Amendment_0003.pdf

PDF 140 KB Posted

Attached to
Boundary Channel Drive Vehicle Access Control Point, Pentagon, Washington, DC
Solicitation number
W912DR-16-R-0003
Issued by

About this file

Solicitation Amendment 0003

View the file

Other files

File Type Posted
Solicitation_Amendment_0002.pdf PDF
Solicitation_Amendment_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912DR-16-R-0003: Boundary Channel Drive Vehicle Access Control Point (ACP) Pentagon, Washington D.C This amendment hereby incorporates the follow ing changes to the solicitation:

1. Provide RFI responses

2. Remove/Add FAR Clauses

All other terms and conditions w ill remain the same.

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Dec-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-16-R-0003

X 9B. DATED (SEE ITEM 11)

17-Nov-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Dec-2015

CODE

US ARMY CORPS OF ENGINEERS BALTIMORE DIS

10 SOUTH HOWARD STREET

ROOM 7000

BALTIMORE MD 21201-2536

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-16-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUESTS FOR INFORMATION

W912DR-16-R-0003

Boundary Channel Drive Vehicle Access Control Point

Requests for Information (RFIs) 08 December 2015 Amendment 0003

Question 009: If we have no Lobbying Activity what do we with the Disclosure of Lobbying Activities form?

Response: If there is no Lobbying Activity, answer N/A and return the form with your proposal.

Question 010: Should this be flowed down to our Teaming Commitment Partners?

Response: No, if it is the Teaming Agreement partner. Yes, if a Joint Venture (JV).

Question 011: For the project experience, Section 2.1.1 states that “The Offeror shall submit information on no more than five (5) completed design-build projects.” Our proposed design firm has projects that meet the design-build requirement. However, our construction firm has significant, relevant experience that is design-bid-build and/or construction only. Can this section be amended to include design-bid-bid and construction only experience?

Response: All projects submitted under Factor 1, section 2.1.1. must demonstrate design-build experience.

Question 012: Can proposers include Design Bid Build projects as past experience as well as the Design Build projects requested in the RFP?

Response: All projects submitted under Factor 1, section 2.1.1. Must demonstrate design-build experience.

Question 013: We have standard USACE PPQ’s as well as ACAS and CCAS ratings showing past performance on projects within the last six years. Can we you these in lieu of “new” PPQ’s.

Response: The past performance questionnaire (Attachment B) must be completed.

Please follow instructions as directed under Factor 1, section 2.1.2. ACASS and CCASS may be submitted in addition to these forms.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by reference:

52.204-7 System for Award Management JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2015 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004

The following have been deleted:

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.215-21 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data -- Modifications

OCT 2010

52.225-11 Buy American--Construction Materials Under Trade Agreements

MAY 2014

252.215-7009 Proposal Adequacy Checklist JAN 2014

SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

The following have been modified:

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $36,500,000.00.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xvi) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvii) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.

(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

X (i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iii) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(iv) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vi) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

52.203-2 Certificate Of Independent Price Determination APR 1985 52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.204-3 Taxpayer Identification OCT 1998 52.209-5 Certification Regarding Responsibility Matters OCT 2015 52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.223-1 Biobased Product Certification MAY 2012 52.223-4 Recovered Material Certification MAY 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.247-7022 Representation Of Extent Of Transportation Of Supplies By Sea

AUG 1992

SECTION 00700 - CONTRACT CLAUSES

52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.229-3 Federal, State And Local Taxes FEB 2013 52.236-24 Work Oversight in Architect-Engineer Contracts APR 1984 52.236-25 Requirements for Registration of Designers JUN 2003 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

SECT 00700 INFO TEXT

SECURITY LANGUAGE FOR UNCLASSIFIED CONTRACTS

All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract (to include grants, cooperative agreements and task orders) who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position. The contractor shall have each applicable employee complete a SF-85P and submit to the Security Officer, Baltimore District, Corps of Engineers, P. O. Box 1715, Baltimore, MD 21203-1715 within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS. Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to Security Officer, Baltimore District, Corps of Engineers, P. O. Box 1715, Baltimore, MD 21203-1715. For those contractors that do not have a CAGE Code or Facility Security Clearance, the Security Office, Baltimore District, Corps of Engineers, will process the investigation in coordination with the Contractor and contract employees.

In accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers’ contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. (NOTE: exceptions to the above requirement include foreign nationals who perform janitorial and/or ground maintenance services.) The contractor shall submit to the Division/District Contract Office, the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B).

Note: Classified contracts require the issuance of a DD Form 254 (Department of Defense Contract Security Classification Specification).

End of Text

DESIGN-BUILD CONTRACT ORDER OF PRECEDENCE (AUG 1997)

(a) The contract includes the standard contract clauses and schedules current at the time of contract award. It entails

(1) the solicitation in its entirety, including all drawings, cuts, and illustrations, and any amendments, and (2) the successful offeror's accepted proposal. The contract constitutes and defines the entire agreement between the Contractor and the Government. No documentation shall be omitted which in any way bears upon the terms of that agreement.

(b) In the event of conflict or inconsistency between any of the provisions of this contract, precedence shall be given in the following order:

(1) Betterments: Any portions of the accepted proposal which both conform to and exceed the provisions of the solicitation.

(2) The provisions of the solicitation. (See also Contract Clause:

SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION.)

(3) All other provisions of the accepted proposal.

(4) Any design products including, but not limited to, plans, specifications, engineering studies and analyses, shop drawings, equipment installation drawings, etc.. These are "deliverables" under the contract and are not part of the contract itself. Design products must conform with all provisions of the contract, in the order of precedence herein.

End of Clause

PROPOSED BETTERMENTS

(a) The minimum requirements of the contract are identified in the Request for Proposal. All betterment’s offered in the proposal become a requirement of the awarded contract.

(b) "Betterment" is defined as any component or system which exceeds the minimum requirements stated in the Request for Proposal. This includes all proposed betterment’s listed in accordance with the "Proposal Submission Requirements" of the Solicitation, and all Government identified betterment’s.

(c) "Government identified betterment’s" include the betterment’s identified on the "List of Accepted Project Betterment’s" prepared by the Proposal Evaluation Board and made part of the contract by alteration, and all other betterment’s identified in the accepted Proposal after award.

RESPONSIBILITY OF THE CONTRACTOR FOR DESIGN (May 2002)

(a) The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other non-construction services furnished by the Contractor under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiency in its designs, drawings, specifications, and other non-construction services and perform any necessary rework or modifications, including any damage to real or personal property, resulting from the design error or omission.

(b) The standard of care for all design services performed under this agreement shall be the care and skill ordinarily used by members of the architectural or engineering professions practicing under similar conditions at the same time and locality. Notwithstanding the above, in the event that the contract specifies that portions of the Work be performed in accordance with a performance standard, the design services shall be performed so as to achieve such standards.

(c) Neither the Government’s review, approval or acceptance of, nor payment for, the services required under this contact, shall be construed to operate as a waiver of any rights under this contract or of any cause of action arising out of the performance of this contract. The Contractor shall be and remain liable to the Government in accordance with applicable law for all damages to the Government caused by the Contractor’s negligent performance of any of these services furnished under this contract.

(d) The rights and remedies of the Government provided for under this contract are in addition to any other rights and remedies provided by law.

(e) If the Contractor is comprised of more than one legal entity, each entity shall be jointly and severally liable hereunder.

(End of clause)

SEQUENCE OF DESIGN-CONSTRUCTION

(a) After receipt of the Contract Notice to Proceed (NTP) the Contractor shall initiate design, comply with all design submission requirements as covered under Division 01 General Requirements, and obtain Government review of each submission. No construction may be started, except as specified in each task order or until the Government reviews the Final Design submission and determines it satisfactory for purposes of beginning construction. The ACO or COR will notify the Contractor when the design is cleared for construction. The Government will not grant any time extension for any design resubmittal required when, in the opinion of the ACO or COR, the initial submission failed to meet the minimum quality requirements as set forth in the Contract.

(b) If the Government allows the Contractor to proceed with limited construction based on pending minor revisions to the reviewed Final Design submission, no payment will be made for any in-place construction related to the pending revisions until they are completed, resubmitted and are satisfactory to the Government.

