969 as compact item repair shops. The buildings have been vacant for at least the past five years. The buildings are similar in size, with building 51450 being 8,280 GSF, and 51451 being 6,960 GSF. Both buildings are in need of major renovation to adequately serve the proposed tenants. Building 51450 shows signs of significant water intrusion and damage due to the failing roof system. A hazardous materials survey performed during the field investigation phase found asbestos containing materials and lead based paints in both buildings.

DEMOLITION

Demolition involves gutting the interiors of both buildings and leaving only bearings walls, floor slabs, and roof structures. Additionally, adjacent buildings 51449, 51452, 51453, and 51454 are to be removed.

CIVIL/SITE

The site encompasses approximately 3.3 acres. Parking will be provided for a total of 96 vehicles; this includes 86 POV, 4 ADA and 6 GOV (screened from view). New site walkways and egress paths will also be provided.

STRUCTURAL

Structural work is limited to providing lintels for new openings in bearing walls, concrete infill of slab on grade openings, framing for new mechanical roof openings, and a new concrete ramp to Building 51450.

ARCHITECTURAL

The buildings will be fully modernized and updated to meet the space program identified in the January 2019 Jacobs Space Planning Report. The only additional program component is

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 2

UNCLASSIFIED // FOR OFFICIAL USE ONLY

a digital forensics lab in 51451 to be housed in the location noted as “Unused” in the space report. This additional program component will support aspects of the 301th MI BN digital forensics mission. Renovation will bring the buildings up to current building, fire, and accessibility codes as well as address problems such as failing roof systems. Windows will be removed and openings infilled with masonry to match existing. Exterior walls will be furred and insulated.

MECHANICAL

Complete new HVAC systems will be provided for both buildings. This will consist of Multi Zone VAV Packaged Roof Top Units delivering conditioned air thru low pressure primary supply duct, VAV Term. Packaged Units will be located on concrete pads at grade.

Communication rooms will be served by split system DX units. Mechanical rooms will be served by unit heaters.

PLUMBING

All new plumbing systems will be provided with low flow water saving fixtures. Domestic hot water will be provided by an instantaneous gas heater in each building.

ELECTRICAL

Existing service transformer, feeders to service boards, and existing switchboards will remain for both buildings. All conduit, conductors, light fixtures, wiring, devices and panelboards fed from service boards will be removed and replaced. Design includes a gas powered emergency generator for critical loads to be served during an extended power outage. New lighting will be LED with local controls tied to occupancy sensors. Emergency lighting will be by battery-powered wall packs.

FIRE PROTECTION & LIFE SAFETY

Both buildings will be protected by a new wet pipe sprinkler system fed from a new dedicated water supply. Both buildings will be provided with new fire alarm/mass notification systems.

TELECOM

A complete new structured cabling system will be provided. A new outside plant infrastructure pathway and cable will be provided to both buildings. Within each building, a Demarcation Room will support the telecommunications services entering the building.

Directly adjacent to the demarc, will be a Comm Room with dedicated cabinets for each network (two in 51451 and three in 51450). Building 51450 also contains a dedicated Comm Room to support all horizontal connectivity located within the Secure Area.

SECURITY

The scope of this project includes a pathways only for a GFGI Access Control System/Intrusion Detection System security design Both buildings will be provided with an access control system (ACS), and intrusion detection systems (IDS).

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 3

UNCLASSIFIED // FOR OFFICIAL USE ONLY

AUDIO VISUAL

The scope of this project includes a pathways only audiovisual design for Building 51450 within the INSCOM Conference Room. This design will consist of a VTC camera, AV transmitter connections behind displays, table microphones, and a wall mounted touch panel for system control.

ANTI-TERRORISM / FORCE PROTECTION SYSTEMS

The buildings will meet or exceed requirements of UFC 4-010-01 for existing buildings within a controlled perimeter. A standoff distance of 80 feet has been identified in the design based on recommendations for existing conventional construction of unreinforced exterior walls.

SUSTAINABILITY

The renovations will be compliant with UFC 1-200-02 High Performance and Sustainable Building requirements. A third party certification such as LEED or Green Globes is not required per Scope of Work.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 4

1.1 CIVIL NARRATIVE

CODES AND REFERENCES

Government Publications:

UFC 1−200−01 – DoD Building Code (11/01/2018)

UFC 1−200−02 − High Performance & Sustainable Building Requirements (09/07/2018)

UFC 3−201-01 – Civil Engineering (04/01/2018)

UFC 3−201-02 – Landscape Architecture (11/01/2019)

UFC 3−210−10 − Low Impact Development (02/01/2016)

UFC 3−230−01 − Water Storage and Distribution (10/01/2018)

UFC 3−240−01 − Wastewater Collection (11/01/2014)

UFC 3−250−01FA − Pavement Design for Roads and Parking Areas (11/14/2016)

UFC 3−250−03 − Standard Practice Manual for Flexible Pavements (05/30/2018)

UFC 3−250−04 − Standard Practice for Concrete Pavements (07/29/2009)

UFC 4−010−01 − DoD Minimum Antiterrorism Standards for Buildings (12/12/2018)

