This abstract of bids document summarizes six bids received in response to Solicitation Number W912DR21B0006 for the Dyke Marsh Wetlands Restoration & Stabilization Project Phase 2 North Sill Extension in Alexandria, Virginia. The Corps of Engineers is seeking continuation of construction of an armor stone sill to protect the shoreline by connecting to the existing sill and extending it northward along the coastline. Bids include costs for placement of marine mattresses from a barge as the foundation for the sill and placing large armor stone on top to build up the sill with spaces for windows, with tie-off to allow for future extension by the customer. The apparent low bidder is Coastal Design & Construction, Inc. at $1,847,145, followed by Actaeon, LLC at $1,971,415.41, and the government estimate is $2,764,215. This 100% small business set-aside procurement has a bid due date of October 5, 2021 and is being conducted by the Baltimore District of the Corps of Engineers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3. DATE OPENED PAGE
10/5/2021 1 of 4
4. ISSUING OFFICE Name and title of Certifying Official (Type) Gary Faykes - Contracting Officer I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed 5 October 2021 received in response to this solicitation.
Contracting Officer: GARY A. FAYKES
5. PROJECT TITLE
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F.)
A. HIRED LABOR
B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)
X C. REASONABLE CONTRACT C. Amendment Acknowledged (Including Profit)
7A. 7B. 7C. D. E. F. E. F. E. F.
ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED
No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT
0001 Reimbursement of Performance and Payment Bonds 1 JOB LS 30,837.06$ LS 61,750.00$ LS 24,800.00$
All costs in connection with mobilization and demobilization associated with the construction of the stone sill, complete as shown on drawings and as specified.
1 JOB LS 283,709.18$ LS 757,700.00$ LS 82,000.00$
All costs in connection with the construction of the entire length of the 12” marine mattress assemblies associated with the stone sill complete as shown on drawings and as specified.
1 JOB LS 1,341,111.11$ LS 1,460,700.00$ LS 1,401,000.00$
All costs in connection with the construction of the stone sill, from station 21+00 to 25+00 excluding stone window sills 1 and 2 (Base Bid Item 0005), complete as shown on drawings and as specified.
1,064 C.Y. 288.13$ 306,570.32$ 443.00$ 471,352.00$ 310.00$ 329,840.00$
All costs in connection with the construction of the stone window sill for windows 1 and 2, complete as shown on drawings and as specified.
11 C.Y. 280.62$ 3,086.82$ 310.00$ 3,410.00$ 257.00$ 2,827.00$
0006 All costs in connection with the construction of the stone endcap, complete as shown on drawings and as specified. 21 C.Y. 290.52$ 6,100.92$ 443.00$ 9,303.00$ 318.00$ 6,678.00$
TOTAL ESTIMATED BASE BID AMOUNT 1,971,415.41$ 2,764,215.00$ 1,847,145.00$
All costs in connection with the construction of the stone sill, from station 25+00 to station 29+00 excluding stone window sill 3 (Optional Bid Item 0008), complete as shown on drawings and as specified.
1,148 C.Y. 288.16$ 330,807.68$ 443.00$ 508,564.00$ 310.00$ 355,880.00$
All costs in connection with the construction of the stone window sill for window 3, complete as shown on drawings and as specified.
5 C.Y. 259.94$ 1,299.70$ 310.00$ 1,550.00$ 254.00$ 1,270.00$
All costs in connection with the construction of the stone sill, from station 29+00 to station 33+00 excluding stone window sills 4 and 5 (Optional Bid Item 0010), complete as shown on drawings and as specified.
1,131 C.Y. 288.15$ 325,897.65$ 443.00$ 501,033.00$ 310.00$ 350,610.00$
All costs in connection with the construction of the stone window sills for windows 4 and 5, complete as shown on drawings and as specified.
9 C.Y. 270.77$ 2,436.93$ 310.00$ 2,790.00$ 257.00$ 2,313.00$
All costs in connection with the construction of the stone sill, from station 33+00 to station 35+00 excluding stone window sill 6 (Optional Bid Item 0012), complete as shown on drawings and as specified.
589 C.Y. 288.02$ 169,643.78$ 443.00$ 260,927.00$ 310.00$ 182,590.00$
All costs in connection with the construction of the stone window sill for window 6, complete as shown on drawings and as specified.
5 C.Y. 259.94$ 1,299.70$ 310.00$ 1,550.00$ 257.00$ 1,285.00$
Yes
Bid Bond 20%
8/23/2021W912DR21B0006
Dyke Marsh Wetlands Restoration & Stabilization Project Phase 2 North Sill Extenson, Alexandria, VA
No. 1
BALTIMORE DISTRICT, CORPS OF ENIGNEERS
2 HOPKINS PLAZA
9. OFFERS
Bid Bond 20%
Coastal Design & Construction, Inc.
6364 Allmondsville Road
P.O. Box 650 Gloucester, VA 23061
Yes
6. NUMBER OF AMENDMENTS ISSUED: One (1) C. Amendment Acknowledged
Actaeon, LLC 4600 Powdermill Road, STE 450-C
Beltsville, MD 20705
No. 2
BALTIMORE, MD 21201
ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER
All costs in connection with the construction of the stone sill, from station 35+00 to station 38+20 excluding stone window sill 7 (Optional Bid Item 0014), complete as shown on drawings and as specified.
778 C.Y. 288.19$ 224,211.82$ 443.00$ 344,654.00$ 310.00$ 241,180.00$
All costs in connection with the construction of the stone window sill for window 7, complete as shown on drawings and as specified.
5 C.Y. 259.94$ 1,299.70$ 310.00$ 1,550.00$ 257.00$ 1,285.00$
TOTAL ESTIMATED BASE AND OPTIONAL BID
AMOUNT 3,028,312.37$ 4,386,833.00$ 2,983,558.00$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
1. SOLICITATION NUMBER PAGE
ABSTRACT OF OFFERS W912DR21B0006 3 of 4 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 Reimbursement of Performance and Payment Bonds 1 JOB LS 114,958.00$
All costs in connection with mobilization and demobilization associated with the construction of the stone sill, complete as shown on drawings and as specified.
1 JOB LS 947,171.00$
All costs in connection with the construction of the entire length of the 12” marine mattress assemblies associated with the stone sill complete as shown on drawings and as specified.
1 JOB LS 2,529,357.00$
All costs in connection with the construction of the stone sill, from station 21+00 to 25+00 excluding stone window sills 1 and 2 (Base Bid Item 0005), complete as shown on drawings and as specified.
1,064 C.Y. 383.66$ 408,214.24$
All costs in connection with the construction of the stone window sill for windows 1 and 2, complete as shown on drawings and as specified.
11 C.Y. 2,407.00$ 26,477.00$
0006 All costs in connection with the construction of the stone endcap, complete as shown on drawings and as specified. 21 C.Y. 2,517.00$ 52,857.00$
TOTAL ESTIMATED BASE BID AMOUNT 4,079,034.24$
All costs in connection with the construction of the stone sill, from station 25+00 to station 29+00 excluding stone window sill 3 (Optional Bid Item 0008), complete as shown on drawings and as specified.
1,148 C.Y. 423.62$ 486,315.76$
All costs in connection with the construction of the stone window sill for window 3, complete as shown on drawings and as specified.
5 C.Y. 3,332.00$ 16,660.00$
All costs in connection with the construction of the stone sill, from station 29+00 to station 33+00 excluding stone window sills 4 and 5 (Optional Bid Item 0010), complete as shown on drawings and as specified.
1,131 C.Y. 428.34$ 484,452.54$
All costs in connection with the construction of the stone window sills for windows 4 and 5, complete as shown on drawings and as specified.
9 C.Y. 3,135.00$ 28,215.00$
OFFERS (Continued)
Bid Bond 20%
Phase 2 North Sill Extenson, Alexandria, VA Dyke Marsh Wetlands Restoration & Stabilization Project
Yes
No.6No. 3 No. 4
Copper River Infrastructure Services, LLC 1577 C Street #300
Anchorage, AK 99501
No. 5
All costs in connection with the construction of the stone sill, from station 33+00 to station 35+00 excluding stone window sill 6 (Optional Bid Item 0012), complete as shown on drawings and as specified.
589 C.Y. 447.22$ 263,412.58$
All costs in connection with the construction of the stone window sill for window 6, complete as shown on drawings and as specified.
5 C.Y. 5,067.00$ 25,335.00$
All costs in connection with the construction of the stone sill, from station 35+00 to station 38+20 excluding stone window sill 7 (Optional Bid Item 0014), complete as shown on drawings and as specified.
778 C.Y. 528.64$ 411,281.92$
All costs in connection with the construction of the stone window sill for window 7, complete as shown on drawings and as specified.
5 C.Y. 6,378.00$ 31,890.00$
TOTAL ESTIMATED BASE AND OPTIONAL BID
AMOUNT 5,826,597.04$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236- OPTIONAL FORM 1419 (11-88)