RESPONSES_-_RFI_Group__2.pdf

PDF 14 KB Posted

Attached to
Renovation and Repair Project Federal contract opportunity
Solicitation number
W912DR-16-R-0010
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

RFI RESPONSES 2

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Group #2

KTR RFI #

Originating Company

Originator (Full Name) Discipline Full RFI Question

Full RFI Response (Leave Blank)

John C. Grimberg Co. John Meckley JCG Staff

Spec 013553 Security Procedures paragraph 1.2 says that this is a US Citizen only project. Pg 5 of the Solicitation seems to allow US Persons also to work on this project. US Persons includes lawful Permanent Resident Aliens.

Please clarify whether workers at this jobsite must be US Citizens.

All workers utilized at the job site must be US Citizens. (CTR)

John C. Grimberg Co. John Meckley JCG Staff

On Drawing TS-101, there is reference to a new communications duct bank tying into an existing manhole (MH-05). There is no direction as to what the requirements are for the OSP backbone cable.

Please clarify. (See accompanying illustrations from the drawings for futher clarification)

The outside plant (OSP) cabling shall consist of (1) 600 pair copper, (1) 24 strand single mode fiber, and (1) 48 strand multi-mode fiber. Each cable will tie to the existing trunks from the existing MH-05 and terminate inside the CSR. The copper cabling will terminate on a protective entrance terminal (PET), the single mode fiber will terminate to a fiber patch panel, and the multi-mode fiber will terminate to a fiber patch panel.

John C. Grimberg Co. John Meckley JCG Staff

On Drawings T-601 through T-615, there are various Telecommunications System Riser Diagrams. None of these drawings direct us as to what the backbone requirements are. The drawing below which is T-615, shows conduits between TR’s, but again no direction.

Please clarify. (See accompanying illustrations from the drawings for futher clarification)

There are no inside plant (ISP) backbone requirements. Cabling will be provided by the Fit-Up contractor.

John C. Grimberg Co. John Meckley JCG Staff

On Drawing T-001, The Telecommunications Legend (below) show various outlets receiving “Keyed LC Fiber Ports”. As an example, a half shaded triangle shows “(3) Keyed LC Fiber Ports” are to be provided for that outlet. Typically LC fiber connectors are in pairs (Duplex). The outlet diagram on the below right (Drawing T-501) appears to show 3 single LC ports.

Are we to assume that the intent is to have 6 strands of fiber to each of these outlet types, two per port as opposed to 1 strand per port? Please advise. (See accompanying illustrations from the drawings for futher clarification)

The Telecommunication Legend and T-501 are correct. The illustrations are diagrammatic.