RFI Group #1
KTR RFI #
Originating Company
Originator (Full Name) Discipline Full RFI Question
Full RFI Response (Leave Blank)
Whiting-Turner Kyle Krueger
GC
If an FTP site is encrypted, password protected, controlled by the prime contractor, and approved by the USACE for use on another project to transmit Unclassified/FOUO information, may that FTP site be used for sharing documents for this project?
No. FTP sites may not be used for sharing documents for this project. (TML)
Whiting-Turner Kyle Krueger
GC
Page 4 of the solicitation, Item 0003, 0004, and 0005:
Please confirm the words “spelling” and “spelled” should be read as “spalling” and “spalled.”
The words should state "Spalling" or "Spalled." (CTR)
Whiting-Turner Kyle Krueger
GC
Page 4 of the solicitation, Item 0007: Please provide a numerical value in place of the “%.” Example, “…reinforcement steel less than 1/2 inch diameter”
The "%" should be replaced by
"3/4" (CTR)
Whiting-Turner Kyle Krueger
GC
Page 4 of the solicitation, Item 0009: Should this estimated quantity be 150,000sf similar to item 0010? It appears that option 0009 and 0010 might both pertain to the same physical areas.
Yes. 150,000 sq-ft should be used. (CTR)
Whiting-Turner Kyle Krueger
GC
Page 6 of the solicitation, last sentence on page: This sentence states, “There may be minimal asbestos, lead paint, and bio-hazards remediation.” Is there a survey or final environmental assessment that can be provided? If not, can the USACE provide an assumed type and quantity of abatement for a baseline, other than what is provided on Page 4 Item No 10?
There is no survey or final environmental assessment that can be provided. Assume no asbestos or biohazards remediation. Assume lead paint abatement as identified in Item No 0010. (TML)
Whiting-Turner Kyle Krueger
GC
Bidding contractors were asked to provide a limited list of
(5) attendees for the 7/18 site walk through prior to the USACE releasing the drawings and specifications. Now that we have reviewed the drawings and specifications we believe a 2nd walk is warranted. We kindly request another site walk-through ASAP in order to accurately review and price the work.
No. A second site visit will not take place. (TML)
Whiting-Turner Kyle Krueger
GC
Please confirm that the GOVERNMENT’s PHASE-1 CONTRACTOR will infill and finish all current slab trenches, openings, and depressions and make concrete even and ready to receive new flooring.
The Phase 1 Contractor will repair/infill major depressions and floor penetrations. The Phase 2 Contractor is responsible for all surface preparation as required to install new finished floors, per contract plans and specifications. (TML)
Whiting-Turner Kyle Krueger
GC Are we required to use the same roofer as Phase-1 in order to uphold that roofing contractor’s warranty? Work within this solicitation will require alteration to that Phase-1 roof.
Yes, the Contractor is required to use the same roofer to uphold the existing roofing warranty.
Whiting-Turner Kyle Krueger
GC
Drawing A202 General Note 4 states, “All exterior windows on all floor levels of Building K shall be covered with GWB on the interior side, UNO. See details.” Then, Window Details sheet A616 lists new windows and shows three details for windows that are cased open for daylight (1 through 3/A616), and three details for windows that receive GWB over them (4 through 6/A616) . It is unclear which details apply to each window of the building, old or new. It could be assumed that all existing windows receive GWB over them, while new windows are cased open for daylight.
Please clarify.
Drawing A-616 has been revised per Amendment #2. Revised drawing will clarify applicable details. (CTR)
Whiting-Turner Kyle Krueger
GC
Sheet A645-Interior Finish Materials Legend lists Raised Access Flooring (RAF1) as one of the finish materials. After inspecting the Sheets A631 through A634-Interior Finish Schedule, there is no mention of Raised Access Flooring within those schedules. Please confirm that there is truly no Raised Access Flooring required for this project.
Raised Area Flooring is not included in the design and shall not be part of the proposal.
(CTR)