CONTRACTOR'S ROLE DURING DESIGN PROCESS (Jun 1998)

The Contractors construction management key personnel shall be actively involved during the design process to effectively integrate the design and construction requirements of this contract. In addition to the typical required construction activities, the Contractor's involvement includes, but is not limited to actions such as: integrating the design schedule into the Master Schedule to maximize the effectiveness of fast-tracking design and construction (within the limits allowed in the contract), ensuring constructibility and economy of the design, integrating the shop drawing and installation drawing process into the design, executing the material and equipment acquisition programs to meet critical schedules, effectively interfacing the construction QC program with the design QC program, and maintaining and providing the design team with accurate, up-to-date redline and as-built documentation. The Contractor shall require and manage the active involvement of key trade subcontractors in the above activities.

DESIGN CONFERENCES

Pre-Work: As part of the Pre-work Conference conducted after contract award, key representatives of the Government and the Contractor will review the design submission and review procedures specified herein, discuss the preliminary design schedule and provisions for phase completion of the D/B documents with construction activities (fast tracking) , as appropriate, meet with Corps of Engineers Design Review personnel and key Using Agency points of contact and any other appropriate pre-design discussion items.

Design Review/Finalize: After award of the contract, the Contractor shall visit the site and conduct extensive interviews, and problem solving discussions with the individual users, base personnel, Corps of Engineers personnel to acquire all necessary site information, review user operations, and discuss user needs. The Contractor shall document all discussions. The design shall be finalized as direct result of these meetings.

Design Review Conferences: Review conferences will be held on base for each design for each submittal. The Contractor shall bring the personnel that developed the design submittal to the review conference. The conferences will take place the week after the review is complete.

VALUE ENGINEERING AFTER AWARD (Jun 1999)

(a) In reference to FAR 52.248-3, Value Engineering-Construction, the Government may refuse to entertain a "Value Engineering Change Proposal" (VECP) for those "performance oriented" aspects of the Solicitation documents which were addressed in the Contractor's accepted contract proposal and which were evaluated in competition with other offerors for award of this contract.

(b) The Government may consider a VECP for those "prescriptive" aspects of the Solicitation documents, not addressed in the Contractor's accepted contract proposal or addressed but evaluated only for minimum conformance with the Solicitation requirements.

(c) For purposes of this clause, the term "performance oriented" refers to those aspects of the design criteria or other contract requirements which allow the offeror or Contractor certain latitude, choice of and flexibility to propose in its accepted contract offer a choice of design, technical approach, design solution, construction approach or other approach to fulfill the contract requirements. Such requirements generally tend to be expressed in terms of functions to be performed, performance required or essential physical characteristics, without dictating a specific process or specific design solution for achieving the desired result.

(d) In contrast, for purposes of this clause, the term "prescriptive" refers to those aspects of the design criteria or other Solicitation requirements wherein the Government expressed the design solution or other requirements in terms of specific material, approaches, systems, and/or processes to be used. Prescriptive aspects typically allow the offerors little or no freedom in the choice of design approach, materials, fabrication techniques, methods of installation, or any other approach to fulfill the contract requirements.

PERFORMANCE OF WORK BY THE CONTRACTOR

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20% percent of the total amount of work to be performed under the contract, not including design work. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF THE GOVERNMENT

All designs, drawings, specifications, notes, and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201 (b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws. The Contractor for a period of three (3) years after completion of the project agrees to furnish all retained works on the request of the Contracting Officer. Unless otherwise provided in this contract, the Contractor shall have the right to retain copies of all works beyond such period.

GOVERNMENT-FURNISHED SPECIFICATIONS, DRAWINGS, SURVEYS, AND SPECIFICATIONS IN THE

REQUEST FOR PROPOSAL (JUL 2002)

This is to clarify DFARS 252.236-7001, Contract Drawings and Specifications, refers to any Government-furnished design or design criteria included in the Request for Proposal (RFP).

GOVERNMENT-FURNISHED SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2003)

This is to clarify FAR 52.236-21, Specifications and Drawings for Construction, refers to any specifications and drawings furnished in the Request for Proposal (RFP). The term "specifications" refers to the design criteria or scope of work, in addition to any attached specifications.

