NWK DVA STL Industry Day 20251217.pdf
PDF 5 MB Posted
- Solicitation number
- W912DQ26RA030
About this file
This document is an industry webinar presentation for the VA John J. Cochran Division Medical Center expansion project in St. Louis, Missouri. The project involves a major infrastructure upgrade valued at $1.62B in FY26 appropriations, including construction of a new 585,000 square foot Inpatient Bed Tower, Central Utility Plant, IT/Engineering facilities, and additional parking structures. The project addresses critical needs such as patient safety, physical security, seismic deficiencies, and facility condition improvements, with plans to relocate existing inpatient functions into a new seismically designed tower.
The acquisition strategy utilizes an Integrated Design and Construction (IDaC) approach with a Design-Build-Bid methodology. Key milestones include an industry webinar in December 2025, market research in January 2026, draft RFP release in March 2026, one-on-one feedback meetings in April 2026, and targeted IDaC advertisement in September 2026. The project aims to award the IDaC contract and preconstruction services in January 2027. The VA St. Louis Health Care System will serve as the primary stakeholder, with the US Army Corps of Engineers managing the procurement, and Rogers, Lovelock, & Fritz (RLF) serving as the Architect and Engineering services provider.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Input Invitation Webinar VA Hospital 12052025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING FOR HEROESBUILDING FOR HEROES
VA JOHN J COCHRAN DIVISION, ST LOUIS, MO
REPLACE BED TOWER, CLINICAL EXPANSION, & PARKING GARAGES
Industry Webinar December 17, 2025
OPENING REMARKSOPENING REMARKS
VA JOHN COCHRAN DIVISION, ST. LOUIS, MO
SENIOR EXECUTIVE BOARD
PROCUREMENT INTEGRITY
Procurement Integrity is my Contracting Officer priority throughout the acquisition process. Procurement integrity begins now in these early pre-solicitation exchanges. USACE will conduct a fair and impartial procurement from market research to source selection and award. All materials and information pertaining to acquisition planning and source selection are protected.
We anticipate early and continuous information exchanges with industry throughout the acquisition. The exchanges will become formal after we post the solicitation.
We have default processes in place to protect all materials and information that you decide to share with USACE.
We consider this procurement sensitive information. We all have a personal and organizational responsibility to maintain procurement integrity. If you do share proprietary or confidential information, please identify it as proprietary or confidential.
To help us manage the keeping your information confidential, I ask that you only email, send questions and information to me and Michael France. Our Use the both of us as your USACE POCs.
PROJECT AUTHORIZATION
2010 Requirements Gathering $43M
2022 CA $135M
FY26 Appropriation $1.62B
VA PROGRAM OVERVIEW
VA St. Louis Health Care System A full-service health care facility providing inpatient and ambulatory care in medicine, surgery, psychiatry, neurology, and rehabilitation, as well as over 65 subspecialty areas. It is a two-division facility that serves veterans and their families in east central Missouri and southwestern Illinois.
The John Cochran (JC) Division Located in midtown St. Louis at 915 N Grand Blvd near its affiliated medical schools - St. Louis University and Washington University. It has all of the medical center’s operative surgical capabilities, the ambulatory care unit, and a six-story Clinical Addition that includes surgical facilities, intensive care units, outpatient psychiatry clinics, and expanded laboratory.
DVA Major Project 657-309 Addresses a variety of issues including patient safety and privacy, physical security, mission critical mandates, building seismic deficiencies, facility condition deficiencies, and lack of on-site parking; all working to improve and “right-size” the medical center. Many existing inpatient functions will be relocated into a new seismically designed bed tower. New work includes a Seismically Designed Inpatient Tower, Central Energy Plant, IT/Engineering/Admin Facilities, Substance Abuse Clinic, Elevated Parking, Water Storage (96hr Supply) and Demolition of Aged/Deficient Ancillary Buildings.
Rogers, Lovelock, & Fritz (RLF) Architect and Engineering Services – Designer of Record
PROGRAM PARTNERSHIPS
Department of Veterans Affairs
• Office of Construction & Facilities Management
• St Louis Health Care System, Major Projects Services
Jacobs Government’s Commissioning Agent (CxA)
Schematic Site Plan
KEY MILESTONES
Advertise AE SATOC JAN 2026
Award AE SATOC JAN 2027
Advertise IDaC 3QFY26
Award IDaC JAN 2027
FY26 VA Appropriation 2QFY26
FY26 VA Authorization 4QFY26
Design Resumes APR 2027
JC Division - 915 N Grand Blvd
REPLACE BED TOWER, CLINICAL EXPANSION & PARKING GARAGE
PROGRAM MILESTONE SCHEDULE
K
EY
M
IL
ES
TO
N
ES
Advertise ICT Swing Space & Utility Relocations FEB 2026 Advertise AE SATOC JAN 2026 Phase 1 Advertise Northeast Parking Structure APR 2026 Advertise VA Swing Space APR 2026 IDaC Solicitation 3Q FY26
AE SATOC Award JAN 2027 IDaC Award JAN 2027 Task Order 1 - Validate SD-1 JAN 2027 Task Order 2 – Design Progression Resumes APR 2027
PROGRAM AND BED TOWER SCOPE
• Relocates in-patient functions from a seismically deficient building into a new seismically designed bed tower.
• Improve inpatient privacy by eliminating existing double and triple occupancy inpatient rooms.
• Allows for Primary Care, Women's Health and Outpatient Mental Health
Services to be brought back on campus.
• Relocates SCI Hub to tertiary care facility from Jefferson Barracks and adds SCI Inpatient Beds
• Corrects vertical transport constraint for complex surgical cases
• Corrects safety, physical security, and mission critical resiliency deficiencies
• Replaces seismically deficient mission critical CUP (Central Utility Plant)
• Leading VHA’s HVAC design response to pandemic mode operations
• VASTLHCS is a FEMA designated COOP facility
* Overall, the JC Major Project right sizes the Medical Center and builds a new campus to meet current VA Design Criteria.
Property acquisition and street vacation
PROGRAM AND BED TOWER SCOPE
New Construction Details Inpatient Bed Tower 585,000 SF IRM/Engineering/Warehouse 54,000 SF Central Utility Plant 94,000 SF Treatment Clinic 5,100 SF Additional Parking 1,900 approx. spaces
(3 garages and surface lot)
INTEGRATED DESIGN AND CONSTRUCTION OVERVIEW
A-E
CONCEPT
DESIGN
35% DESIGN 65% DESIGN 95% DESIGN 100% DESIGN
PRECONSTRUCTION SERVICES
RFP FOR OPTION
CONSTRUCTION
DESIGN
BUILDER
A-E
CONCEPT
DESIGN
35% DESIGN 65% DESIGN 95% DESIGN 100% DESIGN
CONSTRUCTION
DESIGN
BUILDER
A-E
CONCEPT
DESIGN
35% DESIGN 65% DESIGN 95% DESIGN 100% DESIGN
DESIGN
BUILDERPr oj ec t D el iv er y
M et ho d
IDaC
D-B-B
D-B
RFP
RFP CONSTRUCTION
INTEGRATED DESIGN AND CONSTRUCTION OVERVIEW
BUILDING FOR HEROES
Integrated Design and Construction Key Objectives
• IDAC is D-B-B
• Design and construction services are contracted concurrently through two efforts.
A-E Services for Complete Design
Pre-Construction Services with Construction Options
• Award construction contractor services early in the project's development.
• Enables the builder's early engagement with the Designer of Record to provide:
Constructability
Cost Input
End Goal Cost-effective design and construction solution with better alignment of scope and budget.
USACE
DOR
CONSULTANTS
BUILDER
SUBCONTRACTOR
COLLABORATION
STAKEHOLDER
PRECONSTRUCTION ACTIVITIES
BUILDING FOR HEROES
-Preconstruction Services include:
-Consultation in construction methodology, current market conditions and identification of coordination issues; Phasing
-Construction cost estimates -to validate designer prepared estimates at each review phase -for alternative designs and materials -for changed market conditions
-Cost control when there is a significant difference or the construction estimate exceeds the target, the estimates will be examined to determine the cause for the differences and steps made to correct the Government or contractor estimates
NOTE: The contractor shall not be responsible for any design services.
The responsibility of the design will remain wholly with the Designer of Record.
AE Contract 15% Design 35% Review 65% Review 95% Review 100% Complete
Construction Contract … Issue RFP to convert Option
PreConst Services Construction
PLANNED ACQUISITION ACTIVITIES
BUILDING FOR HEROES
December 2025: Industry Webinar
January 2026: Update Market Research and Project Labor Market Survey (PLA)
March 2026: Issue Draft IDaC RFP for comments
April 2026: One-on-One Feedback Meetings to Interested Firms
September 2026: Target IDaC Advertisement
January 2027: Award IDaC Contract / Preconstruction Services
SENIOR EXECUTIVE BOARD
QUESTIONS & CLOSING REMARKS
Questions on any information in the sources sought?
Questions on milestones or schedule?
Questions on funding?
File details come from the government source that posted it. Updated .