This document provides responses to inquiries received in relation to solicitation number W912DR20R0005 for the Pentagon Control Tower and Day Station project. The U.S. Army Corps of Engineers, Baltimore District is seeking proposals for design-build services to construct a new control tower and day station facility at the Pentagon in Arlington, Virginia. Key details include: responses were provided to clarify the design-build experience requirements, with design completion required at 100% and construction at 50%; the construction completion date criteria was extended from six to seven years; electronic proposal submission through the DoD SAFE system was instituted in replacement of hard copy submissions; minimum project size, value, and age requirements remained as stated in the original solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Pentagon Control Tower and Day Station, newest first.
File Type Posted
B.08.03_Amendment 0001 W912DR20R0005.pdf PDF
B.08.02_W912DR-20-R-0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PENTAGON CONTROL TOWER AND FIRE DAY STATION

The purpose of this amendment is to provide:

a. Responses to inquiries received during the Request for Information period.

b. Updated submission instructions to account for electonic-only submission of proposals.

1. CONTRACT ID CODE PAGE OF PAGES

1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR20R0005

X 9B. DATED (SEE ITEM 11)

12-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-May-2020

CODE

USACE BALTIMORE

2 HOPKINS PLAZA

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR20R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

REQUEST FOR INFORMATION

RESPONSES TO INQUIRIES RECEIVED DURING REQUEST FOR INFORMATION (RFI) PERIOD

PROVIDED AT END OF AMENDMENT 0002

UPDATED SUBMISSION INSTRUCTION

SOLICITATION:

1) Section 00 20 00 - Instructions for Procurement, Instruction To Offerors, Paragraph 3b, Submission of Proposals: Delete paragraph “Hand Carried and Mailed Proposal” in its entirety and substitute the following:

“b. Submit All Phases of Proposals Electronically Through the Safe Site (https://safe.apps.mil): Submission shall be in a searchable Adobe PDF format. If a large number of files will be sent it is recommend that that they be combined or made into ZIP files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Request for Upload Code: Offerors must email Contract Specialist Michael Getz at michael.j.getz@usace.army.mil no later than five (5) working days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site.

Offerors that fail to email for a request code five (5) working days before proposal submission date may not be able to receive a request code in time to upload their submission. THIS MUST BE DONE FOR BOTH PHASES OF THE PROCUREMENT.

File Description: Include a “File Description” for each file(s) uploaded. The “File Description” will be included in the email notice to the recipient Offerors choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)

Submission shall be in Adobe PDF format.

Instructions to Follow On the Safe Website:

1. After requesting a drop-off code from the Contract Specialist Offerors will receive an email with a link to the SAFE site. Follow the link provided.

2. The link will take you directly to the required drop-off page.

3. Add proposal files via this page. Include a “File Description” for each uploaded file(s).

4. When completing file information for transmittal via the SAFE website, Offerors will be required to enter the email address for the recipient. For this solicitation, the recipient is the Contract Specialist. The Contract Specialist for this solicitation is michael.j.getz@usace.army.mil. The E-Mail address of the Government Employee who initiated the request code will be automatically entered. The Proposer must enter the E- Mail address for the Contract Specialist After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipient you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Even if Offerors successfully upload the proposal to the SAFE site, notification will not be sent to the government recipient until Offerors verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. A Proposer can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.

Receipt of Submissions: For the purposes of establishing whether a proposal submission is considered timely, the government considers the date and time the submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases. The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.”

GENERAL:

2) Offerors’ Requests for Information (RFI’s) and Government Responses: Offerors’ Requests for Information (RFI’s) and Government Responses are attached for information only.

(End of Summary of Changes)

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: Pentagon - Control Tower/Day Station, Arlington, VA Review: W912DR20B0005 (00001) (sorted by CommentID ) Displaying 14 inquiries.

Id Discipline Sheet Detail Spec 8458349 Engineering Support N/A N/A N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Would an engineering sub-consultant be precluded from teaming if they worked on the feasibility study?

On: Mar 18 2020.

Government Response. . Organization Conflicts of Interest are analyzed on a case by case basis. In general, we do not consider it unequal access to information, when the information is not competitively useful because it is more than five years old. On: May 01 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8460369 Contracting RFP section 2.1.1.

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

It is requested that USACE increase the construction completion date age-out clause from 6 years to 7 years. This will align with other recent USACE acquisitions, which have provided for between 7 - 10 year age-out limits for relevant projects.

On: Mar 19 2020.

Government Response. . The request to change the construction completion date from six (6) to seven

(7) years has been approved. The following sentence has been revised in Section 2.1.1. EXPERIENCE IN RELEVANT PROJECTS - "All projects must have a construction completion date no earlier than seven (7) years preceding the original date of issuance of this solicitation. Projects that have a Beneficial Occupancy Date (BOD) within the same date range will also be considered." On: Mar 24 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8479664 Contracting Amendment 1 Proposal Due Date Extension

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In light of current COVID-19 guidelines and best practices, would the government consider postponing submission of the Phase 1 proposal, or amending the RFP to allow for electronic delivery in lieu of hard copies?

On: Mar 30 2020.

Government Response. . We are considering an alternative to submitting the proposals by using the DoD Secure Access File Exchange (DoD SAFE) (https://safe.apps.mil/). Any change will be issued via amendment. On: Apr 06 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8479668 Contracting Amendment 1 Proposal Due Date Extension

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In light of current COVID-19 guidelines and best practices, would the government consider postponing submission of the Phase 1 proposal, or amending the RFP to allow for electronic delivery in lieu of hard copies?

On: Mar 30 2020.

Government Response. . We will be using the DoD SAFE site for the delivery of proposals.

https://safe.apps.mil/. Details will be provided via amendment. On: Apr 22 2020 Current Request Status: Request Closed

Page 1 of 4ProjNet: Logged In User

5/1/2020https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll...

Information for this report is procurement sensitive.

8482300 Contracting RFP Section 2.1.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Experience in relevant projects require all submitted projects as design-build. Please consider relevant projects other than design-build, and stipulate at least one project must be design-build.

On: Mar 31 2020.

Government Response. . Design Build experience must be demonstrated. On: May 01 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8483278 Contracting RFP Section 2.1.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

For projects demonstrating past experience from the Designer, please allow submission of projects that are 100% design complete and are any level (from 0% to 100%) of construction complete. Please eliminate requirement that projects from the Designer must be at least 75% construction complete.

On: Mar 31 2020.

Government Response. . Design must be 100% complete and project must be at least 50% complete on construction. On: May 01 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8495229 Other RFP Section 1.4 Comment Classification: UNCLASSIFIED (U)

For larger and more detailed graphics, such as an Org Chart, a smaller type size can reduce visual density and clutter. Would the Government consider setting a minimum of ten (10) point type size for graphics?

On: Apr 07 2020.

Government Response. . Organization chart must be legible. On: May 01 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8495233 Other RFP Section 2.1 Comment Classification: UNCLASSIFIED (U)

RFP 2.1

In reference to RFP Section 2.1, it states "The submitted material MUST be organized sequentially under tabs for each numbered section to facilitate evaluation."

Does the requirement to provide tabs in Volume I for "each numbered section" extend to the numbered subsections at the fourth (4th) outline level (1. Volume - 2. Factor - 3. Section - 4. Subsection)? Please clarify.

On: Apr 07 2020.

Government Response. . Tabs must separate the factors and numbered sections of the requirement. The Offeror may utilize subsection tabs as it sees fit. Tabs are also not counted in the page count. On: May 01 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8495300 Other RFQ Section 2, page 8 Comment Classification: UNCLASSIFIED (U)

Reference is made to Section 2, page 8 of the RFQ, where the following paragraph states, "In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this solicitation, the prime contractor must have completed at least fifty percent (50%) of the total number of projects that meet the requirements for Factor 1 for consideration in response to the experience requirements of this solicitation."

Page 2 of 4ProjNet: Logged In User

Does this formula apply to prime contractor and proposed designer experience as well? For example, if the prime contractor submits two relevant projects, is the designer experience capped at a maximum of two projects?

On: Apr 07 2020.

Government Response. . As this is a design-build requirement, the Prime and designer are seen as a team. The Prime/subcontractor requirement identified in the question does not apply to the Prime-Designer team. The designer is required to submit as least one project per the requirement; however, the designer experience must not exceed the Prime Offeror's experience. On: May 01 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8497229 Design Team Leader 38 Specifications and Drawings for Construction 52.236-21

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

My company specializes in Air Traffic Control Consoles and Mission Critical Environment Consoles. I'd like to find out how I can get our company on a list of regular console providers for ATC projects.

On: Apr 08 2020.

Government Response. . USACE does not maintain a listing. On: May 01 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8508398 Construction Management page 9 of B.08.02_W912DR- 20-R-0005

2.1.1 Experience in

Relevant Projects

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

For relevant projects, would USACE consider lowering the minimum completion value to $6M? Our team has successfully completed several significant design-build projects at the Pentagon that are in the $5-10M range

On: Apr 13 2020.

Government Response. . No. This requirement shall remain as posted in the solicitation. On: May 01 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8508409 Construction Management page 9 of B.08.02_W912DR- 20-R-0005

2.1.1 Experience in

Relevant Projects

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

For relevant projects, would USACE consider extending the construction completion date to no earlier than 10 years preceding issue of RFP? This RFP is requiring specialized experience and our team has several projects that can be considered if the completion date is extended.

On: Apr 13 2020.

Government Response. . No. This requirement shall remain as posted in the solicitation. On: May 01 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8508410 Construction Management page 9 of B.08.02_W912DR- 20-R-0005

2.1.1 Experience in

Relevant Projects

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

For relevant projects, would USACE consider lowering the minimum project size of 8,600 SF? We have successfully completed several significant design-build projects at the Pentagon that are in the 1-5,000 SF range.

On: Apr 13 2020.

Government Response. . No. This requirement shall remain as posted in the solicitation. On: May 01 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Page 3 of 4ProjNet: Logged In User

8518636 Contracting spec spec spec Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Because of the existing COVID-19 circumstances, is the Offeror still expected to send hard copies of their proposal submission?

On: Apr 17 2020.

Government Response. . Hard copies will not be required for Phase I submission. Electronic submission details will be provided via amendment. On: Apr 17 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.