This is a Bid Inquiry Contracting Officers Report documenting bidder questions and government responses for the Saline #2, HC#4, Ray Carroll federal contract solicitation (W912DQ26BA0050001). The report contains 20 inquiries submitted primarily by Midwest Construction Company between May 2-11, 2026, with government responses provided through May 22, 2026.
The inquiries address clarifications on contract specifications and work requirements for levee repair and construction work across three levee systems: Ray Carroll Levee, Saline County Levee District No. 2, and Howard County Levee District No. 4. Key topics include: access to plans and specifications via Sam.gov and the PIEE Solicitation Module; tree clearing restrictions with mature trees to be marked by the U.S. Army Corps of Engineers (USACE) prior to work; perimeter fencing requirements; equipment notification timelines to the Air Program Manager; sheet piling coating requirements; erosion control material placement specifications; soil property testing requirements for contractor-furnished versus government-provided borrow areas; material disposition procedures; abandoned pipe and conduit removal; moisture content testing for impervious fill; wage rate references; surveying responsibilities; typical section drawings for repairs; and boring data availability. Multiple inquiries resulted in amendments being issued to address specification gaps or clarifications. The government confirmed that USACE will conduct initial staking and post-construction surveys to verify compliance with contract specifications, and that contractors must independently determine haul distances and fill placement locations based on solicitation documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Classified information is NOT permitted on this site.
Bid Inquiry Contracting Officers Report All Inquiries
Project: Saline #2, HC#4, Ray Carroll Review: Saline #2, HC#4, Ray Carroll Bidder Inquiry (00001) (sorted by CommentID ) Displaying 20 inquiries.
Id Discipline Sheet Detail Spec
11820757 Architectural Detail Plan Spec
Comment Classification: UNCLASSIFIED (U)
W912DQ26BA0050001 Please confirm where bidders can access the full plans and specifications for this solicitation.
By: DANNY HANCE; HANCE CONSTRUCTION; (619-204-0259). On: May 02 2026. Forward request by email.
1-0 Evaluation For Information Only. Bidders can access the full plans and specification on the advertised solicitation on Sam.gov site using PIEE Solicitation Module By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 05 2026
1-1 Government Response. Bidders can access the full plans and specification with the advertised solicitation on the Sam.gov site and/or using the PIEE Solicitation Module. By: LAURA HEDRICK; CECT-NWK Contracting Division;
(8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825203 Contracting B-4 Site Map 35 41 00
Comment Classification: UNCLASSIFIED (U)
There is a note on the plans stating "No trees will be disturbed in the excavation." However, Paragraph 3.2 of the specifications refers to clearing of the borrow areas. It is not feasible to refrain from clearing the borrow and maintaining positive drainage. Please clarify.
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. Clearing/grubbing of borrow areas is allowed other than mature trees. Any trees determined to be "mature" will be clearly marked by COE prior to work started. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 08 2026
1-1 Government Response. Clearing/grubbing of borrow areas is allowed other than mature trees. Any trees determined to be "mature" will be clearly marked by COE prior to work starting. By: LAURA HEDRICK; CECT-NWK Contracting Division;
(8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825239 Specifications N/A 01 50 00
Comment Classification: UNCLASSIFIED (U)
Paragraph 2.1.1 refers to perimeter fencing. Please delineate the amount of fencing that will be required for the project, and does it include the borrow areas? It is further mentioned in Paragraph 3.5.
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. An Amendment will be issued to address the issue. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 18 2026
1-1 Government Response. An amendment will be issued to address this issue. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825255 Specifications N/A 01 57 19
Comment Classification: UNCLASSIFIED (U)
Paragraph 3.5.1 states the Air Program Manager must be notified at least 6 months before bringing equipment on site. Does this mean that no physical work can be done on site for at least the first 6 months after award?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. An Amendment will be issued to address the issue. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 18 2026
ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob...
1 of 5 5/22/2026, 7:34 AM
1-1 Government Response. An amendment will be issued to address this issue. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 22 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825274 Specifications N/A NWK-GP-41 Special Conditions
Comment Classification: UNCLASSIFIED (U)
Paragraph l states that removal of mature trees must be prevented. What is the definition of mature trees, and will it affect borrow and fill placement operations?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. Any mature trees will be clearly marked by COE within the borrow areas. No trees within the fill areas meet that determination. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 08 2026
1-1 Government Response. Any mature trees will be clearly marked by COE within the borrow areas. No trees within the fill areas meet that determination. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825291 Specifications C-2 31 41 16
Comment Classification: UNCLASSIFIED (U)
Paragraph 2.1.b includes the material for the sheet piling installation. Does the piling have to be coated?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. No the sheet piling does not have to be coated. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 08 2026
1-1 Government Response. No, the sheet piling does not have to be coated. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825304 Specifications N/A 32 92 19
Comment Classification: UNCLASSIFIED (U)
Paragraphs 2.5.1, 2.5.2, and 2.5.3 reefer to Erosion Control Blanket, Erosion Control Fabric, and Erosion Control Net. Where are these items to be used?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. Install Erosion control materials after seeding in accordance to contract documents By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 14 2026
1-1 Government Response. Install erosion control materials after seeding in accordance to contract documents. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825314 Specifications N/A 32 92 19
Comment Classification: UNCLASSIFIED (U)
Paragraph 3.4 refers to aeration and mowing areas as indicated. Please clarify where these areas are located.
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. The information is located in section 35 41 00 paragraphs 3.20.1 and 3.21.1 and drawing attachments to 35 41 00 for repair areas By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On:
May 18 2026
1-1 Government Response. The information is located in section 35 41 00 paragraphs 3.20.1 and 3.21.1 and drawing attachments to 35 41 00 for repair areas. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 22 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825336 Specifications N/A 35 41 00
2 of 5 5/22/2026, 7:34 AM
Comment Classification: UNCLASSIFIED (U)
Paragraph 1.1.2 defines the priority of the work and states the breaks/breaches shall be completed in order starting upstream and working downstream. Does this mean that Ray Carroll Levee must be done first, followed by Saline County Levee District No. 2, and finally Howard County Levee District No. 4?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. The order of repairs is only associated within the borders of each levee system.
Individual levee systems can be prioritized in any order. By: Manhal Alsaman; ED-G Geotechnical Branch;
(8163893714) On: May 08 2026
1-1 Government Response. The order of repairs is only associated within the borders of each levee system. Individual levee systems can be prioritized in any order. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On:
May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825352 Specifications N/A 35 41 00
Comment Classification: UNCLASSIFIED (U)
Paragraph 1.4.1 requires soil property testing from Contractor furnished borrow areas. Does that mean that Government provided borrow areas do not need to be tested? If they do what is the number of these tests to be performed?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. An Amendment will be issued to address the issue. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 18 2026
1-1 Government Response. The Government provided borrow areas do not need to be tested. An amendment will be issued to address this issue. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 22 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825365 Specifications N/A 35 41 00
Comment Classification: UNCLASSIFIED (U)
Disposition of the cleared materials is provided in Paragraph 3.5. One option is to just windrow the timber and stumps anywhere within the construction limits. Is this correct?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. Yes. Cleared materials can be stored within the construction limits as stated in the contract. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 14 2026
1-1 Government Response. Yes. Cleared materials can be stored within the construction limits as stated in the contract. By:
LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825370 Specifications N/A 35 41 00
Comment Classification: UNCLASSIFIED (U)
Paragraph 3.6 refers to removing abandoned pipes and conduits or plugging them. Are there any such structures as these on the project?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. there are no abandoned pipes or conduits within the work limits to the government knowledge By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 08 2026
1-1 Government Response. To the Government's knowledge, there are no abandoned pipes or conduits within the work limits. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825384 Specifications N/A 35 41 00
Comment Classification: UNCLASSIFIED (U)
Paragraph 3.17.2 states the impervious fill must be placed within plus or minus 2% of optimum moisture. How many tests will be required to verify this?
3 of 5 5/22/2026, 7:34 AM
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. An Amendment will be issued to address the issue. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 18 2026
1-1 Government Response. An amendment will be issued to address this issue. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825402 Specifications N/A Wage Rates
Comment Classification: UNCLASSIFIED (U)
There are no wage rates included in the specifications. Please clarify.
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. Link provided. see Pg 96-97. The heading is on the bottom of page 96, but the verbiage is on the top of page 97 By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 08 2026
1-1 Government Response. See pages 96-97 of the solicitation. The heading is on the bottom of page 96, but the verbiage and link are provided on the top of page 97. A full copy of the wage determination can be provided, if requested. By:
LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825416 Survey N/A N/A
Comment Classification: UNCLASSIFIED (U)
Is the Contractor responsible for completing all surveys, and if so, is an independent Registered Land Surveyor required?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. USACE will stake out work limits before construction starts once and USACE will conduct a post survey to verify work done meets the contract specifications By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 08 2026
1-1 Government Response. The Contractor is not responsible for completing all surveys. USACE will stake out work limits before the construction starts; USACE will also conduct a post survey to verify work done meets the contract specifications.
By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 22 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11825432 Contracting Unknown N/A
Comment Classification: UNCLASSIFIED (U)
There does not appear to be a drawing depicting the typical sections for the Saline Levee District repairs. Please provide.
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 05 2026. Forward request by email.
1-0 Evaluation For Information Only. An Amendment will be issued to address the issue. By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 18 2026
1-1 Government Response. An amendment will be issued to address this issue. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11827628 Contracting N/A 35 41 00
Comment Classification: UNCLASSIFIED (U)
Is any boring data available for the on site borrow material or the location where the sheet pile is to be driven?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 06 2026. Forward request by email.
1-0 Evaluation For Information Only. No boring data available for the on site borrow material or the location where the sheet pile is to be driven By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 14 2026
1-1 Government Response. No boring data will be available for the on site borrow material or the location where the sheet pile is to be driven. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
4 of 5 5/22/2026, 7:34 AM
11833119 Specifications C-1 N/A
Comment Classification: UNCLASSIFIED (U)
The drawing shows the stone protection to be keyed into the ground 3 feet long on a 1 on 3 slope, which is actually 1' deep.
However, the note on the drawing states to key in the stone 3' deep, which would be 9 feet of slope. Please confirm which is correct.
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 11 2026. Forward request by email.
1-0 Evaluation For Information Only. The Quarry-Run-Stone shall run 3 feet along the slope as showing in drawings By:
Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 15 2026
1-1 Government Response. The Quarry-Run-Stone shall run 3 feet along the slope as shown in the drawings. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11833124 Specifications N/A 32 92 19
Comment Classification: UNCLASSIFIED (U)
Paragraph 3.1.1 states that all disturbed areas need to be topsoiled and seeding. Do the worked out areas of the borrow also need to be topsoiled and seeded?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 11 2026. Forward request by email.
1-0 Evaluation For Information Only. seeding the borrow area is not part of this contract By: Manhal Alsaman; ED-G Geotechnical Branch; (8163893714) On: May 14 2026
1-1 Government Response. Seeding the borrow area is not part of this contract. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 18 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11833145 Contracting N/A 35 41 00
Comment Classification: UNCLASSIFIED (U)
Paragraph 3.20.1 states the approx. quantity of levee embankment repair is 850 cy. This is spread over 111,000' of levee. We understand the Government has surveyed the levees and computed the estimated volume. Will the Government provide the actual locations of the fill placement so the Contractor can better determine the haul distance from the borrow sites?
By: Marlene Shaw; Midwest Construction Company; (402-873-6638). On: May 11 2026. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Manhal Alsaman; ED-G Geotechnical Branch;
(8163893714) On: May 18 2026
1-1 Government Response. The Contractor shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: LAURA HEDRICK; CECT-NWK Contracting Division; (8163893023) On: May 22 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
Classified information is NOT permitted on this site.
Patent 11/892,984 ProjNet property of ERDC since 2004.
5 of 5 5/22/2026, 7:34 AM
File details come from the government source that posted it. Updated .