OVERVIEW

This project includes the renovations of Buildings 51450 and 51451. The site work for this project includes all design and construction of site features including but not limited to site planning and permitting, layout, demolition, clearing, grubbing, erosion and sediment control, stormwater management and SWPPP development, site grading, utilities, pavements, pedestrian and vehicular circulation, Anti-Terrorism/Force Protection, and other site features such as landscaping, lighting, fencing and furnishings. It is important to note this site has an 80’ standoff distance surrounding buildings 51450 and 51451. Refer to

1.12 ATFP Narrative for additional information.

EXISTING CONDITIONS

The approximately 3.3-acre site includes the existing buildings 51449, 51450, 51451, 51452, 51453, and 51454 adjacent to a paved parking lot to the east. Buildings 51450 and 51451 have front side porches with truck loading electrical stations. Building 51450 has a loading ramp to the southwest. Various miscellaneous structures are located west of buildings 51450 and 51451 which include, air conditioning units, bollards, fires risers, a turnstile, vacant utility poles, a 3 phase power line, a light pole, free standing wall etc. A scale is located on the south end of the parking lot. Existing underground utilities include domestic water, sewer, gas, and fire protection lines.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 5

DEMOLITION

The demolition of this site includes the removal of buildings 51449, 51452, 51543 and 51454, as well as all associated utilities and retaining walls. The loading ramp to the south of 51450, all electrical boxes along the front porches, AC units and any miscellaneous structures west of 51450 and 51451 will be removed along with any associated concrete pads. The removal of existing asphalt will be limited to the areas within the 80’ standoff and areas with new grading.

PROPOSED SITE PLAN

1) Grading The site will be graded to drain stormwater runoff away from the buildings, walks, and parking areas primarily through overland (sheet) flow. The proposed re-grading of the site will generally maintain existing overall drainage patterns, maximize the cut/fill balance onsite, and adhere to ADA, local, state and federal regulations. Low impact storm water management practices will be used to pre-development hydrology and prevent any net increase in storm water runoff will be maintain.

The site has been conceptually developed to minimize the earthwork requirements necessary for construction and balance within reason the amount of materials brought on and off site.

2) Utilities Existing water and sewer lines will be removed from the west side of building 51450 and new 2” domestic water and a 4” sanitary sewer lines will be connected to the existing main lines. Building 51451 will use the existing domestic water line connection, while the existing sanitary line will be removed and a new 4” sanitary connection will be added to the existing main line. All current gas line locations will remain in place. A new gas line will be added connected to the new standby generator and building 51451. The large transformer between buildings 51450 and 51451 will remain in place. All utilities will be have the minimum land coverage and spacing per UFC requirements.

3) Roadways and Pavements Concrete pavement will be used for the sidewalks, dumpsters and ADA parking and ramps.

Equipment pads will be added for the two new HVAC systems behind buildings 51450 & 51451. An equipment pad will be added for the new standby generator behind building 51451. Sidewalks will be 5 feet in width. The site will include landscape elements(landscape rocks) around buildings 51450 and 51451. There will be 96 parking spaces available(86 POV, 4 ADA, and 6 GOV screened). The screened parking will be located in the northwest corner of the site and will have controlled gate access. All pavements will be designed using the most current UFC standards.

The access road will be approximately a 26-ft wide, clear, paved entrance. The entrance/exit design will be such that it ties into the existing roadway in a safe, efficient, and functional manner. Adequate safe sight distances will be provided for the

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 6 entrance/exit point. All entrances and exits will be designed to provide clear, unobstructed ingress and egress from the parking areas. Vehicle entrances and exits will be designed to ensure that safe sight distances are provided, as required.

A fire lane will be implemented according to the Fort Huachuca specific fire requirements.

The 20’ wide geotextile fire lane will be west of buildings 51450 and 51451 and loop around the south end of 51450 to connect to the proposed access road. Existing fire hydrants will remain in place.

6) Borrow Material To the extent possible, materials anticipated from the earthwork activities on site will be processed and reused on site where acceptable. Where additional materials are required to be hauled from off site sources to meet project specifications, the materials will be tested for contamination prior to being hauled and stockpiled on site.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 7

UNCLASSIFIED // FOR OFFICIAL USE ONLY

1.2 STRUCTURAL NARRATIVE

CODES AND REFERENCES

A full analysis is to be completed by the design build team complying with all applicable Federal and State codes, regulations and design guidelines including:

Government Publications:

UFC 1-200-01 DoD Building Code General Building Requirements

UFC 3-301-01 Structural Engineering

UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings

Other Publications:

2018 ICC International Building Code

ASCE/SEI 7-16 Minimum Design Loads and Associated Criteria for Buildings and Other Structures

ACI 318-14 Building Code Requirements for Structural Concrete

AISC 360-16 Specification for Structural Steel Buildings

AWS D1.1-10 Structural Welding Code – Steel

TMS 402/602-16 Building Code Requirements for Masonry Structures

OVERVIEW

The project involves the renovation of two buildings. Building 51450 is one story and approximately 8,280 square feet in size, and Building 51451 is one story and approximately 6,960 square feet in size. The structural Scope of Work proposes to provide four primary design features. The first feature is to provide steel lintels to support multiple new wall openings for doors and windows. The second feature is to provide concrete infill for multiple slab areas and stairs. The third feature is to provide new structural framing around new mechanical roof openings. The fourth feature is to provide new concrete stairs to Buildings 51450 and 51451.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 8

UNCLASSIFIED // FOR OFFICIAL USE ONLY

BUILDING DESIGN VALUES

The structure will be designed in accordance with the following criteria:

Risk Category: II

Environmental Values

Snow Loads

Ground Snow Load (Pg): 10 psf

Snow Exposure Factor (Ce): 1.0

Snow Thermal Factor (Ct): 1.0

Frost Penetration: 0-inches

Live Loads

Office: 50 psf

Light Storage: 125 psf

Mechanical Room: 125 psf

Wind Loads

Basic Wind Speed: 105 mph

Wind Exposure Category: C

Enclosure Classification (GCpi): +/- 0.18 (Enclosed Building)

Seismic Loads

Site Classification (Assumed): D

Spectral Response Acceleration short period (Ss): 0.25g

Spectral Response Acceleration long period (S1): 0.078g

Seismic Design Category: B

UFC 3-301-01 4-2.2.1 states that exemptions from ICSSC RP 8 Section 1.3 also apply to project’s new occupancy. Buildings assigned SDC B are exempt from seismic evaluation.

Structural Materials and Strengths

Concrete

Concrete f’c = 4,000 psi @ 28 days

Reinforcement, steel bars ASTM A615, Grade 60 ksi

Reinforcement, welded wire ASTM A1064

Structural Steel

Channels, Angles, Plates ASTM A36, Fy = 36 ksi

Welding Electrodes E70XX

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 9

UNCLASSIFIED // FOR OFFICIAL USE ONLY

DESCRIPTION OF STRUCTURAL SYSTEMS

Existing Conditions

Building 51450 The building is one story with a portion of the slab stepped down and is approximately 8,280 square feet in size. The structural system is metal roof deck on steel joists supported by unreinforced masonry with a slab on grade floor.

Building 51451 The building is one story with portions of the slab stepped down and is approximately 6,960 square feet in size. One side of the building’s structural system is metal roof deck on steel joists supported by unreinforced masonry with a slab on grade floor. The other side is a concrete roof slab with edge beams supported by unreinforced masonry and one concrete column in the center of the slab. The floor is a slab on grade.

Demolition

Building 51450 Demolition will consist of removing portions of the existing unreinforced masonry to allow for new exterior doors and windows. Additionally, joist cross bridging will be removed in one area to provide ceiling space for mechanical ductwork. Roof deck will also be removed to provide openings for mechanical equipment. Exact locations will be coordinated with mechanical and architectural designs.

Building 51451 Demolition will consist of removing portions of the existing unreinforced masonry to allow for new exterior doors and windows. Additionally, interior masonry will be removed in one area below the concrete roof to provide space for mechanical ductwork. Roof deck will also be removed to provide openings for mechanical equipment. Exact locations will be coordinated with mechanical and architectural designs.

Renovation

Building 51450 Several existing masonry openings will be partially, if not completely, infilled with new masonry. The stepped down slab area as well as exterior stairs will also be infilled with reinforced concrete. Steel lintels will be installed where existing masonry is removed.

Additionally, horizontal bridging will be installed adjacent to removed joist cross bridging.

A new reinforced concrete stair supported by cast-in-place walls and continuous footings will extend from the existing loading dock down to new concrete sidewalk as well. New structural steel angles will frame new mechanical roof openings. The angles will frame back to existing steel joists.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 10

UNCLASSIFIED // FOR OFFICIAL USE ONLY

Building 51451 Several existing masonry openings will be partially, if not completely, infilled with new masonry. Stepped down slab areas as well as exterior stairs will also be infilled with reinforced concrete. Steel lintels will be installed where existing masonry is removed. New reinforced concrete stairs supported by cast-in-place walls and continuous footings will extend from the existing loading dock and side door down to new concrete sidewalk as well. New structural steel angles will frame new mechanical roof openings. The angles will frame back to existing steel joists.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 11

UNCLASSIFIED // FOR OFFICIAL USE ONLY

1.3 ARCHITECTURAL NARRATIVE

CODES AND REFERENCES

A full analysis has been completed by the design team complying with the most current applicable Federal and State codes, regulations, and design guidelines including but not limited to:

International Building Code 2018 (IBC)

NFPA 101 Life Safety Code 2018

NFPA 10 Standard for Portable Fire Extinguishers

Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines (ADAABAAG), July 23, 2004, amended August 5, 2005.

ICD/ICS 705, Latest Edition

UFC 1-200-01 General Building Requirements

UFC 1-200-02 High Performance and Sustainable Building Requirements

UFC 3-101-01 Architecture

UFC 3-110-03 Roofing

UFC 3-120-10 Interior Design

UFC 3-600-01 Fire Protection Engineering for Facilities

UFC 4-010-01 Minimum Antiterrorism Standards for Buildings

UFC 4-010-05 SCIF Planning, Design and Construction

OVERVIEW

The U.S. Army Corps of Engineers (USACE) and INSCOM are planning to renovate two existing buildings, 51450 and 51451, located at Ft. Huachuca. Renovation will bring the buildings up to current building, fire, and accessibility codes as well as address problems like failing roof systems, etc. The buildings will consolidate individual INSCOM activities, which are currently scattered around the base, to a single location. Currently, the spaces occupied by each group do not meet their space and security needs and the new buildings will address these deficiencies as well. Building 51450 will house the INSCOM Det 52 Detachment, INSCOM G2X Program Management Offices (G2X PMOs), an Army Operations Group (AOG) element, and Army Field Support Center (AFSC) matrixed support. Building 51451 will house elements of the 308th and 310th Military Intelligence Battalions (MI BNs) of the 902nd Military Intelligence Brigade (MI BDE), the INSCOM G2 Security Operations Center (ISOC) Response Branch West Fort Huachuca Office, and AFSC matrixed support.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 12

UNCLASSIFIED // FOR OFFICIAL USE ONLY

EXISTING CONDITIONS

Buildings 51450 and 51451 were built in 1969 as compact item repair shops. The buildings have been reconfigured several times for various motor pool and warehouse-type functions. Both buildings have sat vacant for the last five years. The buildings are roughly the same size with building 51450 being 8,280 SF and 51451 being 6,960 SF. Construction is similar with non-reinforced masonry exterior walls and a steel roof structure, though 1/3 of the roof structure of 51451 changes to a concrete system. Front and rear exterior walls are load bearing allowing for the interiors to be free of load bearing walls with the exception of the concrete roof section of 51451 which requires an interior CMU bearing wall and a concrete column. The roof systems on both buildings need to be replaced as they have both been patched several times. Building 51450 shows signs of significant water intrusion and damage due to the failing roof system. Existing toilet rooms in both buildings do not meet current code. Building doors, walls, interiors, and other elements are well worn and in need of replacement. A hazmat survey performed during the field investigation of the buildings found substantial amounts of asbestos. Refer to the hazmat report provided in the appendix of this document for more information.

DEMOLITION

Demolition for both buildings will be largely similar. The interiors will be completely gutted leaving only the exterior walls, floor slab, and steel roof structure. Additionally, the interior load bearing wall and concrete column in 51451 will also remain. All exterior man doors, barn doors, roll up doors, and windows will be removed. Rough openings for new doors will be cut into the exterior walls. The roof systems on both buildings will be removed and the deck prepped for the installation of a new membrane roof. Both buildings have concrete loading dock platforms running the length of the front wall. These loading docks are outfitted with bumpers that will be removed.

LIFE SAFETY AND FACILITY CIRCULATION

The buildings are non-combustible structures. Both will be protected by a wet pipe sprinkler system and fire alarm system.

ANTI-TERRORISM / FORCE PROTECTION SYSTEMS

In accordance with DoD Uniform Facilities Criteria - UFC 4-010-01, the basis of design for the new buildings is designated as normal. The buildings are inside a controlled perimeter.

See Section 1.12 ATFP Narrative for additional information.

SUSTAINABILITY CONSTRUCTION GUIDELINES

The renovation of the buildings will follow UFC 1-200-02 High Performance and Sustainable Building requirements. Architecturally this will include the specification and use of environmentally certified products, including recycled and recyclable products, flooring systems, and low-emitting materials such as low-VOC adhesives and sealants, paints, and coatings. Locally manufactured building products will be specified when possible to reduce the environmental impact of the long distance hauling of building materials.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 13

UNCLASSIFIED // FOR OFFICIAL USE ONLY

During the construction process, the contractor will follow environmentally sensitive guidelines for site disturbance, reduce the volume of landfill contribution through recycling construction waste, and utilize practices to keep the building clean during the construction process in order to improve worker and occupant comfort. Third party certification documenting compliance is not required.

BUILDING 51450

BUILDING EXTERIOR

General Building 51450 has an existing overall height of 17’-4” +/-. The existing exterior walls are unreinforced CMU. The existing roof construction is metal deck on steel trusses.

Wall Construction The existing exterior wall construction 8” unreinforced CMU. The front and rear walls are load bearing and support the roof structure. Exterior walls will be repainted to meet the current Installation Planning Standards. R-7.6 closed cell spray foam insulation will be installed on the interior side of the wall inside 2½” metal stud furring. Exterior walls will meet the requirements set forth in ICD 705 for Secure Open Storage.

Existing wall construction will be augmented to meet ASHRAE 189.1 for above grade mass walls.

Doors Exterior doors will be heavy duty, insulated hollow metal units in hollow metal frames.

All door hardware shall comply with ANSI/BHMA A156 and be in accordance with the UFC.

All locksets shall be coordinated with the facility grand master keying system.

Construction cores shall be used during the erection of the facility, and all final keys and cores will be turned over to the government for installation. All exterior doors will have an STC rating of 45.

Security hardware will be coordinated with the user’s requirements for access control.

Roof Construction The existing roof structure will be cleaned and repaired as required. A new white EPDM roofing system will be installed. Roof penetrations will be coordinated with structural and mechanical. Roof curbs and structural framing will be provided at new openings for outside air intake.

Roof construction will meet ASHRAE 189.1. The total roof assembly will achieve a min R- 26.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 14

UNCLASSIFIED // FOR OFFICIAL USE ONLY

BUILDING INTERIOR

General The interior of Building 51450 will be an office environment and appropriately designed to match the function of the space. Room finishes will be durable to accommodate low maintenance.

