A02._W912DR17Q0005_Solicitation_Amendment_072617.pdf
PDF 2 MB Posted
- Solicitation number
- W912DR17Q0005
About this file
The purpose of this amendment is to respond to the requests for information, revise part of the specification, and to add updated maps and pre-bid attendance sheet. Please see enclosed attachment. All other terms and conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A02._W912DR17Q0005_Solicitation_Document_071117.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to respond to the requests for information, revise part of the specif ication, and to add updated maps and pre-bid attendance sheet. Please see enclosed attachment. All other terms and conditions remain unchanged
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR17Q0005
X 9B. DATED (SEE ITEM 11)
11-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2017
CODE
USACE, BALTIMORE DISTRICT
10 S. HOWARD ST
ROOM 7000
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR17Q0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
AMENDMENT NO. 0001 TO W912DR-17-B-0017
EFFECTIVE DATE JULY 25, 2017 PAGE 1 OF 1 PAGES
SPECIFICATIONS:
1) Section 32 92 19.13 INTERIOR DIKE SLOPE SEEDING sub-paragraph 3.2.2.1 Preparation:
Revise the first sentence to read “Existing vegetation may need to be removed or mowed unless otherwise specified in the plans or by the Contracting Officer”.
2) Section 32 93 00.13 LANDSCAPING FOR TIDAL MARSH, DIKE SLOPE, AND HABITIAT ISLAND SHRUB ZONES sub-paragraph 2.1.4.1 Mycorrhizal Fungi Inoculum: Delete this paragraph entirely.
3) Section 32 93 00.13 LANDSCAPING FOR TIDAL MARSH, DIKE SLOPE, AND HABITIAT ISLAND SHRUB ZONES article 2.7 BIRD DETERRENT: In the sentence beginning with “Bamboo Stakes: Eight foot……” add the following to the end of the sentence “, minimum diameter of one inch”.
4) SECTION 32 93 00.13 LANDSCAPING FOR TIDAL MARSH, DIKE SLOPE, AND HABITIAT ISLAND SHRUB ZONES article 3.5 BIRD DETERRENT REMOVAL: Add the following sentence to the end of the paragraph “Bamboo poles must be stockpiled at an area on Poplar Island to be determined by the Contracting Officer.”
DRAWINGS:
5) Sheet GI003: Delete this sheet as originally issued and substitute therefor the attached like numbered sheet dated 7/21/2017.
6) Sheet GI004: Delete this sheet as originally issued and substitute therefor the attached like numbered sheet dated 7/21/2017.
7) Sheet CS101: Delete this sheet as originally issued and substitute therefor the
8) Sheet CS102: Delete this sheet as originally issued and substitute therefor the
9) Sheet CS103: Delete this sheet as originally issued and substitute therefor the attached like numbered sheet dated 7/24/2017.
10) Sheet CS105: Delete this sheet as originally issued and substitute therefor the attached like numbered sheet dated 7/24/2017.
GENERAL:
Attached For Information Only are Questions and Answers dated 7/25/2017 and the Pre-Bid Site
Visit Sign-In Sheet.
ATTACHMENTS:
A/S
Questions and Answers For Information Only
W912DR-17-B-0017
July 25, 2017
Q1. Spec Section 32 92 00.13, page 12, par. 3.5 Bird Deterrent Removal references removing all bamboo poles after 1 year and disposing of off-site. However, note 5 on plan sheet CS103 and CS105 states that bamboo pole are to be removed and stockpiled at an approved location on the island. Which is correct?
A1. Note 5 on Plan Sheets is correct. See Amendment.
| Poplar FBO Amendment 1 072617.pdf |
| Poplar WetlandsPlantingAMD01 |
| AMD01 |
| Amended Drawings 01 |
| Amended Drawings 01 |
| Pages from Cell5AB_PlantingPlan_Amendment1_07-24-2017-2 |
QnAs01
Pre-Bid Site Visit Sign In Sheet
File details come from the government source that posted it. Updated .