W912DQ22R4007 0002.pdf
PDF 770 KB Posted
- Attached to
- Small Business ID/IQ MATOC Federal contract opportunity
- Solicitation number
- W912DQ22R4007
About this file
This document provides details of a solicitation for a Small Business Multiple Award Task Order Contract (MATOC) for construction services. The U.S. Army Corps of Engineers, Kansas City District is seeking proposals for design-build and design-bid-build projects within the Kansas City District and other areas of the Northwestern Division, with a total ordering capacity of $45 million over five years. The solicitation is fully set aside for small businesses with a size standard of $39.5 million. Seven offerors will be selected to compete for up to five indefinite delivery/indefinite quantity contracts to be awarded. Individual task orders will be for military construction, operations and maintenance projects, and other facility construction. Proposals are due by May 6, 2022 and the evaluation will be conducted according to best value procedures in FAR Part 15. Offerors must be registered in the System for Award Management and address any questions to the Bidder Inquiry portal provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.03 Amendment 0001_SB MATOC.pdf | ||
| B.04.21 W912DQ22R4007_Consolidation Memo_Redacted.pdf | ||
| B.08.02_Solicitation_W912DQ22R4007 Phase I.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Small Business MATOC
The purpose of this amendment is to correct the number years in the definition of substantially complete definition that w as added in amendment 0001.
The date and time for submission of proposals remains May 6, 2022 at 1:00 P.M. local Kansas City time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ22R4007
X 9B. DATED (SEE ITEM 11)
05-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Apr-2022
CODE
USACE, KANSAS CITY CT
FEDERAL BLDG CT-M 601 E 12TH STREET
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ22R4007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SUMMARY OF CHANGES
1. Purpose of the Amendment: To correct the number years in the definition of substantially complete ( numbered as 6) under Technical Factors To Be Evaluated in Phase 1, Factor 1-1 Corporate Experience, Evaluation Criteria.
2. The date and time for submission of proposals remains the same, 6 May 2022 at 1:00 P.M. local Kansas City time.
3. Offerors are required to acknowledge this amendment. Failure to acknowledge all amendments may cause rejection of the proposal.
4. All other terms and conditions remain unchanged and in force.
Deletions are red w/strikethrough. Correction is in green BOLD underline.
Technical Factors To Be Evaluated in Phase 1, Factor 1-1 Corporate Experience, Evaluation Criteria.
1. Design-build projects.
2. Projects in which the prime contractor’s role is similar to the role proposed for this MATOC.
3. Projects involving new vertical construction with similar scope and magnitude as projects expected under this MATOC.
4. Projects that demonstrate historic renovation experience.
5. Projects that demonstrate sustainment, renovation, and modernization experience.
6. Projects completed or substantially complete within the last 6 8 years as of the proposal submission date. The project will be considered substantially complete if it is 95% or more complete.
7. Projects with a value of $6.0M or greater.
File details come from the government source that posted it. Updated .