Floor Construction The existing structural floor is slab on grade. The location of the mechanical room within the building is moving to a more central location requiring the floor of the existing mechanical room, which is 16 inches below finish floor, to be infilled with concrete to bring it level with the finish floor elevation.

Partitions Standard interior partitions will be gypsum wallboard over minimum 20-gauge metal stud framing at 16-inch on-center. Minimum thickness of wallboard will not be less than 5/8-inch and all gypsum board surfaces will be finished in accordance with GA 214 Level 4.

Standard interior partitions for toilet rooms receiving wall tile will be cement board over minimum 20-gauge metal stud framing at 16-inch on-center.

Interior partitions requiring an STC rating of 45 will be two layers of gypsum wallboard on one side and on layer of gypsum board on one side over minimum 20-gauge metal stud framing at 16-inch on-center. Minimum thickness of wallboard will not be less than 5/8-inch and all gypsum board surfaces will be finished in accordance with GA 214 Level 4.

Walls will be filled with 3” acoustical batt insulation.

Interior partitions requiring an STC rating of 45 for secure open storage will meet ICD/ICS 705 requirements. Construction will be two layers of gypsum wallboard on one side and on layer of gypsum board on one side over minimum 20-gauge metal stud framing at 16-inch on-center. Gypsum board will be 5/8-inch Type X and all gypsum board surfaces will be finished in accordance with GA 214 Level 4. Walls will be filled with 3” acoustical batt insulation.

Interior partitions designated for SCIF spaces will meet ICD/ICS 705 requirements.

Construction will be two layers of gypsum wallboard on each side over minimum 20-gauge metal stud framing at 16-inch on-center. Gypsum board will be 5/8-inch Type X and all gypsum board surfaces will be finished in accordance with GA 214 Level 4. Walls will be filled with 3” acoustical batt insulation.

Doors Interior doors for storage rooms and mechanical, electrical, and comms rooms will be painted, hollow metal in 16-gauge steel frames.

Interior doors for private offices, open office areas, and toilet rooms will be solid core wood in 16-gauge steel frames.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 15

UNCLASSIFIED // FOR OFFICIAL USE ONLY

Interior doors and frames into SCIF spaces or secure spaces requiring an STC of 45 will be steel and provided as tested assemblies. Doors will meet ICD/ICS 705 requirements.

All door hardware shall comply with ANSI/BHMA A156 and be in accordance with the UFC.

All locksets shall be coordinated with the facility grand master keying system.

Construction cores shall be used during the erection of the facility, and all final keys and cores will be turned over to the government for installation.

FINISHES

Wall Finishes Occupied spaces will receive a painted wall finish with 4-inch rubber base. All paints and coatings shall comply with the VOC standards established in the Green Seal Standard-1993.

The following types of paint shall be used:

Alkyd Enamel: Interior door frames and metal items Latex Enamel: All other interior surfaces Flat Finish: Ceilings Satin Finish: Walls Semi-Gloss Finish: Doors and door frames

Toilet rooms will have floor to ceiling ceramic tile.

Floor Finish Carpet tile – Private offices, open office space, conference rooms, cyber café.

Rubber tile – Entry, corridors, storage rooms, interior comms rooms.

Porcelain tile – Toilet rooms Sealed Concrete – Mechanical rooms, electrical rooms, demark rooms, janitor’s closet

Ceiling Finishes

Painted gypsum board ceilings will be provided in the toilet rooms. The mechanical, electrical, and comms rooms will be open to structure. All other spaces will receive a 2x2 acoustical lay-in grid ceiling.

Casework

All casework will be plastic laminate on particleboard cores. Cabinet interiors will be finished in white melamine. Counter tops will be solid surface.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 16

UNCLASSIFIED // FOR OFFICIAL USE ONLY

BUILDING 51451

BUILDING EXTERIOR

General Building 51451 has an existing overall height of 19’-6” +/-. The existing exterior walls are unreinforced CMU. The existing roof construction is metal deck on steel trusses for 2/3 of the building with 1/3 being a concrete 2-way slab supported by a central column.

Wall Construction The existing exterior wall construction 8” unreinforced CMU walls. The front and rear walls are load bearing and support the roof structure. Exterior walls will be repainted to meet the current Installation Planning Standards. R-7.6 closed cell spray foam insulation will be installed on the interior side of the wall inside 2½” metal stud furring. Exterior walls will meet the requirements set forth in ICD 705 for Secure Open Storage.

Existing wall construction will be augmented to meet ASHRAE 189.1 for above grade mass walls.

Doors Exterior doors will be heavy duty, insulated hollow metal units in hollow metal frames.

All door hardware shall comply with ANSI/BHMA A156 and be in accordance with the UFC.

All locksets shall be coordinated with the facility grand master keying system.

Construction cores shall be used during the erection of the facility, and all final keys and cores will be turned over to the government for installation. All exterior doors will have an STC rating of 45.

Security hardware will be coordinated with the user’s requirements for access control.

Roof Construction The existing roof structure will be cleaned and repaired as required. A new white EPDM roofing will be installed. Roof penetrations will be coordinated with structural and mechanical. Roof curbs and structural framing will be provided at new openings for outside air intake.

Roof construction will meet ASHRAE 189.1. The total roof assembly will achieve a min R- 26.

BUILDING INTERIOR

General The interior of Building 51451 will be an office environment and appropriately designed to match the function of the space. Room finishes will be durable to accommodate low maintenance.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 17

UNCLASSIFIED // FOR OFFICIAL USE ONLY

Floor Construction The existing structural floor is slab on grade. The floor of the existing mechanical room is 16 inches below finish floor requiring it to be infilled with concrete to bring it level with the finish floor elevation.

Partitions Standard interior partitions will be gypsum wallboard over minimum 20-gauge metal stud framing at 16-inch on-center. Minimum thickness of wallboard will not be less than 5/8-inch and all gypsum board surfaces will be finished in accordance with GA 214 Level 4.

Standard interior partitions for toilet rooms receiving wall tile will be cement board over minimum 20-gauge metal stud framing at 16-inch on-center.

Interior partitions requiring an STC rating of 45 will be two layers of gypsum wallboard on one side and on layer of gypsum board on one side over minimum 20-gauge metal stud framing at 16-inch on-center. Minimum thickness of wallboard will not be less than 5/8-inch and all gypsum board surfaces will be finished in accordance with GA 214 Level 4.

Walls will be filled with 3” acoustical batt insulation.

Interior partitions requiring an STC rating of 45 for secure open storage will meet ICD/ICS 705 requirements. Construction will be two layers of gypsum wallboard on one side and on layer of gypsum board on one side over minimum 20-gauge metal stud framing at 16-inch on-center. Gypsum board will be 5/8-inch Type X and all gypsum board surfaces will be finished in accordance with GA 214 Level 4. Walls will be filled with 3” acoustical batt insulation.

Doors Interior doors for storage rooms and mechanical, electrical, and comms rooms will be painted, hollow metal in 16-gauge steel frames.

Interior doors for private offices, open office areas, and toilet rooms will be solid core wood in 16-gauge steel frames.

Interior doors and frames secure spaces requiring an STC of 45 will be steel and provided as tested assemblies. Doors will meet ICD/ICS 705 requirements.

All door hardware shall comply with ANSI/BHMA A156 and be in accordance with the UFC.

All locksets shall be coordinated with the facility grand master keying system.

Construction cores shall be used during the erection of the facility, and all final keys and cores will be turned over to the government for installation.

Windows The window between Observation Room 163 and Interview 159B will be special construction to accommodate function as a one-way mirror and have an STC of 53. Frame will be steel, with dual pane glazing and a large air gap between panes.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 18

UNCLASSIFIED // FOR OFFICIAL USE ONLY

FINISHES

Wall Finishes Occupied spaces will receive a painted wall finish with 4-inch rubber base. All paints and coatings shall comply with the VOC standards established in the Green Seal Standard-1993.

The following types of paint shall be used:

Alkyd Enamel: Interior door frames and metal items Latex Enamel: All other interior surfaces Flat Finish: Ceilings Satin Finish: Walls Semi-Gloss Finish: Doors and door frames

Toilet rooms will have floor to ceiling ceramic tile.

Floor Finish Carpet tile – Private offices, open office space, conference rooms.

Rubber tile – Entry, corridors, storage rooms, interior comms rooms.

Porcelain tile – Toilet rooms Sealed Concrete – Mechanical rooms, electrical rooms, demark rooms, janitor’s closet

Ceiling Finishes

Painted gypsum board ceilings will be provided in the toilet rooms. The mechanical, electrical, and comms rooms will be open to structure. All other spaces will receive a 2x2 acoustical lay-in grid ceiling.

Casework

All casework will be plastic laminate on particleboard cores. Cabinet interiors will be finished in white melamine. Counter tops will be solid surface.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 19

UNCLASSIFIED // FOR OFFICIAL USE ONLY

1.4 MECHANICAL NARRATIVE

CODES AND REFERENCES

A full analysis is to be completed by the design team complying with all applicable Federal, State, and local codes, regulations and design guidelines including, but not limited to the following:

Army Sustainable Design and Development (SDD) Policy

ASHRAE 55 – Thermal Environmental Conditions for Human Occupancy

ASHRAE 62.1 – Ventilation for Acceptable Indoor Air Quality

ASHRAE 90.1-2013 – Energy Standard for Buildings Except Low-Rise Residential Buildings

ASHRAE 189.1-2014 - Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings

ETL 98-4 – Building Manager Energy Conservation Handbook

Energy Policy Act of 2005 (EPAct 2005)

Energy Independence and Security Act of 2007, 19 Dec 2007 (EISA 2007)

Executive Order 13423 (as adopted in UFC 1-200-01 and UFC 3-410-01)

International Building Code (as adopted in UFC 1-200-01 and UFC 3-600-01)

International Plumbing Code (as adopted in UFC 1-200-01 and UFC 3-420-01)

International Mechanical Code (as adopted in UFC 1-200-01 and UFC 3-410-01)

UFC 1-200-01 – General Building Requirements

UFC 1-200-02 – High Performance and Sustainable Building Requirements

UFC 3-400-02 – Design: Engineering Weather Data

UFC 3-410-01 – Heating, Ventilating, and Air Conditioning Systems

UFC 3-410-02 – Direct Digital Control for HVAC and Other Building Control Systems

UFC 3-470-01 – Utility Monitoring and Control System (UMCS) Front End Integration

UFC 3-420-01 – Plumbing Systems

UFC 3-450-01 – Noise and Vibration Control

UFC 3-580-01 – Telecommunications Interior Infrastructure Planning and Design

UFC 4-010-01 – DoD Minimum Antiterrorism Standards for Buildings

UFC 4-010-05 – Sensitive Compartmented Information Facilities Planning, Design, and Construction

UFC 4-010-06 – Cybersecurity of Facility-Related Control Systems

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 20

UNCLASSIFIED // FOR OFFICIAL USE ONLY

IC Tech Specs for ICD/ICS 705, Version 1.4, September 28, 2017

OVERVIEW

The mechanical systems will be designed to support the mission of the end user and provide environmental comfort and ventilation to building occupants.

All ductwork penetrating secure wall will be designed per ICD/ICS 705. All ductwork penetrating secure boundaries will be provided with dielectric breaks, grounded and Man-bars where required. Access panels will be provided on the secure side for inspection.

Outdoor air intake locations will be provided a minimum of 10 feet above grade to satisfy code and ATFP requirements and to limit the quantity of contaminants that enter the building. Emergency switch (es), connected to the BAS, will be provided. Isolation controls will be provided for HVAC air systems in compliance with UFC 4-010-01, including ultra-low leakage shut off dampers in outdoor air, exhaust air, and relief air paths and an emergency control function to close them via emergency air distribution shutoff switch.

EXISTING CONDITIONS

Building 51450: Existing HVAC systems consists of hot water heating plant and swamp coolers for summer operation. Heating Plant consists of gas fired boiler, associated hot water pump(s) and standard thermostat controls.

Building 51451: Existing HVAC system consist of cooling plant with air cooled chiller with associated pump(s) and heating plant with gas boiler and associated pump(s). A multi zone Air Handling Unit with chilled water coil, hot water coil, supply and return fans with low pressure supply/return duct work is used to condition and ventilate buildings.

Existing gas service and water service enter the building by the mechanical rooms.

DEMOLITION

All existing HVAC systems shall be removed. Existing gas and water services shall be re-used and re-routed as required.

OUTDOOR DESIGN CONDITIONS

The outdoor design conditions are based on the 99% Heating Dry Bulb and 1% Cooling DB/WB ASHRAE Outdoor Design Criteria for Tuscon INTL, AR.

Summer Winter Function DB

(°F)

WB

(°F)

DB

(°F)

WB

(°F)

Source of Design Temperatures

General Conditions 103.6 65.7 34.4 -- 1% DB/MCWB -Cooling, 99% DB - Heating

Dehumidification 68.1 76.7 -- -- 1% DP/MCDB - Cooling Air-Cooled Condensers 108.6 -- -- -- 1% DB + 5 deg F

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 21

UNCLASSIFIED // FOR OFFICIAL USE ONLY

Table 1. Design Conditions

Location: 31.55 °N, 110.35 °W Elevation: 4898 feet Climate Zone: 3B

INDOOR DESIGN CONDITIONS

Target cooling and heating conditions for spaces are provided as indicated and for the following Design conditions:

Summer WinterRoom Type

DB (F) RH (%) DB (F)

Source of Design Temperatures Notes

Conference 78 50 68 UFC 3-410-01 2 Corridor 78 50 68 UFC 3-410-01 2 Mechanical/ Electrical Rm -- -- 55 UFC 3-410-01 1 Office 78 50 68 UFC 3-410-01 2 Restroom 78 50 68 UFC 3-410-01 2 Storage 78 50 68 UFC 3-410-01 2

Note 1: Mechanical Room is provided with heat only and general ventilation fan.

Note 2: All calculations are based on 75 deg. F indoor air dry bulb temperature with understanding that 78 deg. F is the upper space temperature limit.

Table 2. Indoor Design Conditions

All heating only spaces shall be maintained at 55 degrees F during unoccupied mode unless otherwise noted.

HVAC SYSTEMS

Proposed HVAC system for both buildings shall consist of Multi Zone VAV Packaged Roof Top Units delivering conditioned air thru low pressure primary supply duct, VAV Terminals with electric reheat and low pressure distribution duct work and diffusers and grilles.

All Packaged Roof Top units shall have variable volume supply fan(s) (either use of VFD`s or ECM`s), ECM condenser fans, inverter/VFD compressor(s), air economizer with low leakage motor operated dampers, MERV 8 + MERV-13 filters, VFD/ECM driven power exhaust/relief fans and high turn down ratio gas furnaces with full load and part load energy efficiencies exceeds ASHRAE 90.1-2016 requirements.

Minimum Ventilation air shall be pre-conditioned by an energy recovery Ventilator(s) (ERV`s) and shall be introduced to the multi Zone VAV RTU return duct. Energy Recovery Ventilator shall have polymer membrane energy core for heat transfer between exhaust air stream and outside air stream.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 22

UNCLASSIFIED // FOR OFFICIAL USE ONLY

The communication rooms will be served by split system DX units. Condensing Units shall be located on grade outside the building. Mechanical Rooms shall be provided with electric unit heaters.

Exhaust Systems:

Toilet exhaust, break rooms and janitor closet exhaust shall be provided by ERV`s exhaust fan.

Noise Control:

The building and mechanical systems will be designed in accordance with UFC 3-450-01, Noise and Vibration Control and ASHRAE guidelines. Acoustic attenuation between secure and non-secure areas will be designed in accordance with UFC 4-010-05 – Sensitive Compartmented Information Facilities Planning, Design, and Construction.

Automatic Temperature and Building Automatic Control System (BAS):

Electronic (DDC) microprocessor-based environment of direct digital control and monitoring for a building energy management system (UMCS) shall be provided. The BAS architecture will be based on a distributed processing system of microprocessor-based, fully intelligent, standalone controllers operating in a multi-tasking local area network with Niagara Framework with Fox and Lonworks open protocol communications capable of future integration into a base wide utility management and control system (UMCS) utilizing Niagara Frameworks with LonWorks protocol. A central portable operator’s control workstation, computer-based with color graphic command/control, software and programming necessary to provide enhanced systems management for energy management including time-of-day control, holiday/after-hours scheduling, start/stop time optimization, supply air reset, static pressure reset, air side economizer, demand-based CO2 ventilation monitoring and control, facilities management functions and preventative maintenance program. Interior and exterior lighting systems shall be controlled by local lighting controllers. Alarm interface shall include alarm monitoring / reporting for the new building’s Fire/life safety systems (Fire/Life Safety monitoring and reporting only), generator, and hot water heater and associated circulation pump. BAS shall further monitor all utility (sub) meters inclusive of electric, water, gas as well as lighting power sub meter(s), receptacle power sub meter(s), HVAC power sub meter(s), IT power sub meter(s) and service hot water heater sub meter. All Packaged Roof Top Units DDC controls shall be provided by the manufacturer.

(An) Emergency shutoff switch (es) is/are provided in accordance with UFC 4-010-01 in the HVAC control system. The switch immediately shuts down the air distribution system throughout the building except where interior pressure and airflow control more efficiently prevent the spread of airborne contaminants and/or ensure the safety of egress pathways.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 23

UNCLASSIFIED // FOR OFFICIAL USE ONLY

The shutoff switches are easily accessible by building occupants located similarly to manual fire alarm boxes in accordance with NFPA 72.

Fundamental and Enhanced Building Systems Commissioning:

The intent of the fundamental building systems commissioning process is to ensure activities compliance in accordance with latest version of ASHRAE 189.1 as determined by UFC 1-200- 02.

HVAC, Plumbing and Electrical (MEP) Systems Commissioning will ensure delivery to the Owner of MEP systems which are fully functioning in accordance with all specifications and which the Owner's personnel are fully trained and equipped to operate, maintain and troubleshoot.

Contractor will assist the independent Third-party commissioning agent in executing a Commissioning Program which delivers the intended results of an MEP System commissioning, using whatever personnel, time and resources are required to comply with project commissioning requirements.

UTILIZATION OF HIGH EFFICIENCY, ECONOMICAL SYSTEMS

Per the Army Sustainable Design and Development (SDD) Policy, the Executive Order 13423, and the Energy Policy Act of 2005, this project shall target minimum 30% less energy than the ASHRAE 90.1-2013 baseline building (EPAct calculation method).

The design is targeting a 32% energy reduction (excluding plug loads) in comparison to ASHRAE 90.1-2013 which is in compliance with the UFC. In order to achieve these targets, high efficiency systems and equipment shall be used.

NATURAL GAS SYSTEM AND PIPING

Natural gas service and meter are existing and located by the building mechanical room doors. New natural gas piping will be extended from the existing infrastructure to serve the new facility. Existing utility pressure regulator shall be removed and a new regulator with 2 psi gas distribution shall be installed. Each equipment- generator, Packaged Roof Top Unit and Domestic Water Heater- shall be provided with a local regulator to provide 10” w.c.

(DWH/RTU) and 14” w.c.(generator) downstream gas pressure. A new sub-meter, regulator and valve will be installed at the building. The meter will have local readout/trending and EMCS (BAS) interface for remote monitoring and trend logging. Gas pipes are sized per National Fuel Gas Code. Gas piping main distribution are schedule 40 black steel pipes with malleable screwed 175 psi fittings or schedule 40 black steel pipe with 175 psi weld fittings.

At Building 51451, a new natural gas regulator to provide 2 PSI pressure distribution shall be installed by the utility company.

USACE/RSFO UNCLASSIFIED // FOR OFFICIAL USE ONLY Page 24

UNCLASSIFIED // FOR OFFICIAL USE ONLY

1.5 PLUMBING NARRATIVE

CODES AND REFERENCES

The new plumbing systems will consist of all fixtures, potable cold and hot water piping and equipment, piping insulation, water heating equipment, sanitary waste and vent piping systems, and other specialty piping and equipment within 5 feet of the building. The Plumbing system will be provided in accordance with the most recent versions of the following below. In the event of a specification conflict, the most stringent will apply.

Unified Facilities Criteria 3-401-01 Mechanical Engineering

Unified Facilities Criteria 3-420-01 Plumbing Systems

Unified Facilities Criteria 1-200-02…

This is the start of the file's text. The full file is on GovTribe.