Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
W912DR-10-R-0024, ELECTRONICS MAINTENANCE SHOP, DEPOT LEVEL, (C4ISR) TOBYHANNA ARMY DEPOT, PENNSYLVANIA. THE PURPOSE FOR THE MODIFICATION IS TO CHANGE THE SITE VISIT DATE TO JANUARY 11, 2010 @ 1:00 PM. AND TO CHANGE THE
PROJECT DURATION TO 410 DAYS.
1. CONTRACT ID CODE PAGE OF PAGES
FAR (48 CFR) 53.243
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Dec-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-10-R-0024
X 9B. DATED (SEE ITEM 11)
23-Dec-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Dec-2009
CODE
US ARMY CORPS OF ENGINEERS BALTIMORE DIS
10 SOUTH HOWARD STREET
ROOM 7000
BALTIMORE MD 21201-2536
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR-10-R-0024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The contractor period of performance end date has decreased by 30 days from 440 days to 410 days.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visit is scheduled 11 January @ 1:00 PM. The site visit will convene/start in Bldg 1010 and then we will visit the actual contruction site on the Depot Name: Joseph Benenati USACE Northeastern Resident Office Building 1010, McDonough Loop Tobyhanna Army Depot Tobyhanna, PA 18466
Telephone: 570-615-7052, Ext 14
(End of provision)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
INFORMATIONAL TEXT
COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) FAR 52.211-10
The Contractor shall be required to commence work under this contract within 10 calendar days after the date the Contractor receives Notice To Proceed, prosecute said work diligently, and complete the entire project ready for use not later than 410 calendar days after date of receipt of Notice To Proceed. The time stated for completion shall include as-built drawings, O&M manuals, operational tests/reports, training and instructions, equipment lists, final cleanup of all Contractor work areas and all other contract requirements.
The Contractor shall begin work on the Warehouse immediately after receiving notice to proceed. Due to UXO clearance of the "construction area" for the antenna positioner and control building, that site will not be accessible for (230) calendar days after NTP. Subject area may be released earlier as approved by the TYAD EMD and directed by the COR. Those areas of the Maintenance Shop designated to receive Government-furnished equipment (See the Equipment Layout Drawing) must be made available for Government installation to begin not more than 410 days after the date that the Contractor receives Notice to Proceed.
W912DR-10-R-0024
(End of Summary of Changes)