RFI Group #14
KTR RFI #
Originating Company
Originator (Full Name) Discipline Full RFI Question
Full RFI Response (Leave Blank)
13 John C. Grimberg Co. John Meckley JCG Staff There are 17 proposed trees that are called out to be planted (Detail on Sheet C-503).
Pricing can fluctuate significantly depending on size but there doesn't seem to be any sizing called out. Can you provide this information?
Also, is there a drawing showing where these trees will be planted?
Tree planting will not be required.
14 John C. Grimberg Co. John Meckley JCG Staff Will sod or seed will be utilized for permanent stabilization? It appears there will be minor disturbed area around the building that will need to be revegetated.
Seed will be utilized for permanent stabilization.
15 John C. Grimberg Co. John Meckley JCG Staff Concerning the bio-swales, there did not seem to be any plans or notes in the spec that indicate how deep the swale itself is, or what material(s) it is supposed to be comprised of.
Is there a section view available or a standard detail for reference?
The section cuts for the bioswales were being developed when the IFC plans were submitted. Assume a 2' media depth for all bioswales. The media will need to meet MDE standards.