This solicitation is for the Renovation and Repair of Building "K" on Fort Meade, Maryland. This project consist of the construction for the renovation and repair of the interior. The exterior of the building and roof w ere repaired under a separate contract.
Funds are currently available for this acquisition.
This is an unrestricted acquisition utlizing a single phase best value approach.
1. The Statement of Aff iliation (SOA) w as due during the Pre-solictation Phase (24 June 2016).
The magnitude of construction is betw een $25,000,000 and $100,000,000. NAICS Code: 236220 Small Business Size Standard: $36.5M
Deadline for submission of w ritten requests for information (RFIs) 5 AUG 2016
All RFI's should be submitted via email to Renee McMillan-Cox at melissa.r.mcmillan-cox@usace.army.mil and Nancy J Sykes at nancy.sykes@usace.army.mil.
Site Visit is scheduled MONDAY, 18 JUL 2016 at 9:00 AM local time. Contractors cannot pick up draw ings w ithout an approved Fort George G Meade (FGGM) Form 191 and the Statement of Aff iliation (SOAs) vetted by the client. For instructions please contact Renee McMillan-Cox at melissa.r.mcmillan-cox@usace.army.mil.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-Jul-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________12 Aug 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S.ARMY CORPS OF ENGINEERS, BALTIMORE
10 S. HOWARD STREET
ROOM 7000
BALTIMORE MD 21201
W912DR
PAGE OF PAGES
1 OF
CODE W912DR
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour) Sealed envelopes containing offers
REAL PROPERTY SERVICES F.O.
300 SENTINEL DRIVE
STE 400
ANNAPOLIS JUNCTION MD 20701
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 410-962-2197 TEL: FAX:
W912DR-16-R-0010 62
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912DR-16-R-0010
Section 00010 - Solicitation Contract Form
PRICE SCHEDULE
1.1 BASIS OF BIDS
1.1.1 Unit Price Schedule
This contract will be awarded as one lump sum with unit prices required for specifically selected work.
A schedule of the unit price work is contained in Standard Form SF 1442, "Solicitation, Offer and Award." See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236- 16, Quantity Surveys," "DFARS.252.236-7008, Contract Prices - Bidding Schedules."
NOTES TO OFFERORS
Offerors must quote on all items including Optional Items. Failure to quote on all items may be cause for rejection of the proposal.
Optional Items may be exercised at any time within 180 calendar days after contract award.
The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above. The Government may exercise any, all or none of the listed Optional Items in any order.
No additional time for contract completion will be allowed when an Optional Item is exercised.
VARIATION IN ESTIMATED QUANTITIES. If the quantity of a unit-price item in this contract is an estimated quantity and the actual quantity of the unit-price item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified. (FAR 52.211-18 APR 1984)
SECTION 01 01 00
PRICE SCHEDULE
ITEM NO
DESCRIPTION
ESTIMATED
QUANTITY
UNIT UNIT
PRICE
EXTENDED AMOUNT
0001 All costs in connection with the renovation of Building K, complete as shown on drawings and specified, but exclusive of Base Bid Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010 and Optional Bid Item 0011 below
1 JOB
0002 Allowance for costs associated with Baltimore Gas and Electric Company (BGE) gas and electric installation, complete as shown on drawings and specified, which is estimated but not guaranteed to be approximately $30,000.
1 JOB
0003 Concrete repair, small repair of spelling less than 1 square foot and less than 1- 1/2 inch deep (exclusive of reinforcement or galvanic anodes).
9 CF
0004 Concrete repair, medium, repair of spelled concrete up to 5 square feet, 1- 1/2 inches to 4 inches deep(exclusive of Reinforcement steel or galvanic anodes).
63 CF
0005 Concrete repair, large, repair of spelled concrete greater than 5 square feet or more than 4inches deep(exclusive of Reinforcement steel or galvanic anodes).
CF
0006 Deformed steel bars for concrete reinforcement.
100 LB
0007 Drill and epoxy grout concrete reinforcement steel less than % inch Diameter.
LF
0008 Galvanic anodes. 40 EA 0009 Epoxy painting of existing interior concrete ceiling, walls and columns to cover existing lead paint.
1 JOB
0010 Removal of lead paint from concrete under slabs, beams, walls and columns (approximately 150,000 SF)
150,000 SF
Optional Bid Item
All additional costs in connection with substituting wall coverings in lieu of wall paint which is in the base bid, complete as shown on drawings and Specified.
