A10_W912DR-16-T-0072.pdf
PDF 301 KB Posted
- Attached to
- Secuirty Install services at three (3) U. S. Armed Forces Recruiting Offices in Mechanicsburg, PA
- Solicitation number
- W912DR-16-T-0072
About this file
The scope of this project involves the removal of mini-blinds labels stickers logos and graphics from all glass exterior entrance doors where FASARA Exterior Design Film will be installed. The contractor shall provide all required permits supplies labor material and travel to accomplish the installation of (1) Dual roller shades on all exterior storefront glass windows (excluding glass doors) (2) Peep-hole on rear exterior doors from leased space (3) Video Intercom Entry Control System for.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A10_W912DR-16-T-0072.pdf | ||
| Attachment_2_to_PWS.pdf | ||
| Attachment_6_to_PWS.xls | XLS spreadsheet | |
| Attachment_1_to_PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DR-16-T-0072 02-Aug-2016
b. TELEPHONE NUMBER
410-962-3987
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 09 Aug 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DR9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ERIC L TAYLOR
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE
10 S. HOWARD STREET
ROOM 7000
BALTIMORE MD 21201
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W912DR 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
RE DIV MILITARY PROJECTS SUP
G. DELLPHINE JACKSON
PO BOX 1715
BALTIMORE MD 21203-1715
TEL: 410-962-4723 FAX:
FAX:
TEL: 410-962-2196 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$7.0M
NAICS:
561790
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF67
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912DR-16-T-0072
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Windsor Park Shopping Center
FFP
Windsor Park Shopping Center, 5210 Simpson Ferry Road, Mechanicsburg, Pennsylvania 17055 FOB: Destination
NET AMT
0001AA 1 Each Video Intercom Entry System JP Series
FFP
A surface mounted video intercom entry control system shall be installed only at the exterior main entrance to the military recruiting station (rear doors are excluded). This system will require a coordinated electric door strike or maglock, deadlatch, appropriate power supply and release configuration.
0001AB 1 Each Frosted Film
FFP
When exterior glass entry door(s) are present, these door(s) shall have a translucent window film, 3M (or equal) Fasara Exterior film, finish: Milky Crystal, Product #:SH2MLCRX (or equal); and shall be applied to the exterior side of the glass. This film shall provide a frosted- glass effect and shall be installed by a 3M (or equal) approved installer following all applicable manufacturer instructions
0001AC 1 Each Dual Motorized Roller Shade
FFP
All exterior windows shall have roller shades installed. Shades to be Hunter Douglas, Contract Roller Shade: Model #RB500 or equivalent, finish to be "anodized aluminum
0001AD 2 Each Peephole
FFP
Install a door-view/peep-hole in every secondary access to each office and rear exit with 180 degree viewing range installation height: 5'-0" above finished floor.
Windsor Park Shopping Center
FFP
Windsor Park Shopping Center, 5248 Simpson Ferry Road, Mechanicsburg, Pennsylvania 17055
0002AA 1 Each Video Intercom Entry System JP Series
FFP
A surface mounted video intercom entry control system shall be installed only at the exterior main entrance to the military recruiting station (rear doors are excluded). This system will require a coordinated electric door strike or maglock, deadlatch, appropriate power supply and release configuration.
0002AB 1 Each Frosted Film
FFP
When exterior glass entry door(s) are present, these door(s) shall have a translucent window film, 3M (or equal) Fasara Exterior film, finish: Milky Crystal, Product #:SH2MLCRX (or equal); and shall be applied to the exterior side of the glass. This film shall provide a frosted- glass effect and shall be installed by a 3M (or equal) approved installer following all applicable manufacturer instructions
0002AC 1 Each Dual Motorized Roller Shade
FFP
All exterior windows shall have roller shades installed. Shades to be Hunter Douglas, Contract Roller Shade: Model #RB500 or equivalent, finish to be "anodized aluminum"
Clearview Shopping Center
FFP
Clearview Shopping Center, 1000 Carlisle Street, Hanover, Pennsylvania 17331
0003AA 1 Each Video Intercom Entry System JP Series
FFP
A surface mounted video intercom entry control system shall be installed only at the exterior main entrance to the military recruiting station (rear doors are excluded). This system will require a coordinated electric door strike or maglock, deadlatch, appropriate power supply and release configuration
0003AB 2 Each Frosted Film
FFP
When exterior glass entry door(s) are present, these door(s) shall have a translucent window film, 3M (or equal) Fasara Exterior film, finish: Milky Crystal, Product #:SH2MLCRX (or equal); and shall be applied to the exterior side of the glass. This film shall provide a frosted- glass effect and shall be installed by a 3M (or equal) approved installer following all applicable manufacturer instructions.
0003AC 4 Each Dual Motorized Roller Shade
FFP
All exterior windows shall have roller shades installed. Shades to be Hunter Douglas, Contract Roller Shade: Model #RB500 or equivalent, finish to be "anodized aluminum"
0003AD 1 Each Peephole
FFP
Install a door-view/peep-hole in every secondary access to each office and rear exit with 180 degree viewing range installation height: 5'-0" above finished floor
INSTRUCTIONS TO OFFERORS
Award will be made to the offeror with the Lowest Priced Technically Acceptable (LPTA) proposal.
Quotes can be submitted via e-mail to Eric L. Taylor, Contract Specialist at email: eric.l.taylor@usace.army.mil or fax at (410)-962-2001, ATTN: Eric L. Taylor or also via mail to U.S. Army Corps of Engineers, Contracting Division, Simplified Acquisition Team, ATTN: Eric L. Taylor, 10 South Howard Street, 7th floor, Room 7000, Baltimore, MD 21201-2530.
The Offeror shall submit:
(1) A detailed breakdown of the video intercom system listing the components to the system(s) including the quantities for each of the components along with the quote.
(2) Capabilities statement
(3) Two (2) past performances on projects that are similar to the scope of work in this solicitation and any additional information demonstrating technical ability under NAICS 561790 to meet the requirements of the Government for this project.
(4) Warranty - Shades to have a lifetime warranty and pass the NFPA 701 Small Scale test.
The contractor shall supply a one (1) year warranty on both labor and material from date of acceptance on all other products.
Questions concerning this solicitation must be submitted in writing by email only to eric.l.taylor@usace.army.mil no later than 5 August 2016 at 12:00 PM EST. This will allow responses to be posted on FBO prior to solicitation closing.
Must complete all line items to be considered for award. All line items must be priced.
Partial pricing shall be considered non-responsive.
Site Visit
Prospective bidders are advised to contact the following point of contact should they wish to visit the project before bidding:
Barbara J. Harris at 410-962-0774 or email barbara.j.harris@usace.army.mil In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Please bring valid photo identification and a copy of the solicitation for verification purposes.
EVALUATION CRITERIA
Evaluation Criteria:
Factor 1: Technical
The quotes were evaluated to ensure the contractors described methods and approach for fulfilling the listed specifications in sufficient detail to communicate a feasibility of approach as described below.
Feasibility of Approach - The quotes were evaluated to determine whether the contractor's methods and approach to meeting the requirements provide the Government with a high level of confidence of successful completion. The evaluation considered the realism of the allocated labor mix and materials offered.
Quality of Materials – The quote meets every minimum material specification provided in the solicitation package.
Extra consideration is not provided for exceeding specifications.
Warranty – Warranty information is quoted and provided with the solicitation.
The Technical Factor Ratings. The adjectival ratings depict how well the quote meets the Technical requirements.
Marginal levels of technical expertise and methodology will be interpreted to indicate a lack of understanding concerning the requirements and may result in the entire quote receiving an unacceptable rating and/or being eliminated from the competitive range.
1. Acceptable- Quote clearly meets the minimum requirements of the solicitation.
2. Unacceptable- Quote clearly does not meet the minimum requirements of the solicitation.
Factor 2: Past Performance
Factor 2 (Past Performance) will be evaluated utilizing the information provided by the Contractor, the Past Performance Questionnaires, and by checking other sources such as the Contractor Performance Assessment Reporting System (CPARS).
Evaluation Criteria: The Government will assess past performance using a two part assessment of the relevancy of, and the Contractor’s performance on, recent projects. Past performance information that will be considered may include, but not limited to: timeliness, management of subcontractors, timely payment to subcontractors or suppliers, safety, and customer relations. Information gathered from other sources (e.g., CPARS) may also be used in the evaluation. For
Contractors with “relevant” projects will be evaluated on how well they have performed. Contractors who demonstrate satisfactory past performance will receive a performance confidence assessment rating of “satisfactory” and will be considered eligible for award. Contractors who receive a “no confidence” performance confidence assessment rating will not be given an award. If Contractor does not have any relevant experience, a rating of “neutral” will be given and the Contractor will still be considered eligible for award.
To be considered responsive, the contractor shall:
1. Provide all information required in the chart, including reference contact information.
2. Provide projects that are relevant.
3. Provide projects that are recent.
4. Provide project narratives which detail the relevancy of the referenced project to the current PWS, with similarities highlighted in yellow.
The government will evaluate the past performance information as follows:
Past Performance Relevancy Ratings
1. Relevant: Present/past performance effort involved a project that is/was similar in size, scope and complexity to the current requirement.
2. Somewhat Relevant: Present/past performance effort involved a project that is/was somewhat similar in size, scope and complexity to the current requirement.
3. Not Relevant: Present/past performance effort involved a project that is/was marginally or not similar in size, scope and complexity to the current requirement.
Performance Confidence Assessment Rating
1. Satisfactory Confidence: Based on the Contractor’s recent/relevant performance record, the government has a reasonable expectation that the contractor will successfully perform the required effort.
2. No Confidence: Based on the Contractor’s recent/relevant performance record, the government has no expectation that the contractor will be able to successfully perform the required effort.
3. Neutral: No recent/relevant performance record is available or the contractor performance record is so sparse that no meaningful confidence assessment rating cannot be reasonably assigned.
Factor 3: Price
Price/Cost Factor Evaluation - Price will be evaluated in accordance with FAR 13.106-2. The Government requires detailed pricing information to assist in determining the extent to which the price is fair and reasonable. The Government will evaluate quotes for award purposes by adding the total of all CLIN prices to ensure that pricing in not unbalanced.
No adjectival rating will be given for cost/price. The following criteria will be used to evaluate cost/price:
1) Fair and Reasonableness
2) Realism
3) Completeness, Accuracy, and balance of the quote.
The total price shall be equal to the sum of the total of all of the cost elements. The Government will verify the Quote calculation of the total quoted price. The Government will evaluate quotes for award purposes by adding the total price for all items for the basic requirement.
PAST PERFORMANCE QUESTIONAIRE
PAST PEFORMANCE SUBMISSION: (See Attached Past Performance Questionnaire) Submission Requirements: The Offeror shall provide proof of a Certified General Appraiser license in the State of New Jersey. A trainee or associate appraiser is not acceptable. Past performance refers to the quality of recent project experience from the customer’s perspective. The Offeror shall arrange for the reference customer point of contact for two projects to fill out the Questionnaire and return directly to Eric Taylor, Contract Specialist, e-mail at Eric.L.Taylor@usace.army.mil. The questionnaires must be forwarded directly by the references. The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments. Two References from previously completed jobs must be submitted and include a point of contact and phone numbers. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as appraisal services. References must be recent within the past 3 years.
Evaluation Criteria: The Government will assess the degree of success of Offeror’s recent, relevant past performance. Owners/references will be asked to comment on items such as quality of service, timeliness, management of subcontractor work, including timely payment to subs or suppliers, safety, relations between customer and contractor, level of support for such things as correcting errors. Any offeror who has demonstrated satisfactory past performance will be considered eligible for award. Any offeror who demonstrated unsatisfactory past performance will not be considered eligible for award. If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, or if the offeror has no past performance record and cannot tie significant, relevant experience of key personnel proposed for this project to cited experience, past performance will be evaluated neither favorably nor unfavorably. Award of contract will be based on Lowest Price Technically Acceptable (LPTA). To qualify as technically acceptable, the responsible contractor provides a quote which conforms to the performance work statement; has no negative past performance; and submits the lowest price.
PAST PEFORMANCE SUBMISSION: (See Attached Past Performance Questionnaire)
Submission Requirements: Past performance refers to the quality of recent project experience from the customer’s perspective. The Offeror shall arrange for the reference customer point of contact for two projects to fill out the Questionnaire and return directly to Eric Taylor, Contract Specialist, e-mail at Eric.L.Taylor@usace.army.mil. The questionnaires must be forwarded directly by the references.
The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments. Two References from previously completed jobs must be submitted and include a point of contact and phone numbers. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as appraisal services. References must be recent within the past 3 years.
Evaluation Criteria: The Government will assess the degree of success of Offeror’s recent, relevant past performance. Owners/references will be asked to comment on items such as quality of service, timeliness, management of subcontractor work, including timely payment to subs or suppliers, safety, relations between customer and contractor, level of support for such things as correcting errors. Any offeror who has demonstrated satisfactory past performance will be considered eligible for award. Any offeror who demonstrated unsatisfactory past performance will not be considered eligible for award. If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, or if the offeror has no past performance record and cannot tie significant, relevant experience of key personnel proposed for this project to cited experience, past performance will be evaluated neither favorably nor unfavorably.
Award of contract will be based on Lowest Price Technically Acceptable (LPTA). To qualify as technically acceptable, the responsible contractor provides a quote which conforms to the performance work statement; has no negative past performance; and submits the lowest price.
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: Past performance refers to the quality of recent project experience from the customer’s perspective.
The Offeror shall arrange for the reference customer point of contact for two projects to fill out the Questionnaire and return directly to Eric L. Taylor, Contract Specialist, e-mail at Eric.L.Taylor@usace.army.mil. The questionnaires must be forwarded directly by the references. The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments. Two References from previously completed jobs must be submitted and include a point of contact and phone numbers. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as what is described in the PWS.
References must be recent within the past 3 years.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed E VG S M U N price(s)?
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
PERFORMANCE WORK STATEMENT
ARMED FORCES RECRUITING FACILITIES
FY16 SECURITY UPGRADES
BALTIMORE DISTRICT
Performance Work Statement (PWS)
A. GENERAL
1. Scope of work The scope of this project involves the removal of mini-blinds, labels, stickers, logos and graphics from all glass exterior entrance doors where FASARA Exterior Design Film will be installed. The contractor shall provide all required permits, supplies, labor, material and travel to accomplish the installation of: (1) Dual roller shades on all exterior storefront glass windows (excluding glass doors); (2) Peep-hole on rear exterior doors exiting leased space;
(3) Video Intercom Entry Control System for Single and Multiple Service locations; and (4) FASARA Exterior Frosted Film on exterior storefront glass doors. This project is being executed by the U.S. Army Corps of Engineers, Baltimore District (hereafter USACE). Contractor shall furnish all required permits, equipment, materials, labor and transportation necessary to perform the entirety of the scope. Services shall be provided in accordance with the following scope of work and schedule. Contractor’s work and responsibility shall include, but not limited to, all job planning to include exact field measurements, moving and returning furniture as required, training of the system, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein.
2. Attachments
Attachment 1 - A table showing the recruiting office locations and other site-specific information.
Attachment 2 – Recruiting Center Floor plans.
Attachment 3 – Special Applications #1 GT Series (Multi Service w/Shared Entrance Door)
Attachment 4 – Special Application #1 JP Series (Single or Multi Service w/Separate Entrance Doors)
Attachment 5 – Peep Hole, Frosted Film, Single/Dual Motorized Roller Shades
Attachment 6 – Contractor Monthly Record of Accidents
3. Locations Recruiting facilities are located in Central Pennsylvania.
4. Technical Point of Contact, Corps of Engineers’ Representative (COE)
The Technical Point of Contact will be the designated Corps of Engineers’ Representative (COE), Barbara Harris or request additional information at 410-962-0774 or email Barbara.j.harris@usace.army.mil.
5. Schedule
Work shall be completed within 1 year/365 days of Notice to Proceed (NTP). The Contractor shall provide the COE Representative a schedule within five to seven (5-7) business days’ notice prior to the start of work for each location. The project area will be open to the Contractor, upon approved scheduled dates and times, (generally Monday through Friday within the hours of 9:00 AM and 5:00 PM) and all work must be done during those hours unless additional hours are approved by the COE Representative. No work shall be done on weekends, evenings, or Government holidays. Approval for the scheduled dates and times shall be given by COE Representative.
6. Federal Holidays
Each scheduled service item in the Scope of Work (paragraph A.1 above) has performance time allowance with the specifications found at Part III below. Services are not permitted on weekends or federal holidays. For information purposes only, federal holidays are as follows:
New Year’s Day – January Martin Luther King - January
Presidents Day – February Memorial Day - May Independence Day – July Labor Day – September Columbus Day – October Veterans Day – November Thanksgiving – November Christmas Day – December
7. Work Plan (WP)/Schedule A work plan and schedule submitted by the contractor is required and shall be approved by the COE Representative.
8. Safety The contractor will comply with all pertinent provisions of the latest edition of the U.S. Army Corps of Engineers Safety and Health Requirements Manual COE EM 385-1-1. The manual may be viewed at the following location:
http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx . The contractor shall also comply with all OSHA work safety standards. The COR or Contracting Officer can and will order the cessation of work at any time should the safety of employees and visitors become jeopardized.
9. Accident Prevention Plan (APP)
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. The APP shall be due 10 days after contract award. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Federal, State, and local safety and health requirements.
The APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, State and local safety and health laws, rules, and regulations. The Contractor shall comply with Federal Acquisition Regulation Clause No. 52.236-13 for Accident Prevention, which is added by reference. Special attention shall focus on the requirements of EM 385-1-1, specifically Section 01.A.11 through 01.A.18, Figure 1-2 AHA, and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). The APP shall be developed by a qualified person. The contractor shall be responsible for documenting the qualified person’s credentials. Work shall not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project.
As part of the APP the contractor must prepare a Site Safety and Health Plan (SSHP) to address all site activities.
The SSHP shall be prepared in accordance with requirements of Appendix C in the SSHP, and EM 385-1-1 (latest version) and also satisfy state requirements that call for a Contingency Plan under remediation regulations. The SSHP shall be attached to the APP as an appendix. SSHP elements adequately covered elsewhere in the APP need not be duplicated again in the SSHP.
The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
The Contractor shall conduct a safety meeting at each project site on the first day of work, whenever a new activity or phase of work begins. All safety meetings shall be documented.
10. Accident Reporting All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $2,000.00, shall be verbally reported to the COR within 24 hours of the incident. Serious accidents as described in
EM 385-1-1 Section 01.D.02 shall be immediately reported to the COR. ENG Form 3394 shall be completed and submitted to the COR within five working days of the incident. ENG Form 3394 can be found at:
http://asktop.net/wp/download/25/ENG%20FORM%203394%20United%20States%20Army%20Corps%20of%20E ngineers%20Accident%20Investigation%20Report.pdf
The Contractor shall complete the “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) with the information on the attached EXCEL spreadsheet. Hours shall be submitted through the Quality Control System (QCS) to the COR no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the GDA shall be electronically.
11. Preconstruction Meeting Prior to the start of the project, the COE Representative will schedule and conduct a “Prework Meeting.” The Corps’ Representative, Contractor’s Project Manager and Quality Control Personnel shall participate in this meeting. This meeting will be held either on-site or teleconference call at the time, date and location agreeable to the COE Representative and Contractor. No work shall be performed under this contract prior to this meeting. The purpose of the meeting is to enable the COE’ Representative to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This meeting will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. During the Prework Meeting the Contractor shall provide the name of the project superintendent with a telephone number for project coordinator.
The following is a general list of items for discussion during this Preconstruction Conference:
i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.
ii. Contractor’s Safety Program (including sub-contractors).
iii. Modified Activity Hazard Analysis (Submitted & accepted prior to start of work on site)
iv. Accident Reporting (ENG Form 3394)
v. Correspondence, Communication and Administrative Procedures.
vi. Invoicing and payment.
It is not permissible to contact Military personnel, at the facilities, with questions or ask them direction regarding the work described. You must contact the Army Corps of Engineers Representive listed above.
12. Qualifications and Professional Requirements The Contractor shall possess the necessary professional and technical experience to complete the tasks and accomplish the service requirements of this PWS in a timely manner.
The Contractor must remain current with, all professional certifications/licenses required to perform the tasks listed in the PWS. The Contractor’s personnel must be qualified and available to commence work at Notice to Proceed
(NTP).
13. Permits The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract. Contractor shall immediately provide copy of permits to the COE Representative upon request.
14. Security
The Contractor shall comply with all established security policies and all contractor personnel must be able to produce a picture identification at any time. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the
Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least a 24 hour notice of any such closure.
15. Damage to Government and Private Property
The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the Contractor’s actions. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the COE Representative immediately of damage to Government and private property and injury to any person resulting from the Contractors’ operation.
Also, the Contractor shall notify the COE Representative of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed.
16. Contractor’s Personnel
a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names prior to their working on Government Property. The contractor’s employees shall have a valid State or Government issued identification card available for verification at all times.
b. Employee Conduct - The Contractor shall be responsible for seeing that the firm’s employees strictly comply with all Federal, State, and Municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees and/or termination of the contract. Smoking, chewing tobacco and spitting are prohibited inside and within 25 feet of any entrance/exit or air-intake to recruiting facilities.
c. Removal of Contractor’s Employees - The COE Representative may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the COE Representative, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
d. Alcohol, drugs, prescription narcotics and firearms are prohibited on project grounds.
17. Inspections
a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization for each separate service item is in full compliance with this contract and the instructions, provisions, specifications, and floor plans herein.
b. General Inspection - Upon the completion of work at each facility, the Contractor will perform an inspection of all areas under this contract to insure compliance with the specifications in Part C below. The Contractor or his representative must be able to commit personnel, equipment, and resources to correct deficiencies. The Services Inspection Form (form to be provided to the Contractor at the pre-construction meeting) will be submitted to the CO E Representative to allow verification of results for payment. A Government representative may accompany the contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.
c. Equipment/Supplies Inspections - The COE Representative may inspect required equipment and supplies at any time when in use on Government property. Any individual, crew, or equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and accepted by the COE Representative. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
18. Payment After final inspection and acceptance by the Government of each set of deliverables under paragraph 5 above, the Contractor shall submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, location, dates of service, description of work, quantities and cost per location. This is to be accomplished for each of the items in the scope of work at paragraph 1 above by materials and by labor and total amount due per location.
Attention: Barbara Harris
City Crescent Building U.S. Army Corps of Engineers 10 S. Howard Street, 7th Floor Room 7620
Baltimore, Maryland 21201
Or email to: Barbara.j.harris@usace.army.mil.
19. Warranty
a. Shades to have a lifetime warranty and pass the NFPA 701 Small Scale test.
b. The contractor shall supply a one (1) year warranty on both labor and material from date of acceptance on all other products.
B. TECHNICAL REQUIREMENTS
1. Summary All materials shall be new and unused at the time of installation.
2. Condition of Equipment
All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements.
3. Changes to Frequency and/or Quantities
The Government reserves the option, should it become necessary, to decrease supplies in any or all project locations. The Government may also, at any time during the duration of this contract, close any property or portion of the property and delete any subsequent service in the closed property or location. The Contractor shall be given adequate notification to prepare for either contingency. This decrease will be deducted in accordance with the bidding schedule or a negotiated cost. In addition, the COE Representative may on special occasions decide to reschedule a service frequency in order to avoid conflict with visitation or unnecessary expense. A minimum of twenty-four hours notification shall be given to the Contractor in such cases.
4. Existing Conditions The attached Floor Plans and photographs provide a general representation of the facilities and work areas.
5. Requests for Information Requests concerning the work of this project should be directed to the Technical Point of Contact.
6. Submittals
Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be accomplished using proper internal controls and review procedures.
7. Clean Up
The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area free from the accumulation of waste materials daily. Upon completing work in an area, the Contractor shall remove any tools, equipment, and trash that are not the property of the Government. Upon completion of work, the Contractor shall clean up the job site to a professional appearance to the satisfaction of the Government.
8. Government Resources
The Contractor is responsible for providing all materials to complete the project. Unless specified elsewhere in the contract, the Government will not provide any equipment, telephone services, or other resources. The Contractor may use the sanitary facilities, electricity and water at the Armed Forces Recruiting Facilities, but must proceed directly to and from the sanitary facilities.
9. Omissions This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable and functional product.
10. Other Contracts The Government may undertake or award other contracts for additional work not related to this contract and the Contractor shall fully cooperate with other contractors working onsite and Government employees. The Contractor shall not commit or permit any act that will interfere with the performance of work by another contractor or by Government employees.
11. Receiving and Storing Materials The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive nor store material or supplies for the Contractor and will not be responsible for damage to Contractor equipment or materials.
The Contractor shall keep hardware free of dirt and debris. Materials shall be handled in a manner that ensures delivery to the office location in sound, undamaged condition. The Contractor is responsible for the disposal of materials off site.
12. System Training
The Contractor/installer shall provide training to each Service’s assigned recruiting facility personnel (i.e. Army, Navy, Air Force, Air Force Reserve, Marine Corps, Air National Guard). Training to be a minimum of 1 hour and provide for the operation of the system, the keypad usage, the changing of the entry code(s), and other remote entry usage functions. Expect to train 2-25 Recruiters per location; no training materials are required.
C. PRODUCTS
U. S. Armed Forces Recruiting Facilities
Note: All supplied/installed components/equipment shall be equal to or exceed the performance of those models…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .