SEE ADDENDUM

(No Collect Calls)

W912DR20Q0001 30-Oct-2019

b. TELEPHONE NUMBER

410-962-4978

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 18 Nov 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912DR9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

AISHA R BOYKIN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U.S ARMY CORPS OF ENGINEERS

2 HOPKINS PLACE 03-B-07

BALTIMORE MD 21201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 410-962-0175 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$15,000,000

NAICS:

238910

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF46

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 30 - BLOCK 14 CONTINUATION PAGE

INSTRUCTION TO OFFERORS

Please see block 8. Any questions concerning this solicitation must be submit Request for Information (RFIs) by e-mail only to aisha.r.boykin@usace.army.mil no later than 12 November 2019 at 11:00 AM (EST).

Quotes can be submitted via e-mail to Aisha Boykin, Purchasing Agent at e-mail aisha.r.boykin@usace.army.mil, Contracting Division, Services and Supplies Branch.

Site visits must be conducted prior to the submission of quote. The site visit will be held on 06 November 2019 at 1100 am (EST). Please meet at the PA Fish and Boat Access Parking lot off of State Route 171, 4.1 miles north of Forest City, PA.

The point of contact for the site vist is Jeff Meadows at 570-213-2264.

By submission of a quote, the Offeror acknowledges the requirement that prospective awardee must have an active registration in the SAM database prior to award, during performance, and through final payment of any contract resulting from this proposal.

Lack of active registration in the SAM database will make an Offeror ineligible for award. Offerors and contractors may obtain information on registration and annual confirmation requirements by calling 1-888-227-2423, or at: http://www.sam.gov.

Interested Offeror’s shall submit the required technical documents, past performance information and complete the price schedule as stated below in the “Evaluation and Basis of Award.” All line items must be priced. Quotes providing partial pricing shall be considered non-responsive.

EVALUATION CRITERIA:

A. TECHNICAL:

The offer will be evaluated to ensure all the items below are provided:

Technical Requirements: This information consists of the Offeror’s intended approach to executing the contract.

1. Equipment plan: The proposed equipment list should only include the equipment which will be used on this contract. Equipment listed should be identified for use on roadways. Include size, make, model, and ownership (owned or rented) of equipment.

2. Capabilities plan: The proposed capabilities should include adequate documentation to illustrate the Offeror’s capabilities to successful complete the work identified within the solicitation.

The Government will check Offeror’s equipment, staffing and capabilities plans for each project for completeness and reasonableness. A complete and reasonable equipment, staffing and capabilities plan will receive an Acceptable rating. Incomplete or unreasonable plans will receive a rating of Unacceptable. Government will evaluate the clarity and strength of the overall organization and how well it is organized and structured to execute the entire scope of work. The Government will evaluate the capability of the firm to execute the project. The Government will evaluate the Contractor’s resources to determine if it has the capability to self-perform the required amount of the project, in accordance with public policy to assure adequate interest in and supervision of all work.

The following ratings will be assigned to each Offeror’s Technical Submission:

Technical Submission Rating Definition

TECHNICAL RATING DEFINITION

ACCEPTABLE Offeror meets the minimum requirements of the solicitation.

UNACCEPTABLE Offeror does not clearly meet the minimum requirements of the solicitation.

B. PAST PERFORMANCE:

Technical Requirements: The Offeror shall demonstrate recent, relevant experience on similar projects. If the Offeror is a joint venture, each firm shall demonstrate experience.

Submit at least 2 detailed examples of relevant work that are currently well underway or performed within the past 5 years. Work experience shall be demonstrated for at least 5 years.

1. Evaluation Criteria: The Government will evaluate how well the Offeror demonstrated their recent (within three years of the issue date of the RFQ), relevant experience with similar projects. If the Offeror is a joint venture, each entity must demonstrate qualifying experience comparable to its role on the project. The Government reserves the right to verify the experience record of cited projects or other recent projects or to interview owners or references. The Government reserves the right to check any or all cited references to verify supplied information. A rating of Unacceptable will be given to an Offeror who cannot demonstrate a history of recent, relevant experience. The Government will consider extent of recent experience, degree of relevance of such experience to this project, demonstrated familiarity with similar sites and local conditions. Some examples of relevancy to this project may include, but not be limited to: (1) Number, size, type work, location; (2) Dates (completion within last 3 years); and (3) Firm's role and extent of work self-performed (subcontracting out all work is an examples of less relevant experience).

2. The past performance questionnaire (form PPQ-0) contained herein must be provided to two references. The references need to complete and submit the questionnaire directly to Aisha Boykin via email at aisha.r.boykin@usace.army.mil.

The following ratings will be assigned to each Offeror’s Past Performance Submission:

Past Performance Rating Definition

PAST PERFORMANCE RATING DEFINITION

ACCEPTABLE Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

UNACCEPTABLE Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.

NEUTRAL No past performance or reference information submitted.

C. PRICE

Bid schedule must be filled out completely. Government template provided. All line items must be priced. Quotes providing partial pricing shall be considered non-responsive.

Pricing will be evaluated in accordance with FAR 15.402. The government may require additional pricing information to assist in determining the extent to which the price is fair and reasonableness and the pricing information shall be provide if requested. The Government will evaluate quotes for award purposes by adding the total of all CLIN prices to ensure that pricing is not unbalanced. Offeror must complete all line items to be considered for award. This submission item is not rated. Award will be made for the lowest-price, technically acceptable offer.

USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1- 4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: Past performance refers to the quality of recent project experience from the customer’s perspective. The Offeror shall arrange for the reference customer point of contact for three projects to fill out the Questionnaire and return directly to Aisha Boykin, Purchasing Agent, e-mail at aisha.r.boykin@usace.army.mil. The questionnaires must be forwarded directly by the references. Ensure the reference is clearly marked for the applicable Offeror when submitted. The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments.

Two References from previously completed jobs must be submitted and include a point of contact and phone numbers. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as bridge demolition services. References must be recent within the past 5 years.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract Rating will be neither positive nor negative.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

TO BE COMPLETED BY CLIENT

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E

VG

S

M

U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced E VG S M U N

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back- up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes

No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

PRICE SCHEDULE

STILLWATER LAKE

FOREST CITY, PENNSYLVANIA

BRIDGE DEMOLITION

PRICE SCHEDULE

The Contractor, as an Independent Contractor and not as an agent of the Government, shall furnish all labor, supervision, materials, equipment and supplies to perform work in accordance with the specifications of the Statement of Work.

CLIN DESCRIPTION UNIT OF MEASURE AMOUNT

0001 Bridge Demolition Lump Sum

Offeror’s must quote on all line items. Failure to quote on all line items may be cause for rejection of the proposal.

STATEMENT OF WORK

STILLWATER DAM

FOREST CITY, PENNSYLVANIA

BRIDGE DEMOLITION

STATEMENT OF WORK

Statement of Work: The US Army Corps of Engineers at Stillwater Dam in Forest City, Pennsylvania requires bridge demolition of an out of Service Bridge. The Contractor shall provide all labor, supervision, materials, equipment, and supplies to complete the following:

1. Summary: Demolish and remove the deck, parapets, and girders of an existing road bridge over the East Branch Lackawanna River at Stillwater Lake near Forest City, PA

2. Location and Access: The abandoned concrete road leading to the bridge parallels State Route 171. The primary route of access is from the north (See attached Figure 1) near the boat launch parking area. An alternate route from the south is available. However, the alternate route may require minor roadway improvements and consists of tight turns not suitable for large equipment.

3. Structure: The Bridge is a two-span structure. The deck of each span is 34’-4” long on an approximately 47 degree skew and 26’-4” wide. The deck is covered by a 1.5” asphalt overlay. The reinforced concrete rails are 35” high. An unknown quantity of 2’ tall reinforced concrete beams support the deck. The clearance between the bridge and the water is between 2’ and 3’ at normal pool elevation. See attached Photographs for pictures of the structure.

4. Demolition: The bridge deck, rails, and beams shall be removed by any means excluding explosive demolition. The abutments and mid-stream pier may remain. No continuous path of travel shall remain across the river. The demolition spoils shall be placed at the north and south ends of the roadway as a barrier to travel. If possible to remove the beams intact, they may be placed transversely across the roadway as a barrier. Rebar protruding from concrete must be cut off flush with the concrete and disposed of off-site; all rebar encapsulated by concrete may remain. The water depth at the bridge is around 5’ to 8’ deep. To prevent restricting the river flow, accumulations of concrete in the water will not be allowed.

DELIVERABLES

1. Pre-Work Submittals - A paper or digital copy of the following shall be submitted within 10 days of award to the COR:

A. Accident Prevention Plan B. Activity Hazard Analysis C. Work Plan

2. Post-Work Submittals: A paper or digital copy of the following shall be submitted within

15 days of work completion to the COR: Daily Construction Quality Control Reports.

SPECIAL CONDITIONS

1. Period of Performance: Work shall commence no later than 15 days from award and be completed within 30 days. The start date will be coordinated with Head Dam Operator, Mr. Joe Chernesky.

2. Performance of Work: The Contractor shall perform work only during normal Corps of

Engineers duty hours (7:00 a.m. to 3:30 p.m., Monday through Friday, excluding national holidays). Exceptions to this condition must be coordinated with and approved in advance by the Operations Manager, Susquehanna River Project.

3. Accident Prevention: In performing this contract the Contractor shall comply with all current Federal, State, and Local safety regulations, including Corps of Engineers Safety and Health Requirement Manual EM 385-1-1 and shall comply with any subsequent changes.

Information regarding acquiring the Corps of Engineers Safety and Health Requirement Manual EM 385-1-1 may be found on the USACE Headquarters website at http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx Prior to commencement of work under this contract the Contractor shall furnish to the Government an Accident Prevention Plan in accordance with Section I, Article 01.A.12 of the EM 385-1-1, dated 30 November 2014.

4. Accident Reporting: In the event of an accident or injury involving contractor personnel or equipment in performance of work, the Contractor shall immediately notify the Government representative by the most expedient means feasible. The Contractor shall complete forms furnished and/or provide a written description of the incident within 24 hours of notification to do so.

5. Operations and Storage Areas: The Contractor shall confine all operations (including storage of materials) to areas authorized or approved by the Construction Control Representative. The Contractor shall hold and save the Government, its officers, and agents free and harmless from liability of any nature occasioned by the Contractor’s performance.

6. Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures

(provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

7. Escorting: All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

8. Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

9. Housekeeping: The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work site and premises, any rubbish, tools, equipment, and materials that are not property of the Government. Upon completing the work the Contractor shall restore the work area to the original condition, to be approved by the Contracting Officer.

10. Environmental Protection: The Contractor is required to comply with all Federal, State, and

Local environmental regulations.

11. Permits and Licenses: The Contractor shall, at his/her own expense, obtain any license or permits required to perform the contract. The Contractor shall comply with all Federal, State, and Local laws and regulations and shall comply with any subsequent changes.

12. Records and Reports: In addition to the administrative requirements dictated elsewhere in this contract, the Contractor shall complete a Daily Construction Quality Control Report form to maintain record of contract performance, accident/injury incidence, and observance of project deficiencies. Forms will be distributed at pre-work conference.

13. Superintendent: The Contractor shall act as or provide a Superintendent who acts as a quality control manager whenever the work specified herein is being performed. The Superintendent shall conduct overall management coordination and be the central point of contact with the Government for performance of all work under this contract. The Superintendent and any individual designated to act for him/her shall have full authority to contractually commit the Contractor for prompt action on matters pertaining to the administration of the entire contract. Such authorization shall be submitted in writing to the Government representative. The Superintendent shall deal directly with the Government representative for normal day-to-day administration of the contract provisions. The Superintendent will be required to attend pre-work conference(s) prior to commencing work under this contract.

14. Project Operation: Stillwater Lake is a flood control project and the Contractor’s access to the work area and the execution of the requirements specified herein shall not significantly interfere with the daily operations of the projects or employees. The site of the work is subject to periodic flooding. The Contractor shall consider the potential for high levels in the scheduling of this contract. A specific program shall be established by the Contractor to evacuate personnel, equipment, and materials as necessary in the event of high water. It is the responsibility of the Contractor to coordinate all work with Mr. Chernesky.

INVOICES AND PAYMENT

15. Invoices: The Contractor shall submit itemized invoices no sooner than 5 days from the completion of the contract activity and no later than 15 days from the completion of the total contract activity. The invoice shall accurately reflect work completed. Each invoice at a minimum shall contain the following information:

Contractor name and address, exactly as it appears on the contract Contract number Date of invoice submission Invoice or Call Order number Invoice total

16. Corrections: Incorrect invoices will be returned to the Contractor for correction before processing payment. Corrected invoices shall be re-dated to reflect the new submission date.

17. Remittance: Invoices shall be submitted via post-mail and/or electronic mail to the following addresses for payment. Should changes occur to the mailing addresses the Contractor shall be notified of the correct recipient.

(a) Original invoices for supplies/services under the contract will be submitted to and payment will be made by:

VIA Post Mail USACE Finance Center ATTN: Disbursing 5722 Integrity Drive Millington, TN 38054-5005

(b) One copy of all invoices shall be emailed to the following for review and certification:

VIA Post Mail: U.S. Army Corps of Engineers Susquehanna River Project ATTN: Ann Derr 5960 Susquehanna Trail, Suite 1

Turbotville, PA 17772 VIA Electronic Mail: Ann.L.Derr@usace.army.mil

BRIDGE PHOTOGRAPHS

Stillwater Dam

Forest City, PA

Bridge Demolition

PHOTOGRAPHS

Photograph 1: Bridge deck and parapets.

Photograph 2: North access route approach road

Photograph 3: South access route approach road

QASP

Quality Assurance Surveillance Plan (QASP)

1. INTRODUCTION:

1.1. Purpose: The role of the government in quality assurance is to ensure contract standards are achieved. The purpose of the QASP is to identify the methods and procedures the government will use to evaluate contractor actions while performing the requirements in the contract specifications. It is designed to provide an effective surveillance method by monitoring contractor performance for each service listed in the contract specifications for the subject contract.

1.2. The QASP provides a systematic method to evaluate the services the contractor is required to provide. The QASP is based on the premise that the government desires to maintain a high quality standard for services for which it has contracted.

1.3. This QASP has been developed by the requiring activity, Susquehanna River

Project. It is designed to provide direction to personnel performing “on the ground” contract administration and quality assurance. Personnel monitoring the contract terms, conditions, and specifications will periodically review the QASP throughout the life of the contract.

2. ROLES AND RESPONSIBILITIES:

2.1. Contracting Officer Representative (COR). The COR is responsible for quality assurance guidance and to ensure that contract quality requirements, specifications, standards, and thresholds are defined, practical, enforceable, necessary, and verifiable.

2.2. The COR evaluates and documents contractor performance in accordance with the QASP and contract specifications. The COR will utilize Quality Assurance Evaluators (QAE) to perform the hands on day to day quality surveillance of the contractor. QAE’s are nominated by the COR, subject to Contracting Officer approval and designation. COR’s may utilize other surveillance support personnel as authorized in AR 70-13.

2.3. The COR informs the contractor of the names, duties, and limitations of authority for all quality assurance personnel assigned to the contract.

2.4. The COR notifies the Contracting Officer of any significant performance deficiencies.

2.5. The COR maintains surveillance documentation and recommends improvements to the QASP throughout the life of the contract.

2.6. Contracting Officer (KO). The Contracting Officer is responsible to safeguard the interests of the United States in contractual relationships. Only the contracting officer is authorized to bind the government and then, only to the extent of the authority delegated to them through the issuance of a warrant.

2.7. The KO delegates authority for inspection and/or acceptance in accordance with terms of the contract.

3. DESCRIPTION OF SERVICES:

3.1. Scope of Work. The Contractor shall provide all labor, supervision, materials, equipment and supplies required to demolish an out of Service Bridge.

4. QUALITY REQUIREMENTS:

4.1. Quality Control Program. The contractor, not the government, is responsible for management and quality control actions to meet the terms of the contract.

4.2. The quality control program is the driver for quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program, discussed and agreed to at the beginning of the contract, provides the measures needed to lead the contractor to success.

4.3. Once the quality control program is accepted, careful application of the process and standards presented in the remainder of this document will ensure a consistent quality assurance program.

5. SURVEILLANCE:

5.1. Surveillance Schedule. The Contracting Officer Representative (COR) will work with assigned quality assurance evaluators to develop a surveillance schedule. Changes to the surveillance schedule will be discussed in advance with COR. Surveillance documentation will be kept in the official electronic contract file and/or the official hardcopy contract file.

a) Surveillance Methods. This QASP will incorporate 100% inspections as the approach to ensure the contractor complies with the contract requirements. Re-performance is the preferred method of correcting any unacceptable performance.

b) Validated Customer Complaint. This contract will be inspected for quality assurance using the validated customer complaint surveillance method. Anyone who observes unacceptable services, either incomplete or not performed, should immediately contact the COR. The COR will conduct an investigation to determine the validity of the complaint. If the COR determines the complaint to be valid, the COR will document the findings and notify the customer and the contractor. The COR will retain a copy of the written complaint for the government’s files. If the complaint is valid, the contractor will be given the opportunity to correct the defect.

c) 100% Inspection: 100% inspection will be utilized for this contract and will be noted as follows: 100% inspections will be utilized for all projects. This type of surveillance overrides periodic surveillance. However, validated customer complaints are still utilized. Under the 100% surveillance method all contract performance requirements are inspected for quality assurance at every occurrence within the contract schedule.

d) Surveillance Team. The surveillance team consists of the following key players:

Contracting Officer Representative, Contracting Officer, Contract Administrator, and Quality Assurance Evaluators.

e) Unacceptable Performance. If the number of complaints/defects exceeds the performance threshold for any requirement, the COR will determine the possible cause of this unacceptable performance. Government-caused complaints/defects shall not be counted against the contractor. The same applies to any other requirement of the contract when Government-caused complaints/defects are the cause of unacceptable contractor performance. If the contractor’s performance is judged unacceptable by the COR for any requirement, the COR will inform the contractor’s on-site representative, and request acknowledgement of the unacceptable performance. Unacceptable performance will normally result in the contractor being required to re-perform the unacceptable work. If the work is not able to be re-performed according to specification, the COR will consult with the Contracting Officer to determine the appropriate resolution. If the contractor disputes the results of surveillance, the COR must refer the contractor to the contracting officer for resolution.

f) Revisions. Revisions to this QASP are the responsibility of the requiring activity.

However as a result of partnering with the contractor, surveillance checklists may be revised jointly by COR personnel and contractor personnel. The Contracting Officer must approve any revisions that are significant enough in nature to impact the quality expectations of the contractor.

6. DOCUMENTATION REQUIREMENTS:

6.1 The COR is responsible for maintaining a Surveillance Folder at a designated location either hardcopy or electronic, which may also be a part of the COR’s official contract file. The following information should be contained in the Surveillance Folder:

a. QASP

b. Contractor’s Quality Control Plan, if required.

c. Contract Documents, to include the contract, specifications, modifications, and delivery orders.

d. Appointment Letters and Training Certificates of the COR and other

Surveillance Personnel if applicable.

e. Surveillance Checklists/Inspection Forms.

f. Quality Assurance Surveillance Schedules, if applicable.

g. Corrective Action Notes/Log

h. Invoice and payment documents

i. Meeting Minutes/Memo’s/Miscellaneous Correspondence

7. PERFORMANCE REQUIREMENTS SUMMARY: This summary identifies critical success factors for the contract. It identifies both the performance objectives for those factors and the performance threshold required for each performance objective. The Government reserves the right to inspect all services called for in the contract to determine whether or not the performance objectives and goals were met. The Performance Requirements Summary is an integral part of the QASP.

Performance Objective

Performance Standard Performance Threshold Disincentive Incentive

Demolish Bridge

Demolish existing bridge IAW the specifications.

Bridge deck, rails, and beams required to be 100 % removed.

20% of invoice deduction or re-performance for failing to meet the performance threshold

Full payment of invoice

Maintain Clear Waterway

Prevent restricting river flow IAW the specifications

Provide continuous flow of water with clearing of debris within 8 hours of placement in the river.

20% of invoice deduction or re-performance for failing to meet the performance threshold

Full payment of invoice

Report Submittals

Required reports/invoices are submitted within designated timeframe

Required reports/invoices are submitted within designated time frame 95% of the time

5% deduction from invoice for failure to meet the performance threshold

Full payment of invoice

Safety Maintained during operations

No accidents or incidents due to contractor’s failure to take safety precautions

No accidents or incidents due to contractor’s failure to take safety precautions

5% deduction from invoice for safety violation.

Full payment of invoice

Environmental Protection

Comply with requirements for erosion and sediment controls

Comply with regulations for erosion and sediment controls

5% deduction from invoice for violation.

Full payment of invoice

*The absence of any contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract including the clauses entitled “Inspection of Services” and “Default”.*

7.1 Performance Evaluation and Re-Performance. Performance of a service will be evaluated to determine whether or not it meets the performance threshold.

Re-performance is the preferred method of correcting any unacceptable performance.

The contractor shall provide the Government written or verbal response why the performance threshold was not met, how performance will be returned.

OPSEC

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

W912DR20Q0001

CONTRACTING OFFICER STATEMENT

The Primary Contracting Officer for this action is Angela Smith, however, any Contracting Officer holding the appropriate warrant authority in the Baltimore District can serve as the Contracting Officer for this contract. Also, please note that any time the primary Contracting Officer changes, it will be incorporated into the contract via unilateral modification to the contract.

Section SF 1449 - CONTINUATION SHEET

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

CLAUSES INCORPORATED BY REFERENCE

52.203-18 Prohibition on Contracting With Entities That Require Certain

Internal Confidentiality Agreements or Statements-- Representation

JAN 2017

52.204-2 Security Requirements AUG 1996 52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2018

52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.216-25 Contract Definitization OCT 2010 52.219-14 Limitations On Subcontracting JAN 2017 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

52.232-23 Assignment Of Claims MAY 2014 52.232-25 Prompt Payment JAN 2017 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-1 Site Visit APR 1984 52.242-3 Penalties for Unallowable Costs MAY 2014 52.243-1 Changes--Fixed Price AUG 1987 52.244-6 Subcontracts for Commercial Items AUG 2019 52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012

52.249-1 Termination For Convenience Of The Government (Fixed Price) (Short Form)

APR 1984

252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.232-7010 Levies on Contract Payments DEC 2006

CLAUSES INCORPORATED BY FULL TEXT

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (AUG 2019)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L.

109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.

C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.

L. 111-117, section 743 of Div. C).

___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Nov 2016) of 52.219-9.

____ (iii) Alternate II (Nov 2016) of 52.219-9.

____ (iv) Alternate III…