A-10_Solicitation_for_W912DR-16-T-0097_for_WAD_Boiler_Cleaning.pdf
PDF 362 KB Posted
- Attached to
- Boiler Cleaning & Maintenance
- Solicitation number
- W912DR-16-T-0097
About this file
Solicitation for WAD Boiler Cleaning Maintenance Services
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-10_W912DR-16-T-0097_Amendment_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DR-16-T-0097 20-Sep-2016
b. TELEPHONE NUMBER
000-000-0000
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 05 Oct 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DR9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MICHAEL J GETZ
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE
10 S. HOWARD STREET
ROOM 7000
BALTIMORE MD 21201
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 410-962-2196 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$15.0
NAICS:
238220
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF76
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912DR-16-T-0097
Section SF 30 - BLOCK 14 CONTINUATION PAGE
INSTRUCTIONS TO OFFEROR
Quotes can be submitted via e-mail at Michael.J.Getz@usace.army.mil or fax at (410)-962-2001, ATTN:
Michael Getz or via mail to U.S. Army Corps of Engineers, Contracting Division, Simplified Acquisition Team, ATTN: Michael Getz, 10 South Howard Street, 7th floor, Room 7000, Baltimore, MD 21201- 2530.
This award will be Lowest Price Technically Acceptable (LPTA)
Submission requirements:
1) Technical capiblities: The contractor shall submit Two (2) Past performance references for similar Projects
2) Completed Past Performance Questionnaires
3) Quote- Bid Schedule
Must complete all line items to be considered for award. All line items must be priced. Quotes providing partial pricing shall be considered non-responsive.
Questions concerning this solicitation must be submitted by email no later than 27-SEP-2016 at 11:00 AM EST. This will allow responses to be posted on FBO prior to solicitation closing.
Email: Michael.J.Getz@usace.army.mil
Site Visit
A site visit is not required but if the offerors or quoters would like to have a site visit then they should contact John Fisher, Foreman Pipefitting & Plumbing Unit at 202-764-2010. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
PAST PEFORMANCE SUBMISSION: (See Attached Past Performance Questionnaire)
Submission Requirements: Past performance refers to the quality of recent project experience from the customer’s perspective. The Offeror shall arrange for the reference customer point of contact for two projects to fill out the Questionnaire and return directly to Michael Getz, Contract Specialist, e-mail at Michael.J.Getz@usace.army.mil. The questionnaires must be forwarded directly by the references. The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments. Two References from previously completed jobs must be submitted and include a point of contact and phone numbers. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as boiler cleaning and maintenance services. References must be recent within the past 3 years.
Evaluation Criteria: The Government will assess the degree of success of Offeror’s recent, relevant past performance. Owners/references will be asked to comment on items such as quality of boiler cleaning and maintenance services, timeliness, management of subcontractor work, including timely payment to subs or suppliers, safety, relations between customer and contractor, level of support for such things as correcting errors. Any offeror who has demonstrated satisfactory past performance will be considered eligible for award. Any offeror who demonstrated unsatisfactory past performance will not be considered eligible for award. If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, or if the offeror has no past performance record and cannot tie significant, relevant experience of key personnel proposed for this project to cited experience, past performance will be evaluated neither favorably nor unfavorably.
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: Past performance refers to the quality of recent project experience from the customer’s perspective. The Offeror shall arrange for the reference customer point of contact for two projects to fill out the Questionnaire and return directly to Michael Getz, Contract Specialist, e-mail at Michael.J.Getz@usace.army.mil. The questionnaires must be forwarded directly by the references. The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments. Two References from previously completed jobs must be submitted and include a point of contact and phone numbers. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as boiler cleaning and maintenance services. References must be recent within the past 3 years.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed E VG S M U N price(s)?
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
PRICE SCHEDULE
BID SCHEDULE
Annual Cleaning of Washington Aqueducts “Eight (8) Boilers”
BASE YEAR:
Unit Total Line Item Service Item Description Qty Unit Price Price
Annual Cleaning
Annual cleaning of Eight (8) boilers at the Washington Aqueduct per attached Statement of Work
1 JOB
Emergency Maintenance- Optional Item
Labor: Normal business hrs 4
HRS
Emergency Maintenance- Optional Item
Labor: After normal business hrs 3
HRS
Emergency Maintenance- Optional Item
Labor: Holidays 1
HRS
Total $_________
OPTION YEAR 1:
Line Item Service Item Description Qty Unit Price Price
Annual Cleaning
Annual cleaning of Eight (8) boilers at the Washington Aqueduct per attached Statement of Work
Emergency Maintenance - Optional Item
Labor: Normal business hrs 40 HRS
Emergency Maintenance - Optional Item
Labor: After normal business hrs 32 HRS
Emergency Maintenance - Optional Item
Labor: Holidays 16 HRS
OPTION YEAR 2:
Line Item Service Item Description Qty Unit Price Price
Annual Cleaning
Annual cleaning of Eight (8) boilers at the Washington Aqueduct per attached Statement of Work
Emergency Maintenance - Optional Item
Labor: Normal business hrs 40 HRS
Emergency Maintenance - Optional Item
Labor: After normal business hrs 32 HRS
Emergency Maintenance - Optional Item
Labor: Holidays 16 HRS
NOTE: Hourly rate quoted should include all mark-ups (labor burden, taxes, OH, etc.)
PERFORMANCE WORK STATEMENT
Washington Aqueduct Division PWS for Annual Cleaning & Maintenance of Eight Boilers
PERFORMANCE WORK STATEMENT (PWS)
1. INTRODUCTION/BACKGROUND: The Washington Aqueduct requires the annual cleaning of eight boilers, at various locations throughout the facility and emergency service for the boilers on an as needed basis. This contract is necessary in order to maintain the boilers in a safe and operational state, and to ensure the proper operation of the heating system allowing for a correct combustion and the consequent reduction of energy consumption, pollution, and therefore reducing the environmental impact. Preventive interventions on these boilers will reduce fuel consumption and maintenance costs. The services required include cleaning, closure, and ensuring the boilers pass the test standards utilized by the District Of Columbia Boiler Inspector.
2. GENERAL REQUIREMENTS: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Annual Cleaning of Boilers and emergency service on an as needed basis.
a. Perform the cleaning, and prepare for inspection of the boilers listed below:
1. Three (3) Hurst fire-tube boilers, Model S4-X-125-15 located in the basement of the Dalecarlia Administration Building 5900 MacArthur Blvd. Washington, DC 20016
2. One (1) Hurst fire-tube boiler, Model S750-30-11 located in the Dalecarlia Maintenance Bldg. 5900 MacArthur Blvd. Washington, DC 20016
3. Two (2) Smith Cast iron sectional boilers, Model 19HE-06-130290 and 19HE- 06- 130075 located in the Little Falls Pumping Station on the “C” floor.
4. Two (2) Hurst fire-tube boilers, model S5-X50-15 located in the McMillan Chemical building basement 2500 1st Street NW Washington, DC 20001-
b. Provide emergency maintenance service at pre-determined hourly rates. The emergency service consists of (per year) forty (40) hours service at straight time rate, thirty-two (32) hours at overtime rate (time & one half) and sixteen (16) hours at premium rate (week-ends & holidays). These hours will be utilized by the government on an as-needed basis. The hourly rate quoted is to be net, inclusive of all wages, payroll burden, taxes, insurance, small tools & equipment, overhead, profit, and all other mark-ups.
Non-Personal Services: The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the Contracting Officer immediately.
3. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years.
General Information
Quality Control: The contractor shall maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall include procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor shall submit its Quality Control Plan (QCP) to the COR for approval within 7 (seven) calendar days after contract award. After acceptance of the quality control plan, the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
Hours of Operation: The contractor is responsible for conducting business, between 07:00am through 02:30 pm, Monday thru Friday except on Federal holidays.
Place of Performance: The work to be performed under this contract will be performed at the following three locations:
1. Dalecarlia Water Treatment Plant 5900 MacArthur Blvd. Washington, DC 20016
2. Little Falls Pumping Station (access from Clara Barton Parkway, MD, East Bound)
3. McMillan Water Treatment Plant 2500 1st Street NW Washington, DC 20001-1022
Type of Contract: The Government will award a firm Fixed Price Contract.
Security Requirements: AT Level, I Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas will complete AT Level I awareness training within 30 calendar days after the contract start-date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, prior to issuance of Installation Access Passes. AT Level I awareness training is available online at:
https://atlevel1.dtic.mil/at .
Access and General Protection/Security Policy and Procedures. The contractor and all associated subcontractor employees will comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative). The contractor will also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshal office, director of emergency services, or security office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and local policy. In addition to the changes otherwise authorized by the
Changes Clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
iWATCH/iSALUTE Training. The contractor and all associated subcontractors will brief all employees on the local iWATCH/iSALUTE program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training will be completed within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance, with the results reported to the COR. According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training.
PHYSICAL Security: Contractor personnel will be escorted during the performance of this contract.
Contracting Officer Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies, coordinate availability of government furnished property, and provide site entry of Contractor personnel. A COR will be appointed at the time the contract is awarded. The COR is not authorized to change any of the terms and conditions of the contract.
Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:00 a.m. to 2:30 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
General: The Contractor shall furnish all supplies, material, equipment, facilities and services required to perform work under this contract.
Materials : All material used, partially or totally, to perform works required in this contract and not furnished by the U.S. Government, shall be included in the total contract cost and cannot be reimbursed by the U.S. Government.
Equipment: The Contractor shall furnish all necessary equipment, tools, supplies, and any other material necessary for the efficient, safe performance of this contract. Equipment shall be the type and size suitable for commercial operations.
Accidents: The Contractor shall be responsible for complying with any, and municipal laws, codes and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occurs as a result of the Contractor’s fault or negligence. The Contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract prior to Substantial Completion.
Conduct of Operations and Personnel: The Contractor shall ensure all the works are conducted in a manner that will minimize interference with the work of the Government personnel and other Contractors.
Clean-up and Disposal: The Contractor shall clean up the works area at the completion of the specific task, or at the close of each workday, whichever comes first, and properly dispose of waste generated in the performance of this contract. Waste disposal will be off site, by the contractor.
SPECIFIC TASKS:
Basic Services. The contractor shall provide all personnel, labor, vehicles, containers, tools, materials (including new gaskets on the boiler manholes and doors), equipment, transportation, supervision and other items and services necessary to manage and perform annual cleaning and inspection of the Boilers.
Cleaning Procedures
CLEANING
1. Open the boilers fire and watersides.
2. Remove and replace all old gasket material from doors and manhole ports.
3. Clean and vacuum combustion chamber.
4. Punch all tubes and vacuum soot and scale.
5. Drain and flush waterside.
6. Open and check all low water cut off valves, replace gaskets and test for leaks.
7. Clean and check pressure manifolds.
8. Leave boilers open for inspection by the D.C. Boiler Inspector.
9. Check pressure relief valves.
10. Clean work area daily.
11. Inspect all refractory in combustion chamber.
CLOSURE AND TESTING
1. Replace gaskets on manhole covers and hydro-test at 1 ½ times operating pressure and check for leaks.
2. Replace gaskets on fireside doors and seal.
3. Fire test and adjust the burners under no-load conditions for gas and # 2 fuel oil.
4. Fire test and adjust the burners under load conditions for gas and # 2 fuel oil, after the boilers are placed in service for the heating season. Test shall include CO2, CO, O2, and excess air, flue gas temperature, smoke draft and efficiency. A written report of the results shall be provided to the COR.
5. Lubricate related pumps, motors and bearings.
6. Test all contacts and safety switches for proper operation
Boilers Inspections and Testing Procedures
Perform inspection and testing immediately after the cleaning of each boiler.
Perform inspection and testing of each burner, clean as per manufacturer manual recommendations and adjust calibrations as necessary.
Once inspection/testing is completed, a written report of the findings shall be provided to the COR for each boiler.
Spare Parts: The amount for spare parts for each line item shall not be exceeded. Before replacing parts, the contractor shall submit prices for the parts to the COR (in accordance with the discount applied to the price listing that will be submitted at the time of the quote). The prices will be reviewed and evaluated by COR/POC, for approval. Contractor shall indicate the discount applied (in accordance with their offer).
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items, as follows. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Standard Performance
Threshold Method of Surveillance
PRS # 1.4 Perform the cleaning, the inspection and the hydraulic pressure test at max rate of eight
(8) boilers.
Efficiency shall be maintained at acceptable levels to ensure proper functionality of Boilers.
Zero Deviation
100% Inspection
PRS # 1.6.1The contractor shall develop and maintain an effective quality control plan (QCP) to ensure services are performed in accordance with this PWS.
Efficiency shall be maintained at acceptable levels to ensure non- recurrence of defective services.
PRS # 4.7 The Contractor shall clean up the works area at the completion of the specific task, or at the close of each workday
Efficiency shall be maintained at acceptable levels to ensure the performance of this contract be in compliance with all local laws and regulations.
PRS # 5.1 The contractor shall provide all personnel, labor, vehicles, containers, tools, materials, equipment, transportation, supervision and other item and services.
Efficiency shall be maintained at acceptable levels in order to perform the work subscribed under this contract.
7. DELIVERABLES
In fulfillment of this contract, the Contractor shall be required to provide deliverables. All deliverables shall be submitted to the Contracting Officer’s Representative (COR). The following tables detail the deliverables and delivery schedule. Except as indicated below, or with explicit written permission from the government, Deliverables shall not contain proprietary or copyrighted information or have any restriction on reproduction or distribution.
Unless otherwise specified, the Government will have a maximum of ten (10) working days from the day the draft deliverable is received to review the document, provide comments back to the contractor, approve or disapprove the deliverable(s). The contractor will also have a maximum of ten (10) working days from the day comments are received to incorporate all changes and submit the final deliverable to the Government.
CDRL 0001 - Contractor identification information
In accordance with paragraph 1.6.12
No later than seven (7) calendar days after the contract award date.
In case of any changes in the personnel staff, not later than seven (7) calendar days from entry on duty.
CDRL 0002 - iWATCH/iSALUTE and OPSEC Training certificates
In accordance with paragraph 1.6.7
Within 30 calendar days after completion of the training
CDRL 0003 - AT Level I Training certificates
In accordance with paragraph 1.6.7
Within 30 calendar days after completion of the training
CDRL 0004 - Contractor’s Key Personnel contact information
In accordance with paragraph 1.6.11
No later than seven (7) working days after the contract award date.
CDRL 0005 - Quality Control Plan
(QCP)
In accordance with paragraph 1.6.1
Within seven (7) calendar days after contract award.
(End of PWS)
QASP
QUALITY ASSURANCE SURVEILLANCE PLAN
Annual Cleaning of Eight (8) Boilers at Washington Aqueduct
Contract Description: The U.S. Army Corps of Engineers, Baltimore District, proposes to procure, by means of full and open competition, Cleaning of Eight (8) Boilers at the Washington Aqueduct.
The Cleaning is performed annually.
Contractor’s name: NA
1.PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
Confirm that the action is conducted utilizing proper procedures and in accordance with the approved work and safety plans.
Define the roles and responsibilities of participating Government officials.
Define the types of work to be performed with required end results.
Document the evaluation methods that will be employed by the Government in assessing the Contractor’s performance.
Provide the Surveillance Activities Table and Corrective Action Request (CAR) form that will be used by the Government in documenting and evaluating the Contractor’s performance.
Describe the process of performance documentation.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis.
However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
52.246-4 Inspection of Services – Fixed-Price
2.GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned KO: Colette Day Organization or Agency: USACE – Baltimore District: Contracting Office Telephone: 410-962-2187 Email: Colette.B.Day@usace.army.mil
b. Contract Specialist (KS) - The KS acts as an acquisition consultant and serves as liaison between the USACE – Baltimore District: Contracting Office and the requesting program office (USACE – Baltimore District: Washington Aqueduct.
Assigned KS: Michael Getz Telephone: 410-962-3455 Email: Michael.J.Getz@usace.army.mil
c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned COR: TBD Telephone:
Email:
d. Other Key Government Personnel - This includes Performance Monitors, Inspectors, etc. who act on behalf of the COR to monitor performance (i.e., Technical Manager).
Name: John Fisher Title: Pipefitter Telephone: 202-764-2010 Email: john.a.fisher@usace.army.mil
3.CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s Task Manager for this contract.
Task Manager – N/A Telephone:
Email:
4.PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, shown in Table 1 below, includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Table 1. Performance Standards for Cleaning Eight (8) Boilers
Task Indicator Standard Acceptable
Quality Level Surveillance
Method Incentive
Perform required cleaning on Eight (8) boilers.
Contractor to show capability of planning, executing and performing the required work to the Boilers.
Qualified personnel are available and in location as needed to properly perform maintenance tasks described in Statement of Work.
The Contractor shall provide related services such as preparing and providing required reports and submitting necessary information as specified. Tasks shall be performed in such a manner as to conform to the Statement of Work.
Direct Observation and 100% Inspection by COR and Technical Manager.
Favorable Past Performance Rating.
Perform required Cleaning of Eight (8) Boilers.
Contractor to show capability of planning, executing and performing the required work to the Eight boilers.
Qualified personnel are available and in location as needed to properly perform maintenance tasks described in Statement of Work.
The Contractor shall provide related services such as preparing and providing required reports and submitting necessary information as specified. Tasks shall be performed in such a manner as to conform to the Statement of Work.
Direct Observation and 100% Inspection by COR and Technical Manager.
Favorable Past Performance Rating
5.METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on- site representative when a defect is identified and inform the manager of the specifics of the problem.
The COR, with assistance from the KS, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.
REPORT
Issue a report and if required certifications as stated in the Statement of Work. . The government will analyze the contractor's reports.
6.RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a high to low, or neutral outcome. The following ratings shall be used:
HIGH:
Likely to cause significant disruption of schedule, increased cost or degradation of performance; risk may be unacceptable even with special Contractor emphasis and close government monitoring
MODERATE:
Can potentially cause some disruption of schedule, increased cost, or degradation of performance;
special Contractor emphasis and close government monitoring will probably be able to overcome difficulties
LOW:
Has little potential to cause disruption of schedule, increased cost or degradation of performance; normal Contractor effort and normal government monitoring will probably overcome difficulties
NEUTRAL: Unable to provide an evaluation.
7. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments or other actions.
b. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract
Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability. Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
OPSEC
2. Access and General Protection/Security Policy and Procedures. All contractor and all associated sub‐ contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
4. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub‐contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
13. Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
15. Pre‐screen candidates using E‐Verify Program. The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.uscis.gov/e‐verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
PRIMARY CONTRACTING OFFICER
"The primary Contracting Officer for this action is Colette Day, however, any Contracting Officer holding the appropriate warrant authority in the Baltimore District can serve as the Contracting Officer for this contract.
Also, please note that any time the primary KO changes, it will be incorporated into the contract via unilateral modification to the contract."
Section SF 1449 - CONTINUATION SHEET
SUBMISSION OF INVOICES
(a) Original invoices for services performed under the contract will be submitted to and payment will be made by:
USACE Finance Center Attn: Disbursing 5722 Integrity Drive Millington, TN 38054-5005
(b) One copy of all invoices shall be forwarded to the following for review and certification:
USACE Washington Aqueduct Division Attn: John Fisher 5900 Macarthur Blvd NW, Washington DC 20016
John.F.Fisher@usace.army.mil
CLAUSES INCORPORATED BY REFERENCE
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.208-9 Contractor Use of Mandatory Sources of Supply or Services MAY 2014 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Items OCT 2015 52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.219-14 Limitations On Subcontracting NOV 2011 52.222-50 Combating Trafficking in Persons MAR 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-18 Availability Of Funds APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-3 Continuity Of Services JAN 1991 52.243-1 Changes--Fixed Price AUG 1987 52.244-6 Subcontracts for Commercial Items JUN 2016 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Aug 2016)
AUG 2016
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991
252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
(i) technical capability of the item offered to meet the Government requirement
(ii) past performance
(iii) price
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding…