C.04.01- Abstract of Bids 19Feb20 Reece ACP_20B0002.pdf

PDF 251 KB Posted

Attached to
REECE ROAD ACCESS CONTROL POINT, FORT MEADE, MD
Solicitation number
W912DR20B0002
Issued by

About this file

This abstract of bids document summarizes eight contractor bids received in response to solicitation number W912DR20B0002 for the Reece Road Access Control Point project at Fort Meade, Maryland. The U.S. Army Corps of Engineers, Baltimore District issued the solicitation seeking construction of access control facilities, utilities, site work, and roadway dualization. Bids ranged from $18.3 million to $32.4 million for the base project and optional items. Contractors were required to provide bid bonds and acknowledge any amendments to the solicitation. Evaluation will consider the total base bid amount as well as additional costs for optional roadwork items. Award is anticipated to occur by late February 2020 with completion expected by 2022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED PAGE

19-Feb-20 1 of 3

4. ISSUING OFFICE Name and title of Certifying Official (Type) I CERTIFY that I have opened, read, and

USACE, BALTIMORE DISTRICT recorded on this abstract all offers Signature Date Signed 20 February 2020 2 HOPKINS PLAZA received in response to this solicitation.

BALTIMORE, MD 21201 Contracting Officer Gary Faykes

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

X C. REASONABLE CONTRACT C. Amendment Acknowledged: C. Amendment Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the REECE ACCESS CONTROL POINT, FT MEADE to points 5 feet outside the building lines, complete as shown on drawings and specified.

JOB 3,787,849.07$ 3,047,387.63$ 4,175,000.00$

All costs in connection B34 with construction of all utilities and site work beyond points 5 feet outside the building lines and all roadway dualization work, complete as shown on drawings and specified but exclusive of Bid Items 0003, 0004, and 0005 and Optional Bid Items below.

JOB 12,983,937.42$ 14,832,443.38$ 14,400,000.00$

0003 Subgrade Stabilization with Stone and Geotextile (payment item 31 00 00-1 in Specifications). 20,000 SY $23.985 479,700.00$ $26.77 535,400.00$ $27.00 540,000.00$

0004 Costs for work to be performed by Baltimore Gas and Electric Company (BG&E) complete as shown and specified. JOB 968,221.34$ 968,221.34$ 968,221.34$

0005 Costs for work to be performed by Comcast complete as shown and specified. JOB 42,289.60$ 42,289.60$ 42,289.60$

TOTAL BASE BID AMOUNT 18,261,997.43$ 19,425,741.95$ 20,125,510.94$

All costs in connection with construction of all utilities and all site work for the Reece Road dualization from Ernie Pyle Road Intersection to Rose Street complete as shown and specified as Bid Option 1.

JOB 1,957,021.24$ 2,019,755.47$ 1,770,000.00$

Costs for work to be performed by Baltimore Gas and electric Company (BG&E) for Bid Option 1 complete as shown and specified.

JOB 42,751.28$ 42,751.28$ 42,751.28$

All costs in connection with construction of all utilities and all site work for the Reece Road dualization from Rose Street to McArthur Road complete as shown and

JOB 2,791,581.57$ 3,139,287.65$ 3,050,000.00$

Costs for work to be performed by Baltimore Gas and Electric Company (BG&E) for Bid Option 2 complete as shown and specified.

JOB 326,025.00$ 326,025.00$ 326,025.00$

TOTAL ESTIMATED OPTIONAL AND BASE BID AMOUNT 23,379,376.52$ 24,953,561.35$ 25,314,287.22$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

6. NUMBER OF AMENDMENTS ISSUED: 2 (two) Yes

Bid Bond 20%

17-Jan-20W912DR20B0002

No. 1

9. OFFERS

Bid Bond 20%

MAGNA JV

101 Davis Ave

Leesburg, VA 20175

Yes

No. 2

Perimeter Security Partners, LLC 5038 Thoroughbred Lane

Brentwood, TN 37027

Gary Faykes, Contracting Officer

5. PROJECT TITLE

Reece Road Access Control Point Fort Meade, Maryland

1. SOLICITATION NUMBER PAGE

ABSTRACT OF OFFERS W912DR20B0002 2 OF 3

CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the REECE ACCESS CONTROL POINT, FT MEADE to points 5 feet outside the building lines, complete as shown on drawings and specified.

--- JOB --- 4,450,100.00$ 4,975,000.00$ 3,850,000.00$ 5,711,016.00$

All costs in connection B34 with construction of all utilities and site work beyond points 5 feet outside the building lines and all roadway dualization work, complete as shown on drawings and specified but exclusive of Bid Items 0003, 0004, and 0005 and Optional Bid Items below.

--- JOB --- 14,955,713.00$ 14,260,000.00$ 14,600,000.00$ 13,489,327.80$

0003 Subgrade Stabilization with Stone and Geotextile (payment item 31 00 00-1 in Specifications). 20,000 SY $25.00 500,000.00$ $27.50 550,000.00$ $27.00 540,000.00$ $29.90 598,050.00$

Costs for work to be performed by Baltimore Gas and Electric Company (BG&E) complete as shown and specified.

--- JOB --- 968,221.34$ 968,221.34$ 968,221.34$ 968,221.34$

0005 Costs for work to be performed by Comcast complete as shown and specified. --- JOB --- 42,289.60$ 42,289.60$ 42,289.60$ 42,289.60$

TOTAL BASE BID AMOUNT 20,916,323.94$ 20,795,510.94$ 20,000,510.94$ 20,808,904.74$

Option

All costs in connection with construction of all utilities and all site work for the Reece Road dualization from Ernie Pyle Road Intersection to Rose Street complete as shown and specified as Bid Option 1.

--- JOB --- 1,763,999.72$ 2,130,000.00$ 2,050,000.00$ 1,837,889.47$

Costs for work to be performed by Baltimore Gas and electric Company (BG&E) for Bid Option 1 complete as shown and specified.

--- JOB --- 42,751.28$ 42,751.28$ 42,751.28$ 42,751.28$

All costs in connection with construction of all utilities and all site work for the Reece Road dualization from Rose Street to McArthur Road complete as shown and specified as Bid Option 2.

--- JOB --- 2,673,000.00$ 3,550,000.00$ 3,400,000.00$ 3,242,169.91$

Costs for work to be performed by Baltimore Gas and Electric Company (BG&E) for Bid Option 2 complete as shown and specified.

--- JOB --- 326,025.00$ 326,025.00$ 326,025.00$ 326,025.00$

TOTAL ESTIMATED OPTIONAL AND BASE BID AMOUNT $ 25,722,000* 26,844,287.22$ 25,819,287.22$ 26,257,740.40$

* Bids have been input into Abstract of Bids document exactly as they appear in contractor's submission, regardless of error(s).

New Brunswick, NJ 08901

Bid Bond 20%Bid Bond 20% Bid Bond 20%

No. 5

2. PROJECT TITLE

Bid Bond 20%

Yes

OFFERS (Continued)

Reece Road Access Control Point Fort Meade, MD

No. 6No. 3 No. 4 Ocean Construction Services, Inc. 104 Aragina Blvd Virginia Beach, VA 23462

QED/Schlosser JV, LLC 11918 Haddon Lane

Woodbridge, VA 22192

Asher Construction, Inc.

219 C Adam Smith Street

Benaka Inc.

7 Lawrence Street

Eldersburg, MD 21784

Yes Yes Yes

1. SOLICITATION NUMBER PAGE

ABSTRACT OF OFFERS W912DR20B0002 3 OF 3

CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the REECE ACCESS CONTROL POINT, FT MEADE to points 5 feet outside the building lines, complete as shown on drawings and specified.

--- JOB --- 5,320,000.00$ 6,836,534.78$

All costs in connection B34 with construction of all utilities and site work beyond points 5 feet outside the building lines and all roadway dualization work, complete as shown on drawings and specified but exclusive of Bid Items 0003, 0004, and 0005 and Optional Bid Items below.

--- JOB 12,083,000.00$ 13,809,492.93$

0003 Subgrade Stabilization with Stone and Geotextile (payment item 31 00 00-1 in Specifications). 20,000 SY 600,000.00$ 749,400.00$

Costs for work to be performed by Baltimore Gas and Electric Company (BG&E) complete as shown and specified.

--- JOB --- 968,221.34$ 968,221.34$

0005 Costs for work to be performed by Comcast complete as shown and specified. --- JOB --- 42,289.60$ 42,289.60$

TOTAL BASE BID AMOUNT 19,013,510.94$ 22,405,938.65$

Option

All costs in connection with construction of all utilities and all site work for the Reece Road dualization from Ernie Pyle Road Intersection to Rose Street complete as shown and specified as Bid Option 1.

--- JOB --- 1,975,000.00$ 4,509,890.64$

Costs for work to be performed by Baltimore Gas and electric Company (BG&E) for Bid Option 1 complete as shown and specified.

--- JOB --- 42,751.28$ 42,751.28$

All costs in connection with construction of all utilities and all site work for the Reece Road dualization from Rose Street to McArthur Road complete as shown and specified as Bid Option 2.

--- JOB --- 3,125,000.00$ 5,100,893.43$

Costs for work to be performed by Baltimore Gas and Electric Company (BG&E) for Bid Option 2 complete as shown and specified.

--- JOB --- 326,025.00$ 326,025.00$

TOTAL ESTIMATED OPTIONAL AND BASE BID AMOUNT $ 24,482,287* 32,385,499.00$

* Bids have been input into Abstract of Bids document exactly as they appear in contractor's submission, regardless of error(s).

2. PROJECT TITLE

Bid Bond 20%

Yes

OFFERS (Continued)

Reece Road Access Control Point Fort Meade, MD

No. 7 No. 8 Tuckman-Barbee Construction, Inc.

16000 Trade Zone Avenue Suite 102

Upper Marlboro, MD 20774

Doyon Technical Service, Inc.

3450 South 344th Way., Ste. 100

Federal Way, WA 98001

Bid Bond 20%

Yes

Not Provided Not Provided

1
C.04.01- Abstract of Bids 19Feb20(Part B) Reece ACP_20B0002.pdf
2
C.04.01- Abstract of Bids 19Feb20(Part C) Reece ACP_20B0002.pdf
2
2020-02-20T09:14:21-0500
FAYKES.GARY.A.1086691600

File details come from the government source that posted it. Updated .