AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE PURPOSE OF THIS AMENDMENT IS TO DOCUMENT REVISIONS TO THE INFORMATIONAL TEXT OF SECTION L (PP. 40-45). THE

FOLLOWING LOCAL CLAUSES HAVE BEEN REMOVED:

1) PG. 41 OF 53, LOCAL CLAUSE, "SUBCONTRACTING GOALS"

2) PG. 42 OF 53, LOCAL CLAUSE, "END ITEMS OF SMALL BUSINESSES"

3) PG. 43 OF 53, LOCAL CLAUSE, "SUBCONTRACTING PLAN EVALUATION"

THE REVISED INFORMATIONAL TEXT SEGMENT OF THE SOLICITATION IS ENCLOSED.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

CONTRACTING P.O.C. TAMARA W RIGHT 410-962-4958

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-11-R-0059

X 9B. DATED (SEE ITEM 11)

25-Jul-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2011

CODE

USACE, BALTIMORE

10 SOUTH HOWARD STREET, ROOM 7000

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-11-R-0059

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INFORMATIONAL TEXT

EVIDENCE OF AUTHORITY TO SIGN BIDS/PROPOSALS

Evidence of the authority of individuals signing bids/proposals to submit firm bids/proposals on behalf of the bidder/offeror is required except where the bid/offer is signed, and shows that it is so signed, by: The President, Vice-President, or Secretary of Incorporated bidders; a partner in case of partnership; the owner in the case of sole proprietorships. Failure to submit with the bid satisfactory evidence of authority of all other persons may be cause for rejection of bid as an invalid or non-responsive bid.

End of Clause

(CENAB-OC APR 1984)

(FAR 4.102)

(was 52.204-4008)

INQUIRIES

Prospective bidders/offerors may submit inquiries relating to the solicitation by:

Writing:

Baltimore District, Corps of Engineers ATTN: (Tamara Wright), Acquisition Branch, Contracting Division, 10 South Howard Street Baltimore, Maryland 21201

Fax:

410-962-0174

Email:

Tamara.A.Wright@usace.army.mil

When submitting your inquiry, please provide the project name, location and solicitation number. ALL INQUIRIES

MUST BE IN WRITING.

DELIVERY OF BIDS/PROPOSALS

Bids/Proposals may be delivered in person to the Contracting Division, Baltimore District, Corps of Engineers, Room 7000, City Crescent Building, 10 South Howard Street, Baltimore, Maryland 21201.

(CENAB-CT JUL 1993)

(FAR 14.302)

(was 52.214-4024)

SERVICE OF PROTEST

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protest that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (address as follows) by obtaining written and dated acknowledgment of receipt from:

(for hand delivered protests):

U.S. Army Engineer District, Baltimore ATTN: District Counsel/CENAB-OC Room 6420, City Crescent Building 10 South Howard Street Baltimore, Maryland, 21201

(For mailed protests):

U.S. Army Engineer District, Baltimore

ATTN: CENAB-OC

P.O. Box 1715 Baltimore, Maryland 21203-1715

(b) The copy of any protest shall be received in the office designated above within one day of filing protest with the

GAO.

(CENAB-CT APR 97)

(FAR 52.233-2)

(was 52.233-4041)

EVALUATION OF CONTRACTOR PERFORMANCE

As a minimum, the contractor’s performance will be evaluated upon final acceptance of the work. However, interim evaluation may be prepared at any time during the contract performance when determined to be in the best interest of the Government.

The format for the evaluation will be DD2626, and the contractor will be rated either outstanding, satisfactory, or unsatisfactory in the areas of Contractor Quality Control, Timely Performance, Effectiveness of Management, Compliance with Labor Standards, and Compliance with Safety Standards. The contractor will be advised of any unsatisfactory rating either in an individual element or in the overall rating prior to completing the evaluation, and all contractor comments will be made a part of the official record. Performance Evaluation Reports will be available to all DOD Contracting Offices for their future use in determining contractor responsibility.

