A-10_DR18Q0019__Solicitation_Amendment_032618.pdf
PDF 238 KB Posted
- Attached to
- Washington Aqueduct Sodium Hypochlorite 12. 5%
- Solicitation number
- W912DR18Q0019
About this file
Amendment one (1)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to change the period of perfromance from five (5) years to three (3) years. Please see attached new evaluation criteria, ordering procedures, price schedule and SOW . All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR18Q0019
X 9B. DATED (SEE ITEM 11)
01-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Mar-2018
CODE
USACE, BALTIMORE DISTRICT
2 HOPKINS PLAZA
ROOM 03-G-01
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR18Q0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
EVALUATION CRITERIA
I. INTRODUCTION
The intent for this Request for Proposal is to solicit proposals for a contract to fulfill the requirements of the Scope of Work attached to this solicitation. The Washington Aqueduct Dalecarlia Water Treatment Plant has a requirement for Sodium Hypochlorite for use at the Washington Aqueduct’s two water treatment plants (WTPs), Dalecarlia WTP and McMillan WTP.
Offeror’s are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors.
Offerors shall submit in their proposal all requested information specified in this section of the solicitation at or before the exact time specified. If an Offeror believes that the requirements in these instructions contain and error, ambiguity, omission or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer in writing with supporting rationale.
In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals.
II. BASIS OF AWARD
The Government will award this contract on a Lowest Price Technically Acceptable (LPTA) basis. The Contract will be consist of a three (3) year ordering period. The contract type is Firm Fixed Price, Indefinite Delivery Indefinite Quantity Contract.
Overall Relative Order of Important of Evaluation Factors:
• When technical and past performance are combined, they are approximately equal to price.
The evaluation factors are as follows:
Factor I – Technical Capability: the Offeror must provide information as specified in the attached Scope of Work.
Each submittal will be evaluated to ensure requirements are met.
Factor II – Past Performance: An acceptable rating is required to be considered for award. The Offeror must provide information demonstrating that they have already successfully performed as a prime contractor within the last five (5) years of at least two (2) chemical contracts of equal or greater complexity to this solicitation in the minimum price range of $100,000 - $500,000. This information shall be submitted on the Past Performance Contacts Questionnaire (attached) and information requested on this document must be submitted. The Offeror shall submit at least two references, including point of contact name, email address and phone number, that can verify past performance listed in this paragraph. This shall be submitted directly to the Contract Specialist via email at tolulope.o.olojo@usace.army.mil. Failure to do so will deem Offeror non-responsive.
The Past Performance Questionnaire included in this solicitation is provided for the Offeror or its team members to submit to the Contract Specialist for each project the Offeror includes in its proposal for Factor 2 – Past Performance. Ensure correct phone numbers and email addresses are provided for the client point of contact.
Completed Past Performance Questionnaires (PPQ) should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before solicitation closing date, the Offeror should complete and submit with the quote the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.
Questionnaires may be submitted directly to the Contract Specialist (via email) at least 2 days prior to the mailto:tolulope.o.olojo@usace.army.mil solicitation closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFQs. However, this does not preclude the Government’s from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors may include performance recognition documents received within the last 5 years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.
The Government may review any other sources available to retrieve past performance information. Other sources may include, but are not limited to, ast Performance Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
Factor III – Offerors shall insert proposed pricing in the Price Schedule, proposing a price on all proposed items.
The unit prices shall include all markups for providing the specified Sodium Hypochlorite requirements. Markups are defined as all other direct and indirect costs, management, supervision, contractor furnished equipment, material, and supplies, travel, overhead and profit.
The absence of any information required to support the evaluation factors herein and as described below will result in disqualification from competition, as that offer will be found non-responsive and unacceptable. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for the Factors I and II.
III. EVALUATION RATINGS
The following ratings, as defined, will be assessed to the evaluations factors as indicated below.
FACTOR I – Technical Capability Rating Definition
Acceptable Proposal clearly meets the minimum requirements of the RFQ
Unacceptable Proposal does not clearly meet the minimum requirements of the RFQ
FACTOR II – Past Performance Rating Definition
Acceptable
Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. *
Unacceptable
Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.
* Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “neutral.”
FACTOR III – Price Price will be evaluated based on technical acceptability.
ORDERING PROCEDURES
H.1 Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Contracts
a. The contract type is an Indefinite Delivery, Indefinitely Quantity (IDIQ) Single Award Task Order
Contract (SATOC), pursuant to FAR Part 16. Task orders will be issued on a Firm Fixed Price.
b. The Government intends to evaluate proposals and award on IDIQ SATOC, as a small business set aside.
c. The minimum guarantee is $3,000. The Basis of Award for the SATOC is Lowest Price.
d. Contract Rates: The Contractor shall use the contract rates established on the Price schedule on all task orders under the base IDIQ. The Contractor may propose less than the contract rate on task orders, but must not exceed the rates established on the base IDIQ contract.
e. Performance shall be authorized only by issuance of task orders by the Government Contracting Office; the procedures are discussed in H.2 Ordering Procedures, in the Section titled “Special Contracting Requirements” in the solicitation. No work will be performed before a written and signed (by a warranted Contracting Officer) task order. Task orders may be issued by facsimile or electronic mail (e-mail).
f. Except for the limitations stated FAR 52.216-19, there is no limit on the number or size of task orders that may be issued except that a task order or (multiple task orders) may not be issued over the IDIQ contract capacity. This contract shall be used for work at the Washington Aqueducts sites only.
Task orders must be issued within the ordering period of the base IDIQ. The task order period may extend beyond the end of the ordering period. However, issuance of a new task order may not occur after the expiration of the base ordering period. The ordering period shall not exceed three (3) years.
h. The North American Industry Classification System (NAICS) code for the acquisition is 325180 – All other basic organic chemical manufacturing with a size standard of 1000 employees.
H.2 Ordering Procedures
a. The Government shall have the right to award task orders in the cumulative amount of up to 5,760 dry tons during the life of this contract.
b. The Contracting Officer will notify the SATOC holder of an existing requirement by issuing a delivery order, specifying quantity of delivery and delivery date.
c. The time set for delivery will be set in each delivery order.
d. Task orders will be issued by a Contracting Officer using a Department of Defense form 1155. Each task order will include the following information at a minimum:
(1) Date of delivery order
(2) Contract and delivery order numbers
(3) Fixed price of the delivery order
(4) Delivery requirements
(5) Accounting and appropriation data
PRICE SCHEDULE
Sodium Hypochlorite Price Schedule
CLIN Supplies Annual
Quantity Unit of measure Unit Price Total
0001 Provide bulk liquid Sodium Hypochlorite, 12.5 Trade %, to Dalecarlia Water Treatment Plant
1080 Dry Ton $ $
0002 Provide bulk liquid Sodium Hypochlorite, 12.5 Trade %, to McMillan Water Treatment Plant
840 Dry Ton $ $
1001 Provide bulk liquid Sodium Hypochlorite, 12.5 Trade %, to Dalecarlia Water Treatment Plant
1080 Dry Ton $ $
1002 Provide bulk liquid Sodium Hypochlorite, 12.5 Trade %, to McMillan Water Treatment Plant
840 Dry Ton $ $
2001 Provide bulk liquid Sodium Hypochlorite, 12.5 Trade %, to Dalecarlia Water Treatment Plant
1080 Dry Ton $ $
2002 Provide bulk liquid Sodium Hypochlorite, 12.5 Trade %, to McMillan Water Treatment Plant
840 Dry Ton $ $
Grand Total $
Unit prices should include all labor, skills and material required for delivery. If inflation is applicable, it should be reflected in unit prices beginning in Year 2.
SPECIFICATIONS - SOW
26 March 2018
SPECIFICATIONS - SCOPE OF WORK
SODIUM HYPOCHLORITE 12.5% -
NaOCl (BULK LIQUID)
Summary
The summary table references the location of specific information within this Scope of Work. The Contractor must comply with all requirements listed herein, regardless of inclusion in the summary table.
Section(s)
Chemical name Sodium Hypochlorite 1, 6
Strength 12.5 trade percent 1, 6a
Projected annual quantity 1,920 tons free available chlorine 3
Unit of measure for invoicing tons free available chlorine 13a
Delivery form (tote vs. bulk) Bulk 8
Delivery load size As requested (see section for max size) 8b
NSF/ANSI Certification 60 7
AWWA Standard B300 6a
Physical/chemical requirements Various 6
Bid submittal requirements See section 4
Contract award submittal requirements See section 5
Delivery requirements See sections 8-12
Delivery documentation See section 8g
1 Requirement- Furnish through an IDIQ contract all of the Washington Aqueduct’s Sodium Hypochlorite
(12.5 Trade Percent) in accordance with these specifications. Sodium Hypochlorite is used at Washington Aqueduct’s two water treatment plants (WTPs), Dalecarlia WTP and McMillan WTP. Sodium Hypochlorite shall conform to the requirements of ANSI/AWWA Standard B300, latest revision, for Sodium Hypochlorite, except as modified or supplemented herein, and shall conform to NSF/ANSI Standard 60.
2 Period of Performance – Three (3) years contract
3 Government Projected Requirements:
Dalecarlia WTP: Approximately 3,240 tons Free Available Chlorine (FAC) during period of performance.
McMillan WTP: Approximately 2,520 tons Free Available Chlorine (FAC) during period of performance.
4 Submittals -
a. Submittal shall include the following information
1. A product information sheet (product bulletin) issued by the product manufacturer
2. A certified laboratory report for a representative sample of product demonstrating compliance of the Contractor’s product with the requirements of Section 6 (Physical / Chemical Requirements)
3. Certification by a certification organization accredited by the American National Standards Institute stating that product meets the NSF/ANSI Standard 60 for addition to drinking water
4. A safety data sheet (SDS) that complies with paragraph (g) of 29 CFR 1910.1200
5. Offeror shall respond with written statement on company letterhead signed by company senior level official that states, “Contractor is able to provide an uninterrupted supply of Sodium Hypochlorite to Washington Aqueduct.”
b. If the product of more than one facility or manufacturer may be supplied to fulfill this contract, the information described in Section 4a must be submitted for each separate facility and manufacturer. Any request to change the product and/or manufacturer during the contract period must be submitted for approval to Contracting Officer’s Representative.
c. Proposal Sample: Submit a 1500 milliliter chilled sample of the required product to the Approved Testing Laboratory listed in these Specifications. The proposal sample(s) shall be representative of each of the specific facility (ies) and specific manufacturing process (es) from which the bidder intends to acquire the Sodium Hypochlorite under this contract. If, during the period of performance, Contractor acquires Sodium Hypochlorite from a different manufacturing facility and/or process, a representative sample from the new source must be submitted and accepted by the Contracting Officer’s Representative (COR) prior to delivery. The laboratory shall perform the following analytical tests and prepare a certified Sample Analysis Report:
Proposal Sample – Sample Analysis Requirements
Available chlorine equivalent, GPL
Weight percent sodium hypochlorite (NaOCl)
Weight percent sodium hydroxide (NaOH)
Weight percent sodium carbonate (Na2CO3) pH
Specific gravity
Weight percent insoluble matter by weight
Iron, mg/L
Copper, mg/L
Nickel, mg/L
Bromate, mg/L
Chlorate, mg/L
Perchlorate, mg/L
Chloride, mg/L
Filtration Time for 1000 ml using the “Suspended Solids Quality Test for Bleach Using the Vacuum Filtration” method distributed by Powell Fabrication and Manufacturing, Inc. and available at http://www.powellfab.com http://www.powellfab.com/
d. All costs associated with proposal sample analysis shall be borne by the Prospective Contractor. A complete copy of the Approved Testing Agency’s Sample Analysis Report shall be submitted with the Prospective Contractor’s bid. Failure to submit a sample or meet the requirements of the Specification shall result in Contractor being disqualified.
e. The Approved Testing Agency is listed below for all analysis. No other laboratory shall be used unless authorized by Washington Aqueduct.
Approved Testing Agency:
Nova Chem Laboratories, Inc.
5172 College Corner Pike PO Box 608 Oxford, Ohio45056 Ph: 513-523-3605 Fax: 513-523-4025 bbubnis@novachemlabs.com
5 Information Required Upon Contract Award -a The following information is required not later than 14 days after contract award to the individuals listed below:
TO BE FILLED IN AT CONTRACT AWARD
Information Required Upon Contract Award
Sales Office Information Address
Email Address
Telephone number(s)
Normal working hours
Responsible personnel
Ordering Office Information
Telephone number(s) During working hours During non-working hours
Email address
Normal working hours
Responsible personnel
Technical Services Department Information
Address
Email Address
Telephone number(s)
Normal working hours mailto:bbubnis@novachemlabs.com
Responsible personnel
Chemical-Emergency Assistance (24 hours a day)
Telephone number(s)
Responsible personnel
Product Information for the Chemical Supplied
Product information bulletin from product manufacturer
Certification from accredited certification organization of compliance with NSF/ANSI 60
Safety Data Sheet (SDS) that complies with paragraph (g) of 29
CFR 1910.1200
b The Contractor shall provide a completed, signed Accident Prevention Plan in accordance with Part
1910, Title 29 of the Code of Federal Regulations and EM 385-1-1, 15 Sep 08, for approval. A template is provided as Appendix A.
c Prior to the first chemical delivery and each time there is a change in dispatcher and/or delivery personnel the Contractor shall forward the following information:
Information Required Upon Change in Dispatcher and/or Delivery Personnel
Dispatcher Information Address
Email Address
Telephone number(s)
Normal working hours
Responsible personnel
Cargo Trailer Operator Documentation
Names and photographs of the cargo trailer operators making deliveries d Quarterly Testing Reports. Upon the first delivery and every 90 days, the Contractor shall collect a sample from the same batch of Sodium Hypochlorite that is to be furnished to the Washington Aqueduct.
This sample shall be forwarded by the Contractor to the Approved Testing Agency listed in these Specifications for the analytical tests listed in paragraph 3A. Charges for all quarterly reports by the Approved Testing Laboratory shall be included in the Contractor’s quoted price.
6 Physical / Chemical Requirements – a Sodium Hypochlorite shall meet or exceed the ANSI/AWWA Standard B300, latest revision except as modified or supplemented herein. All sampling and testing shall be in accordance with ANSI/AWWA Standard B300, latest revision. Sodium Hypochlorite shall conform to the following requirements:
Physical / Chemical Characteristics
Parameter Minimum Required Maximum Allowed
Solution strength, Grams per Liter (GPL) available chlorine equivalent
120 130
Insoluble matter, percent by weight. 0.15
Filtration time achieved for 1000 mL sample when applying the “Suspended Solids Quality Test for Bleach Using the Vacuum Filtration” method distributed by Powell Fabrication and Manufacturing, Inc. and available at http://www.powellfab.com.
3 minutes pH 11.5 13
Iron, mg/L 0.3
Copper, mg/L 0.05
Nickel, mg/L 0.05
Chlorate, mg/L 1,500 b The Sodium Hypochlorite supplied shall be in liquid form.
c The Sodium Hypochlorite supplied shall be clear and straw-colored with no visible cloudiness, impurities, or sediment.
d Sodium Hypochlorite supplied shall contain no substances in quantities capable of producing harmful health effects on those consuming water that has been properly treated with Sodium Hypochlorite.
e Sodium Hypochlorite supplied shall be mixed prior to delivery. Mixing in the delivery truck is prohibited.
7 Quality Assurance Requirements – a Certification of Suitability for Drinking Water - Sodium Hypochlorite supplied under this contract is a direct additive used in the treatment of potable water and shall be certified as suitable for treatment of drinking water by an accredited certifying organization in accordance with the requirements of the National Sanitation Foundation / American National Standards Institute Standard 60 (NSF/ANSI Standard 60), Drinking Water Treatment Chemicals—Health Effects.
b Maximum Usage Level (MUL) for NSF/ANSI Standard 60 certification shall be greater than or equal to 80 mg/L.
c Certification shall be performed by a certification organization accredited by the American National Standards Institute, and evaluation shall be accomplished in accordance with requirements that are no less restrictive than those listed in NSF/ANSI Standard 60.
d Contractor shall inform Washington Aqueduct that certification has been revoked or has lapsed within 7 days of the time the Contractor receives oral or written notification from the certification organization.
Loss of certification after Contract award shall constitute sufficient grounds for termination of the Contract by the Government.
8 Delivery -a Delivery date and time shall be arranged upon placement of order.
b Quantity - The Contractor shall make Sodium Hypochlorite deliveries upon request, in single-unit tank trucks, in quantities requested. Delivery volumes shall not exceed:
Dalecarlia WTP: Deliveries shall not exceed the following maximum volumes: Dalecarlia 4900 gallons.
McMillan WTP: Deliveries shall not exceed the following maximum volumes: McMillan 4900 gallons c Tote Bin Retrieval - Not applicable to deliveries of Sodium Hypochlorite.
d Cargo Trailer Enclosure - Not applicable to deliveries of Sodium Hypochlorite.
e All delivery drivers shall possess a valid commercial driver’s license with the proper Hazardous Material (HAZMAT) endorsements accepted by District of Columbia. All delivery personnel must have company cell phones to facilitate deliveries.
f Security Tags – Each tank truck unloading hose coupling, manway, and hatch shall be sealed and include a security tag number (see NSF/ANSI Standard 60 Section 3.9.3.1). The security tag numbers shall be e-mailed to Washington Aqueduct personnel below after each cargo trailer has been loaded and is ready for shipping.
Deliveries to the Dalecarlia WTP:
Washington Aqueduct Dalecarlia Water Treatment Plant MacArthur Blvd., N.W.
Washington, D.C. 20016-2514
Deliveries to the McMillan WTP:
Water Treatment Plant 2500 First Street, N.W.
Washington, D.C. 20001 g Documentation Required for Each Delivery-
Documentation Required for Each Delivery
Each Delivery - The Contractor shall e-mail the personnel listed in (f) above the following information prior to each delivery leaving the manufacturing facility:
1. Chemical Product Name/ Manufacturer Name
2. Bill Of Lading Number
3. Departure Date And Time
4. Expected Delivery Date And Time
5. Hauler’s Company Name
6. Driver/ Operator’s Name And Driver’s License State And Number
7. Truck License Number
8. Cargo Trailer License Number
9. Seal Numbers For All Hatches and Doors
Upon arrival at the facility, the cargo trailer operator shall present to on-site personnel the following items:
1. Bill of lading including lot number or identification of the specific load of chemical delivered
2. Machine stamped weight certificate
3. Certified manufacturer’s laboratory report for the specific load of chemical delivered.
The report shall contain the following data:
Date and Time of Manufacture
Date and Time of Shipment
Sodium Hypochlorite (weight percent)
Excess Sodium Hydroxide
(weight percent)
Excess Sodium Carbonate (weight percent)
Suspended Solids Test Time (minutes)
Specific Gravity and reference temperature h The Contractor shall notify the control room (Dalecarlia telephone 202-764-2700; McMillan telephone
202-762-0166) and the email recipients (as listed above in item 8F) of any changes in the driver, cargo trailer, and or delivery schedule.
i Routine Deliveries - The Sodium Hypochlorite delivery shall be between 0700 and 1400 hours Monday through Friday except federal holidays. Any exception to this requirement must be approved by one of the individuals listed in Section 8F.
j Emergency Deliveries - Emergency deliveries may be required within 24 hours after notification and might include holiday and night hours.
k In the event that the load is rejected, the Contractor shall have 24 hours to supply another shipment. In the event that the Contractor is unable or unwilling to supply another shipment within this time period, Washington Aqueduct has the right to procure a shipment from another source.
l Holding time prior to delivery - The delivery time of the shipment shall not exceed 72 hours from the time of Sodium Hypochlorite manufacture. Temperature of the Sodium Hypochlorite stored prior to delivery to the Washington Aqueduct shall be less than or equal to 20 degrees C. Temperature of the Sodium Hypochlorite upon delivery to the Washington Aqueduct shall be less than or equal to ambient temperature.
m The Contractor is responsible for assuring delivery quantities do not exceed the current funded delivery order.
n All deliveries of Sodium Hypochlorite shall be freight prepaid, F.O.B. to the following Government facilities:
Washington Aqueduct Dalecarlia Water Treatment Plant 5900 MacArthur Blvd., N.W.
And
McMillan Water Treatment Plant 2500 First Street, N.W.
Washington, D.C. 20001 o Directions:
Directions to the Dalecarlia WTP:
From 495 take the River Road exit towards D.C.
Take a right on to Goldsboro (614) Take a left on to Massachusetts Avenue At the Westmoreland Circle take the 2nd right on to Dalecarlia Parkway Merge right on to Loughboro Road Take a right on to MacArthur Blvd.
Take a left at the Dalecarlia WTP gate
Directions to the McMillan WTP:
From 495 take the Georgia Ave. exit (South) towards Washington, D.C.
Turn left on to Harvard St.
Turn left on to 5th St. then keep to the right around the reservoir Turn right on to 1st St.
Turn right at the McMillan WTP gate
9 Offloading Requirements a Removal of security tags - Upon arrival, security tags are to be removed from hose coupling, manways, and hatches in presence of Washington Aqueduct personnel after seal numbers are verified by Washington Aqueduct personnel to assure the cargo has not been tampered with.
b Sampling and Testing Prior to Offloading. At the sole discretion of Washington Aqueduct, the Contractor’s delivery personnel (driver) may occasionally be asked to provide a sample of the chemical from the delivery vehicle before unloading the cargo. Washington Aqueduct will supply the sample container and the driver shall collect the sample from the transportation equipment and turn it over to a Washington Aqueduct representative. Alternatively, the Contractor shall allow Washington Aqueduct to collect a sample of the Contractor’s product from Washington Aqueduct’s transfer piping at the beginning of the offloading process, and the collected sample shall be considered representative of the Contractor’s product. Washington Aqueduct reserves the right to subject samples of the chemical to quick tests to ensure that product meets basic conditions of these Specifications. The Contractor shall allow 60 minutes for this testing to be completed.
c Filling appropriate tanks - Washington Aqueduct’s representative will identify the proper storage tank(s) to fill for each delivery. Contractor shall be responsible for transferring chemical from the delivery vehicle into the storage tanks at the delivery site and shall observe the entire filling operation at each delivery site. Contractor shall be responsible for the accidental discharge of the product into the wrong storage tank(s).
d Air padding system - Contractor shall provide an air padding system (an air compressor and pumping system) to be used (at Washington Aqueduct’s sole discretion) as an alternative to Washington Aqueduct’s transfer system. Contractor shall furnish a Washington Aqueduct- approved, leak-free connection device between the vehicle and Washington Aqueduct’s intake receptacle (a quick disconnect coupling compatible with the WTPs’ couplings). Contractor shall provide all necessary hoses, fittings, air-padding, etc. required to safely and efficiently offload the chemical into designated storage tanks.
e Contractor shall be reimbursed for industry-standard demurrage charges incurred as a result of delays caused by the Washington Aqueduct whenever unloading has not started within (2) two hours after arrival.
f Contractor shall ensure delivery personnel’s compliance with all OSHA requirements, including personal protective equipment for Contractor delivery personnel.
10 Rejection of Deliveries a Failure to provide required documentation upon delivery constitutes grounds for rejection of deliveries.
b Any load tested by Washington Aqueduct that fails to comply with these Specifications shall constitute grounds for rejection of that load.
c Washington Aqueduct reserves the right to reject any delivery that has been contaminated.
11 Condition of Delivery Vehicle a Chemical compatibility - The Sodium Hypochlorite shall be delivered in tank trucks dedicated only to transporting Sodium Hypochlorite.
b It is the Contractor’s responsibility to verify the cleanliness of the transporting equipment before loading.
The transporting equipment shall be clean and free of residue that may contaminate the product or impede the unloading process. All appurtenant valves, pumps, and discharge hoses used for the delivery of bulk chemicals shall be supplied by the Contractor and shall be clean and free from contaminating material.
c All delivery vehicles used for the chemical delivery, under this agreement, shall be in good mechanical order and shall be in full compliance with the applicable requirements of the Hazardous Materials Regulations of the Department of Transportation, Code of Federal Regulations, as currently issued.
d Washington Aqueduct reserves the right to refuse any deliveries made with equipment that is poorly maintained and/or leaking chemical. Any cargo trailer found leaking chemicals is considered an emergency situation requiring immediate attention by the Contractor and shall not be allowed to depart until the Contractor or his designated representative makes appropriate repairs.
12 Spillage a The Contractor shall immediately report any spills caused during the filling operations to the operations control center of the Dalecarlia WTP 202-764-2700 or McMillan WTP 202-762-0166 (as applicable).
b The Contractor shall take immediate and appropriate actions to clean up any spill. The Contractor shall be responsible for all clean-up of spillage and contaminated matter in accordance with all applicable laws and regulations. The Contractor shall be responsible for any spills or hazardous chemical releases resulting from the failure of its or its subcontractor’s delivery equipment or from failure of attendant delivery personnel in the proper performance of their duties.
c If a spill is not cleaned up, Washington Aqueduct may hire a certified hazardous material handling company to clean up the spill, and the cost of such service will be charged to the Contractor and deducted from the amount due to the Contractor.
13 Invoicing a Unit of measure for payment shall be: Tons free available chlorine of Sodium Hypochlorite 12.5% delivered FOB destination. Solution strength of 12.5% will be used for billing purposes.
i) Tons free available chlorine for payment will be calculated as follows:
𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇 𝐹𝐹𝐹𝐹𝐹𝐹 = 𝑁𝑁𝑁𝑁𝑁𝑁 𝑊𝑊𝑁𝑁𝑊𝑊𝑊𝑊ℎ𝑁𝑁 (𝑙𝑙𝑙𝑙) 𝑥𝑥
1 𝑊𝑊𝑔𝑔𝑙𝑙
𝑆𝑆𝑆𝑆 𝑥𝑥 8.34 𝑙𝑙𝑙𝑙
𝑥𝑥
3.78 𝐿𝐿
𝑊𝑊𝑔𝑔𝑙𝑙
𝑥𝑥
125 𝑊𝑊𝐹𝐹𝐹𝐹𝐹𝐹
𝐿𝐿
𝑥𝑥
1 𝑁𝑁𝑇𝑇𝑇𝑇
907,185 𝑊𝑊
Or
𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇 𝐹𝐹𝐹𝐹𝐹𝐹 =
𝑁𝑁𝑁𝑁𝑁𝑁 𝑊𝑊𝑁𝑁𝑊𝑊𝑊𝑊ℎ𝑁𝑁 (𝑙𝑙𝑙𝑙)
16,000 𝑥𝑥 𝑆𝑆𝑆𝑆𝑁𝑁𝑆𝑆𝑊𝑊𝑆𝑆𝑊𝑊𝑆𝑆 𝑆𝑆𝐺𝐺𝑔𝑔𝐺𝐺𝑊𝑊𝑁𝑁𝐺𝐺
b The contractor shall provide truck net weight, specific gravity and reference temperature, and solution strength (g/L of free available chlorine) for each tanker truck delivery on each invoice.
c The Contractor shall mail the original delivery invoices to:
USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005 Attn: EFT/Disbursing
And a copy to:
5900 MacArthur Blvd., N.W.
Attn: Support Management Services, COR (to be named at contract award)
APPENDIX A
OUTLINE FOR LIMITED-SCOPE CONTRACTS
ACCIDENT PREVENTION PLAN
An Accident Prevention Plan (APP) is a safety and health policy and program document. Contractor’s APP shall address the identified hazards involved and the control measures to be taken. The APP shall interface with the employer’s overall safety and health program, and a copy shall be available on the work site.
The Contractor’s site-specific APP shall include the following.
1. Title, signature, and phone number of the plan preparer.
2. Background Information to include: Contractor; Contract number; Project name; Brief project description, description of work to be performed, and location.
3. Statement of Safety and Health Policy detailing their commitment to providing a safe and healthful workplace for all employees.
4. Responsibilities and Lines of Authorities – to include a statement of the employer’s ultimate responsibility for the implementation of his SOH program and identification and accountability of personnel responsible for safety.
5. Training – All contract and sub-contract personnel shall have completed required safety training before coming on-site. Provide a list of required training. Provide certification of training for employees prior to arriving on-site.
6. Procedures for job site inspections - assignment of responsibilities and frequency.
7. Procedures for reporting and investigating any accidents as soon as possible but not more than 24 hours afterwards to the Contracting Officer/Representative (CO/COR). An accident that results in a fatal injury, permanent partial or permanent total disability shall be immediately reported to the Contracting Officer.
8. Emergency Planning: Identify plan for contract and sub-contract employees working alone to be provided with an effective means of emergency communication. This may be cellular phone, two-way radio or other acceptable means. The selected means of communication must be readily available and must be in working condition.
9. Personal Protective Equipment: Identify personnel protective equipment to be provided.
(a) WORK CLOTHING - Minimum Requirements. Employees shall wear clothing suitable for the weather however minimum requirements for work shall be short-sleeve shirt, long pants (excessively long or baggy pants are prohibited) and leather work shoes. If analysis determines that safety-toed (or other protective) footwear is necessary they shall be worn.
(b) Eye and Face Protection. Eye and face protection shall be worn as determined by an analysis of the operations being performed.
(c) Hearing Protection. Hearing protection must be worn by all those exposed to high noise activities.
(d) Head Protection. Hard hats shall comply with ANSI Z89.1and shall be worn by all workers when a head hazard exists.
(e) High Visibility Apparel shall comply with ANSI/ISEA 107, Class 2 requirements at a minimum and shall be worn by all workers exposed to vehicular or equipment traffic.
(f) Gloves of the proper type shall be worn by persons involved in activities that expose the hands to cuts, abrasions, punctures, burns and chemical irritants.
10. Hazardous Substances: A hazard communication program must be provided and in effect. MSDSs shall be available at the worksite. Employees shall have received training in hazardous substances being used. When the eyes or body of any person may be exposed to corrosives, irritants or toxic chemicals, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within 10 seconds of the worksite.
The following have been deleted:
INSTRUCTIONS TO OFFERORS
PAST PERFORMANCE PPQ
SECTION SF 1449 - CONTINUATION SHEET
The following were previously included by reference and are now included by full text:
52.233-3 PROTEST AFTER AWARD (AUG. 1996)
(a) Upon receipt of a notice of protest (as defined in FAR 33.101) or a determination that a protest is likely (see FAR 33.102(d)), the Contracting Officer may, by written order to the Contractor, direct the Contractor to stop performance of the work called for by this contract. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Upon receipt of the final decision in the protest, the Contracting Officer shall either--
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled either before or after a final decision in the protest, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--
(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to an adjustment within 30 days after the end of the period of work stoppage;
provided, that if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon a proposal at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(e) The Government's rights to terminate this contract at any time are not affected by action taken under this clause.
(f) If, as the result of the Contractor's intentional or negligent misstatement, misrepresentation, or miscertification, a protest related to this contract is sustained, and the Government pays costs, as provided in FAR 33.102(b)(2) or 33.104(h)(1), the Government may require the Contractor to reimburse the Government the amount of such costs. In addition to any other remedy available, and pursuant to the requirements of Subpart 32.6, the Government may collect this debt by offsetting the amount against any payment due the Contractor under any contract between the
Contractor and the Government.
(End of clause)
(End of Summary of Changes)
| SPECIFICATIONS - SCOPE OF WORK SODIUM HYPOCHLORITE 12.5% - NaOCl (BULK LIQUID) |
| 3 Government Projected Requirements: |
| 4 Submittals - |
| 5 Information Required Upon Contract Award - |
| 6 Physical / Chemical Requirements – |
| 7 Quality Assurance Requirements – |
| 8 Delivery - |
| 9 Offloading Requirements |
| 10 Rejection of Deliveries |
| 11 Condition of Delivery Vehicle |
| 12 Spillage |
| 13 Invoicing |
| APPENDIX A |
File details come from the government source that posted it.