Update 9001 Atchison CSO Supplemental CLIN Schedule V2.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- W912DQ27BA002
About this file
This is a supplemental bid schedule attachment (CLIN Schedule) for the Atchison Storm Sewer Separation Improvements construction project issued by the U.S. Army Corps of Engineers, Kansas City District under solicitation number W912DQ27BA002. The file appears to be an Excel-based pricing template documenting Contract Line Item Numbers (CLINs) and associated costs for the storm sewer separation and improvement work in Atchison, Kansas.
The project scope requires contractors to furnish all equipment, labor, operators, supervision, site superintendent services, quality control, supplies, materials, and incidentals necessary to perform storm sewer separation improvements along with pavement, sidewalk, driveway, and parkway restoration work. This is an Invitation for Bid (IFB) solicitation issued as a competitive fixed-price construction contract. An organized site visit was scheduled for October 20 at 10:00 am CDT at the City of Atchison Public Works & Utilities Department located at 1801 Main Street, Atchison, KS 66002. Bidders are required to reference the RTA Plans and Specifications provided as separate attachments and submit pricing according to the CLIN structure outlined in the supplemental bid schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.07.01 Site Visit Attendance.pdf | ||
| 2026_09_21_503708_ATCH_CSO_RTA_PLANS.pdf | ||
| 503708_ATCH_CSO_RTA_SPECS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supp Bid Sched
| Atchison Sewer Improvement |
| SUPPLEMENTAL BID SCHEDULE |
| The contractor shall complete the following Supplemental Bid Schedule in addition to the Bid Schedule. This Supplemental Bid Schedule is not contractually binding. The Government will use this Supplemental Bid Schedule to assist in the evaluation of prices. The individual supplemental bid items should add up to the prices for the bid schedule. In the event that the CLIN subtotal in the supplemental bid schedule does not match the CLIN total in the bid schedule, the CLIN bid schedule shall control and will be the price evaluated by the Government. |
| CLIN 0001 | ||||||
| 16th Street Alignment | Est. Qty. | Unit | Unit Price | Subtotal | ||
| Removal of Existing Structures | 1 | JOB | - | $ | ||
| Sewer Pipe Installation (Materials and Labor) | 1 | JOB | - | $ | ||
| Drainage Structure/Junction Box Installation (Materials and Labor) | 1 | JOB | - | $ | ||
| Erosion Control | 1 | JOB | - | $ | ||
| Curb & Gutter Construction/Repair | 1 | JOB | - | $ | ||
| Street and Driveway Construction/Repair | 1 | JOB | - | $ | ||
| Seed and Sod | 1 | JOB | - | $ | ||
| Sidewalk Repair Replacement | 1 | JOB | - | $ | ||
| Outfall Structure to White Clay Creek | 1 | JOB | - | $ |
CLIN 0001 SUBTOTAL $
| CLIN 0002 (Option) | ||||||
| 15th Street Alignment | Est. Qty. | Unit | Unit Price | Subtotal | ||
| Traffic Control and Protection | 1 | JOB | - | $ | ||
| Removal of Existing Structures | 1 | JOB | - | $ | ||
| Sewer Pipe Installation (Materials and Labor) | 1 | JOB | - | $ | ||
| Drainage Structure/Junction Box Installation (Materials and Labor) | 1 | JOB | - | $ | ||
| Erosion Control | 1 | JOB | - | $ | ||
| Curb & Gutter Construction/Repair | 1 | JOB | - | $ | ||
| Street and Driveway Construction/Repair | 1 | JOB | - | $ | ||
| Seed and Sod | 1 | JOB | - | $ | ||
| Sidewalk Repair Replacement | 1 | JOB | - | $ |
CLIN 0002 SUBTOTAL $
CONTRACT TOTAL $
Note: Any work not specifically noted shall be priced with the most closely related CLIN.
File details come from the government source that posted it. Updated .