W912DR-11-R-0030 - SB SATOCC.pdf

PDF 336 KB Posted

Attached to
$49. 99M Single Award Task Order Construction Contract (SATOCC)
Solicitation number
W912DR-11-R-0030
Issued by

About this file

Solicitation for W912DR-11-R-0030

View the file

Other files

File Type Posted
RSFO Division 1 - March 2011 .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEFINITE-DELIVERY, INDEFINITE QUANTITY, FIRM FIXED PRICE SINGLE AWARD TASK ORDER CONSTRUCTION CONTRACT (SATOCC)

The scope of this contract encompasses a broad variety of major and minor repair, modif ication, rehabilitation, alterations, design-build, design-bid-build and new construction projects in support of DoD organizations w ithin the Intelligence Community. Customers to be serviced by this contract w ill belong to secure and non-secure sites. This contract w ill have requirements that focus on the Baltimore-Washington corridor but may be used throughout the Continental United States. This procurement shall be a 100% set-aside for Small Businesses. A Top Secret Facility Clearance is required at the time the offer is due, and at time of aw ard and for the duration of the contract.

The proposed contract term shall be five (5) years. Total estimated amount and maximum is $49,999,999.99. The guaranteed minimum for the proposed contract is $50,000.00.

NINA ALBRITTON 410-854-0737

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

18-Mar-2011

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1825 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________18 Apr 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, BALTIMORE

10 SOUTH HOWARD STREET, ROOM 7000

BALTIMORE MD 21201

W912DR

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912DR-11-R-0030 94

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DR-11-R-0030

Section 00010 - Solicitation Contract Form

BID SCHEDULE

COEFFICIENT SCHEDULE

Design-Bid-Build

(DBB)

Design-Build

(DB)

Non-Secure:

$0 to $500K Non-Secure:

>$500K Secure:

$0 to $500K Secure:

>$500K

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 49,999,999.99 Lump Sum Single Award (TOCC)

FFP

Indefinite Delivery Indefinite Quantity (IDIQ) Task Order Construction Contract for the Baltimore-Washington corridor with the availability to be utilized throughout the Continental United States.

Contract Specialist- Nina Albritton, 410-854-0737 Project Manager- Dale Daniel, 410-854-4136 FOB: Destination

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 5 yrs. ADC 49,999,999.99 REAL PROPERTY SERVICES FIELD

OFFICE

DALE T. DANIEL

133 NATIONAL BUSINESS PARKWAY,

SUITE 100

ANNAPOLIS JUNCTION MD 20701

410-854-4136 FOB: Destination

Section 00100 - Bidding Schedule/Instructions to Bidders

SECTION 100

SECTION 00100

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits for one Indefinite Delivery, Indefinite Quantity (IDIQ) Firm-Fixed Price Task Order Construction Contract for the Real Property Services Field Office of the Baltimore District Corps of Engineers. The resultant contract will be a five year contract with a maximum dollar value of $49,999,999.99.

1.2 The award will be an IDIQ contract that will be funded on an annual basis at 20 percent per year ($10M per year). Task orders may be either Design-Build or Design-Bid-Build. The individual projects will be a variety of construction types from mechanical and electrical to new construction. The task orders will range in size and complexity from small to large and from non-complex to non-technical. Projects may be classified or unclassified.

Funding may be either Military Constructions funding (MILCON) or Operations and Maintenance (O&M) funding.

Occasionally, there may be other types of funding that could be utilized if authorized for constructions projects. All task orders will be firm fixed priced task orders. The period of performance for the contract will be five years. A Top Secret Facility Site Clearance is required for the awardee. The offeror successful in obtaining this contract award will be that offeror whose proposal represents the best value and is determined to provide the most benefit to the Government.

Further details regarding this project include the following: This contract is for a broad variety of major and minor repair, modification, rehabilitation, alterations and new construction projects in support of customers in the Intelligence Community, Department of Defense organizations and other agencies that are supported by the Real Property Services Field Office. Further projects may include demolition; geo-technical investigation: infrastructure;

interior fit-up; communications, security, and counter terrorism (including weapons of mass destruction), Supervisory Control and Data Acquisition (SCADA), and anti-terrorism/force protection (AT/FP) requirements.

Projects may be either Design-Build or Design-Bid-Build. The geographic area for this contract is anticipated to be limited to the Baltimore-Washington corridor but may be used throughout the District of Columbia (CONUS).

Work performed may be either in secure or non-secure sites.

The Contractor and RSFO will be required to respond rapidly to Government requirements with outstanding professionalism and top quality craftsmanship, without compromising safety standards, current mission requirements, and readiness. It is imperative that the Contractor provide a flexible and multi-disciplined work force.

Most of the work to be accomplished will be in areas where classified Top Secret operations are conducted. It is mandatory that the Contractor maintain a balanced work force of cleared Top Secret personnel to work in such areas. Also, it is mandatory that the prime contractor has and maintains an active Top Secret Facility Site Clearance for the prime contractor.

For Design-Build task orders, no separate task order will be issued for design. The coefficient for that task order will be applied to the overall project that will include the cost for the design.

1.3 The purpose of these instructions are to establish a uniform evaluation procedure for the proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). In as much as the proposal shall describe the capability of the Offeror to perform the resulting contract, the proposal shall be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

1.4 For the purposes of this solicitation, the Government will utilize a single phase process. At the time of solicitation, a seed project (task order) is not available. If a seed project becomes available during the solicitation phase, the Government reserves the right to add the seed project as a proposal requirement. This may be done at any time during the solicitation phase, to include after a competitive range has been determined, if applicable. If a competitive range has been determined, the seed project will only be made available to those offerors within the competitive range.

2. GENERAL INSTRUCTIONS

2.1 Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. A design firm or construction contractor may offer more than one proposal by entering into more than one association.

Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.

2.2 Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement.

2.3 If applicable, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.

2.4 Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), subcontractors that will perform major or critical aspects of this requirement, or other associated business, will not be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight of the information to this procurement. Information about subcontractors may not be given much weight unless the proposal contains evidence that the subcontractor is committed to perform the work. If information about a subcontractor is properly submitted and given weight during the evaluation, the expectation is that this subcontractor will perform this work.

Before utilizing another subcontractor for this work, the Government must consent.

2.5 SPECIAL NOTE: This contract requires the firm to possess, at the time of proposal and the time of award, an active Top Secret Facility Site Clearance. This requirement is mandatory for the exact entity submitting the proposal. This means that the entity identified in block 14 of the Standard Form 1442 must have the Top Secret Facility Site Clearance in that name along with the matching Cage Code. For example, if Company A and Company B form a Joint Venture called Company AB, then Company AB must have an active Top Secret Facility Site Clearance. Even if both Company A and Company B each individually posses the clearance, unless Company AB posses its own Top Secret Facility Site Clearance, the proposal will not be eligible for award.

2.6 It is the intent of the Government to disqualify any proposal that, at the time of proposal, does not possess an active Top Secret Facility Site Clearance immediately and not further evaluate it.

2.7 Offerors shall submit their proposal to the address shown in Block 7 of Standard Form 1442.

2.8 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT:

3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.

3.2 Table of Contents. Each binder of the proposal shall contain a detailed table of contents. The complete table of contents shall be included in each binder. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 Printed Matter Submissions. Written material shall be on 8 ½ x 11 inch paper printed in no less than an 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated. A single 8 ½ x 11 inch sheet with written material on one side only shall constitute one page. (for organization chart or schedules, a folded 11” x 17” format may be used) However, if both sides of the sheet bear written material then this single sheet shall be counted as two pages.

3.4 Binders. Proposals shall be submitted in tabbed, three ring binders.

3.5 Number of Copies. Offerors shall submit the following:

Binder 1 (Technical): an original and seven copies Binder 2 (Price): an original and two copies

3.6 Proposals shall be marked:

Date of Closing: 18 April 2011

Time of Closing: 10:00 AM

Solicitation RFP: W912DR-11-R-0030

3.7 Proposal shall be organized as follows:

Binder 1(Technical): Factors 1, 2 and 3 Binder 2 (Price): Tabs A, B, C, D, E and F (Factor 4)

FACTOR 1 Experience in Task Order Construction Contracts

FACTOR 2 Past Performance in Task Order Construction Contracts

FACTOR 3 Work Plan

FACTOR 4 Price

TAB A: Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB B: Company Agreement(s), if applicable (i.e. joint venture, teaming, etc.) See paragraph 2.2. Note to 8(a) Joint Ventures — The Small Business Administration (SBA) must approve a joint venture agreement prior to the award of a contract on behalf of the joint venture. See paragraph 2.3.

TAB C: Bid Bond. The bonding requirement for this contract is as following. Performance and Payment Bonds will be issued per year for one-fifth of the total value of the contract capacity of $49,999,999.99 or $10,000,000 per year. If task orders awarded at any given time during the contract exceed the bonding issued, the contractor shall provide additional bonding before executing further work. Task order and may range from $2,000 to $49,999,999.99. Therefore, to determine the required amount for a bid bond, the full value of the contract, $49,999,999.99 will be used.

TAB D: Memo identifying the Cage Code for the Prime Contractor to verify the Top Secret Facility Site Clearance

TAB E: Certificate of Corporate Principal/Authority

TAB F: Coefficient Schedule (Bid Schedule)

The total number of pages required is at the discretion of the offeror. It is anticipated that no more than 100 pages should be necessary.

4. EVALUATION RATINGS

4.1 Proposal Ratings: Factors. Factors 1 and 3 will be adjectivally rated. Factor 2 will be rated as risk rating.

Offerors submitting proposals for this project should limit submissions to data essential for the evaluation of proposals.

FACTOR 1 Experience in Task Order Construction Contracts

FACTOR 2 Past Performance in Task Order Construction Contracts

FACTOR 3 Work Plan

See paragraph 6 below for a discussion of the evaluation criteria applicable to these factors.

4.2 Technical Rating Definitions. The following rating definitions will be utilized in the evaluation of factors 1 and 3:

EXCELLENT: The proposal has exceptional merit and reflects an excellent approach which will clearly result in the superior attainment of all requirements and objectives. This clearly achievable approach includes numerous strengths, and essentially no weaknesses, which can be expected to result in outstanding performance. The proposal provides solutions which are unquestionably feasible and practical. These solutions are further considered to be exceptionally clear and precise, fully supported, and demonstrate a clear understanding of the requirements.

GOOD: The proposal demonstrates a sound approach which is expected to meet all requirements and objectives. This sound approach includes strengths, and few relatively minor weaknesses, which collectively can be expected to result in good performance. The proposal provides solutions which are considered feasible and practical. These solutions are further considered to be clear and precise, supported, and demonstrate an understanding of the requirements.

ACCEPTABLE: The proposal demonstrates a sound approach which is capable of meeting all requirements and objectives. The approach includes both strengths and weaknesses, where the strengths are not outweighed by the weaknesses. Collectively, the strengths and weaknesses are likely to result in acceptable performance. The proposal solutions are generally feasible and practical. These solutions are further considered to be somewhat clear and precise, partially supported, and demonstrate a general understanding of the requirements.

MARGINAL: The proposal demonstrates an approach which may not be capable of meeting all requirements and objectives. The approach has weaknesses of substance and strengths, which if they exist, are outweighed by the weaknesses. Collectively, the strengths and weaknesses are not likely to result in acceptable performance. The proposal contains solutions which may not be feasible and practical. These solutions are further considered to lack clarity and precision, are generally unsupported, and do not demonstrate a complete understanding of the requirements.

UNACCEPTABLE: The proposal demonstrates an approach which, based on a very high risk, will very likely not be capable of meeting all requirements and objectives. This approach has numerous weaknesses and strengths which, if they exist, are far outweighed by weaknesses. Collectively, the strengths and weaknesses will not result in acceptable performance. The proposal contains solutions which are not feasible and practical. The solutions are further considered to lack any clarity and precision, are unsupported, and do not demonstrate an understanding of the requirement.

4.3 Performance Risk Rating Definitions. Factor 2 will be evaluated using the following Performance Risk Levels:

VERY LOW – Essentially no doubt exists that the Offeror will successfully perform the required effort based on their past performance

LOW - Little doubt exists that the Offeror will successfully perform the required effort based on their performance record.

MODERATE - Some doubt exists that the Offeror will successfully perform the required effort based on their performance record.

HIGH - Significant doubt exists that the Offeror will successfully perform the required effort based on their performance record.

NEUTRAL – When an offeror is without a record of relevant past performance or for whom information on past performance is not available.

5. SUBMISSION REQUIREMENTS

For purposes of this RFP, an “Offeror” may include a group of two or more entities that have formed a “contractor team arrangement,” as that term is defined in the Federal Acquisition Regulation, Section 9.601. In the case of entities that have formed a contractor team arrangement, the experience and performance history of any member of the team, whether or not gained while working with the other member(s) of the currently-proposed contractor team arrangement, will be considered as a part of the evaluation of the Offeror’s proposal. In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this RFP, the prime contractor must have completed at least 50% of the total number of projects submitted for Factor 1 for consideration in response to the past performance requirements of this RFP. An Offeror that relies upon the performance history of a member or members of a proposed contractor team arrangement will be expected to maintain that arrangement during performance of any contract awarded to that Offeror under this RFP. As a part of their proposal, the Offeror must provide a contractor team agreement signed by all parties, identifying the legal name(s) of all entities and describing the nature of each entity’s relationship (teaming/partnering, joint venture, mentor/protégé, etc.) and their role on this project. This documentation shall be provided in Binder 1 of the Offeror's proposal.

5.1 FACTOR 1: EXPERIENCE WITH TASK ORDER CONSTRUCTION CONTRACTS: The offeror shall provide information that demonstrates the offeror’s experience with task order construction contracts. This should include both design-build and design-bid-build experiences. The offeror should provide information on a minimum of three and a maximum of five task order construction contracts that have had a performance period within the past five years from the date of the original issuance of this solicitation. At least three of the submitted projects must document the prime contractor’s experience. The remaining projects may come from other members of the contractor team arrangement, as defined above.

Information shall include: the contract number, the contracting agency, contact information for each contract, overall capacity of the contract. Additionally, for each contract provide a matrix that includes: all task orders issued, the description of all projects, dollar value of the initial task order, dollar value of completed task order, period of performance of each task order (or date) and actual period of performance completion (or date). Offerors may use the form entitled “CONTRACTOR PROJECTS” (Attachment A) if desired. This format is highly encouraged.

Similar contracts may include those that include task orders issued for construction projects in a variety of sizes, a variety of construction disciplines, varying degrees of technical complexity and both design-build type task orders as well as design-build task orders. The Offeror may submit other types of projects, but must explain the relevancy of those projects to the project that is being solicited in this RFP.

Project should demonstrate a variety of construction types and methods to assist in evaluating the offeror’s ability and approach to perform work, as described in the Statement of Work, including:

• Security systems

• Force protection features

• Electro Magnetic Radiation (EMR) shielding

• Sensitive Compartmented Information Facilities (SCIF)

• Electronic Test and Repair facilities

• Electronic and Chemical Laboratories

• Communications infrastructure or support facilities

• Structural repairs or construction

• Foundation systems repair, construction, or replacement

• Mechanical systems repair, construction or replacement

• Electrical systems repair, construction or replacement

• Fire protection and alarm systems repair, construction or replacement

• Utility Infrastructure and Systems repair, construction or replacement

5.2 FACTOR 2: PAST PERFORMANCE WITH TASK ORDER CONSTRUCTION CONTRACS: The offeror shall provide information that demonstrates the offeror’s past performance with task order construction contracts listed above. This should include both design-build and design-bid-build experiences.

If a formal evaluation is unavailable, the Offeror shall obtain the information using the “PAST PERFORMANCE QUESTIONNAIRE” (Attachment B) or similar form that provides the same information. Formal performance evaluations are those that are similar to the Department of Defense Performance Evaluation (Construction) Form DD2626. The Offeror may provide an explanation if the performance evaluation rating is less than satisfactory.

Where applicable, the Offeror must explain facts related to any partial or completely terminated project and disclose any projects with an assessment of liquidated damages for the failure to meet the contractually required completion date.

The Government will also analyze past performance by reviewing the Construction Contractor Appraisal Support System (CCASS) and/or the Architect-Engineer Contractor Appraisal Support System (ACASS). The Offeror shall submit all customer completed questionnaires and performance evaluations with its proposal. The Offeror may provide information regarding any awards received for work done on any of the projects described. In the case of an Offeror without a record of relevant past performance, or for whom information on past performance is not available, the Offeror will be rated neutral.

5.3 FACTOR 3: WORK PLAN: To facilitate evaluation, the offeror should organize the submitted material sequentially under tabs. Submit this information in the form of narratives and an organization chart.

5.3.1 Contract Team Organization: Describe in narrative form, how the contract team shall be structured. Describe the principle firms involved and their responsibilities. Identify the team members. All disciplines shall be led by an experienced professional registered in the discipline (if professional registration is available). The Offeror shall submit documentation as to the availability of Key Personnel that indicates each individual’s current assignment and the Offeror’s plan to ensure that the named personnel will be used on this contract; however, if the named person isn’t available upon award, a person with the same or better qualifications shall be substituted and approved by the Government. Key Personnel must be identified with the required TS/SCI facility site clearance. Key Personnel shall include at minimum the Design Collaboration Manager, Project Architect, Civil Engineer, Mechanical Engineer, Electrical Engineer, Fire Protection Engineer, Communications Engineer, Design Project Manager, Construction Project Manager, Safety Manager and Quality Control Officer.

The offer shall discuss their approach to manage multiple, large-scale projects simultaneously. Identify the construction portion the Offeror intends to self perform and the items to be subcontracted. Similarly, the Offeror shall identify the areas they intend to design through consultants and list those design consultants.

5.3.2 Design Organization: This contract may involve a wide variety of construction projects, some of which will be executed in a Design-Build method. This section shall discuss how design will be managed and executed throughout the life of this contract. Multiple design firms may be necessary. The qualifications of the design and construction personnel shall be provided. The narrative shall state why your design team(s) is uniquely qualified to undertake this contract, its approach to sustainable design and process of working with the customer(s) during the design phase.

5.3.3 Construction Organization: This contract may involve a wide variety of construction projects. The Offeror shall discuss its construction organizational structure to manage multiple task orders with concurrent periods of performance. This section shall discuss how construction will be executed throughout the life of this contract. The narrative shall state why your team is uniquely qualified to undertake this contract, its approach to construction and working with the customer(s) during construction.

5.3.4 Quality Management Control System: The Offeror shall describe how they intend to manage quality throughout the contract. Discuss quality management methods proposed throughout the design and construction process.

5.3.5 Safety. The Offeror shall discuss how they intend to manage and execute their Safety program for the contract and each task order.

5.3.6 Organization Chart: The proposed organizational chart shall identify the members or entities of the organization and show the lines of authority and communication of all members of the design and construction entities.

5.3.7 Schedules: The offeror must describe how it will manage multiple task orders with concurrent period of performance.

The offeror must discuss its scheduling capabilities and procedures to be used for this contract, which must include schedule updates, incorporating modifications into the schedule, and other steps to be taken to maintain the individual task order schedules.

5.4 FACTOR 6: PRICE: All offerors will fill in the bid schedule. The bid schedule is made up of the coefficients for the following breakdown of task orders. The Scope of Work, included in the solicitation, contains information as to what is included in the coefficient. This is located in paragraph 2.0 of Section 00010.

Chart A

Design-Build

(DB)

Non-Secure:

$0 to $500K Non-Secure:

>$500K Secure:

$0 to $500K Secure:

The Government estimates the following percentages for each type of task order:

Chart B

Design-Build

(DB)

Non-Secure:

$0 to $500K

10% 15%

Non-Secure:

>$500K

25% 30%

Secure:

$0 to $500K

2% 5%

Secure:

3% 10%

6. EVALUATION CRITERIA

6.1 FACTOR 1: EXPERIENCE IN TASK ORDER CONSTRUCTION CONTRACTS: Offerors must demonstrate sufficient experience in task order construction contracts as stated in paragraph 5.1. The Offeror will be rated on an adjectival basis. To achieve an “acceptable” the offer must submit information listed in paragraph

5.1 that demonstrates that the offeror is capable of meeting all requirements and objectives.

Extra consideration may be given for the following:

a. Experience with multiple task order type construction contracts in a concurrent period

b. High dollar and multiple task orders issued concurrently

c. Task order construction contracts with the Federal Government and/or the U.S. Army Corps of Engineers.

6.2 FACTOR 2: PAST PERFORMANCE IN TASK ORDER CONSTRUCTION CONTRACTS: Past performance will be rated in terms of how likely there is a performance risk to the Government; that is, low performance ratings will be taken as indicators of a high risk that the Offeror will successfully perform the work.

The more relevant a proposed project is the more weight it will be given. If an Offeror has no record of relevant past performance, or if information on the Offeror’s past performance is not available, the Offeror must state that fact. That Offeror will be rated as neutral.

6.3 FACTOR 3: WORK PLAN: The Offeror will be rated on an adjectival basis. To achieve an “acceptable” the offeror will submit the information listed in paragraph 5.3. that demonstrates a sound approach capable of meeting all requirements and objectives.

6.4 FACTOR 4: PRICE:

Price Analysis: The process of examining and evaluating an offeror’s proposed price to determine if it is fair and reasonable without evaluating its separate cost elements and proposed profit/fee will be conducted in accordance with FAR Part 15. Price analysis may involve comparison with other prices; e.g., comparing an offeror’s proposed price with the proposed prices of competing offerors or with previously proposed prices for the same or similar items.

The Government intends to utilize the following process to evaluate the price coefficients. The Government will take the offerors schedule of coefficients from Chart A and multiple them by the percentage estimated in Chart B.

These numbers will then be added together for one overall coefficient that makes up a weighted average of all eight coefficients. This weighted average will be used as a basis of analysis in performing price analysis. If awarded this contract, the proposed coefficients in Chart A will be the contractual coefficients and not the weighted average.

Coefficients will also be analyzed for reasonableness to include offering balanced coefficients.

The following is an example of the analysis to reach the weighted average coefficient. Note: These coefficients are for demonstration only and are not an indication of the Government Estimate or existing rates on current contracts.

Chart A – SAMPLE

Design-Build- Build (DBB)

Design-Build

(DB)

Non-Secure:

$0 to $500K

0.98 1.05

Non-Secure:

>$500K

1.00 1.15

Secure:

$0 to $500K

1.15 1.18

Secure:

1.10 1.20

Chart B – Government Estimated Percentage of Work

Design-Build

(DB)

Non-Secure:

$0 to $500K

2% 5%

Non-Secure:

>$500K

25% 30%

Secure:

$0 to $500K

10% 15%

Secure:

3% 10%

Chart C – SAMPLE Weighted Average

Design-Build

(DB)

Non-Secure:

$0 to $500K

0.01960 0.05250

Non-Secure:

>$500K

0.25000 0.34500

Secure:

$0 to $500K

0.11500 0.17700

Secure:

0.03300 0.12000

The Weighted Average (by adding together all blocks above) would be 1.11210.

The PEB will perform a price analysis to develop a report that summarizes and compares the offerors proposed price information to the independent government estimate. The report will be briefed to the SSEB.

7. EVALUATION PROCEDURE

7.1 The Source Selection Evaluation Board (SSEB) will conduct a review of the Evaluation Board evaluations of proposals against the solicitation requirements and the approved evaluation criteria to ensure an equitable, impartial, and comprehensive evaluation against the solicitation requirements. The fundamental responsibility of the SSEB is to provide the Source Selection Authority with information to make an informed and reasoned selection. The SSEB will therefore prepare a summary report containing adjectival assessments for each factor and their supporting rationale; brief the SSA; and prepare any necessary items for discussion.

7.2 Ratings on individual factors, to include all supporting documentation, will be provided to the Source Selection Authority. The Source Selection Authority, independently exercising prudent business judgment and determine the offeror that proposed the best offer to the Government.

7.3 Discussions: Offerors are advised that it is the intent of the Government to make an award without discussions.

However, the Government reserves the right to hold discussions if it determines that discussions are necessary.

Therefore, proposals should be submitted on the most favorable terms that the Offeror can submit to the Government.

7.4 Exceptions to the contractual terms and conditions of the solicitation (e.g., standard terms and conditions) may result in a determination to reject a proposal.

7.5 The Government reserves the right to reject any or all proposals at any time prior to award.

7.6 The Government reserves the right to accept other than the lowest priced offer.

7.7 Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.

8. BASIS OF AWARD

When combined all non-price factors are significantly more important than price. Of the non-price factors the following factors are in descending order of importance: Factor 1, Factor 2, Factor 3.

Trade-off Analysis: After all of the evaluations have been completed, the SSA will consider all factors to determine which Offeror submitted the proposal that represents the “best value” to the Government for this project.

9. EVALUATION FORMS

Evaluation forms required to be used in responding to this RFP are provided on the following pages. They include:

Attachment A: Contractor’s Projects Attachment B: Past Performance Questionnaire

Attachment A

CONTRACTOR’S TASK ORDER CONTRACTS

Contractor’s Name: ______________________ __________________________________________________

Contract Owners Point of Contact and Title: _____________________________________________________

Contract Owner’s Email: ____________________________________________________________________

Contract Owner’s Phone number: _____________________________________________________________

Type of Contract (SATOCC, MATOCC, JOC, SABER, etc): _______________________________________

Capacity of Contract: $______________________________________________________________________

Detailed Scope of Contract: __________________________________________________________________

Narrative on ability and success at managing multiple task orders concurrently: __________________________

Task (Delivery) Orders Issued. Include the following information regarding each task order under the contract.

You may put this information in a matrix or a table.

1. Task Order Number

2. Scope of Work

3. Dollar Value of Task order (initial award value and final value)

4. Period of Performance of Task Order (initial period and actual period)

5. Subcontractors used on task order, discipline and percent of work (to include AE)

6. Lost time accidents

7. Owner of the project

8. Additional information regarding the task order to include challenges, lessons learned, awards earned or any other information

Attachment B

PAST PERFORMANCE QUESTIONNAIRE

The contractor identified below has made an offer for the award of a contract by the U.S. Army Corps of Engineers, Baltimore District, in response to the referenced solicitation. This is a request for information about the past performance of the offeror, which the offeror has identified as being relevant to the referenced solicitation. The information provided below will be used in the evaluation of the offeror’s past performance. The information, once submitted by the offeror, will be treated confidentially and will not be released. It will be used only to evaluate this offeror for the referenced solicitation. If the project described below was a U.S. Army Corps of Engineers or U.S.

Navy project, please submit the SF-1420 evaluation form in lieu of this form.

Information may be typed or legibly handwritten in ink.

Please evaluate the project performance for which the contractor was solely responsible. Do not allow factors beyond the control of the contractor, which resulted in performance delays or other problems, to affect the evaluation of the contractor’s performance.

Past Project Information:

Contractor:

Project/Contract Title:

Evaluator:

Owner’s Name: __________________________________________________________________________

Name: _______________________________ Date: _________________________________________

Phone No: ____________________ Email Address:______________________________________________

Address: ________________________________________________________________________________

Position held of function in relation to project: __________________________________________________

Signature of Evaluator:

The following is a definition of the rating system used:

Excellent: Performance met contractual requirements and exceeded many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Good: Performance met contractual requirements and exceeded some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Acceptable: Performance met contractual requirements. The contractual performance of the element or sub-element contained some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal: Performance did not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflected a serious problem for which the contractor has not yet identified correction actions. The contractor’s proposed actions were only marginally effective or were not fully implemented.

Unacceptable: Performance did not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contained serious problem(s) for which the contractor’s corrective actions were not effective.

Ratings: In completing this questionnaire, please circle a letter corresponding to your rating, or N/A if you are unable to provide an evaluation:

E=Excellent, G=Good, A= Acceptable, M=Marginal, U=Unacceptable

Please provide clear and concise narrative explanations (both positive and negative) for your answers. This is especially important for any rating above or below satisfactory.

Please rate and provide any supporting information for the following: (Use additional sheets as needed.).

1. The contractor’s overall corporate management, integrity, reasonableness, and cooperative conduct.

Rating: E ___, G ___, A ___, M ___, U ___, N/A ___

Comments:

2. The relationship between the contractor and the owner’s teams.

Rating: E ___, G ___, A ___, M ___, U ___, N/A ___

Comments:

3. The contractor’s on-site management and coordination of subcontractors.

Rating: E ___, G ___, A ___, M ___, U ___, N/A ___

Comments:

4. The contractor’s quality control (CQC) system.

Comments:

5. The contractor’s performance on delivery of quality work.

Comments:

6. The contractor’s ability to meet the performance schedule.

Rating: E ___, G ___, A ___, M ___, U ___, N/A ___

Comments:

7. What did the contractor do to improve schedule problems?

Rating: E ___, G ___, A ___, M ___, U ___, N/A ___

Comments:

8. The contractor’s ability to provide the required work at a reasonable total price.

Rating: E ___, G ___, A ___, M ___, U ___, N/A ___

Comments:

9. The contractor’s compliance with labor standards.

Rating: E ___, G ___, A ___, M ___, U ___, N/A ___

Comments:

10. The contractor’s compliance with safety standards and/or number of incidents.

11. Did the contractor receive any of the following: Cure Notices; Show Cause; Letters of Reprimand;

Suspension of Payments; or Termination? If Yes, please explain.

12. Would you award another contract to this contractor? In no, please explain.

13. Customer satisfaction with end product.

14. Was the contractor been provided with an opportunity to discuss any negative performance ratings? If so, what were the results?

15. OVERALL RATING:

Rating: E ___, G ___, A ___, M ___, U ___, N/A ___

Additional Comments:

CLAUSES INCORPORATED BY REFERENCE

52.204-7 Central Contractor Registration APR 2008 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.222-5 Davis-Bacon Act--Secondary Site of the Work JUL 2005

CLAUSES INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

(End of provision)

52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN

CERTIFIED COST OR PRICING DATA (OCT 2010)

(a) Exceptions from certified cost or pricing data. (1) In lieu of submitting certified cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs.

The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Commercial item exception. For a commercial item exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include--

(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;

(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;

(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation , access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data. If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) The offeror shall prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.

As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a INDEFINITE-DELIVERY INDEFINITE-QUANITITY FIXED PRICE SINGLE AWARD TASK ORDER CONSTRUCTION CONTRACT resulting from this solicitation.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance…