Bid opening Abstract
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| ABSTRACT OF OFFERS - CONSTRUCTION | 1. SOLICITATION NUMBER | 2. DATE ISSUED | DATE OPENED | PAGE OF | ||||||
| W912DR-13-B-0014 | 41495.0 | 41529.0 | 1 of | |||||||
| 4. ISSUING OFFICE | Name and title of Certifying Official (Type) | |||||||||
| Department of the Army | I CERTIFY that I have opened, read, and | |||||||||
| Baltimore District, Corps of Engineers | recorded on this abstract all offers | Signature | Date Signed | |||||||
| 10 S. Howard Street, Rm 7000 | received in response to this solicitation. | Ray Fallaria, Lieutenant Colonel | ||||||||
| Baltimore, Maryland 21203-1715 | Contracting Officer | |||||||||
| 5. PROJECT TITLE | 9. OFFERS | |||||||||
| 8. GOVERNMENT ESTIMATE | NO.1: Boblits Services | NO.2: Kisaq LLC | ||||||||
| SECURE ACCESS LANE (SAL) AND REMOTE SCREENING FACILITY | (Check A, B or C and complete D, E, and F.) | 6925 Olive Danmsel Court Hughesville, MD 20637 | 10807 New Allegiance Dr. #350 Colorado Springs, CO 80921 | |||||||
| PENTAGON RESERVATION, ARLINGTON, VA | ||||||||||
| A. HIRED LABOR | ||||||||||
| B. REASONABLE CONTRACT | B. Bid Security (Type and Amount) | B. Bid Security (Type and Amount) | ||||||||
| (Without Profit) | ||||||||||
| 6. NUMBER OF AMENDMENTS ISSUED | 2 | C. REASONABLE CONTRACT | C. Amendment Acknowledged | C. Amendment Acknowledged | ||||||
| (Including Profit) | ||||||||||
| 7A. | 7B. | 7C. | D. | E. | F. | E. | F. | E. | F. | |
| ITEM | DESCRIPTION OF OFFERED ITEM | EST. | UNIT | UNIT | ESTIMATED | UNIT | ESTIMATED | UNIT | ESTIMATED | |
| No. | QUANTITY | PRICE | AMOUNT IGE | PRICE | AMOUNT (1) | PRICE | AMOUNT (2) | |||
| 0001 | All costs in connection with construction of the Secure Access Lane and Remote Screening Facility, including all utilities to points 5 feet outside the building line, complete as shown on the plans and specified but exclusive of Bid Item 0003 and Optional Bid Items below. | N/A | LS | N/A | $1,917,182.00 | N/A | $2,832,562.00 | N/A | $2,474,966.58 | |
| 0002 | All costs in connection with construction of all outside utilities, including the installation and commissioning of the Under Vehicle Security System (UVSS) and the License Plate Reader (LPR), beyond points 5 feet outside the building lines of the Secure Access Lane and Remote Screening Facility, including utilities to | |||||||||
| points 5 feet outside the building line of the Public Restroom, and all site work complete as shown on drawings and specified but exclusive of Optional Bid Items below. | N/A | LS | $2,436,390.00 | N/A | $2,800,057.00 | N/A | $3,296,960.67 | |||
| 0003 | All costs in connection with the construction of the Canopy complete with lighting, stone cladding, lightning protection and retaining wall complete as shown on the drawings and specified but exclusive of Optional Bid Items below. | N/A | LS | $433,227.00 | N/A | $744,536.00 | N/A | $680,076.14 | ||
| TOTAL ESTIMATED BASE BID AMOUNT | $4,786,799.00 | $6,377,155.00 | $6,452,003.39 | |||||||
| OPTIONAL BID ITEMS | ||||||||||
| 0004 | All costs in connection with the completion of the DoD Information Assurance Certification and Accreditation Process (DIACAP) requirements for the LPR and UVSS complete as specified but exclusive of any work in Bid Item 0002 above. | LS | $81,488.00 | N/A | $452,078.00 | N/A | $287,059.06 | |||
| 0005 | All costs in connection with the installation of the security fencing and gates complete as shown on the plans and specified. | LS | $140,899.00 | N/A | $482,005.00 | N/A | $138,466.97 | |||
| 0006 | All costs in connection with construction of the Public Restroom including utilities to points 5 feet outside the building line complete as shown on the plans and specified. | LS | $489,297.00 | N/A | $681,609.00 | N/A | $606,304.87 | |||
| TOTAL OPTIONAL BID AMOUNT | ||||||||||
| $711,684.00 | $1,615,692.00 | $1,031,830.90 | ||||||||
| TOTAL ESTIMATED BASE & OPTIONAL BID AMOUNT | $5,498,483.00 | $7,992,847.00 | $7,483,834.29 | |||||||
| NSN 7540-01-150-0981 501419-101 | NOTE: If more than two offers are received, continue on OF 1419A. | Prescribed by GSA-FAR(48 CER)53.236-1 | OPTIONAL FORM 1419 (11-88) |
| 1. SOLICITATION NUMBER | PAGE OF | |||||||||||
| ABSTRACT OF OFFERS | W912DR-13-B-0014 | 2 OF | ||||||||||
| CONSTRUCTION | INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on | |||||||||||
| CONTINUATION SHEET | a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items | |||||||||||
| which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional | ||||||||||||
| Continuation Sheets (OF 1419A) as needed. | ||||||||||||
| 2. PROJECT TITLE | OFFERS (Continued) | |||||||||||
| NO.3: Turtle Associates LLC | NO.4: United Builders Group LLC | NO.5: Ikhana LLC | NO.6: CJW/Desbuild Joint Venture LLC | |||||||||
| SECURE ACCESS LANE (SAL) AND REMOTE SCREENING FACILITY | 545 Beckett Road #204 Swedesboro, NJ 08085 | 6300 Chapel Hill Road #120 Raleigh, NC 27607 | 3660 Bessemer Road #200 Mt. Pleaseant, SC 29466 | 8957 Edmonston Rd. Unit Q Greenbelt, MD 20770 | ||||||||
| PENTAGON RESERVATION, ARLINGTON, VA | ||||||||||||
| B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | |||||||||
| 3. CONTRACT ITEMS | C. AMENDMENT ACKNOWLEDGED | C. AMENDMENT ACKNOWLEDGED | C. AMENDMENT ACKNOWLEDGED | C. AMENDMENT ACKNOWLEDGED | ||||||||
| A. | B. | C. | D. | |||||||||
| ITEM | DESCRIPTION OF OFFERED ITEMS | ESTIMATED | UNIT | E. UNIT | F. ESTIMATED | E. UNIT | F. ESTIMATED | E. UNIT | F. ESTIMATED | E. UNIT | F. ESTIMATED | |
| NO. | QUANTITY | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | |||
| 0001 | All costs in connection with construction of the Secure Access Lane and Remote Screening Facility, including all utilities to points 5 feet outside the building line, complete as shown on the plans and specified but exclusive of Bid Item 0003 and Optional Bid Items below. | LS | N/A | $1,822,471.55 | N/A | $2,259,000.00 | N/A | $3,794,159.00 | N/A | $4,479,000.00 | ||
| 0002 | All costs in connection with construction of all outside utilities, including the installation and commissioning of the Under Vehicle Security System (UVSS) and the License Plate Reader (LPR), beyond points 5 feet outside the building lines of the Secure Access Lane and Remote Screening Facility, including utilities to | |||||||||||
| points 5 feet outside the building line of the Public Restroom, and all site work complete as shown on drawings and specified but exclusive of Optional Bid Items below. | LS | N/A | $3,790,875.00 | N/A | $4,840,000.00 | N/A | $496,954.00 | N/A | $1,889,000.00 | |||
| 0003 | All costs in connection with the construction of the Canopy complete with lighting, stone cladding, lightning protection and retaining wall complete as shown on the drawings and specified but exclusive of Optional Bid Items below. | LS | N/A | $600,000.00 | N/A | $645,000.00 | N/A | $545,527.00 | N/A | $1,259,000.00 | ||
| TOTAL ESTIMATED BASE BID AMOUNT | $6,213,346.55 | $7,744,000.00 | $4,836,640.00 | $7,627,000.00 | ||||||||
| OPTIONAL BID ITEMS | ||||||||||||
| 0004 | All costs in connection with the completion of the DoD Information Assurance Certification and Accreditation Process (DIACAP) requirements for the LPR and UVSS complete as specified but exclusive of any work in Bid Item 0002 above. | LS | N/A | $75,000.00 | N/A | $236,000.00 | N/A | $31,093.00 | N/A | $345,000.00 | ||
| 0005 | All costs in connection with the installation of the security fencing and gates complete as shown on the plans and specified. | LS | N/A | $150,000.00 | N/A | $139,000.00 | N/A | $138,693.00 | N/A | $271,000.00 | ||
| 0006 | All costs in connection with construction of the Public Restroom including utilities to points 5 feet outside the building line complete as shown on the plans and specified. | LS | N/A | $495,000.00 | N/A | $575,000.00 | N/A | $447,766.00 | N/A | $370,000.00 | ||
| TOTAL OPTIONAL BID AMOUNT | $720,000.00 | $950,000.00 | $617,552.00 | $986,000.00 | ||||||||
| TOTAL ESTIMATED BASE & OPTIONAL BID AMOUNT | $6,933,346.55 | $8,694,000.00 | $5,454,192.00 | $8,613,000.00 | ||||||||
| LOWEST BIDDER | ||||||||||||
| NSN 6540-01-280-5502 | 501419-201 | Prescribed by GSA-FAR (48 CFR) 53.236-1 | OPTIONAL FORM 1419A (11-88) |
| 1. SOLICITATION NUMBER | PAGE OF | |||||||||||
| ABSTRACT OF OFFERS | W912DR-13-B-0014 | 3 OF | ||||||||||
| CONSTRUCTION | INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on | |||||||||||
| CONTINUATION SHEET | a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items | |||||||||||
| which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional | ||||||||||||
| Continuation Sheets (OF 1419A) as needed. | ||||||||||||
| 2. PROJECT TITLE | OFFERS (Continued) | |||||||||||
| NO.7: EMLS-FutureNet Security, JV, LLC | NO.8: | NO.9: | NO.10: | |||||||||
| SECURE ACCESS LANE (SAL) AND REMOTE SCREENING FACILITY | 12801 Auburn Street #511 Detroit,MI 48223 | |||||||||||
| PENTAGON RESERVATION, ARLINGTON, VA | ||||||||||||
| B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | |||||||||
| 3. CONTRACT ITEMS | C. AMENDMENT ACKNOWLEDGED | C. AMENDMENT ACKNOWLEDGED | C. AMENDMENT ACKNOWLEDGED | C. AMENDMENT ACKNOWLEDGED | ||||||||
| A. | B. | C. | D. | |||||||||
| ITEM | DESCRIPTION OF OFFERED ITEMS | ESTIMATED | UNIT | E. UNIT | F. ESTIMATED | E. UNIT | F. ESTIMATED | E. UNIT | F. ESTIMATED | E. UNIT | F. ESTIMATED | |
| NO. | QUANTITY | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | |||
| 0001 | All costs in connection with construction of the Secure Access Lane and Remote Screening Facility, including all utilities to points 5 feet outside the building line, complete as shown on the plans and specified but exclusive of Bid Item 0003 and Optional Bid Items below. | N/A | LS | N/A | $2,023,750.00 | |||||||
| 0002 | All costs in connection with construction of all outside utilities, including the installation and commissioning of the Under Vehicle Security System (UVSS) and the License Plate Reader (LPR), beyond points 5 feet outside the building lines of the Secure Access Lane and Remote Screening Facility, including utilities to | |||||||||||
| points 5 feet outside the building line of the Public Restroom, and all site work complete as shown on drawings and specified but exclusive of Optional Bid Items below. | N/A | LS | N/A | $2,749,850.00 | ||||||||
| 0003 | All costs in connection with the construction of the Canopy complete with lighting, stone cladding, lightning protection and retaining wall complete as shown on the drawings and specified but exclusive of Optional Bid Items below. | N/A | LS | N/A | $899,000.00 | |||||||
| TOTAL ESTIMATED BASE BID AMOUNT | $5,672,600.00 | |||||||||||
| OPTIONAL BID ITEMS | ||||||||||||
| 0004 | All costs in connection with the completion of the DoD Information Assurance Certification and Accreditation Process (DIACAP) requirements for the LPR and UVSS complete as specified but exclusive of any work in Bid Item 0002 above. | N/A | LS | N/A | $133,500.00 | |||||||
| 0005 | All costs in connection with the installation of the security fencing and gates complete as shown on the plans and specified. | N/A | LS | N/A | $144,900.00 | |||||||
| 0006 | All costs in connection with construction of the Public Restroom including utilities to points 5 feet outside the building line complete as shown on the plans and specified. | N/A | LS | N/A | $328,500.00 | |||||||
| TOTAL OPTIONAL BID AMOUNT | $606,900.00 | |||||||||||
| $0.00 | $0.00 | |||||||||||
| TOTAL ESTIMATED BASE & OPTIONAL BID AMOUNT | $6,279,500.00 | |||||||||||