Abstract of Bids
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DPW_award_notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER 2. DATE ISSUED DATE OPENED PAGE OF 07-May-15 29-Jun-15 1 of 5
4. ISSUING OFFICE Name and title of Certifying Official (Type) Department of the Army I CERTIFY that I have opened, read, and Baltimore District, Corps of Engineers recorded on this abstract all offers Signature Date Signed 10 S. Howard Street, Rm 8141 received in response to this solicitation.
Baltimore, Maryland 21203-1715 Contracting Officer
5. PROJECT TITLE 9. OFFERS
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F.)
A. HIRED LABOR
B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)
6. NUMBER OF AMENDMENTS ISSUED 3 C. REASONABLE CONTRACT C. Amendment Acknowledged C. Amendment Acknowledged (Including Profit)
7A. 7B. 7C. D. E. F. E. F. E. F.
ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT (1) PRICE AMOUNT (2)
All costs in connection with construction of the Directorate of Public Works (DPW) Building, Fort Meade, MD, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified.
1 JOB - $5,083,430.00 - $6,400,000.00 - $6,148,000.00
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work, complete as shown on drawings and specified.
1 JOB - $1,593,388.00 - $1,425,000.00 - $1,780,000.00
Overexcavation and Replacement with Structural Fill Beneath DPW Building (payment item 31-00-00-1, as specified in Section 31- 00-00. 2000 CY $42.64 $85,280.00 $100.00 $200,000.00 $60.50 $121,000.00
All costs in connection with new electric line and natural gas line installation by BG&E complete as shown on drawings and specified (Price established by BG&E).
1.00 JOB
- 15,200.00 - 15,200.00 15,200.00
TOTAL BID AMOUNT $6,777,298.00 $8,040,200.00 $8,064,200.00
W912DR-15-B-0002
YES
20% BID BOND 20% BID BOND
Tuckman-Barbee
YES
DPW FACILITY
FT MEADE. MD
1 2
AG JV
1. SOLICITATION NUMBER PAGE OF
ABSTRACT OF OFFERS W912DR-15-B-0002 2 OF 5
CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
DPW FACILITY 6
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
20%BID BOND
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED
A. B. C. D. YES
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the Directorate of Public Works (DPW) Building, Fort Meade, MD, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified.
1 JOB - $5,470,000.00 $4,334,735.00 $6,450,000.00 $6,200,000.00
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work, complete as shown on drawings and specified.
1 JOB - $1,600,000.00 $2,889,823.00 $786,000.00 $1,400,000.00
Overexcavation and Replacement with Structural Fill Beneath DPW Building (payment item 31-00-00-1, as specified in Section 31- 00-00. 2000 CY $55.000 $110,000.00 $64.00 $128,000.00 $52.00 $104,000.00 $100,000.00
All costs in connection with new electric line and natural gas line installation by BG&E complete as shown on drawings and specified (Price established by BG&E).
1 JOB - 15,200.00 15,200.00 15,200.00 15,200.00
TOTAL BID AMOUNT $7,195,200.00 $7,367,758.00 $7,355,200.00 $7,715,200.00
NSN 6540-01-280-5502 501419-201 Prescribed by GSA-FAR (48 CFR) 53.236-1 OPTIONAL FORM 1419A (11-88)
20% BID BOND 20% BID BOND 20% BID BOND
YES YES YES
OFFERS (Continued)
FT MEADE, MD
3 4 5
TRISONBENAKA Inc MELTECH CJW CONTRACTORS
ABSTRACT OF OFFERS W912DR-15-B-0002 3 OF 5
CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
DPW FACILITY 10
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
20% BID BOND
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED
A. B. C. D. YES
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the Directorate of Public Works (DPW) Building, Fort Meade, MD, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified.
1 JOB - $5,404,800.00 $6,726,570.00 $5,592,800.00 $7,125,000.00
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work, complete as shown on drawings and specified.
1 JOB - $1,372,677.00 $2,363,346.00 $1,830,000.00 $1,718,000.00
Overexcavation and Replacement with Structural Fill Beneath DPW Building (payment item 31-00-00-1, as specified in Section 31- 00-00. 2000 CY $53.66 $107,323.00 $89.68 $179,352.00 $65.00 $130,000.00 $138.00 $276,000.00
All costs in connection with new electric line and natural gas line installation by BG&E complete as shown on drawings and specified (Price established by BG&E).
1 JOB - 15,200.00 15,200.00 15,200.00 15,200.00
TOTAL BID AMOUNT $6,900,000.00 $9,284,468.00 $7,568,000.00 $9,134,200.00
NSN 6540-01-280-5502 501419-201 Prescribed by GSA-FAR (48 CFR) 53.236-1 OPTIONAL FORM 1419A (11-88)
YES YES YES
OFFERS (Continued) 7 8 9
ARGO SYSTEMS CLASSIC SITE SOLUTIONS FACILITIES SOLUTIONS AMERICAN ARTISANS GROUP
ABSTRACT OF OFFERS W912DR-15-B-0002 4 OF 5
CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
DPW FACILITY 14
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
20% BID BOND
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED
A. B. C. D. YES
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the Directorate of Public Works (DPW) Building, Fort Meade, MD, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified.
1 JOB - $5,677,468.00 $7,463,191.00 $6,449,800.00 $5,719,035.00
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work, complete as shown on drawings and specified.
1 JOB - $1,777,161.00 $1,981,988.00 $1,991,800.00 $1,643,554.00
Overexcavation and Replacement with Structural Fill Beneath DPW Building (payment item 31-00-00-1, as specified in Section 31- 00-00. 2000 CY $75.180 $150,359.00 $140.40 $280,803.00 $59.00 $118,000.00 $45.36 $90,720.00
All costs in connection with new electric line and natural gas line installation by BG&E complete as shown on drawings and specified (Price established by BG&E).
1 JOB - 16,325.00 15,200.00 15,200.00 15,200.00
TOTAL BID AMOUNT $7,621,313.00 $9,741,182.00 $8,574,800.00 $7,468,509.00
NSN 6540-01-280-5502 501419-201 Prescribed by GSA-FAR (48 CFR) 53.236-1 OPTIONAL FORM 1419A (11-88)
YES YES YES
OFFERS (Continued) 11 12 13
EDIFICE SOLUTIONS SAF INC BRECHBILL AND HELMAN FACILITIES SITE CONTRACTING
ABSTRACT OF OFFERS W912DR-15-B-0002 5 of 5 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
DPW FACILITY 18
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED A. B. C. D.
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the Directorate of Public Works (DPW) Building, Fort Meade, MD, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified.
1 JOB - $5,670,000.00
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work, complete as shown on drawings and specified.
1 JOB - $1,400,700.00
Overexcavation and Replacement with Structural Fill Beneath DPW Building (payment item 31-00-00-1, as specified in Section 31- 00-00. 2000 CY $55.000 $110,000.00
All costs in connection with new electric line and natural gas line installation by BG&E complete as shown on drawings and specified (Price established by BG&E).
1 JOB - 15,200.00
TOTAL BID AMOUNT $7,195,900.00
NSN 6540-01-280-5502 501419-201 Prescribed by GSA-FAR (48 CFR) 53.236-1 OPTIONAL FORM 1419A (11-88)
20% BID BOND
YES
OFFERS (Continued) 15 16 17
KALLIDUS TECH
| PAGE 1 |
| PAGE 2 |
| PAGE 3 |
| PAGE 4 |
| PAGE 5 |
| 2015-07-01T14:11:12-0400 | |
| WOOD.ROBERT.A.1042117281 |
File details come from the government source that posted it. Updated .