(CENAB-CT JUN 1996)

(FAR 36.201)

(was 52.236-4000)

SUMMARY FOR THE PAYMENT OFFICE

All modifications will provide sufficient information to permit the paying office to readily identify the changes for each Contract Line Item (CLIN) and SubCLIN item as follows:

(a) The amount of funds obligated by prior contract actions, to include the total cost and fee if a cost-type contract; the target fee at time of contract award if a cost-plus-incentive-fee contract; the base fee if a cost-plus-award-fee contract; or the target price and target profit if a fixed-price incentive contract;

(b) The amount of funds obligated or deobligated by the instant modification, categorized by the types of contracts specified in paragraph (a) of this section; and

(c) The total cumulative amount of obligated or deobligated funds, categorized by the types of contracts specified in paragraph (a) of this section.

(was 52.232-4131)

SAFETY ASSURANCE

Preconstruction Safety Meeting: Representatives of the Contractor shall meet with the Contracting Officer or his/her representative(s) prior to the start of repair, alteration or construction activities for the purpose of reviewing the Contractor's safety and health programs and discussing implementation of all safety and health provisions pertinent to the work to be performed under the contract. The Contractor shall be prepared to discuss, in detail, the measures he/she intends to take in order to control any unsafe or unhealthy conditions associated with the work to be performed under the contract. This meeting may be held in conjunction with the preconstruction conference, if so directed by the Contacting Officer. The conduct of this meeting is not contingent upon a general preconstruction meeting. The level of detail for the safety meeting is dependent upon the nature of the work and the potential inherent hazards. The Contractor's principal on-site representative(s) shall attend this meeting.

Compliance with Regulations: All work, including the handling of hazardous materials or the disturbance or dismantling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 20 CFR 1926/1910. Work involving the disturbance or dismantling of asbestos or asbestos containing materials, the demolition of structures containing asbestos, and/or the disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subparts A and B, ETL 1110-1-118 and DA Circular 40-83-4. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply.

Contractor Responsibility:

(a) The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his part or that of his employees or subcontractors, which results in illness, injury, or death. Contractors are required to report any accidents and injuries to the Contracting Officer's Representative within 24 hours of the accident. A written report (ENG 3394) shall be submitted within 72 hours of the accident to the Contracting Officer's Representative.

(b) The Contractor is subject to the safety and health standards of both the Occupational Safety and Health Act (OSHA) and the Corps of Engineers General Safety Requirements, EM 385-1-1. Implementation of OSHA provisions rests in the statutory requirement while compliance with EM 385-1-1 is a contractual matter.

(c) The Contractor should review the accident-prevention clauses of the contract, the Corps of Engineers General Safety Requirements, EM 385-1-1, latest revision, referred to therein, and the special and technical provisions applicable to safety. The Contractor should assure himself that he has full knowledge of the personal protective equipment (including respiratory equipment) that must be provided workmen, and that he is familiar with medical surveillance and recordkeeping requirements and with the safety standards applicable to machinery and mechanized equipment, ladders and scaffolds, fire prevention and protection, stripping of concrete forms, cleanup and housekeeping and other safety measures for the prevention of accidents during construction.

Inspections, Tests, and Reports: The required inspections, tests, and reports made by the contractor, subcontractors, specially trained technicians, equipment manufacturers, and others as required, shall be at the contractor's expense.

These reports shall be furnished in accordance with the terms contained herein.

a. MATERIALS AND EQUIPMENT: Special facilities, devices, equipment, clothing, and similar items used by the Contractor in the execution of work shall comply with the applicable regulations.

b. HAZARDOUS MATERIALS: The Contractor shall bring to the attention of the Contracting Officer any material suspected of being hazardous which he encounters during execution of the work. A determination will be made by the Contracting Officer as to whether the Contractor shall perform tests to determine if the material is hazardous. If the Contracting Officer directs the contractor to perform tests, and/or if the material is found hazardous and additional protective measures are needed, a contract change may be required, subject to equitable adjustment under the terms of the contract.

(CENAB-CT MAY 1992)

(FAR 36.513)

(was 52.236-4038)

(End of Summary of Changes)