Warranty of Design (MAY 2002)

(a) The Contractor warrants that the design shall be performed in accordance with the contract requirements.

Design and design related construction not conforming to the Contract requirements shall be corrected at no additional cost to the Government. The standard of care for design is defined in paragraph (b) of special contract requirement 52.236-5004, Responsibility of the Contractor for Design.

(b) The period of this warranty shall commence upon final completion and the Government’s acceptance of the work, or in the case of the Government’s beneficial occupancy of all or part of the work for its convenience, prior to final completion and acceptance, at the time of such occupancy.

(c) This design warranty shall be effective from the above event through the Statute of Limitations and Statute of Repose, as applicable to the state that the project is located in.

(d) The rights and remedies of the Government provided for under this clause are in addition to any other rights and remedies provided in this contract or by law.

DEVIATING FROM THE ACCEPTED DESIGN (JUN 2002)

(a) The Contractor must obtain the approval of the Designer of Record and the Government’s concurrence for any Contractor proposed revision to the professionally stamped and sealed and Government reviewed design, before proceeding with the revision.

(b) The Government reserves the right to non-concur with any revision to the design, which may impact furniture, furnishings, equipment selections or operations decisions that were made, based on the reviewed design.

(c) Any revision to the design, which deviates from the contract requirements (i.e., the RFP and the accepted proposal), will require a modification, pursuant to the Changes clause, in addition to Government concurrence. The Government reserves the right to disapprove such a revision.

(d) Unless the Government initiates a change to the contract requirements, or the Government determines that the Government furnished design criteria are incorrect and must be revised, any Contractor initiated proposed change to the contract requirements, which results in additional cost, shall strictly be at the Contractor's expense.

(e) The Contractor shall track all approved revisions to the reviewed and accepted design and shall incorporate them into the as-built design documentation, in accordance with agreed procedures. The Designer of Record shall document its professional concurrence on the as-builts for any revisions in the stamped and sealed drawings and specifications.

PARTNERING (FEB 2000)

In order to most effectively accomplish this contract, the Government proposes to form a partnership with the Contractor to develop a cohesive building team. It is anticipated that this partnership would involve the <NAME THE USING ORGANIZATIONS AND OTHER CRITICAL PARTIES HERE>, the Contractor, primary subcontractors and designers and the Corps of Engineers. This partnership would strive to develop a cooperative management team drawing on the strengths of each team member in an effort to achieve a quality project within budget and on schedule. This partnership would be bilateral in membership and participation will be totally voluntary. Any cost associated with effectuating this partnership, excluding travel and lodging cost of Government personnel, will be borne by <<SELECT AN OPTION TO SPECIFY: the Contractor/each party/the Government.

The partnering meetings shall be held in [Fill in with Date, Time, Place, etc.].

GOVERNMENT RE-USE OF DESIGN (MAY 2006)

In conjunction with the DFARS 252.227-7022, Government Rights (Unlimited), the Government will not ask for additional originals or copies of the design works after the Contractor provides all required design documentation and as-built documentation under the instant contract. Further, if the Government uses the design for other projects without additional compensation to the Contractor for re-use, the Government releases the Contractor from liability in the design on the other projects, due to defects in the design that are not the result of fraud, gross mistake as amounts to fraud, gross negligence or intentional misrepresentation.

52.203-14 Display of Hotline Poster(s) OCT 2015 52.204-7 System for Award Management JUL 2013 52.215-1 Alt II Instructions to Offerors--Competitive Acquisition (Jan 2004) -

Alternate II

OCT 1997

52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010 52.215-22 Limitations on Pass-Through Charges--Identification of

Subcontract Effort

OCT 2009

52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.222-56 Certification Regarding Trafficking in Persons Compliance

Plan.

MAR 2015

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items

MAY 2008

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.229-4 Federal, State, And Local Taxes (State and Local Adjustments)

FEB 2013

52.249-14 Excusable Delays APR 1984 252.215-7002 Cost Estimating System Requirements DEC 2012 252.219-7011 Notification to Delay Performance JUN 1998 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005

The following were previously included by reference and are now included by full text:

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)

(a) Definitions. As used in this clause--

``Active duty wartime or campaign badge veteran,'' ``Armed Forces service medal veteran,'' ``disabled veteran,'' ``protected veteran,'' ``qualified disabled veteran,'' and ``recently separated veteran'' have the meanings given at FAR 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)

(a) Definition. Ozone-depleting substance, as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR part 82 as--

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform;

or

(2) Class II, including, but not limited to, hydrochlorofluorocarbons.

(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:

“WARNING: Contains (or manufactured with, if applicable), a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.”----------------------------

The Contractor shall insert the name of the substance(s).

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

SECTION 00800 DB REQUIREMENTS

KEY PERSONNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS (MAY 2006)

In connection with this contract, any in-house personnel, subcontractors, and outside associates or consultants will be limited to individuals or firms that were specifically identified in the Contractor's accepted proposal. The Contractor shall obtain the Contracting Officer's written consent before making any substitution for these designated in-house personnel, subcontractors, associates, or consultants. If the Contractor proposes a substitution, it shall submit the same type of information that was submitted in the accepted proposal to the Contracting Officer for evaluation and approval. The level of qualifications and experience submitted in the accepted proposal or that required by the Solicitation, whichever is greater, is the minimum standard for any substitution.

TRAINING – FEB 2000

The Contractor shall provide operational and maintenance training for all systems furnished under this contract for the operating and maintenance personnel. The system manufacturer shall conduct the training, where feasible. All operation and maintenance manuals shall be submitted and approved prior to conducting the training and shall be used during training. The Contractor shall videotape the training session on VHS tapes and provide the tapes to the Government.

SECTION 00800 INFO TEXT

CONTRACTING OFFICER INFORMATION

The primary Contracting Officer for this action is Robert Wood; however, any Contracting Officer (KO) holding the appropriate warrant authority in the Baltimore District can serve as the Contracting Officer for this contract.

Also, please note that any time the primary KO changes; it will be incorporated into the contract via unilateral modification to the contract.

SUBMISSION OF INVOICES

(a) Original invoices for services performed under the contract will be submitted to and payment will be made by:

USACE FINANCE CENTER

ATTN: DISBURSING

5722 INTEGRITY DRIVE

MILLINGTON, TN 38054-5005

(b) One copy of all invoices shall be forwarded to the Contracting Officer Representative (COR) for review and certification. Please note that the COR will be assigned at the time of award of the contrat.

ELECTRONIC PROCESSING OF INVOICES

The UFC has implemented new processes and revised current processes to allow supported activities and vendors to submit invoices electronically to the USACE Finance Center. These changes should streamline the imaging process, reduce the risk of invoices being misrouted and ensure all invoices received are processed in a timely manner.

As a result of these new processes, email addresses have been established for each activity and will be available for use beginning 01 May 2010. A list of the email addresses for each activity has been attached to this email. They are also available in the global address list as CEFC-E1 Invoices.

In order to ensure the proper processing of your invoices, it is critical invoices be packaged and submitted utilizing the process outlined below and sent to the correct activity specific email address. Failure to properly submit invoices will result in the email being returned to the sender for correction and resubmission. The UFC mailroom will incorporate the PDF files from the emails into the Web DMS.

Invoices received by the supported activities should be submitted to your activity specific email address. Please Note: The CEFC-Payments email address is reserved for Vendors only.

Scanning and submitting an invoice for processing:

1. Circle the amount to be paid. Do not highlight items. Highlighting a document and then scanning it frequently causes the image to be illegible. The background of the invoice should not be dark or colored as this will cause the image to be too dark to read.

2. Each PDF file should contain only one invoice, receiving report and back-up documentation for that one invoice.

3. Each PDF file should be assembled/scanned in invoice, receiving report, back-up documentation order.

4. The obligation number should be the name of the PDF file as well as referenced in the subject line of the e-mail. The e-mail will be incorporated into the PDF file prior to scanning into Web DMS. Please ensure the PDF file is legible prior to submitting it to the UFC for processing.

5. Submit only one PDF file per email.

REQUIRED INSURANCE FOR GOVERNMENT INSTALLATION & DREDGING

Pursuant to the contract clause entitled, 52.228-5, Insurance – Work on a Government Installation or on Dredging projects (which ever applies), the contractor shall procure and maintain during the entire period of this performance under the contract the following minimum insurance:

COVERAGE FOR GOVERNMENT INSTALLATION

Type Amount

Comprehensive General Liability $500,000 per occurrence

Bodily injury or death

Motor Vehicle Liability (for each motor vehicle):

Bodily injury or death $200,000 per person $500,000 per occurrence

Property Damage: $ 20,000 per occurrence

Workers' Compensation and Employer's Liability: $100,000 per person

COVERAGE FOR DREDGING

Type Amount

Comprehensive General Liability $500,000 per occurrence

Bodily injury or death

Marine Liability -

Excess towers' liability $1,000,000 per occurrence Excess protection and indemnity insurance $1,000,000 per occurrence

Workers' Compensation and Employer's Liability: $100,000 per person (including Longshore & Harbor Workers' Compensation)

Workers' Compensation and Employer's Liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statues, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.

The Contractor agrees to insert the substance of this clause, including this paragraph, in all subcontracts hereunder.

SUMMARY FOR THE PAYMENT OFFICE

All modifications will provide sufficient information to permit the paying office to readily identify the changes for each Contract Line Item (CLIN) and SubCLIN item as follows:

(a) The amount of funds obligated by prior contract actions, to include the total cost and fee if a cost-type contract; the target fee at time of contract award if a cost-plus-incentive-fee contract; the base fee if a cost-plus-award-fee contract; or the target price and target profit if a fixed-price incentive contract;

(b) The amount of funds obligated or deobligated by the instant modification, categorized by the types of contracts specified in paragraph (a) of this section; and

(c) The total cumulative amount of obligated or deobligated funds, categorized by the types of contracts specified in paragraph (a) of this section.

EVALUATION OF CONTRACTOR PERFORMANCE

As a minimum, the contractor’s performance will be evaluated upon final acceptance of the work. However, interim evaluation may be prepared at any time during the contract performance when determined to be in the best interest of the Government.

The format for the evaluation will be DD2626, and the contractor will be rated either outstanding, satisfactory, or unsatisfactory in the areas of Contractor Quality Control, Timely Performance, Effectiveness of Management, Compliance with Labor Standards, and Compliance with Safety Standards. The contractor will be advised of any unsatisfactory rating either in an individual element or in the overall rating prior to completing the evaluation, and all contractor comments will be made a part of the official record. Performance Evaluation Reports will be available to all DOD Contracting Offices for their future use in determining contractor responsibility.

HEAD PROTECTION (HARD HATS)

The entire work area under this contract is designated as a hard hat area. The contractor shall post the area as per paragraph 05.D.01, EM 385-1-1, and shall insure that all contractor personnel, vendors, and visitors utilize hard hats within the project area.

TESTING LABORATORIES

Testing is required to be performed by the Contractor as part of his Quality Control program to verify contract compliance. This Quality Control Testing is to be conducted by a project or commercial laboratory which has been found adequate and qualified by a Corps of Engineers Division Laboratory Inspection team.

(a) A composite listing of approved testing laboratories within the North Atlantic Division is available on the following website: http://www.erdc.usace.army.mil/Portals/55/docs/CEERD-GV/CEERD-GM-C/150204_CEERD- GM-C_ValidatedLabs.pdf. The Contractor should engage the services of a laboratory contained in the composite list.

(b) The Contractor may engage the services of a laboratory other than those contained in the aforementioned list provided:

(1) The Contractor identifies and proposes the unapproved laboratory a minimum of 90 days prior to the start of testing. This time is necessary to allow for scheduling an inspection by a Corps of Engineers Division Laboratory team. The time for Government inspection will not be the basis for an increase in the contract performance period.

(2) All costs of Government inspection shall be the responsibility of the contractor.

(3) The process for requesting Government inspection and approval prior to award may be found at the following link: http://acwc.sdp.sirsi.net/client/en_US/search/asset/1045310.

Equipment Ownership and Operating Expense Schedule (MAR 1995)

(a) This special contract requirement does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region [insert Roman numeral for the appropriate region of the schedule]. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .