AMD03.pdf
PDF 16 KB Posted
- Solicitation number
- W912DR-14-R-0003
About this file
Amendment 0003 dtd JUN 26 2014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| F-1_Award_Info_SB_MATOC.pdf | ||
| successful_phase_one_letter.pdf | ||
| AMD02.pdf | ||
| AMD01.pdf | ||
| W912DR-14-R-0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.:
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
PROJECT NO. (If applicable)
0003 JUN 26, 2014
6. ISSUED BY
USACE, BALTIMORE
10 SOUTH HOWARD STREET,
ROOM 7000
BALTIMORE MD 21201
CODE W912DR ADMINISTERED BY:
See Block 6
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
X
W912DR-14-R-0003
9B. DATED (SEE ITEM 11)
10 JUN 2014
10A. MODIFICATION OF CONTRACT/
ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers __ is extended __X__ is not extended. RECEIPT OF PHASE 1 TECHNICAL PROPOSAL: 11:00 AM, LOCAL TIME 02 JUL 2014 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE
DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER No. ITEM 10A B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor _ is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) DESIGN BUILD AND DESIGN-BID-BUILD IN
SUPPORT OF US ARMY CORPS OF ENGINEERS (USACE) BALTIMORE DISTRICT (NAB)
SEE THE FOLLOWING PAGE
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY ________________________________
(signature of person authorized to sign)
BY _________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PAGE 2 OF 2 PAGES
AMENDMENT NO. 0003 TO RFP W912DR-14-R-0003
EFFECTIVE JUN 26, 2014
SOLICITATION:
(1) SECTION 00100, Paragraph 1.3: delete paragraph as originally issued and substitute therfor the following:
“1.3. Each Offeror is required to submit a proposal consisting of the following volumes:
a. Phase 1: Volume I – Past Performance, Management Approach, and Technical Approach, (Factors 1-3), (original and four copies)
b. Volume II – Administrative Documents (original, no copies)
c. Electronic Requirement - In addition to the written binder requirement in block 13A of the SF1442, all Offerors must provide an electronic copy of their, technical proposals in .pdf format on a compact disc(s) (CD).”
(2) SECTION 00100, Paragraph 1.4.2: delete paragraph as originally issued and substitute therfor the following:
“1.4.2. Volume II (Administrative Documents): The Administrative Documents must be placed in a separate envelope. It must contain the following:
a. SF 1442 (Solicitation, Offer and Award). Note - All amendments must be acknowledged in block 19;
b. Certificate of Corporate Principal/Authority;
c. Section 00600.
Those down selected to Phase II will have to re-sign the SF1442.”
Narrative
File details come from the government source that posted it. Updated .