ATTACHMENT C:
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement.
These thresholds are critical to mission success.
Performance Objective
Provide access to aid U.S. Army Corps of Engineers (USACE) b id i
Standard Performance Threshold
Method of Surveillance
PRS # 1.
The contractor shall provide the required equipment with the qualified operating personnel during the times and dates indicated and at the specified locations per Item 1 and Item 2, parts 1, 2, 3, 5, & 8.
The contractor provided the required equipment with the qualified operating personnel during the times and dates indicated and at the specified locations.
The Contractor shall arrive with the equipment and personnel on the dates and times specified in the
PWS.
USACE COR will monitor Contractor performance during inspection activities.