RESPONSES_-_RFI_Group__11.pdf
PDF 13 KB Posted
- Attached to
- Renovation and Repair Project Federal contract opportunity
- Solicitation number
- W912DR-16-R-0010
About this file
RFI GROUP RESPONSE 11
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Group #11
KTR RFI # Originating Company Originator (Full Name) Discipline Full RFI Question Full RFI Response
(Leave Blank)
1 Grunley Construction Ryan Garland Projector Screens Plesase confirm if projector screens are (GFCI) per detail 1/I-403 or (GFGI) per detail 4/I-403.
All should be Government Furnished Government Installed, but contractor to provide the supports above the ceiling.
2 Grunley Construction Ryan Garland Wall Base Please clarify what is the matching mitered wall base trim per Detail 5/I-401 to be matched to, wall base per finish schedule or wall protection panels?
The matching mitered wall base trim shall match the wall protection panels and be part of the wall panel system.
3 Grunley Construction Ryan Garland General
Please confirm if you intend on revising the bid form to reflect the changes that were made to the CLIN Line items in Amendment 2.
Price scheduled has been revised. Reference attachment.
4 Grunley Construction Ryan Garland Floor Leveling
Please reference detail 3 / drawing A615 for the sill detail at the blast doors.
This work is not indicated anywhere else on the drawings (structural or architectural) as to where the deck is installed and to what extent of the floor area, is this just an infill on the existing slab or will the slab need to be sawcut to install this floor leveling application, etc. Please provide more clarification, drawings and details as to where, to what extent of the floor area and how to do this work.
Floor leveling application only occurs over existing exterior porch area that is shown to be enclosed as interior office area and elevator vestibules on this project. This includes North portion of Open Office 131 and all of Elevator Vestibules 138, 216, and 338; and the exterior existing covered porch area between columns 17 & 18 and I & K (at first floor level only) to provide a level entrance area from the new stairs and ramp into the main doors. Reference S-301 for area of raised floor for first floor areas. Second and third floors are similar. Door sill detail 3 should only be scheduled for doors 138A, 216A, & 338A, the blast doors that occur on the raised exterior porch area to be enclosed. All other exterior blast door sill details should be changed to Sill Detail 6 (Typ of 19 doors).
Sheet1
File details come from the government source that posted it. Updated .