1 JOB
TOTAL ESTIMATED BASE AND OPTIONAL BID AMOUNTS $____________________
Section 00100 - Bidding Schedule/Instructions to Bidders
PLANS AND SPECIFICATIONS
Plans and specifications will be provided in person on a disk to pre-approved offerors. A certification statement at time of pickup will be required to be signed by a corporate officer on behalf of the offeror. Also, the individual picking up the plans and specifications will be required to show a photo ID and provide a business card at the time of pick up. A copy of the certification statement to be provided is attached below. Copies of all drawings, site plans, and specifications must be returned no later than 60 days after public notification of award. The awardee is permitted to retain their respective copy until further notification. To arrange for pick-up please email:
Renee McMillan-Cox at melissa.r.mcmillan-cox@usace.army.mil and Nancy Sykes at nancy.sykes@usace.army.mil.
CERTIFICATION STATEMENT
Building K, Fort Meade, Maryland
I, _________________________, certify that I am the ________________________________________ of the corporation named as bidder/offeror therein and certify that I have a comprehensive understanding of the handling designation "Unclassified//For Official Use Only (U//FOUO)" on all documents received. I understand that U//FOUO is a document designation, not a classification. This designation for the provided material is information or material which, although Unclassified, may not be appropriate for public release in accordance with DoD Directives and Regulations. Dissemination must be approved by the government prior to release
FTP Sites are NOT allowed.
I understand that access to review these drawings and specifications is limited to only the personnel who have been pre-approved and vetted by the government. All employees of the company that I represent are U.S. citizens, or U.S. persons as defined in 8 U.S.C. 1 101(a)(20) or Title 8 U.S.C. 1 324b(a)(3), who will work on the Joint Operation Center Project and who will handle project information, in any format.
The Documents that are reproduced will be accounted for in a Distribution Log, in a manner consistent with the document control procedures outlined in the Construction Security Plan (2.03.E). Transmission of the date via electronic media requires protection in accordance with ICD 705, Chapter 1.F.4. The Distribution Log must be available electronically to the Government immediately upon request.
These drawings and specifications remain the property of the U.S. Government. I also attest to my understanding that all material provided shall be returned to the Real Property Services Field Office within one (1) week after award. The awardee is permitted to retain their respective copy until further notification.
Signature: ___________________________________
Phone Number: ( ) _________________________
Document No(s):
Attach a business card:
DOC CONTROL & DISTRIBUTION
Document Control Procedures:
mailto:nancy.sykes@usace.army.mil
Contractors are responsible for document control. Only contractors with approved Statements of Affiliations will be provided the plans and specifications. The Prime Contractor will be responsible for distribution to their subcontractors. Statements of Affiliation are not required in order for subcontractors to receive the documents however the prime contractor should use their discretion on how the documents are distributed. It is highly recommended the Prime contractor does not distribute more than is necessary in order to bid on the project.
Therefore, the Prime Contractor should consider only providing up to 50% of the document. Contractors are responsible for keeping a tracking log of all subcontractors that have received the plans and specifications.
Please refer to the Division 1 Specifications, Site Construction Security Plan (SCSP), Paragraph 2.03.5 Document
Control Procedures. The ICS 705-1.F.4 is available online and provides that "Construction plans and all related documents shall be handled and protected in accordance with the CSP. If classification guides dictate, plans and related documents may require classification. Under no circumstances should plans, diagrams, etc. that are identified for a SCIF be sent or posted on unprotected information technology systems or Internet venue without encryption”.
Document Control Distribution:
Files CAN be emailed, but must be BOTH encrypted and password protected. Files physically transmitted on CD can be sent, but must also be BOTH encrypted and password protected. The shipping/distribution should be logged and tracked (via FedEx, UPS, USPS Certified Return Receipt). Files can be viewed by subcontractors in person, provided that the Prime contractor controls the document access at their facility.
Transmission of the date via electronic media requires protection in accordance with ICD 705, Chapter 1.F.4. The Distribution Log must be available electronically to the Government immediately upon request.
All hard copy plans and specifications printed and distributed must be returned within one (1) week after award.
All electronic copies must be deleted and destroyed. All CD’s must be returned within one (1) week after award.
FTP Sites are NOT Allowed.
SUBMISSION REQUIREMENTS
SECTION 00100
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1.0 OVERVIEW.
1.1 This Request for Proposal (RFP) solicits for the repair of the INSCOM Building K on Fort Meade, Maryland.
1.2 The award will be a single Firm Fixed-Price Design-Bid-Build contract. This project includes extensive renovation and repairs to a 96,496 gross square foot general Administrative facility that was damaged by fire and is in a failed condition. The building has three (3) stories with a basement and attic. The three (3) stories above grade total 72,441 gross square feet. The basement is 24,052 gross square feet. This project will upgrade the building systems and allow for the introduction of new code compliant interior space with adequate handicap access, life safety, and reliability of systems. Utility systems capacity and reliability will be designed to support mission critical loads to mandated standards commensurate with the facility mission criticality review. Information assurance requirements will be incorporated into the design. This project includes: demolitions and replacement of the HVAC and electrical systems, emergency switchboard, uninterruptable power supply (UPS), automatic transfer switches (ATS), a generator yard, communications, renovate and repair the administrative offices to include storage space, restrooms, training areas, etc., install light fixtures with code compliant units, replace flooring, installation of a code compliant fire alarm and suppression system, installation of a passenger elevator and demolition of existing ramps and walkways to upgrade to American Disabilities ACT (ADA) entrance ramp; replace and repair of the conduit distribution throughout the facility. There may be minimal asbestos, lead paint and bio-hazards remediation. This project requires a back-up Bi-Fuel Emergency generator that can meet all of its requirements. The renovated facility will need to meet minimum DOD Antiterrorism standards. There will be a conversion of the existing space adding secured space. Also, within this project will involve the installation of one new Fire Alarm control Panel with fire alarm devices. This piece of equipment is required to control the sequence of operations of the fire alarm devices and provide a display of the inputs and outputs. The devices such as visual notification appliances (strobes), audible notification appliances (speakers), initiating devices (e.g. manual pull stations, smoke detectors, duct smoke detectors, and monitor modules), and control devices (e.g. control modules) will be required for this project. These devices must all be compatible with the fire alarm control panel (FACP) provided by the same manufacturer in order to send and receive addressable signals to/from the FACP.
1.3 The purpose of these instructions is to establish a uniform evaluation procedure for the proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). In as much as the proposal shall describe the capability of the Offeror to perform the resulting contract, the proposal shall be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.
1.4 For the purposes of this solicitation, the Government will utilize a single phase process.
2.0 GENERAL INSTRUCTIONS
2.1 Firms formally organized as a Design-Bid-Build (DBB) team that have been associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. A firm may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.
2.2 Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement. The teaming agreements shall be provided and submitted in Tab A of Binder 1.
2.3 If applicable, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.
2.4 Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), subcontractors that will perform major or critical aspects of this requirement, or other associated business, will not be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight of the information to this procurement. Information about subcontractors may not be given much weight unless the proposal contains evidence that the subcontractor is committed to perform the work. If information about a subcontractor is properly submitted and given weight during the evaluation, the expectation is that this subcontractor will perform this work.
Before utilizing another subcontractor for this work, the Government must consent.
2.5 Offerors shall submit their proposal to the address shown in Block 7 of Standard Form 1442.
2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
3.0 GENERAL PROPOSAL FORMAT:
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each binder of the proposal shall contain a detailed table of contents. The complete table of contents shall be included in each binder. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 Printed Matter Submissions. Written material shall be on 8 ½ x 11 inch paper printed in no less than a 10 point font. For organization charts or schedules, a folded 11” x 17” format may be used. The page count is at the discretion of the contractor. However, it is anticipated this should be approximately 40 pages but no more than 50 pages in total.
3.4 Binders. Proposals shall be submitted in tabbed, three ring binders.
3.5 Number of Copies. Offerors shall submit the following:
Binder 1 (Technical): an original and five copies Binder 2 (Small Business): an original and three copies Binder 3 (Price): an original and one copy
3.6 Proposals shall be marked:
Date of Closing: 11 August 2016
Time of Closing: 11:00 AM
Solicitation RFP: W912DR-16-R-0010
3.7 Electronic Submission. In addition to the hard copies required in paragraph 3.5, all Offerors shall submit their proposal on a CD-ROM. Written portions of the proposal should be in MS Word or Adobe Acrobat PDF format.
The electronic version shall be either a single file tabbed in the same order as the hard copy or multiple files hyperlinked to a single table of contents. Any portion of the proposal not available in electronic format, i.e. cut sheets, should be scanned in Adobe Acrobat PDF format, thus making it available electronically. The CD-ROM must be clearly labeled by solicitation number, project name, installation, and Offeror’s name. The CD-ROM shall be marked with a label stating “Unclassified//Controlled Unclassified Info.” In the event of any conflict between the electronic submission and the hard copy submission, the hard copy submission will govern and will be the material upon which the Government bases its evaluation and ultimately, its decision. Electronic media may be submitted in an un-editable format.
3.8 Proposal shall be organized and tabbed as follows:
BINDER 1: Technical Proposal
TAB A: Company/Teaming Agreement(s), if applicable. See paragraph 2.2. Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture. See paragraph 2.3.
TAB B: FACTOR 1 Past Performance of Relevant Projects
TAB C: FACTOR 2 Project Management/Risk Management Plan
BINDER 2: Small Business Proposal
TAB D: FACTOR 3 Small Business Participation Plan (All Offeror’s must submit their Small Business Participation Plan).
TAB E: Small Business Subcontracting Plan (In addition to the Small Business Participation Plan “large businesses” must submit their Small Business Subcontracting Plan).
BINDER 3: Price
TAB F: Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB G: Bid Bond.
TAB H: Certificate of Corporate Principal/Authority.
Sample: CERTIFICATE OF CORPORATE AUTHORITY
(This Certificate shall be submitted as part of the proposal or signed contract if the Offeror is a corporation.)
CERTIFICATE
I, _______________________________, certify that I am the ______________________________ of the corporation named as bidder/Offeror therein, that _________________________________, who signed this bid/proposal on behalf of the bidder/Offeror, was then _______________________ of said corporation; that said bid/proposal was duly signed for and in behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.
By: ___________________________________ (Corporate Seal)
(Signature)
(Typed Name of Corporation)
TAB I: Compliance Statement. The Offeror is required to certify that all items submitted in the technical proposal comply with the RFP requirements and any differences, deviations or exceptions must be stated and explained in this section. Offerors are required to complete the statement and submit it with their technical proposal. Even if there are no differences, deviations or exceptions, the Offeror must submit the Compliance Statement stating that no differences, deviations or exceptions exist.
Sample: Statement of Compliance: This Offeror hereby certifies this proposal is in compliance with the solicitation and its requirements. There are no exceptions, deviations or differences.
TAB J: FACTOR 4: Price Schedule
4.0 EVALUATION RATINGS
4.1 Proposal Ratings: Factors 1, 2 and 3 will be adjectivally rated. Offerors submitting proposals for this project should limit submissions to data essential for the evaluation of proposals.
See paragraph 6 below for a discussion of the evaluation criteria applicable to these factors.
4.2 Technical Rating Definitions. The following combined technical/risk rating definitions will be utilized in the evaluation of factors 2 and 3.
4.3 Past Performance Assessment Definitions. Factor 1 will be evaluated using the following Performance Confidence Assessments:
RATING DESCRIPTION
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence No recent/relevant performance record is available or the Offeror’s performance recordis (Neutral) so sparse that no meaningful confidence assessment rating can be reasonably assigned.
TABLE 1 – COMBINED TECHNICAL/RISK RATINGS
Color Rating Description
Blue Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Purple Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements and contains one or more deficiencies.
Proposal is unawardable.
Past Performance shall also be rated in accordance with the relevancy of the past performance. The following will be used for Factor 1:
Relevancy ratings will be used by the Government in assessing the relevancy of the submitted projects to allow assessment of the overall confidence rating.
RATING DESCRIPTION
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Present/past performance effort involved some of the scope and magnitude of effort and Relevant complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
5.0 SUBMISSION REQUIREMENTS
For purposes of this RFP, an “Offeror” may include a group of two or more entities that have formed a “contractor team arrangement,” as that term is defined in the Federal Acquisition Regulation, Section 9.601. In the case of entities that have formed a contractor team arrangement, the experience and performance history of any member of the team, whether or not gained while working with the other member(s) of the currently-proposed contractor team arrangement, may be considered as a part of the evaluation of the Offeror’s proposal.
In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this RFP, the prime contractor must have completed at least two of the total number of projects submitted for Factor 1 for consideration in response to the experience requirements of this
RFP.
An Offeror that relies upon the performance history of a member or members of a proposed contractor team arrangement will be expected to maintain that arrangement during performance of any contract awarded to that Offeror under this RFP. As a part of their proposal, the Offeror must provide a contractor team agreement signed by all parties, identifying the legal name(s) of all entities and describing the nature of each entity’s relationship (partnership, joint venture, prime/sub or mentor/protégé) and their role on this project. Past Performance information will not be considered without the teaming arrangements. This documentation shall be provided in Binder 1 of the Offeror's proposal.
5.1 FACTOR 1: PAST PERFORMANCE OF RELEVANT PROJECTS: Projects submitted must demonstrate past performance by the physical and successful completion of similar projects within six years of the original date of issuance of this RFP. The Offeror shall submit past performance information on at least three but not more than four completed similar projects. In the case of a joint venture teaming arrangement, each member of the joint venture entity must each submit at least one project under this factor. The information regarding the projects that is required to be supplied is identified on the form entitled “CONTRACTOR PAST EXPERIENCE” (Attachment A).
Similar projects shall demonstrate all of the following project types (either individually or in combination thereof):
- One Construction project valued at $40,000,000 or greater
- One renovation/repair project greater than $35,000,000 of similar size and scope
- One Design-Bid-Build (DBB) project greater than $35,000,000 of similar size and scope
- Construction projects that include back-up generators and switching capabilities for power supply
- Installation and commissioning of the central heating and cooling systems.
It is also highly desirable to provide a project that demonstrates the application of effective security measures during construction and following an approved Construction Security Plan (CSP).
The Offeror may submit other types of projects, but must explain the relevancy of those projects to the project that is being solicited in this RFP.
The Offeror shall provide the assigned performance evaluations for the submitted projects that demonstrate the Offeror’s performance on recent and relevant projects. The Offeror shall provide formal performance evaluation if available. Formal performance evaluations are those similar to the Department of Defense Performance Evaluation (Construction) Form DD 2626. The Government’s preference is the formal evaluation. If the formal evaluation is included, a Past Performance Questionnaire (PPQ) is NOT required or desired.
If a formal evaluation is unavailable, the Offeror shall obtain the information using the Past Performance Questionnaire included (Attachment B). The Past Performance Questionnaire included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 1, Past Performance of Relevant Projects. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal.
If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Renee McMillan-Cox via email at melissa.r.mcmillan-cox@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Offerors may use previously completed PPQs and do not need to have one completed specifically for this project but must include it as a hardcopy.
Offerors may include performance recognition documents received within the last six years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
5.2 FACTOR 2: PROJECT MANAGEMENT/RISK MANAGEMENT PLAN. To facilitate evaluation, the Offeror shall organize the submitted material sequentially under tabs. Submit this information in the form of narratives and an organization chart.
5.2.1 Project Narrative. The Offeror must submit a detailed narrative on their technical approach, sequence of work;
site utilization and other management aspects of the project in order ensure an on time completion of the project.
Include a discussion on the potential high-risk features of the work that may adversely impact the completion date and the Offerors plan to mitigate these risks.
mailto:melissa.r.mcmillan-cox@usace.army.mil
5.2.2 Project Team Organization: The Offeror shall provide a narrative on how their project team will be structured for this project. They shall describe the principal firms involved and their responsibilities and relationships to each other. At a minimum, the following key personnel shall be identified: Project Manager, Full-time On-site Site Safety Health Officer (SSHO), Quality Control Manager (USACE QCM trained), On-site Superintendent(s), Scheduler (or Project Engineer) and the LEED Accredited Professional (LEED AP). All disciplines shall be led by an experienced professional registered in the discipline (if a professional registration is available). Resumes with professional credentials shall be provided. Discuss in detail the team roles and responsibilities, how the teams will interact and communicate, the organizational structure, etc. Submit an “Availability of Key Personnel” statement that indicates each individual’s current assignment and the Offeror’s plan to ensure that the named personnel will be used on this project; however, if the named person isn’t available upon award, a person with the same or better qualifications shall be substituted and approved by the Government. Identify the portion the Offeror intends to self perform and the items customarily subcontracted.
The Offeror will submit an organization chart identifying the proposed team that will execute this project. The proposed organizational chart shall identify the members or entities of the organization and show the lines of authority and communication of all members of the design and construction entities. This chart should clearly indicate who the ultimate decision maker is for the proposed team.
This organization chart should include the Offeror’s key personnel, and key subcontractors, testing firms, quality control and commissioning agents. The organizational chart shall show the relationship of each entity to the Offeror.
The Key Personnel Resumes shall also include the following:
1. Personnel’s Title on this project
2. Number of years with this firm and with other firms
3. Number of years in this position or role
4. Specialization
5. Professional Registration (Type and State Registration)
6. Personnel’s specific experience and qualifications relevant to this project
5.2.3 Quality Management Control System: The Offeror shall describe how they intend to manage quality throughout the contract. Discuss quality management methods proposed throughout the design and construction process. Discuss how you will implement the USACE three phase quality control program.
5.2.4 Safety: The Offeror shall discuss how they intend to manage and execute their Safety program for the contract.
Discuss how your program implements and/or adheres to EM 385-1-1. Provide your company’s EMR Rate and DART rates for projects submitted in Factor 1, if available.
5.2.5 LEED Silver Certifiable: The Offeror shall describe how they intend to maintain documentation to meet the LEED Silver Certifiable requirement throughout the contract. Discuss management and quality methods for maintaining the LEED Documentation Notebook throughout the construction process.
5.2.6 Schedule: The Offeror shall provide a detailed schedule(s) showing how the work will be performed in order to meet the definition of substantial completion for the deliverables and the maximum number of days described in FAR clause 52.211-10. The Offeror shall submit a preliminary schedule for construction and a narrative report.
Schedules or diagrams may be provided separately in a size that is easily read, but shall be bound and clearly labeled as Addendum to Binder 1. The schedules shall be task oriented, indicating the number of calendar days, after notice to proceed, by which deliverables are to be achieved. Assume 30 November 2016, notice to proceed date.
The Offeror shall use a critical path method in either the Precedence Diagram Method (PDM) or the Arrow Diagram Method (ADM); however, schedules shall be graphically represented. The schedule should show adequate detail, logic and sequences to demonstrate Offeror can meet required completion date.
The Offeror must describe how it will schedule this project to include how to start the project; include discussions on important early activities, such as pre-work submittals, site organization, structural steel delivery, etc. The Offeror must describe and discuss its plan to sequence and manage key activities such as site work, building construction, and/or other key features.
The Offeror must discuss its scheduling capabilities and procedures to be used for this project, which must include schedule updates, incorporating modifications into the schedule, and other steps to be taken to maintain the completion date. The Offeror also must include a discussion of the potential high-risk features of the work that may adversely impact the completion date and the Offeror’s plan to mitigate those high-risk features. The Offeror must describe how it will schedule this project to meet the periods of performance.
BINDER 2: Small Business Participation Plan
5.3 FACTOR 3: SMALL BUSINESS PARTICIPATION PLAN (required for all Offerors): All Offerors (both large and small businesses) will be evaluated on the level of proposed participation of U.S. small businesses in the performance of acquisition (as small business prime Offerors or small business subcontractors) relative to the objectives and goals established herein. The government will evaluate:
a. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;
b. The extent of commitment to use such firms (and enforceable commitments will be considered more favorably than non-enforceable ones);
c. Identification of the complexity and variety of the work small firms are to perform;
d. The extent of participation of small business prime Offerors and small business subcontractors in terms of the percentage of the value of the total acquisition.
e. The extent to which the Offeror meets or exceeds the goals: The Government must be able to verify that each percentage is based on the value of the total acquisition (TAV) (not percentage of subcontracted dollars). Goals for this procurement are:
Small Business: {45%} of the total contract value;
Small Disadvantaged Business (SDB): {12%} of the total contract value;
Woman-Owned Small Business (WOSB): {14%} of the total contract value;
Historically Underutilized Business Zone (HUBZone) Small Business: {7%} of the total contract value; Veteran Owned Small Business (VOSB): {10%} of the total contract value;
Service Disabled Veteran Owned Small Business (SDVOSB): {7.5%} of the total contract value.
Historically Black Colleges and Universities and Minority Institutions (HBCU/MI) {0%}
(Note, for example, that a participation plan that reflects {14%} of the contract value for WOSB would also count towards the overall Small Business Goal; and percentages for SDVOSB also count towards VOSB).
Small Business Participation Proposal (Format)
All Offerors (both large and small businesses) are required to complete a Small Business Participation Proposal.
Offerors should propose the level of participation of small businesses (as a small business prime and/or small https://www.acquisition.gov/FAR/05-36/html/FARTOCP19.html business subcontractors) in the performance of the acquisition relative to the objectives/goals set forth in the evaluation of this area.
(a) Check the applicable size and categories for the PRIME Offeror only -- Check all applicable boxes:
{ } Large Prime { } Historically Black Colleges or Universities and Minority Institutions (HBCU) or { } Small Business Prime; also categorized as a
{ } Small Disadvantaged Business (SDB) { } Woman-Owned Small Business (WOSB) { } Historically Underutilized Zone (HUB Zone) Small Business { } Veteran Owned Small Business (VOSB) { } Service Disabled Veteran Owned Small Business (SDVOSB)
(b) Submit the total combined percentage of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime and Subcontractors):
Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $250,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 25%; and 75% for large business equaling 100%.
Total Percentage planned for Large Business(es) _______% = $ _______
Total Percentage planned for Small Business(es) _______% = $ _______
100%
(c) Please indicate the total percentage of participation to be performed by each type of subcategory small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category:
Example: Victory Prop Mgt (WOSB and SDVOSB) performing 2%; and Williams Group (SDB, HubZone and WOSB) performing 3%. Results equate to: SDB 3%; HubZone 3%; WOSB 5%; SDVOSB 2%; VOSB 2%;). SDVOSBs are also VOSBs automatically; however VOSBs are not automatically SDVOSBs.
Small Disadvantaged Business _________% = $_______________ HUB Zone Small Business _________% = $_______________ Woman Owned Small Business _________% = $_______________ Service Disabled Veteran Owned SB _________% = $_______________ Veteran Owned Small Business _________% = $_______________
HBCU/MI _________% = $_______________
Detailed explanations must be provided when the percentages fall short of the participation goals listed within the RFP. The government does not recognize zero percent as a goal. However, if zero percent goals are submitted they must be supported with a detailed explanation and/or a mitigation plan to address how the Offeror will achieve participation where zero goals are cited. If the Offeror does not submit a detailed rationale/explanation, the zero percentage will be evaluated as a weakness. All percentages should use the value of the total acquisition as a baseline. The Government must be able to verify that each percentage is based on the value of the total acquisition.
(d) List principle supplies/services to be performed by Small Businesses:
Example: If a Small Business qualifies also as a WOSB and a SDVOSB, and you can add them to each category below in which they qualify.
Name of Company Identify Type of Service/Supply
Small Business (SB):
Small Disadvantaged Business (SDB):
Women-Owned Small Business (WOSB):
Historically Underutilized Business Zone (HUB Zone):
Veteran Owned Small Business (VOSB):
Service Disabled Veteran Owned Small Business (SDVO):
Historically Black Colleges and Universities and Minority Institutions (HBCU/MI):
(e) Describe the extent of commitment to use small businesses (for example, what types of commitments if any are in place for this specific acquisition either – small business prime, written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc.) Provide documentation regarding enforceable commitments to utilize any Small Business category, as defined in FAR Part19, as subcontractors. Documentation validating business relationships described must be submitted. Demonstrating proof of enforceable commitments is to be weighted more heavily than non-enforceable ones.
Additional Important Note for Other Than U.S. Small Businesses ONLY.
Small Business Subcontracting Plan is Required (FAR 52.219-9).
Separate from Small Business Participation Plan, other than U.S. Small Business Offerors, must also submit a subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003 (or DFARS 252.219- 7004 if the Offeror has a comprehensive subcontracting plan). Other than U.S. Small Businesses must submit acceptable subcontracting plans to be eligible for award. Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan.
BINDER 3: Price Proposal
5.4 FACTOR 4: PRICE: The offeror shall submit the price schedule for this factor.
6. EVALUATION CRITERIA
6.1 FACTOR 1: PAST PERFORMANCE: Past performance will be rated in terms of how likely there is a performance risk to the Government; that is, high confidence performance ratings will be taken as indicators of a low risk that the offeror will successfully perform the work. The more relevant a proposed project is, the more consideration it will be given in the overall confidence assessment rating. If an Offeror has no record of relevant past performance, or if information on the Offeror’ past performance is so sparse, that no meaningful confidence assessment rating can be reasonably assigned, the Offeror must state that fact. That Offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated either favorably or unfavorably on past performance.
If a submitted project does - meet the minimum requirements identified above, that submitted project will not be considered for purposes of evaluation of FACTOR 1. In the situation where the minimum number of three projects is not met, the highest rating that may be assigned is ‘Limited Confidence’. For example, if a project was completed more than six years from the original date of RFP issuance, it will not be considered for purposes of evaluation of
FACTOR 1.
6.2 FACTOR 2:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .