This document contains specifications for an audiovisual systems project and details of a related federal contract opportunity. The specifications outline requirements for a complete AV system for a facility, including hardware, software, installation, testing and training. Key components are digital signal processors, remote control systems, equipment racks, cabling infrastructure and security measures. The related federal contract is solicitation number W912DR21R0026 for maintenance and supply facilities at the SOCOM Humphreys Engineer Center in Alexandria, Virginia. No further details are provided on products or services required under the opportunity.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 27 41 00
AUDIOVISUAL SYSTEMS
02/20
PART 1 GENERAL
1.1 DEFINITIONS
1. ADA: Americans with Disabilities Act
2. AV: Audiovisual
3. Bid: Herein, used interchangeably with "proposal"
4. CATV: Central or Mastr Antenna Television (broadband)
5. DSP: Digital Signal Processor
6. IR: Infrared
7. NICL: Material and work which is NOT in Contract and for which the Installer in not reaponsible except as otherwise detailed herein.
8. The term "shall" is mandatory
9. The term "will" is informative
10.The term "should" be advisory
11.Term "provide" means furnish and install.
12. AV Consultant: Wiley|Wilson
13. Bidder: Qualified firm intending to tender a bid on the systems described herein
14. Owner:
15. Construction Manager (CM) ofr General Contractor (GC): The representative responsible for general building construction and onsite coordination between sub-contractors
1.2 RELATED DOCUMENTS
A. Division 1 - Applicable sections of Division 1 shall govern all work under this section.
B. Audiovisual (AV) System Drawings C. Telecommunications (T) Series Drawing D. Other Drawings:
1. Related Architectural Drawings; for reference only
2. Related Electrical Drawings; for referene only
1.3 SCOPE OF WORK
Provide the following in accordance with Specifications and Drawings:
Submittals delivered in a timely manner as described hereinafter.
Verification of dimensions and other conditions at project site. Review conduit system as shown in electrical section of building construction documents and, where applicable, as built conditions. Notify Consultant, Architect, GC, and EC within four weeks after award of contract of any deficiencies or inadequacies in conduit system design.
Detailed design of Digital Signal Processor system "maps," including remote- control accommodations.
Complete programming of audiovisual remote control system inclusive of graphical layout and source code programming
Power distribution within equipment racks including power connection to electrical outlets as described in electrical section of building construction documents.
Incidentals necessary for a complete working system.
Initial testing and adjustments, demonstration of system for approval, participation in acceptance tests, final adjustments as required.
Record Documents, "As-Built" drawings and Owner's Manual.
Training of operating personnel.
Notify appropriate parties of conflicts in a timely manner.
Work cooperatively with other trades to resolve conflicts.
1.4 SYSTEM DESCRIPTION
1.4.1 Design Intent
Provide a complete and functioning audiovisual (AV) system inclusive of all hardware, software and training to meet or exceed the performance features outlined in this document.
1.4.1.1 Design Standards
1. The Owner's goal is to have available a cohesive and fully functional system. Therefore, part of the development efforts for successfully implementing the AV systems should include:
a. Install the system in a manner that complies with AVIXA, BiCSi and ICIA cable routing standards. Route all audio, video, and control cabling elements in a subtle, unobtrusive manner to maintain the architectural and visual integrity of the building.
b. Except where plenum cable is used above finished ceilings, it is required that all cabling be routed inside the comprehensive system of conduit. Floor and wall boxes shall serve as the primary interface points to the AV system.
c. Provide and install cover plates, connectors, and associated cabling to link all floor and wall boxes to all affiliated local and remote AV components. No wiremold or surface-mounted raceway will be permitted. The AV contractor shall coordinate faceplate materials, colors, and finishes with the faceplates used by other trades on the project and the architect to match aesthetics.
d. Provide and install security covers on any electronics with front panel controls that should not need to be adjusted after initial set-up. All components permanently mounted to rack rail systems shall be installed with industry accepted security screws.
e. All ceiling mounted AV equipment shall be secured to building structure.
f. No more than thirty lamp hours shall be expired for projection system set-up at the time of final systems acceptance. Should more hours than this be expired, the AV contractor shall replace the lamp at no cost to the Owner.
g. Steel cable security systems and padlocks to secure structure shall be provided for all surface mount loudspeakers, document cameras, video cameras, flat panel displays, and projectors. All padlocks provided for security shall be keyed to a single master key.
h. Provide intellectual property release and install an editable version of all master source code for all digital signal processing, remote control or microprocessor-based systems included on this project to an owner furnished personal computer. Also provide a hardcopy on portable media.
i. Provide necessary audio, video, RGBHV, HDMI, DVI, USB, and control signal repeaters, extenders, and amplifiers for any run greater than 30 feet and as needed to maintain required signal levels for receipt at destination device. All audio lines shall be balanced at the source, prior to any cable pull longer than 20 feet. There are no exceptions.
j. Video camera locations shall receive AC power from associated equipment rack low voltage transformers within 60 feet.
k. For each input/output point of interface to the system, provide a suitable length patch cord for owner use for every signal type present.
Provide umbilical style cable management for any mobile solutions.
l. Provide all programming; inclusive of all modules, drivers compiled/uncompiled software, mobile projects and webpages as required for a fully functioning system.
2. Performance Standards: Unless restricted by the published specifications of a particular piece of equipment, or unless otherwise required, the following minimum performance standards shall be met by each system:
a. Analog Audio:
a.S/N (including crosstalk and hum): Min. 70 dB b.Total Harmonic Distortion: <1% c.Frequency Response: 20Hz to 20KHz
b. High Definition Multimedia Interface (HDMI):
TMDS Channel Pixel Clock 165MHz
Bandwidth for 1080p signals 4.46Gbps
EDID and CEC Version 1.3c
c. Performance Test Signal Paths: The signal paths for the above Performance Standards shall be as follows:
1. Audio: From any and all source inputs (for microphones, audiotape units, videotape units, etc.) through all audio processing, audio distribution amplifiers (ADA), mixers, switchers, codec, etc., to all electrical signal destinations.
2. Video: From all source inputs (for cameras, computers, videotape units, etc.) through all distribution amplifiers (VDA), processors, switchers, etc., to all signal destinations.
d. Remote Control Standards: As a minimum, the remote control system for each space shall be programmed to include the following:
1. Owner Logo on first page.
2. Automatic System Shutdown.
3. AM/ PM Clock Settings.
4. 50 % audio level default.
5. Automatic system shutdown after five (5) hours of inactivity.
6. Separate Program and Microphone Audio Level Control with mute function.
7. Volume/ Mute control for program and speech audio reinforcement on every screen.
8. Panel layout to include user screens, as well as, password protected technician pages.
9. Raise and lower projection screen when projection is powered on/ off respectively.
10. Assign room computer as default system source upon power up.
11. Activate a minimum of three (3) presets for each installed remote controllable video camera.
12. Provide remote control room management software and full licensing for each system on the project.
13. Full function control of all source components, display units, processing devices and switching electronics.
14. In sub-dividable spaces, provide both IR and closed contact partition sensor control, and automation of control system scenerios.
15. Provide "Are you sure?" page to follow System Off button to deter accidental system shutdown.
16. Touch panel page layouts shall be submitted for approval.
Prior to designing touch panel layouts, meet with the Owner and review existing control system standards on campus and determine a basis of design.
17. Follow-up programming and modifications as requested by the Owner shall be provided 6 months after system acceptance. Provide and install updated editable source code to the Owner following these updates. Provide a copy of editable source code on a portable medium (i.e. USB thumb drive). In the event, the touch panel / program code and or requested changes are not acceptable, Owner reserves the right to have the programmer of their choice complete the project at no additional cost to the Owner. Any and all additional costs incurred shall be covered by the winning bidder. The Contractor shall meet with the Owner during the construction process and agree on the additional system features that will be used by the Owner on the project.
18. In the event the remote control system programming becomes compromised during the warranty period, provide the necessary effort to make the system fully functional once again.
19. Provide all hardware, software and licensing for full Crestron Fusion support of all AV elements within the project.
1.5 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AUDIOVISUAL AND INTEGRATED EXPERIENCE ASSOCIATION (AVIXA)
AVIXA Latest Editions, standards for design and installation of audiovisual equipment and devices
BUILDING INDUSTRY CONSULTING SERVICES INTERNATIONAL
TDMM Thirteenth Edition, Telecommunications Distributions Methods Manual
ELECTRONIC INDUSTRIES ALLIANCE (EIA)
EIA/TIA 568-C Commercial Building Telecommunications Wiring Standard
EIA/TIA 569-B Commercial Building Standard for Telecommunications Pathways and Spaces
EIA/TIA 606A Administration Standard for the Telecommunications Infrastructure of Commerical Buildings
EIA/TIA 607A Commercial Building Grounding/Bonding Requirements
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 802.3 (2018) Ethernet
U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)
FCC Part 68 Connection of Terminal Equipment to the Telephone Network (47 CFR 68)
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout
INTERNATIONAL COMMUNICATIONS INDUSTRY ASSOCIATION
ICIA International Communications Industry
1.6 SUBMITTAL PROCEDURES
Comply with requirements of Section 01 33 00 - Submittal Procedures.
1.6.1 Submittal Data
Submittal data is to be submitted in a three ring binder, a continuous spiral binder, or plastic binding that allows the booklet to lie flat while open. Each booklet shall contain the below in the following order:
Cover Sheet: Include the name of supplying contractor and project name.
Detailed Bill of Materials: Include a listing of: component quantities, equipment manufacturers, model numbers, and description of each component being supplied, and the specification paragraph or drawing sheet that corresponds to the product. Failure to provide this information will result in the rejection of submittals.
Product Data: Include a catalog sheet per product of equipment listed in the Detailed Bill of Materials, in the exact order as the Detailed Bill of Materials. Each catalog sheet shall describe mechanical, electrical and functional equipment specifications. The catalog sheet must also include an and functional equipment specifications. The catalog sheet must also include an image of the product. Photocopy duplications of the manufacturer's original equipment catalog sheets will be allowed as long as they provide adequate clarity of both the printed word and graphics/pictures. If more than one product is shown on the catalog sheet the intended product must be denoted by either an arrow or highlight.
Authorized Distributor Certificate: Recently dated (within one year from submittal date) support letter from manufacturer stating that the supplying contractor is an Authorized Distributor of the product being supplied.
1.6.2 Submittal Format
Submit all materials for review as described above, specifically referenced to the Specification paragraph number (where applicable).
Submit all drawings on sheets of one size, preferably the project standard size. Where materials are presented on sheets 11" x 17" or smaller, organize into three-ring binder which include dividers or tabs between logical sections and project name and binder title labels on face and edge of binders. On submittal drawings, maintain 3/32" minimum lettering height. Submittals with text less than 1/16" in height may be rejected.
Partial Submittals may be rejected. If submitted individually and each in its entirety, the following Submittals shall not be considered partial:
Personnel, Milestones, Conduit Verification Statement Notifications, Rigging and Mounting Drawings and As-Built Documentation.
Product Data and Shop drawings must be submitted together in order to be reviewed.
1.6.3 User Interface
In order to develop a user interface which is both functional and useable, provide working "Beta" copies of system software for review and comment by the owner, architect and the AV consultant as per the below listed schedule
This is anticipated to be an interactive process, requiring at least three submittals prior to first beneficial use. At a minimum, the software development process will have the following milestones:
a. Initial concept Submittal for Review
b. First Beta Review
c. Second Beta Review
d. Final Implementation and On-Site Training: Prior to Final Acceptance
e. Follow-up programming review and updates; Timing (within sixty-days from final acceptance).
1.6.4 Weekly Reporting
Commencing with project award, provide weekly status reporting of milestone task status, anticipated completion date, and related memo notes for the following tasks: submittals, infrastructure verification, pre-wire status, equipment procurement, shop fabrication, remote control system design, installation and termination, field testing and pre-acceptance testing, final acceptance demonstrations, owner training, first owner use, open coordination items and questions.
See below for a partial example of an acceptable weekly reporting list.
Project:
Location: Date:
Project Manager: Delivered by:
Projected Completion:
Status: Notes:
Infrastructure Verfication:
Submittals:
Product Data Drawings
Personnel (etc.)
RFIs:
Installation Status by Space
Room Equipment
Name Number Pre-Wire Order Receive Install Test Notes
1.6.5 Personnel
Provide, in writing, within two weeks after award of Contract, the names, mailing address, phone numbers with extensions, email addresses and paging service numbers (if available) of the following project personnel: Project Manager, Lead Systems Engineer, Field Foreman and Remote Control System Programmer. Installing Contractor shall have both DMC-E and CTS-I certifications. Project engineer shall have CTS-D certification. AV System programmers must be Master certified at a minimum and have a minimum of 12 years programming professionally with preference to those with experience in higher education environments.
1.6.6 Conduit Verification
Within four weeks after award of Contract, submit statement confirming that Contractor has reviewed the conduit system as designed in building construction documents and, where applicable, as built. Notify Consultant, Owner, General Contractor, Architect or Electrical Contractor of deficiencies or inadequacies, if any, in conduit system design or installation. If none, so indicate. Absent conduit verification by Contractor and after installation of conduit as designed, Contractor shall assume costs of equipment, materials, labor and engineering, including services of owner's representative(s) in designing and/or verifying revised wiring approach(es) as relate to providing a fully functional system using conduit as designed or as revised at the discretion of the owner.
1.6.7 Rigging and Mounting Drawings
Submit full size drawings outlining mounting and installation details of all AV equipment requiring integration with cabinetry or architectural elements. Details, stamped and signed by an appropriately licensed engineer, of all equipment mounting methods and materials provided by the Scope of Work, wherein failure of method or materials used for mounting or hanging permanently installed equipment could result in serious personal injury.
Details provided by or requiring approval by licensed engineer may include: method of attachment to building structure or attachment and/or suspension points; method of attachment to supported equipment;
all suspension materials; a materials list including specifications of all suspension materials; calculations used to determine loads and strengths of suspension materials, other as deemed necessary by the engineer.
In the absence of submitted approved, stamped and signed mounting and hanging details, the Owner reserves the right to acquire such engineering approval at the expense of the Contractor. Owner will notify Contractor of such intent. Contractor shall remedy within two weeks or Owner may proceed without Contractor approval and without relieving Contractor from any other obligations set forth by Contract.
1.7 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.05 20 SUSTAINABILITY REPORTING FOR DESIGN-BUILD. Submit the following in accordance with Section 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Certificates of insurance; G
Surety bonds; G
List of proposed subcontractors; G
List of proposed products; G
Construction Progress Schedule; G
Schedule of prices; G
Health and safety plan; G
Work plan; G
Quality control plan; G
Environmental protection plan; G
SD-02 Shop Drawings
Shop Drawings; G
Prior to fabrication, submit contractor generated drawings for approval for all supplied systems. These drawings shall include, but are not limited to, the following:
a. Title Sheet & Symbols Legend
b. All panels, plates, and designation strips, including details relating to terminology, engraving, finish and color.
c. All equipment racks, cabinets, consoles, tables, carts, support bases, and shelves.
d. Schematic drawings (AV & Control Signal Flow), system functional block drawings, including those for audio and video subsystems. Resubmission of contract drawings is unacceptable.
e. All unusual equipment modifications.
f. Front mechanical drawings of each equipment rack.
g. Equipment location drawings.
h. Cable labeling plan.
i. Floor Plans, RCPs and Elevations: Show planned location for all elements and cable routing. Drawings should be at project standard scale and clearly legible.
j. EDID riser/EDID document plan
SD-03 Product Data
Product Data; G
SD-04 Samples
Samples; G
Color and finish samples of any furniture or lecterns.
Color Selection; G
Color options for all items as applicable. Wallplate finishes should be coordinated with the Architect.
SD-05 Design Data
Design Data; G
SD-06 Test Reports
Test Reports; G
Investigation reports; G
Daily checklists; G
Final acceptance test and operational test procedure; G
SD-07 Certificates
Confined space entry permits; G
SD-08 Manufacturer's Instructions
Material Safety Data; G
SD-09 Manufacturer's Field Reports
Factory test reports; G
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G
Equipment manufacturer's operation and service manuals for each make and model of equipment.
System Operation Manual. Produce a manual specifically for the subsystems detailed herein. The manual shall describe all procedures necessary to activate each system to provide for the functional requirements, except as specifically excluded by the Owner. This section shall provide a simple "How-to" users guide for the procedures needed to operate the system. This document shall contain a section on operating the systems equipment in the event of control system failure. Control system touch panel layouts shall be accompanied by narrative text describing "step-by-step" function engagement.
SD-11 Closeout Submittals
As-built Drawings; G
Include contractor generated (mark-up of contract documents is not acceptable) digital record diagrams for all systems including, but not limited to: Schematic wiring diagrams with cable markings, internal wiring diagrams of the equipment rack cabinets, custom equipment modifications and final test results and nominal settings for all adjustble controls
Password Summary Report; G
Software Passwords Schedule (i.e., a spreadsheet listing the manufacturer, model number and location in the Facility, of each piece of audio/video equipment, the software for which is password-protected).Provide to Owner's Representative as a secure document separate from Operating and Maintenance Manuals and As-Built Drawings.
Editable Control System Code; G
Provide the final control system code in an editable format. This must include all source code, both compiled and un compiled code, as well as all modules, including but not limited to any custom created modules, all IR and RS-232 drivers, web pages, mobile projects, touch panel files, etc.
Warranty; G
Provide list and dates of activation of equipment warranties. Provide original manufacturers' certificates.
Equipment Schedule; G
Provide, in Excel format, a schedule of all installed equipment.
This shall include the following: Manufacturer, Model, Quantity, Serial Number, Post-Construction Room Numbers, IP Address (when applicable) and GUI Program File Name (when applicable).
Laminated Signal Flow Diagrams; G
Provide 11 x 17 laminated signal flow diagrams for each room.
Install to the rear door of the rack/lectern of each system, or in an alternate accessible location as approved by the Owner.
Instruction cards, approved by the Owner. Laminate step-by-step instructions outlining system operations for each room that has an AV system. Provide editable file of card to Owner.
Laminated Instruction Cards; G
Provide 8 ½ x 11 Instruction cards, approved by the Owner.
Laminate step- by-step instructions outlining system operations for each room that has an AV system. Provide editable file of card to Owner.
1.8 BID PROPOSALS
1.8.1 Itemized Bid Response
Each piece of equipment shall be individually priced and submitted with Bid Proposals. Provide itemized bid response to include equipment description, manufacturer, model number, unit price, and quantity on a per room basis.
All equipment prices shall reflect required modifications and accessories as needed for a complete and functioning system. The bidders shall utilize the provided AV Bid Spreadsheet that lists each piece of equipment by space to submit along with their proposal for space by space pricing comparison.
Non-equipment charges shall be outlined separately as a single line item on a per room basis. A sum of the audiovisual system total cost shall be provided with the bid proposal.
1.8.2 Contractor Qualification
Demonstrate at least three (3) years of experience in the fabrication, programming, assembly, and installation of audiovisual presentation and remote control systems of similar magnitude and quality as specified for the subject job. Submit documentation to this effect with the bid response.
Be an authorized sales and service center for all listed components and offerings in this specification.
References: Furnish no less than three (3) references for installations of similar size (dollar amount & quantity of spaces receiving integrated technology) and scope, performed throughout the Trenton, NJ area within the past three (3) years. At a minimum, reference information will include the reference company or institute name, contact person's name and title, telephone number, address, and detailed project description, project manager's name, and contact information of the organization that is responsible for day-to-day operation of the audiovisual installation. Also, provide experience in the installation and implementation of Audiovisual systems.
AV Control system programmers must be Master certified at a minimum and have a minimum of 12 years programming professionally with preference to those with experience in higher education environments.
1.8.3 Alternate Proposals
1. Any proposed alternate equipment choices should be requested in writing by the contractor prior to the proposal submission for approval.
Each item on the alternate equipment list must be accompanied by catalog cut sheets and technical specifications.
2. Any and all submissions of alternate equipment will be the financial responsibility of the company that submitted. This includes but is not limited to laboratory testing, equipment demonstrations, etc. The Owner shall not incur any costs in these tests.
1.8.4 Non-Equipment Charges, including but not be limited to:
Engineering: Including all required design drawings, run sheets, instruction manuals, console layout, step-by-step user guide, etc.
Pre-Installation: Work performed on the Installer's premises including all fabrication, modification, assembly, rack wiring, etc.
Installation: Including all on-site installation and wiring, shop drawing, coordination and supervision, testing, checkout, Owner training, etc., performed on the Owner's premises.
General and Administrative: Including all shipping, insurance, and guarantees.
1.8.5 Owner Furnished Equipment (OFE, OFCI)
Identify any Owner Furnished Equipment assumed in the Bid Proposal to be installed and integrated under this contract. Identify all assumed Owner Furnished equipment within each room/space type that will be required to complete the AV systems installation.
1.8.6 State of the Art Development
Supply only the manufacturer's latest developed product. In cases where product development surpasses the criteria of the specification, inform the Architect and Owner; make the newer product available to the project at no additional cost. In no case shall discontinued or obsolete equipment be acceptable. The same requirement applies to software programs developed/updated during the warranty period.
Should a manufacturer discontinue a specified product, provide the manufacturer's recommended replacement at no additional cost to the owner.
Should the manufacturer have no direct replacement product, AV contractor shall propose a product of equal or greater specification from an alternate manufacturer at no additional cost to the owner.
Should a product recall by a specified manufacturer require temporary or permanent replacement of a product specified under this section, notify the Architect and Owner at the earliest possible time and arrange to replace the product in question as quickly as possible.
Equipment found defective or subject to recall prior to scheduled installation shall not be delivered to the jobsite. Equipment defect or intended recall shall not relieve the AV Contractor from any contractual obligations with regard to delivery schedule of product. Under no circumstances shall arrangement for alternate product require the Owner to accept superseded equipment except on a temporary basis.
1.8.7 Service Contract
Submit the costs for a one-year service contract, renewable for up to three years, which shall commence with the completion of the two-year warranty period. These contracts shall be fixed-cost, and can be accepted at the option of the Owner.
The service contract shall include all of the services provided during the warranty period, including complete replacement or repair of defective equipment.
1.9 QUALITY ASSURANCE
1.9.1 Coordination
Coordinate this Section with work of other Project Manual sections and associated trades. Specific references, herein, requiring coordination of certain work shall not obviate responsibility for other required coordination.
1.9.2 Standards and Codes
Comply with Local, state and federal codes, Applicable National Electrical Code, American National Standards Institute and Underwriters' Laboratories, Inc. standards.
All equipment, material, accessories, and loose items provided by Contractor shall be new and shall conform to applicable requirements of the above-mentioned agencies.
If required by local authorities, provide certificates and labels indicating compliance with above-mentioned codes and standards where applicable.
1.9.3 Point of Contact
Designate to the Owner in writing, the responsible person who shall ensure timely and consistent communication with the Owner on progress of the contract. The designated representative shall have full knowledge of all engineering and production procedures and shall report status of the installation and upcoming work plans to the Owner's Project Manager and Consultant on a weekly basis.
Project manager shall have successfully managed not less than two (2) projects of similar size and scope (as defined in previous sections). Bid submission shall detail the percentage of time that the project manager and other key personnel will be involved with the project.
1.10 DELIVERY, STORAGE, HANDLING AND STAGING
Supply, transport, deliver, unload, move to the installation location, unpack, place, assemble, secure, connect, and install all equipment needed to complete the installation. Be responsible for transportation, parking, delivery, and on-site storage of the system's equipment. Be responsible for all transportation of personnel to and from the site.
Reconfirm before delivery that hallways, stairways, passages, doorways, rooms, entries, elevators and foyers are of sufficient size to accommodate the passage and installation of the equipment and systems. Off-site pre-staging of goods is encouraged.
The Owner's acknowledgment of delivery of goods and any payment made on account of such delivery shall not constitute acceptance (partial or otherwise) and shall not diminish obligations as specified.
The actual dates of delivery shall be under the absolute control of the Owner. The dates and times for delivery/installation are critical to the successful completion of the project. Deliveries shall normally be accepted only Monday through Friday 7:30 a.m. to 3:30 p.m. In the event it becomes necessary for goods to be installed outside these hours comply with the instructions of the Owner. Deliveries attempted outside these hours without prior consent of the Owner may be turned away. Comply with all instructions of the Owner and the Contractor concerning time of arrival at the site;
which entrance shall be utilized for delivery; routes to be taken to reach the installation location; and other matters relating to the orderly and timely installation of the system.
Installation shall commence immediately upon delivery of materials to the jobsite, except as directed by Construction Manager. Time required from delivery date to completion of project shall be in accordance with the approved schedules.
1.11 SYSTEM TRAINING
Training: Provide training in the operation and maintenance of the system for personnel designated by the Owner. Record owner training sessions on DVD or other agreed upon media, and make training videos available to the owner at no charge. The training shall be organized as follows:
Two (2) two-hour training classes for system technical operation and maintenance. This class shall cover the following topics:
a. Review of signal flow diagrams.
b. Review of all equipment functions, relevant to the function in this system.
c. Review of initial equipment settings.
d. Demonstration of all functional connections from a user perspective.
e. Review & demonstration of replacement procedures for consumables (e.g., lamps).
f. Review of manufacturers' recommended routine maintenance procedures.
Two (2) two-hour training classes for system engineering concerns. This class shall cover the following topics:
a. Review of signal flow diagrams.
b. Review of all equipment functions, relevant to the installation.
c. Review of initial equipment settings.
d. Review of manufacturer's recommended routine maintenance procedures.
e. Review & demonstration of replacement procedures for consumables (e.g., lamps).
f. Review & demonstration of control system software replacement/upgrade procedures.
One (1) four-hour training classes addressing AV system operations. The classes will demonstrate and describe the following:
a. System set-up and operations.
b. Control system operation.
c. How to attach microphones, record AV signals, and control the sound system.
d. Videoconferencing operation & capabilities (if applicable).
e. Audio monitoring and ADA system operations.
f. Cable antenna television system (CATV).
1.12 WARRANTY
The system warranty shall be for twenty-four (24) months from the date of final acceptance. Provide all equipment, material, and labor required to uphold a full system warranty at no charge to the Owner. All manufacturers' equipment warranties shall be activated in the Owner's name and shall commence on the date of final acceptance. In the case of modified equipment, the manufacturer's warranty is normally voided. In such cases, provide the Owner with a warranty equivalent to that of the original manufacturer.
There shall be no cost to the Owner for maintenance performed during the warranty period beyond the fixed cost of the contract.
Coordinate and provide updates to the control system code & touch panel layouts based on owner feedback of desired functionality during warranty period.
Provide a total of two (2) one-day visits per year, or a total of sixteen
(16) engineering/ service labor hours to conduct preventive maintenance and the Owner directed system adjustments.
Each visit will include:
Cleaning optical lenses.
Checking and replacing projection lamps filters and indicators.
Conducting subjective and objective tests of the audio, video, and control systems of the installed audiovisual systems.
Repair and/or adjust any malfunctioning components located by the technician during this testing. Include control system programming updates and modifications as part of this service contract, providing an updated editable copy of the source code to the Owner.
Provide a service telephone number, staffed by a qualified technician familiar with the equipment installed. Staff this number during normal business hours.
Respond with an on-site technician within 24-hours of a service call for all equipment and system failures.
Replace or repair, at no cost to the owner, any failed equipment hardware or software installations required to provide full system operations.
During the warranty period, advise the Owner in writing each time any routine software and firmware updates become available, giving the Owner the opportunity to upgrade the software/hardware should they so desire at no additional cost. Provide any necessary system modifications after installation of these updates to maintain a fully functioning system.
Provide updates to firmware during service period. Provide any necessary system modifications after installation of these updates to maintain a fully functioning system.
PART 2 PRODUCTS
2.1 PRODUCTS AND MANUFACTURERS
Basis of Design Equipment: The equipment listed below shall serve as the baseline of product features, functionality, and performance. This list is intended to provide a standard of functionality and does not include all products required for a fully functional system. The Bidder is responsible for providing all supporting devices as required to provide the functionalities and performance specifications listed in this document.
All substitutions for these products shall be submitted for approval of the Owner. Acceptance of substitutions is at the sole discretion of the Owner.
1. Television and Projectors
a. No "smart" equipment will be accepted
b. HDMI ports
c. Refer to plans and schedules for additional requirements
Product: Televisions: TV1A, TV1B, TV1C, TV2A, TV2C, TV3B, TV3C, TV4B, TV4D.
Product: Projector: PROJ.
2. DVI 1 in by 2 out Distribution Amplifier
a. Up to 1080p Product: DA1.
3. HDMI 1 in by 4 out Distribution Amplifier
a. HDMI ports
b. Up to 4K
Product: DA2.
4. HD Television Tuner
a. Receives NTSC, ATSC and QAM cable
b. RS-232 and IR controllable
c. HDMI, RGBHV, component and composite video out
d. Dual analog audio outputs
e. Provide optional rack kit (2RU)
Product: TVA.
5. PoE Injector
a. 802.3af Compliant
b. PoE up to 100 meters
c. Provide for all PoE devices
6. Uninterruptible Power Supply
a. 120V, 500W
b. Minimum 10 minute run time
c. 2U Rack Mount
Product: UPS2.
7. 8X8 DigitalMedia Matrix Switch
a. Modular 8x8 input/output card digital matrix
b. Ethernet Controllable
c. HDCP and EDID compliant
d. 4 RU
e. Resolutions up to 4k
f. Provide Input/Output Cards per drawings
Product: AVSW.
8. Audio Amplifier
a. Two channel, 40 watts per channel
b. 2U Rack MOunt
Product: AMP1.
9. Room AV Controller
a. Control via CEC, RS-232, IR, or Ethernet
b. Provides 10/100 Ethernet and USB HID mouse/keyboard ports
Product: CP3.
10. Microphone to Dante transmitter
a. Minimum of two mic level inputs
b. Minimum two Dante outputs
11. AV Transmitter
a. One (1) HDMI Input; One (1) RJ-45 Output
b. Advanced EDID Management
c. HDCP compliant
d. 4k Capable
12. AV Receiver
a. One (1) RJ-45 INput; One (1) HDMI Output
b. HDMI and HDCP compliant
c. Provides EDID and HDCP key management
d. 4K Capable
13. 10.1" Control Touch Panel
a. TFT Active Matrix color LCD display 15:9 aspect ratio
b. Edge lit LED
c. Compatible with CP3 AV controller above.
d. Typically wall mount, but provide Tabletop Enclosure as necesary
Product: TS1, TS2.
14. Balance/Unbalance Converter
a. Provideif necessary to convert signal between KVM switch and Headpone Amplifier
b. One (1) Input; One (1) Output
15. Flush Mounted Ceiling Loudspeakers
a. 7.7" round speaker
b. White in color, or to match ceiling
c. 86dB@ 1W/1M
d. 30 watts program power handling
e. 150 degree nominal conical dispersion
Product: SPKR.
16. Pendant Mounted Ceiling Loudspeakers
a. 9.3" diameter speaker enclosure
b. Minimum 15' Stainless Steel cable for hanging speaker
c. 88dB@ 1W/1M, 70V
d. 100W continuus power.
Product: SPKR2.
17. Classification Sign
a. One line, minimum 32 character LED sign
b. RS-232 communications
c. Power adapter for 120V to usable voltage
Product: SS.
18. Headphone Amplifier, Headphones
a. One (1) Line in; Fuor (4) amplified outputs
b. Table top enclosure
c. Headphone with padded ear cups and wide frequency range
19. Network Switch
a. 24-port switch with integrated firewall
b. Meets Cybersecurity requirements
c. CAT 6 compatible
Product: ESW
20. Video Teleconferecing CODEC
a. Must be approved for classified networks
b. Camera video input and one microphone input
c. Two (2) HDMI inputs and two (2) HDMI Outputs.
d. Provide compaible shelf mount video camera
Product: VTC, CAM
21. Power Distribution Unit
a. Eight (8) switched outputs; One (1) unswitched output
b. Rack mount 1RU
Product: PDU
22. RS-232 Communications Server
a. One (1) input; eight (8) output
b. RJ-45 input, RS-232 serial ports
c. Rack mount, 1RU
Product: MS1
23. Ceiling microphone
a. Tri-element microphone
b. Ceiling mount pendant type
c. Junction box CAT 6 compatible
Product: MIC1
24. KVM Switch
a. Supports a minimum of four PC's
b. Provide keyboard, mouse, monitor, audio and USB
c. HDMI or DVI compatible video acceptable
Product: KVM1
25. Digital Signal Processor
a. Minimum 12 Mic/Line inputs and six (6) line outputs
b. Rack mount, 1RU
Product: DSP1
26. Digital Clock
a. Six (6) time zones
b. Two (2) lines, LED sign, first line for times and second line displays zone/city
c. USB connection to unclassified computer in space
Product: CK
27. Projection Screen
a. 120V Powered projection screen
b. Wall mount screen enclosure
c. 180" diagonal screen, 16:9 aspect ration Product: SCR2
28. Credenza frame
a. 12-RU (21"), 18" deep frame
b. Coordinate frame compatibilty with credenza installer
c. TIA, 19" rack
Product: CAB12
29. AV Cabinet
a. 91"H x 30"W x 42"D, 48 RU freestanding equipment cabinet
b. Provide split fan doors
c. TIA, 19" rack
Product: CAB48
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 General
All installation work shall be in accordance with, but not limited to, this specification and drawings. Work practices shall be performed in accordance with applicable standards, requirements, and recommendations of Federal and Local authorities having jurisdiction.
All discrepancies discovered and any discrepancies which are apparent at the date of submission of bids, shall be immediately corrected without additional charge to the Owner.
Clearly label all user controls for intended use and nominal setting. These labels shall be engraved and filled, or equal. Note: "Dymo" labels are not acceptable.
All equipment to be rack mounted shall be supplied with the appropriate rack mount kits.
Each rack enclosure shall have a single button on/off power distribution panel to include pull out lights and LED voltage indicator (Middle Atlantic PD-815R-PL) located in the first available rack unit.
All equipment racks to include removable, locking front doors and a 4" diameter, low-noise fan.
All rack and instructor stations shall include "security type" screws to secure rack- mounted components.
In rooms containing wireless microphones or assisted listening system, provide an antenna distribution system inclusive of remote antennas as needed to support transparent coverage throughout the space(s).
In rooms containing auto tracking camera systems, provide one (1) day of manufacturers set up and programming.
Provide a spare replacement lamp for each projector specified.
3.1.2 Physical Installation:
Provide system identification plate. Plate shall occupy the first available rack unit in all AV equipment racks. If more than two (2) racks are positioned together, one (1) plate for every two racks is acceptable. All equipment shall be firmly secured in place unless requirements of portability dictate otherwise. Unless granted specific permission by the Owner, install and secure all boxes, equipment, etc., plumb and square.
Fastenings, mounting brackets and supports shall be adequate to support their loads with a safety factor of at least five (5). A safety chain or cable will be tied to all equipment suspended from above.
In the installation of equipment and cable, consideration shall be given not only to operational efficiency, but also to overall aesthetic factors.
3.2 AUDIOVISUAL CABLE INSTALLATION
All cables, regardless of length, shall be marked with wraparound cable markers at both ends. There shall be no unmarked cables at any place in the system. Marking codes used on cables shall correspond to codes shown on "as-built" drawings and/or run sheets. The labeling and numbering system will be coordinated with the Owner.
Provide outdoor rated cabling for any cable that passes through an on-grade floorbox or is required to be under-grade.
All Category cabling for AV systems shall be 6A shielded, with orange IDC jacks.
All wired microphones shall include a 30ft. patch cable with heavy-duty jacket and XLR connectors.
Loudspeakers operating at 8 ohms shall be installed with 12AWG cable as a minimum size/ diameter.
Wall plate and floor box input/output panels shall be installed with audio/ video line drivers on runs exceeding 35ft.
All cabling shall be neatly strapped, dressed, and adequately supported.
Any exposed cabling shall be neatly enclosed in a protective covering.
All audio signal lines shall be balanced at AV I/O plates. Provide ninety
(90) degree connector adapters for all AV cabling at custom AV I/O plates.
All cables shall be grouped according to the signals being carried. In order to reduce signal contamination, separate groups shall be formed for the following cables:
Power cables
RGBHV, Video cables and Control cables
Data cables (when applicable)
Audio cables carrying low level signals
Audio cables carrying line and high level signals
Supply cables as required to meet system performance standards. Any cabling installed in walls or ceilings shall be plenum rated. All cables shall be cut to the length dictated by the run plus the required service loop to permit future equipment movement and relocation. For equipment mounted in drawers or on slides, the interconnecting cables shall be provided with a service loop of appropriate length.
No cable shall be installed with a bend radius less than that recommended by the cable manufacturer. Notify the construction manager in the event that a field condition interferes with the proper installation of any cables or equipment.
Grounding Procedures: In order to minimize problems resulting from improper grounding and to achieve maximum signal-to-noise ratios, the following grounding procedures shall be adhered to:
General: Because of the great number of possible variations in grounding systems, follow good engineering practice, as specified herein, and to deviate from these practices only when necessary to minimize crosstalk and to maximize signal-to- noise ratios in the audio, video, and control systems. Inform the Consultant in the event that there is a deviation from the standard grounding practices prior to actually performing the work.
System Ground: A single "system ground" shall be established for the system. All grounding conductors shall connect to this system ground.
The system ground shall be provided in the equipment rack, and shall consist of a copper bar of sufficient size to accommodate all secondary ground conductors.
A copper conductor, having a maximum of 0.1 Ohms total resistance, shall connect the system ground bar to the nearest grounded, metallic electrical conduit of at least 2 inches in diameter. Be responsible for determining if the metallic conduit is properly electrically bonded to the building ground system, and shall show the grounding path of a document that is provided with the system documentation.
Secondary system grounding conductors shall be provided from all ungrounded equipment in each area, to the primary system grounding point for the area. Each of these grounding conductors shall have a maximum of 0.1 Ohms total resistance.
Under no conditions shall the AC neutral conductor, either in the power panel or in a receptacle outlet, be used for a system ground.
Audio Cable Shields: All balanced audio cable shields shall be grounded at one point only. For ungrounded portable equipment, such as microphones, the shield shall be connected at both ends but grounded at only one end.
Video Receptacles: All video receptacles shall be insulated from the mounting panel, outlet box, or wire way.
Non-continuous cable supports
Audiovisual cables shall be supported AFC with adjustable non-continuous cable supports.
Non-continuous cable supports shall provide a bearing surface of sufficient width to comply with required bend radii of audiovisual cables.
Non-continuous cable supports shall have flared edges to prevent damage while installing cables.
Installation and configuration shall conform to the requirements of the current revision levels of ANSI/ EIA/TIA Standards 568 & 569, NFPA 70 (National Electrical Code), applicable local codes, and to the manufacturer's installation instructions.
Do not exceed load ratings specified by manufacturer.
Follow manufacturer's recommendations for allowable fill capacity for each size non-continuous cable support.
Non-continuous cable supports shall be J-hooks.
3.3 REPAIR/RESTORATION
Any damage to any installed work or product caused by the unpacking, transporting, assembly, connecting, or configuring of the product shall be repaired at no charge to the Owner.
3.4 FIELD QUALITY CONTROL
3.4.1 System Checkout
Once installed and the System Checkout is complete, the system shall be demonstrated as operational to the Owner.
1. If the AV system fails to meet the requirements of this document or those stated by the technical documentation, then the Owner shall reject the installed system and the contractor shall be given notice (either oral or in writing) to correct the failure.
2. If unable to overcome repeated performance deficiencies within thirty (30) days, and if requested to do so by the Owner, remove the equipment and replace at no expense to the Owner.
3. No warranties shall begin until the Owner has authorized final acceptance in writing.
4. Right to Revoke Acceptance: If any equipment and/or goods which have been previously accepted, specifically or by the making of payment, are found to have defects, damage, deficiencies, or fail to conform to the specification, for any cause not attributable to the Owner, the Owner may revoke acceptance.
3.4.2 Conduct pre-acceptance tests
Perform all system performance checks on the installed systems prior to final acceptance testing. The Owner / AV Consultant, may witness the pre-acceptance tests. The Owner / Architect may inspect and operate system components in order to evaluate installation progress and technical compliance prior to acceptance testing.
3.4.3 Contractor System Checkout
1. Perform system checkout before acceptance tests are scheduled.
Furnish all required test equipment. Perform all work necessary to determine and/or modify performance of the system to meet the requirements of this specification.
2. During performance testing, all equipment shall be operated under standard conditions as recommended by the manufacture.
3. Test all audio and video systems for compliance with the Performance Standards using test procedures that follow later in this specification.
4. Maintain documentation of all performance tests for reference by Consultant during the System Acceptance Tests.
5. At the conclusion of the tests, return all equipment settings to previously calibrated positions.
6. Provide written records of all test results in spreadsheet form.
7. Check all control functions, from all controlling devices to all controlled devices,…