This document is a combined synopsis/solicitation for a Request for Quote (RFQ) for Fence Repair/Vegetation Management Services at the Harry S. Truman Lake Project in Warsaw, Missouri. The U.S. Army Corps of Engineers Kansas City District has a requirement for these services, which will be awarded as a Total Small Business Set-Aside contract.
The contractor shall perform all services in accordance with the provided Performance Work Statement (PWS). The key requirements include clearing vegetation along the fence line, applying herbicide, repairing barbed wire fence, and optionally repairing pipe fence. The contract will be awarded for a period of performance of 120 calendar days from the date of award. Quotes must remain valid for at least 60 days from the due date. The North American Industry Classification System (NAICS) code is 561730 - Landscaping Services, with a $9,500,000 small business size standard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08.03 - Amendment 3.pdf | ||
| B.08.03 - Solicitation Amendment 2 Q&A.docx | DOCX document | |
| B.08.03 - Amendment 2.pdf | ||
| COOPER CREEK UPDATE MAP PACKAGE.pdf | ||
| B.08.03 - Amendment 1.pdf | ||
| B.08.03 - Solicitation Amendment 1 Q&A.docx | DOCX document | |
| Site Visit Information.docx | DOCX document | |
| B.01.01 - Attachment Past Performance Questionairre.pdf | ||
| B.01.01 - Attachment Relative Experience Form (New).docx | DOCX document | |
| Cooper Creek Maps .pdf | ||
| B.01.01 - RFQ Vendor's Info Page.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DQ24Q1057
Section A - Solicitation/Contract Form
SYNOPSIS/SOLICITATION
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in subpart 12.603 as supplemented with additional information included in this notice. This announcement constitutes only the solicitation, quotes are being requested and the SF1449 will not be issued.
The solicitation number for this acquisition is W912DQ24Q1057 and it is being issued as a Request for Quote (RFQ).
All quotes must be good for at least 60 days from submitted due date. One contract for Harry S. Truman Fence Repair/Vegetation Management Services will be awarded off of this solicitation.
If you have any questions, please contact Austin Anderson, austin.anderson@usace.army.mil, 816-389-2041. The solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2024-03.
This synopsis/solicitation will be awarded with Total Small Business Set-Aside and the associated North American Industry Classification system (NAICS) code is 561730 - Landscaping Services.
Business size standard is: $9,500,000.00.
Product/Service Code: S208 – Housekeeping – Landscaping/Groundskeeping
Description of Services Required: The U.S. Army Corps of Engineers Kansas City District has a need for Fence Repair/Vegetation Management Services in support of Hary S. Truman Lake Project, Warsaw, MO in the Operations Division of the Kansas City District. The contractor shall perform all services in accordance with the Performance Work Statement (PWS); The Contractor shall comply with all Federal, state, and local laws, ordinances, statutes and regulations pertaining to the provided services.
Place of Contract Performance: Hary S. Truman Lake Project, Warsaw, MO
Far 52.212-1, Instructions to Offerors- Commercial does apply to this acquisition with no addenda to the provision and is located in Section L of this combined synopsis/solicitation.
Enclosures are listed in Section J of this combined synopsis/ solicitation. Four Attachments for this Solicitation have been posted.
Far 52.212-2, Evaluation - Commercial Edited does apply to this acquisition with no addenda to the provision and is located in Section M of this combined synopsis/solicitation.
FAR 52.212-3, Offeror Representations and Certifications -- Commercial Items, does apply to this acquisition with no addenda to the provision, and is located in Section K of this combined synopsis/solicitation.
FAR 52.212-4, Contract Terms and Conditions - Commercial Items, does apply to this acquisition with no addenda to the provision. These specific clauses required are located in Section I of this combined synopsis/solicitation.
FAR 52.212-5, Contract Terms and Conditions - Required to Implement Statutes or Executive Orders- Commercial Items, applies to this acquisition. These specific clauses required are located in Section I of this combined synopsis/solicitation.
In accordance with FAR 52.212-l(k) the prospective awardee shall be registered and active in https://sam.gov/ for their System Award Management (SAM).
PLEASE NOTE: SAM.GOV procedures have been changed as of 8 November 2019. Interested vendors must go to SAM.gov to register in SAM and to review current notices or announcements.
Contractors may obtain information on registration and annual confirmation requirements via the Internet at https://sam.gov/ or by calling (866) 606-8220.
The System for Award Management (SAM) is a Federal Government owned and operated free web site. If you are a small business needing assistance with registering or help with navigating through the website you may contact the Association for Procurement Technical Assistance Centers for help with actions such as SAM.gov registration.
If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local APEX Accelerator (formerly Procurement Technical Assistance Center (PTAC)) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org/sam-registration/ .
(End)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Vegetation Management
FFP
The contractor shall furnish Vegetation Management Services at locations at Harry S. Truman Lake as defined in the Performance Work Statement (PWS). Base Vegetation Clearing/Herbicide Application/Tree Removal for Harry S. Truman ATV trail to support fence repair.
FOB: Destination
PSC CD: S208
NET AMT
0002 1 Job Barbed Wire Fence Repair/Rebuild
FFP
The contractor shall furnish Fence Repair Services at locations at Harry S. Truman Lake as defined in the Performance Work Statement (PWS). Base
- Barbed Wire Fence Repair/Rebuild for Harry S. Truman ATV Trail.
0003 1 Job OPTION Pipe Fence Repair/Rebuild
FFP
The contractor shall furnish off Fence Repair/Rebuild Services at locations at Harry S. Truman Lake as defined in the Performance Work Statement (PWS).
Option 1 - Pipe Fence Repair/Rebuild for Harry S. Truman ATV trail.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Fence Clearing/Repair at Cooper Creek ATV Area Performance Work Statement
PART 1
GENERAL INFORMATION
1. General: This is a non-personnel services contract to remove vegetation and trees and apply herbicide along Cooper Creek ATV Area existing fence line. Contract includes repairs to the fence once cleared of vegetation and trees.
1.1. Description of Services: The contractor shall provide all personnel, plant, labor, materials and equipment to remove the brush/brambles and trees from the specified areas of fence line of Cooper Creek and repair the fence as defined in this Performance Work Statement (PWS). This work is necessary to ensure maintenance of the fence and to ensure that appropriate clearance is achieved to clearly define the ATV riding area. Contractor will apply herbicide where brush/brambles/trees are removed to prevent re-growth of undesirable woody vegetation.
1.2. Background: Truman Reservoir is the largest flood control reservoir in Missouri, with a storage capacity of more than 5 million acre-feet (an acre-foot = 325,000 gal.). Recreational development is extensive.
Twenty parks and access areas, managed by or leased from the U.S. Army Corps of Engineers, are conveniently located around the reservoir. Park areas at Truman Reservoir offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full-service marinas, picnic areas, sand swimming beaches, and a regional visitor center. Many routine maintenance items are contracted to the private sector. Mowing, refuse collection, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps.
1.3. Scope: Services include the clearing of and application of chemical to approximately 1.2 miles of the existing fence line located at Cooper Creek. Clearing of vegetation includes a 4’ path, 8’ high on the government side. At the North fence line and South fence line the government owns both sides, both sides of the fence are to be cleared, along and under the fence. Vegetation clearing/herbicide application will be necessary prior to completion of pipe fence repairs. Acceptable performance standards and current regulations are provided for each task. It is the Contractors’ responsibility to monitor performance and ensure compliance in accordance with the terms and conditions. The location and vicinity maps are provided for reference.
1.4. Period of Performance: All work shall be completed within 120 calendar days of contract award date.
1.5. General Information.
1 Quality Control: The Contractor shall develop and maintain an effective Quality Control Plan. It will be used to demonstrate how the Contractor will meet the needs of the project. The Quality Control Plan shall contain a list of equipment, chemicals and supplies to be used in performing the contract duties. The Plan shall identify the contractor furnished equipment and state how the work will be accomplished, i.e., chainsaw, compact track loader with brush mulcher attachment, weed eater, etc.
The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor shall submit a copy of their quality control plan to the COR for approval prior to the start of work. Complete records of all inspection work performed by the contractor must be maintained and made available to the government during contract performance.
2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
3 Documents and Correspondence: After award, all documents and related correspondence shall be routed to the Contracting Officer; or through the Contracting Officer’s Representative (COR) at the Project Office to the Contracting Officer. Day to day contact and telephone communication with Government personnel shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to ensure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract, and the time spent in such meetings shall be at no additional charge to the Government.
4 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office. The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
5 Contractor Representative: The Contractor shall designate a Quality Control Manager, in writing, who shall serve as the contact for matters involving quality and performance or non-performance of the required work. The designated employee(s) shall be qualified with full authority to act for, and on behalf of, the Contractor as necessary to ensure that the work described herein is performed in accordance with these specifications. The Contractor shall furnish the above written designation to the COR at the project no later than the first day of work. The designation shall include the name(s), title, and telephone number(s) of the responsible individuals.
6 Communication: The contractor Quality Control Manager or alternate shall communicate at the beginning of the project with the COR to provide a status update on work being performed, Monday thru Friday accept Federal holidays or when the government facility is closed for administrative reasons. The Contractor shall furnish to the Contracting Officers Representative, a telephone number attended during normal business hours (7 a.m. - 4:00 p.m.) to which calls concerning the services, performance, or other contractual matters can be discussed. For the purposes of time and date, a message will be deemed to be delivered to the Contractor at such time as it is delivered to the telephone number provided by the Contractor.
7 Contractor Daily Quality Control Report (QCR): Shall be maintained daily, submitted weekly to the COR. QCR will include the following information: the location, date, weather conditions, amount and type of work completed, chemicals used, the amount of chemical used, and any other pertinent information. Daily QCR shall be hand carried to the HS Truman location or sent by electronic mail (email) to the COR. Government will provide blank Daily Quality Control Reports for use.
8 Recognized Holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day. The contractor is not required to work on holidays.
9 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:00AM to 5:00PM Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. Work shall be performed continuously once commenced. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
10 Place of Performance: The work to be performed under this contract will be performed at Harry S.
Truman Reservoir Cooper Creek ATV Area fence enclosure in Henry County Missouri near the town of Deepwater S13 T40 R26.
11 Access: Access will be on SE 700 RD on the north side and SE 800 RD on the south. At no time shall the Contractor trespass on private (adjacent) property without the permission from the property owner.
12 Security Requirements: Contractor performing work under this contract must comply with the requirements of the Antiterrorism/Operations Security Requirements (AT/OPSEC).
13 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
14 Special Qualifications: The Contractor’s employee(s) applying chemical under this contract shall possess a Commercial Applicator’s License acceptable to the State of Missouri; or in lieu thereof (unless otherwise prohibited), applicator may be unlicensed, if he or she is closely supervised by an on-site supervisor who is licensed according to the above requirements. Proof of licensing shall be submitted prior to the start of work. Work experience shall include commercial herbicide application, operation of vegetation clearing equipment and repair and installation of similar fence materials included in this contract.
15 Identification of Contractor Employees: All vehicles on the jobsite shall be easily identified as Contractor vehicles.
16 Contractor Conduct: Contractor personnel shall always be fully clothed while performing these services. Clothing shall be clean and neat in appearance. Contractor personnel shall utilize tact, diplomacy, and courtesy always during contact with the public. Any illegal or criminal activity may result in termination of the contract.
17 Equipment Breakdown/Staffing: Equipment breakdown or staffing issues shall not relieve the Contractor of the responsibility of performing the work as specified. It shall be the responsibility of the Contractor to assure that he/she has, or can obtain on short notice, sufficient backup equipment and personnel to continue the services, as specified, without interruption.
18 Title 36 Rules and Regulations: Contractor and Contractor Personnel will comply with Title 36 Rules and Regulations for the entire period of performance of this contract.
19 Safety Requirements: All services shall be performed in accordance with applicable safety requirements set forth in Corps of Engineers Manual EM-385-1-1, “Safety and Health Requirements Manual” and supplements thereto. The EM-385-1-1 is hereby incorporated by reference, and the Contractor is required to perform this contract in accordance with the standards set forth therein. Any equipment or materials not in conformity with this manual shall be removed from Government property immediately. The Contractor will be expected to take a vital interest in safety, hazard, and to educate their employees to work and plan their work safely.
20 Man, Hours Reporting: The contractor shall report the number of hours worked on government property monthly during the period of performance of services under this contract. These hours will be with the Contractors monthly invoice on the Government provided form and submitted to the
COR.
21 Invoicing: Submitted invoices shall include the date, contract number, Contractor’s name EXACTLY as it appears in SAM.gov, period of performance and amounts being requested on each CLIN of the contract.
1.6. Special Requirements
1 The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this contract. The Contractor shall comply with all applicable environmental Federal, State, and local laws and regulations. The Contractor shall be responsible for any delays resulting from failure to comply with environmental laws and regulations.
2 Stream crossings shall allow movement of materials or equipment without violating water pollution control standards of the Federal, State, and local governments. Any permits needed to construct a temporary stream crossing is the responsibility of the Contractor.
3 Use of Machinery. The use of chainsaws and/or other hand methods will be most of the work to remove unwanted woody vegetation. The use of skid steers or other mechanical equipment is acceptable, but due to the steep rocky terrain and wet conditions this approach should be expected to be very limited. Equipment operation including but not limited to mechanical, passenger vehicles, atvs/utvs may be used on road/access ways and in select areas outside the fence with prior written approval from the COR as site conditions allow.
PART 2
GOVERNMENT FURNISHED EQUIPMENT (GFE)
2. Government Furnished Equipment: None
PART 3
CONTRACTOR FURNISHED ITEMS AND SERVICES
3. Contractor Furnished Items and Responsibilities
3.1. General: The Contractor shall furnish all personnel, herbicide, marker dye, transportation, chain saws and power equipment with fuel, safety equipment, sprayers, axes, hand tools, flagging and all other supplies and equipment necessary to accomplish the work as specified in the PWS. All equipment, materials and supplies shall be approved by the COR prior to initial use.
PART 4
SPECIFIC TASKS
4. Specific Tasks
4.1. Fence line Clearing:
1 Vegetation Removal: The Contractor shall clear all woody vegetation, brush, trees, stumps, vines, and downed trees and limbs from an area extending 4’ wide on both sides of the government’s perimeter fence. If the required clearance is already present where the fence is to be repaired/rebuilt then clearing/spraying is not required. Higher limbs overhanging the cut area shall be cut back to provide a cleared height of 8’ above ground. All limbs that are removed will be cut back to the trunk of the tree. All stubs and stump cuts shall be horizontal, to eliminate sharp stubs. In no case shall remaining stumps or stubs exceed two 2” in height. There are six (6) hazard trees to be removed, those will be flagged at the start of the contract. Cut brush shall be deposited clear of the cut area in the bushes or horizontal piles off the ATV paths. No large piles. No cut trees shall be left entangled in standing trees. The use of skid steers, bulldozers, or other mechanical equipment are acceptable for use where safe to use, use is expected to be limited due to the steep rocky terrain along sides of the fence line and wet conditions. Equipment operation including but not limited to mechanical, passenger vehicles, atvs/utvs may be used on road/access ways and in select areas around the fence with prior written approval from the COR as site conditions allow.
2 Fence Line Chemical Treatment. The Contractor shall apply an herbicide to the entire fence line.
Herbicide shall have the capability to control/kill all local species to which it is applied. No herbicide is to be applied to the end cuts of limb at any time. An adequate marker dye shall be mixed with the chemical in sufficient concentration to leave an obvious and durable stain on the treated stubs, stumps, and stems. All such stems shall be treated on the same day that they are first cut.
4.1.2.1. Application Procedures. Application of chemicals shall be according to the label directions for the material used. When it is the professional opinion of the Contractor that the use of chemicals, mix ratios, carriers, or rates of application, other than those specified, will result in equal or better results, the Contractor may request permission for their use. Any such request shall be submitted in writing and shall specify the chemical, its uses, rates of application, and cost. A label for the chemical shall be submitted with the Contractor's request. Requests shall be submitted to the Project Manager, Harry S. Truman Project Office, at least 30 days prior to the intended use. If granted, permission for the use of an alternate chemical, mix ratio, carrier, or rate of application will be in writing from the Contracting Officer, or his authorized representative. Chemicals, mix ratios, carriers, or application rates other than specified in the label will not be used in the absence of the above specified request and approval. When the use of approved alternate chemicals, mix ratios, carriers, or application rates requested by the Contractor results in an increase in Contractor cost or time, an equitable adjustment will be made to the contract price through the issuance of a contract modification.
4.1.2.2. Label Directions. Label directions and/or warnings relative to temperature or other climatic factors shall be closely adhered to. Care shall be exercised at all times by the Contractor to protect desirable (non-target) species from damage by the required application of chemicals.
The Contractor will receive payment for chemical application only for the portion of cleared area on which chemical was applied.
3 Clear Debris from behind fence gate to allow gates to fully open and close without impediment.
Debris shall be cleared to a minimum of 2” below bottom of gate on the inside of the enclosure.
4 Defects. If any of the services do not conform to contract requirements, the government may require the contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re- performance, the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
5 Missed Areas. If an area or work within an area is missed, the Contractor shall return and re-service the area or affected work immediately upon receipt of such notice by the Contracting Officer, or his/her authorized representative. Failure to correct noted deficiencies will result in withholding of payment for the work not performed. During the progress of this contract, if it becomes apparent that the Contractor is unable to perform the work in accordance with the contract specifications, he/she shall acquire additional supplies, equipment, and personnel, as may be required by the Contracting Officer, to ensure that the work is accomplished as specified in the contract.
6 Barbed wire fence repair: The repair shall include repairing/rebuilding the perimeter fence (approximately 7445’) where shown and will consist of 4 strands of 12 gauge twisted barbed wire, line posts, new t-posts with a minimum specification of 1.25 pounds per foot and all associated components to complete the fence repair. Spacing between t-posts shall be uniform and not exceed 20’. Line posts will be 1 ¼ steel pipe driven a minimum of 20” deep, located every 100 “along the fence line with a manufactured domed cap. Wire shall be attached with a manufacture fence clip or a doubled 14-gauge galvanized wire. Corners shall be a 2.5” minimum steel pipe driven to the depth of 48” and shall be capped with a manufactured domed cap. Finished height of all corner and line posts shall be 48”. One 20 ft. 16 Gauge Heavy Duty 6 Bar Round Corner Gate with heavy-duty collared hinges, a snap chain and welded chain latch shall be installed for power line access. All work shall be conducted on the governments side of the fence.
7 Pipe fence repair (OPTION): Pipe fence repair includes repairs to the existing pipe fence made of well-drilling pipe, including rebuilding missing sections. Distance of extension to the water will be dependent on lake elevation at time of work. Where repairs require replacement or installation of new sections, the Contractor shall use 2 ½” steel well-drilling pipe (match existing) for the posts and top rail. Posts shall be driven to a depth of 48” and will be spaced 96” on center. Steel 1” pipe shall be used for the horizontal pipes and shall be spaced 15” apart. All posts shall be capped or covered by the top rail. See drawing for Fence Detail. There are at least 45 locations to be repaired along the fence. Fence repairs shall be completed in accordance with industry standards for steel pipe construction.
8 Pipe fence and barbed wire fence shall be connected to establish a continuous perimeter.
4.2. Access. Access to the Government boundary shall within reason be by public access roads. The contractor shall be responsible for securing needed access by non-public routes. At no time shall the contractor trespass without written permission from the landowner(s). Clearing work shall be performed only on the Government side of the boundary line.
4.3. Trash Disposal: The Contractor must properly dispose of any litter generated by the contractor (including but not limited to, paint cans, lids, brushes, or food/beverage containers/wrappings). Contractor is responsible for proper disposal of any hazardous waste generated by performance of the contract.
PART 5
TECHNICAL EXHIBITS
5. Technical Exhibit:
5.1. Technical Exhibit 1 - Performance Requirements Summary
5.2. Technical Exhibit 2 - Deliverables Schedule
5.3. Technical Exhibit 3 - AT/OPSEC Requirements
5.4. Technical Exhibit 4 - Quality Control Plan Example
5.5. Technical Exhibit 5 - Blank Daily QCR
5.6. Technical Exhibit 6 - Photos
6. Drawing/Map Attachments:
6.1. Attachment 1-Pipe Fence Cooper Creek Map; Pipe Fence Detail; Repair/Rebuild Pipe Fence Cooper Creek; Cooper Creek ATV Riding Area 1.2 miles of Fence Clearing and Six Hazard Trees Map
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Item PWS Para Performance Standard/AQL (Acceptable Quality Level)
Surveillance Method
Remove Fence Line Vegetation
5.1.1 Clear all woody vegetation, per the
requirements of the PWS.
100% Inspection or Random Inspection
Chemical Treatment 5.1.2
Apply chemical to the cleared area and cut stubs, stumps and stems per the requirement of the PWS
100% Inspection or Random Inspection
Debris Removal 5.1.3
Clear all debris behind gate at least 2” below bottom of gate
100% Inspection or Random Inspection
Barbed Fence Repair 5.1.6
Repair fence per PWS 100% Inspection
Pipe Fence Repair 5.1.7
Repair pipe fence per PWS 100% Inspection
Accident Prevention Plan (APP)
7.2
No more than one (1) error per year.
Complete prior to start of work for the contract award.
Activity Hazard Analysis (AHA)
7.2
No more than one (1) error per year.
Complete prior to start of work for the contract award.
Quality Control Plan
1.5.1 No more than one (1) error per
year.
Complete prior to start of work.
Documentation 1.5.7
1.5.22
Submit required documentation with no more than two errors
100% Inspection or
Random Inspection
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/For mat Submit To Proof of Insurance Once Prior to the Start of Work
1 Copy
Hard copy or electronic
TJ Allnutt 15968 Truman Road Warsaw, MO 65355-4023 tj.allnutt@usace.army.mil
Proof of Valid Driver’s License
Same as Above Same as Above Same as Above
Same as Above
Commercial Herbicide Applicators License
Same as Above Same as Above Same as Above
Same as Above
Quality Control Plan (See Exhibit 6)
Same as Above Same as Above Same as Above
Same as Above
Safety Plan/AHA Same as Above Same as Above Same as Above
Same as Above
First Aid/CPR Certifications
Same as Above Same as Above Same as Above
Same as Above
Corps Watch Acknowledgement
Same as Above Same as Above Same as Above
Same as Above
Monthly Man Hours At work completion
Same as Above Same as Above
Same as Above
Invoices Monthly While work is being performed
Same as Above Same as Above
Same as Above
Daily QCR Maintained daily, submitted weekly
Same as Above Same as Above
Same as Above
TECHNICAL EXHIBIT 3
ANTITERRORISM OPERATION SECURITY REQUIREMENTS (AT-OPSEC)
AT-OPSEC:
ANTITERRORISM/OPERATION SECURITY REQUIREMENTS
1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
2 Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
3 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
TECHNICAL EXHIBIT 4
QUALITY CONTROL PLAN EXAMPLE
Contract Number:
Contractor:
Contract Title:
I will personally assure that all elements of this contract are completed as stated. The following methods will be used to ensure satisfactory services.
Inspection:
1. All work will be personally supervised and inspected by myself or a designated Alternate Quality Control Person (QCP).
Name of Primary QC Person: Phone:
Designated Alternate QCP: Phone:
2. Contract documents will be utilized to ensure completeness of services performed.
3. A copy of the contract specifications and maps/drawings will be kept onsite by the QCP while work is being performed as a reference to ensure that requirements are met.
4. All elements defined in the Performance Requirements Summary of the Performance Work Statement will be checked for completeness prior to leaving the area.
Deficiencies:
1. Should a deficiency occur, measures will be taken by the QCM to correct the deficiency within the timeframes required by the contract. The deficiency should be noted and changes to the QC system made to prevent future deficiencies.
Signature Title Date:
TECHNICAL EXHIBIT 5
DAILY QUALITY CONTROL REPORT
TRUMAN LAKE COOPER CREEK FENCE CLEARING/REPAIR
CONTRACT NO.
DATE: _______________ TEMPERATURE ____________WIND SPEED/DIRECTION __________
TOTAL NO. OF EMPLOYEES WORKING TODAY: ________________________
TOTAL MANHOURS WORKED TODAY: _________________________________
WORK PERFORMED TODAY:
PESTICIDE (TRADE NAME): ______________________________________________________
FORM APPLIED: Liquid
ACTIVE
INGREDIENTS:________________________________________________________________________
EPA REGISTRATION: _______________________EPA CLASSIFICATION: _____________________
HOW THE PESTICIDE WAS MIXED:
APPLICATION EQUIPMENT USED:
DISPOSAL INFORMATION: Disposal per label directions
WEATHER CONDITIONS:
PROBLEMS NOTED:
QCM Signature
TECHNICAL EXHIBIT 6
PHOTOS
Representative sample of conditions as of Dec 2023, not all inclusive
POINTS OF CONTACT
Points of Contact for Solicitation
For questions or concerns regarding this solicitation, please contact:
Austin Anderson Purchasing Agent austin.anderson@usace.army.mil phone: 816-389-2041
Laura Hedrick Contracting Officer laura.l.hedrick@usace.army.mil phone: 816-389-3023
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-1 Contractor Inspection Requirements APR 1984 52.246-4 Inspection Of Services--Fixed Price AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-MAY-2024 TO
29-AUG-2024
N/A USACE, KANSAS CITY +
RACHEL DONATTI
HARRY S TRUMAN POWER HOUSE 29564
POWERHOUSE R
WARSAW MO 65355
660-438-2836
966472
0002 POP 01-MAY-2024 TO
29-AUG-2024
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 30-JUN-2024 TO
29-AUG-2024
N/A (SAME AS PREVIOUS LOCATION)
52.242-15 Stop-Work Order AUG 1989 52.247-34 F.O.B. Destination NOV 1991
Section H - Special Contract Requirements
WAGE DETERMINATION
Harry S Truman Lake Project, Warsaw, Missouri:
Service Contract Act WD # 2015-5089 Henry https://sam.gov/wage-determination/2015-5093/23
Section I - Contract Clauses
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
NOV 2021
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
NOV 2023
52.215-23 Limitations on Pass-Through Charges JUN 2020 52.223-1 Biobased Product Certification MAY 2012 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-10 Waste Reduction Program MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7018 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services
JAN 2023
252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JAN 2023
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial
Services
NOV 2023
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2023)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004s) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
___ (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community--see FAR 3.900(a).
XX (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (6) [Reserved]
___ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub.
L. 111-117, section 743 of Div. C).
XX (9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub.
L. 117-328).
___ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders--Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) (Pub. L. 115-390, title II).
___ (11)(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders--Prohibition. (DEC 2023) (Pub. L.
115-390, title II).
___ (ii) Alternate I (DEC 2023) of 52.204-30.
XX (12) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).
___ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).
____ (14) [Reserved]
____ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).
____ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (17) [Reserved]
XX (18)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-6.
____ (19)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (20) 52.219-8, Utilization of Small Business Concerns (SEP 2023) (15 U.S.C. 637(d)(2) and (3)).
____ (21)(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (JUN 2020) of 52.219-9.
____ (v) Alternate IV (SEP 2023) of 52.219-9.
____ (22) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (ii) Alternate I (MAR 2020) of 52.219-13.
XX (23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).
____ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).
____ (25) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2022) (15 U.S.C.
657f).
XX (26) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP 2023) (15 U.S.C. 632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).
____ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).
____ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (30) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
XX (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
XX (32) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (NOV 2023) (E.O. 13126).
XX (33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
XX (34)(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
____ (35)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
XX (36)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
____ (37) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
____ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
XX (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
XX (40) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
____ (41)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
____ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(JUN 2016) (E.O. 13693).
____ (44)(i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (45)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
XX (46) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
____ (47)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
XX (48) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.
13513).
____ (49) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (50) 52.223-21, Foams (JUN 2016) (E.O. 13693).
____ (51)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (52) (i) 52.225-1, Buy American--Supplies (OCT 2022) (41 U.S.C. chapter 83).
____ (ii) Alternate I (OCT 2022) of 52.225-1.
____ (53)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I [Reserved].
____ (iii) Alternate II (DEC 2022) of 52.225-3.
____ (iv) Alternate III (NOV 2023) of 52.225-3.
____ (v) Alternate IV (OCT 2022) of 52.225-3.
____ (54) 52.225-5, Trade Agreements (NOV 2023) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
XX (55) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (56) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
____ (57) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (58) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.
5150).
____ (59) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
____ (60) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
____ (61) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
XX (62) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C. 3332).
____ (63) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).
XX (64) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (65) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
____ (66) 52.242-5, Payments to Small…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .