W912DQ22B4000-0003 Plan Sheet Changes.pdf
PDF 4 MB Posted
- Solicitation number
- W912DQ22B4000
About this file
This pre-solicitation announcement provides details for an upcoming invitation for bid for construction services. The project involves renovations to Discovery Dormitory Building 1561 at Whiteman Air Force Base in Missouri, including replacement of flooring, walls, doors, fixtures and equipment. The estimated value is between $5-10 million. The solicitation will be issued through SAM.gov and evaluated for price. Bids are due in early 2022, with award to the responsible bidder offering the most advantageous price. The contract will be a one-year firm fixed price construction contract. Small businesses, including joint ventures, are encouraged to compete.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
UP
UP
UP
UP
AB
CD
EG F
H
IJKLMNOP
8.5
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
OFFICE
14AE410
A5
CORRIDOR
STAIR
OFFICE
VESTIBULE
LOUNG
MAILROOM
ENTRY
STAIR
RECREATION
KITCHEN
LAUNDRY
TLT.
CORR.
MECHANICAL
EQUIPMENT
ELECTRICAL
EQUIPMENT
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
STAIR
LOUNGE
VESTIBULE
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
STAIR
20 20 20
SPRINKLER
A. NOT ALL GENERAL NOTES OR SHEET KEY NOTES MAY BE
USED ON THIS SHEET.
B. CONTRACTOR TO FIELD VERIFY AND RECORD ALL DOOR
AND WINDOW SIZES AND DIMENSIONS PRIOR TO WORK
AND PURCHASE OF NEW ITEMS.
C. DEMO ALL EXISTING WINDOWS, FRAMES, AND SILLS.
RETAIN AND REUSE EXISTING METAL FLASHING. IF SILL
BRICK OR FLASHING IS DAMAGED DURING REMOVAL OF
WINDOW AND SILL CONTRACTOR SHALL
REPLACE AND REPAIR AS NECESSARY.
D. PREP WINDOW OPENINGS AND MAKE READY FOR NEW
ATFP COMPLIANT WINDOW AND FRAMES.
E. RE: AE622 FOR WINDOW SCHEDULE AND DETAILS.
F. REMOVE INTERIOR DOORS ONLY AS INDICATED AND PREP
FRAMES FOR NEW DOORS AND HARDWARE.
G. DEMO INTERIOR DOORS AND FRAMES AS INDICATED AND
PREP OPENINGS FOR NEW FRAMES, DOORS AND
HARDWARE.
H. ON ALL DEMOLISHED DOORS THE LOCK CORES SHALL BE
REMOVED AND TURNED OVER TO THE BASE LOCKSMITH.
I. ALL USABLE DOOR CLOSER'S SHALL BE MADE AVAILABLE
TO BE TURNED OVER TO THE BASE BEFORE REMOVAL
FROM SITE.
J. RE: AE410 FOR TYPICAL DORM ROOM DEMOLITION.
K. DEMO EXTERIOR DOORS AND FRAMES AND MAKE READY
FOR NEW DOORS AND FRAMES.
L. DEMO EXTERIOR STORE FRONT GLASS AND FRAMES AND
MAKE READY FOR NEW FRAMES AND GLASS.
M. DEMO EXISTING PATIO SLAB. SEE SHEET KEY NOTE 11.
RE: STRUCTURES FOR NEW CANOPY FOOTINGS AND
SLAB.
N. REMOVE ALL ROOM AND WAY-FINDING SIGNAGE.
O. DEMO ALL SHOWER SURROUNDS, TOWEL BARS,
VANITIES, LINEN CABINET, MEDICINE CABINETS &
FLOORING IN DORM ROOMS. DEMO ONE OF THE CLOSET
DOORS AS SHOWN ON PLAN IN DOOR ROOMS.
P. REFER TO PLUMBING SHEET P-110 KEYNOTES FOR
EXISTING FLUSH VALVE TOILET REPAIR REQUIREMENTS.
Q. REMOVE ALL CARPET TILES AND FLOORING
THROUGHOUT BUILDING. CONTRACTOR IS TO REMOVE
ALL ADHESIVE AND RESIDUE FROM THE FLOORS.
R. RECYCLE CARPET TILES.
S. REMOVE AND DISPOSE OF ALL DEMOLITION DEBRIS.
T. RE: ELECTRICAL SHEETS FOR DEMO INFORMATION.
U. REMOVE AND DISPOSE OF ALL EXISTING FURNITURE,
EQUIPMENT, AND DRAPERIES, EXCEPT AS NOTED.
V. PROTECT, STORE AND REINSTALL EXISTING BILLIARDS
TABLE IN RECREATION ROOM AND ALL FURNITURE IN
DORM MANAGER'S OFFICE.
W. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO
FURNITURE DURING ENTIRE LIFE OF PROJECT.
X. DORM ROOMS & STAIRWAY GYP CEILING TO REMAIN
UNLESS NOTED OTHERWISE ON THE REFLECTED CEILING
PLANS. PREP AND CLEAN EXISTING CEILING TO RECEIVE
NEW FINISH.
Y. DEMO ALL EXISTING CEILING TILES, GRID AND SYSTEMS
THROUGHOUT AS INDICATED.
Z. CONTRACTOR TO NOTE AND TRACK CEILING HEIGHTS OF
EXISTING CEILING TILE SYSTEM. NEW CEILING HEIGHTS
SHALL MATCH EXISTING UNLESS OTHERWISE NOTED ON
NEW WORK RCP'S.
AA. CONTRACTOR TO MEASURE AND RECORD EXISTING
ACCESS PANELS IN CEILING AND PROVIDED NEW ACCESS
PANELS AND CABLE BOXES IN THE CORRIDORS.
BB. DEMO ALL CEILING FANS.
CC. REMOVE ALL ROOM FINISHES AND PREP WALL FOR NEW
FINISHES. RE: IN600 FINISH SCHEDULE
DD. DEMOLISH AND REMOVE FROM SITE ALL GUTTERS AND
DOWN SPOUTS. COORDINATE REMOVAL OF GUTTERS
AND DOWNSPOUTS WITH ARRIVAL OF NEW GUTTERS AND
DOWNSPOUTS.
EE. BEDROOMS - REMOVE WALL DOOR STOP AND PROVIDE
FLOOR DOOR STOPS.
FF. REMOVE ALL EXISTING RESTROOM PORCELAIN WALL
TILES.
DEMO GENERAL NOTES
1. DEMO DOOR FRAME.
2. DEMO DOORS & FRAMES (TURN LOCK CORES OVER TO
BASE LOCKSMITH).
3. DEMO STORE FRONT. DOORS AND FRAMES (TURN LOCK
CORES OVER TO BASE LOCKSMITH).
4. DEMO BUILDING EXPANSION WALL AND CEILING JOINT
COVER AND PREP FOR NEW COVER.
5. DEMO ALL CASEWORK AND COUNTER TOPS.
6. NOT USED.
7. DEMO EXISTING WOOD BENCH AND PREP FOR NEW
BENCH.
8. DEMO STAIR TRAED AND RISER TRIMS.
9. DEMO WALL GUARD.
10. EXISTING DOOR AND FRAME TO REMAIN. PAINT TO MATCH
NEW METAL DOORS AND FRAMES.
11. DEMO EXISTING PATIO RE: CD100.
12. REPLACE CONCRETE BENCH CAP, BRICK VENEER, AND
CMU.
13. DEMO ALL WASHER AND DRYERS.
14. SEE SHEET AE410 FOR TYPICAL KEY NOTE CALL OUTS IN
BEDROOMS, VANITIES & RESTROOMS. APPLIES TO ALL
DORM ROOMS.
15. DEMO EXISTING WINDOWS, FRAMES AND GLAZING.
16. REMOVE THE EXISTING HOOD AND REPLACE IN KIND. SEE
SHEET M110.".
17. REFER TO KEYNOTES ON M-110-M130 FOR MECHANICAL
DEMO REQUIREMENT.
18. DEMO EXISTING DOOR AND FRAME. REPAIR DOOR AND
JAMB SURFACE AFTER REMOVING THE EXISTING DOOR
AND JAMB, AND MATCH ADJACENT WALL FINISH.
19. DEMO MASONRY WALL AND CONCRETE BENCH CAP. THE
BRICKS ARE TO BE REUSED. INFILL THE LAUNDRY ROOM
MECHANICAL OPENINGS WITH EXISTING BRICKS FROM
THE REMAINS OF MASONRY BENCH.
20. REMOVE UNUSABLE ABANDONED WALL ACCESS PANEL.
21. DEMO LAUNDRY ROOM GYP BD CEILING.
22. DEMO EXISTING CONCRETE CAP AND LEAVE THE
EXISTING MASONRY WALL.
23. DEMO ROLL-UP COUNTER SHUTTER
SHEET KEYNOTES
DEMO WINDOW AND PREP FOR
NEW ATFP COMPLIANT WINDOW
SHEET LEGEND
DEMO WALL (EXISTING PARTITION IS
STUD W/GWB ON BOTH SIDES
DEMO ITEMS; DOORS, FRAMES,
SINKS, SHOWERS, WALLS, ETC.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddeml\Documents\491289_DiscoveryReno_RVT18_AI_g5eddeml.rvt
11/30/2021 2:16:00 PM
AD110
DIS
FI
R
ST
F
LO
O
R D
EM
O
LI
TI
O N
P
LA
N
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T E.
L
EM
M A
E.
L
EM
M
A
C . B
R O
W N
M . F
O
SH
E
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
D
IS
C O
VE
R
Y H
AL
L
BU
IL
D
IN
G
_D is cR en o_
R
VT
_A
I.r vt
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AN
SI
D
3/32" = 1'-0"A1 FIRST FLOOR DEMOLITION PLAN
KEYNOTES LISTED MAY NOT APPLY TO EACH DEMO FLOOR
PLAN. REF. INDIVIDUAL DEMO PLANS FOR ACTUAL KEYNOTES.
Am e n dm en t 0
/2
2/
KEY PLAN
SCALE: N.T.S.
A B
C
D
E
D1
A1
PLAN NORTH
16'8' 32'0
DN UP
DN UP
DN
UP
DN UP
AB
CD
EG F
H
IJKLMNOP
8.5
BEDROOM
STAIR
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
STORAGE
STAIR
BEDROOM
BEDROOM
PARTY ROOM
CORR.
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
STAIR
LOUNGE
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
STAIR
4 BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
27520
A. NOT ALL GENERAL NOTES OR SHEET KEY NOTES MAY BE
USED ON THIS SHEET.
B. CONTRACTOR TO FIELD VERIFY AND RECORD ALL DOOR
AND WINDOW SIZES AND DIMENSIONS PRIOR TO WORK
AND PURCHASE OF NEW ITEMS.
C. DEMO ALL EXISTING WINDOWS, FRAMES, AND SILLS.
RETAIN AND REUSE EXISTING METAL FLASHING. IF SILL
BRICK OR FLASHING IS DAMAGED DURING REMOVAL OF
WINDOW AND SILL CONTRACTOR SHALL
REPLACE AND REPAIR AS NECESSARY.
D. PREP WINDOW OPENINGS AND MAKE READY FOR NEW
ATFP COMPLIANT WINDOW AND FRAMES.
E. RE: AE622 FOR WINDOW SCHEDULE AND DETAILS.
F. REMOVE INTERIOR DOORS ONLY AS INDICATED AND PREP
FRAMES FOR NEW DOORS AND HARDWARE.
G. DEMO INTERIOR DOORS AND FRAMES AS INDICATED AND
PREP OPENINGS FOR NEW FRAMES, DOORS AND
HARDWARE.
H. ON ALL DEMOLISHED DOORS THE LOCK CORES SHALL BE
REMOVED AND TURNED OVER TO THE BASE LOCKSMITH.
I. ALL USABLE DOOR CLOSER'S SHALL BE MADE AVAILABLE
TO BE TURNED OVER TO THE BASE BEFORE REMOVAL
FROM SITE.
J. RE: AE410 FOR TYPICAL DORM ROOM DEMOLITION.
K. DEMO EXTERIOR DOORS AND FRAMES AND MAKE READY
FOR NEW DOORS AND FRAMES.
L. DEMO EXTERIOR STORE FRONT GLASS AND FRAMES AND
MAKE READY FOR NEW FRAMES AND GLASS.
M. DEMO EXISTING PATIO SLAB. SEE SHEET KEY NOTE 11.
RE: STRUCTURES FOR NEW CANOPY FOOTINGS AND
SLAB.
N. REMOVE ALL ROOM AND WAY-FINDING SIGNAGE.
O. DEMO ALL SHOWER SURROUNDS, TOWEL BARS,
VANITIES, LINEN CABINET, MEDICINE CABINETS &
FLOORING IN DORM ROOMS. DEMO ONE OF THE CLOSET
DOORS AS SHOWN ON PLAN IN DOOR ROOMS.
P. REFER TO PLUMBING SHEET P-110 KEYNOTES FOR
EXISTING FLUSH VALVE TOILET REPAIR REQUIREMENTS.
Q. REMOVE ALL CARPET TILES AND FLOORING
THROUGHOUT BUILDING. CONTRACTOR IS TO REMOVE
ALL ADHESIVE AND RESIDUE FROM THE FLOORS.
R. RECYCLE CARPET TILES.
S. REMOVE AND DISPOSE OF ALL DEMOLITION DEBRIS.
T. RE: ELECTRICAL SHEETS FOR DEMO INFORMATION.
U. REMOVE AND DISPOSE OF ALL EXISTING FURNITURE,
EQUIPMENT, AND DRAPERIES, EXCEPT AS NOTED.
V. PROTECT, STORE AND REINSTALL EXISTING BILLIARDS
TABLE IN RECREATION ROOM AND ALL FURNITURE IN
DORM MANAGER'S OFFICE.
W. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO
FURNITURE DURING ENTIRE LIFE OF PROJECT.
X. DORM ROOMS & STAIRWAY GYP CEILING TO REMAIN
UNLESS NOTED OTHERWISE ON THE REFLECTED CEILING
PLANS. PREP AND CLEAN EXISTING CEILING TO RECEIVE
NEW FINISH.
Y. DEMO ALL EXISTING CEILING TILES, GRID AND SYSTEMS
THROUGHOUT AS INDICATED.
Z. CONTRACTOR TO NOTE AND TRACK CEILING HEIGHTS OF
EXISTING CEILING TILE SYSTEM. NEW CEILING HEIGHTS
SHALL MATCH EXISTING UNLESS OTHERWISE NOTED ON
NEW WORK RCP'S.
AA. CONTRACTOR TO MEASURE AND RECORD EXISTING
ACCESS PANELS IN CEILING AND PROVIDED NEW ACCESS
PANELS AND CABLE BOXES IN THE CORRIDORS.
BB. DEMO ALL CEILING FANS.
CC. REMOVE ALL ROOM FINISHES AND PREP WALL FOR NEW
FINISHES. RE: IN600 FINISH SCHEDULE
DD. DEMOLISH AND REMOVE FROM SITE ALL GUTTERS AND
DOWN SPOUTS. COORDINATE REMOVAL OF GUTTERS
AND DOWNSPOUTS WITH ARRIVAL OF NEW GUTTERS AND
DOWNSPOUTS.
EE. BEDROOMS - REMOVE WALL DOOR STOP AND PROVIDE
FLOOR DOOR STOPS.
FF. REMOVE ALL EXISTING RESTROOM PORCELAIN WALL
TILES.
DEMO GENERAL NOTES
1. DEMO DOOR FRAME.
2. DEMO DOORS & FRAMES (TURN LOCK CORES OVER TO
BASE LOCKSMITH).
3. DEMO STORE FRONT. DOORS AND FRAMES (TURN LOCK
CORES OVER TO BASE LOCKSMITH).
4. DEMO BUILDING EXPANSION WALL AND CEILING JOINT
COVER AND PREP FOR NEW COVER.
5. DEMO ALL CASEWORK AND COUNTER TOPS.
6. NOT USED.
7. DEMO EXISTING WOOD BENCH AND PREP FOR NEW
BENCH.
8. DEMO STAIR TRAED AND RISER TRIMS.
9. DEMO WALL GUARD.
10. EXISTING DOOR AND FRAME TO REMAIN. PAINT TO MATCH
NEW METAL DOORS AND FRAMES.
11. DEMO EXISTING PATIO RE: CD100.
12. REPLACE CONCRETE BENCH CAP, BRICK VENEER, AND
CMU.
13. DEMO ALL WASHER AND DRYERS.
14. SEE SHEET AE410 FOR TYPICAL KEY NOTE CALL OUTS IN
BEDROOMS, VANITIES & RESTROOMS. APPLIES TO ALL
DORM ROOMS.
15. DEMO EXISTING WINDOWS, FRAMES AND GLAZING.
16. REMOVE THE EXISTING HOOD AND REPLACE IN KIND. SEE
SHEET M110.".
17. REFER TO KEYNOTES ON M-110-M130 FOR MECHANICAL
DEMO REQUIREMENT.
18. DEMO EXISTING DOOR AND FRAME. REPAIR DOOR AND
JAMB SURFACE AFTER REMOVING THE EXISTING DOOR
AND JAMB, AND MATCH ADJACENT WALL FINISH.
19. DEMO MASONRY WALL AND CONCRETE BENCH CAP. THE
BRICKS ARE TO BE REUSED. INFILL THE LAUNDRY ROOM
MECHANICAL OPENINGS WITH EXISTING BRICKS FROM
THE REMAINS OF MASONRY BENCH.
20. REMOVE UNUSABLE ABANDONED WALL ACCESS PANEL.
21. DEMO LAUNDRY ROOM GYP BD CEILING.
22. DEMO EXISTING CONCRETE CAP AND LEAVE THE
EXISTING MASONRY WALL.
23. DEMO ROLL-UP COUNTER SHUTTER
SHEET KEYNOTES
DEMO WINDOW AND PREP FOR
NEW ATFP COMPLIANT WINDOW
SHEET LEGEND
DEMO WALL (EXISTING PARTITION IS
STUD W/GWB ON BOTH SIDES
DEMO ITEMS; DOORS, FRAMES,
SINKS, SHOWERS, WALLS, ETC.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddeml\Documents\491289_DiscoveryReno_RVT18_AI_g5eddeml.rvt
11/30/2021 2:17:16 PM
AD120
DIS
SE
C
O N
D F
LO
O
R D
EM
O
LI
TI
O N
P
LA
N
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T E.
L
EM
M A
E.
L
EM
M
A
C . B
R O
W N
M . F
O
SH
E
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
D
IS
C O
VE
R
Y H
AL
L
BU
IL
D
IN
G
_D is cR en o_
R
VT
_A
I.r vt
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AN
SI
D
3/32" = 1'-0"A1 SECOND FLOOR DEMOLITION PLAN
Am en dm en t 0
/0
1/
KEY PLAN
SCALE: N.T.S.
A B
C
D
E
D1
A1
PLAN NORTH
16'8' 32'0
KEYNOTES LISTED MAY NOT APPLY TO EACH DEMO FLOOR
PLAN. REF. INDIVIDUAL DEMO PLANS FOR ACTUAL KEYNOTES.
DN
DN
AB
CD
EG F
H
IJKLMNOP
8.5
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
STAIR
BEDROOM
BEDROOM
BEDROOM
BEDROOM
STAIR
BEDROOM
BEDROOM
STORAGE
BEDROOM
BEDROOM
LOUNGE
BEDROOM
CORR.
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
LOUNGE
STAIR
STAIR
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
A. NOT ALL GENERAL NOTES OR SHEET KEY NOTES MAY BE
USED ON THIS SHEET.
B. CONTRACTOR TO FIELD VERIFY AND RECORD ALL DOOR
AND WINDOW SIZES AND DIMENSIONS PRIOR TO WORK
AND PURCHASE OF NEW ITEMS.
C. DEMO ALL EXISTING WINDOWS, FRAMES, AND SILLS.
RETAIN AND REUSE EXISTING METAL FLASHING. IF SILL
BRICK OR FLASHING IS DAMAGED DURING REMOVAL OF
WINDOW AND SILL CONTRACTOR SHALL
REPLACE AND REPAIR AS NECESSARY.
D. PREP WINDOW OPENINGS AND MAKE READY FOR NEW
ATFP COMPLIANT WINDOW AND FRAMES.
E. RE: AE622 FOR WINDOW SCHEDULE AND DETAILS.
F. REMOVE INTERIOR DOORS ONLY AS INDICATED AND PREP
FRAMES FOR NEW DOORS AND HARDWARE.
G. DEMO INTERIOR DOORS AND FRAMES AS INDICATED AND
PREP OPENINGS FOR NEW FRAMES, DOORS AND
HARDWARE.
H. ON ALL DEMOLISHED DOORS THE LOCK CORES SHALL BE
REMOVED AND TURNED OVER TO THE BASE LOCKSMITH.
I. ALL USABLE DOOR CLOSER'S SHALL BE MADE AVAILABLE
TO BE TURNED OVER TO THE BASE BEFORE REMOVAL
FROM SITE.
J. RE: AE410 FOR TYPICAL DORM ROOM DEMOLITION.
K. DEMO EXTERIOR DOORS AND FRAMES AND MAKE READY
FOR NEW DOORS AND FRAMES.
L. DEMO EXTERIOR STORE FRONT GLASS AND FRAMES AND
MAKE READY FOR NEW FRAMES AND GLASS.
M. DEMO EXISTING PATIO SLAB. SEE SHEET KEY NOTE 11.
RE: STRUCTURES FOR NEW CANOPY FOOTINGS AND
SLAB.
N. REMOVE ALL ROOM AND WAY-FINDING SIGNAGE.
O. DEMO ALL SHOWER SURROUNDS, TOWEL BARS,
VANITIES, LINEN CABINET, MEDICINE CABINETS &
FLOORING IN DORM ROOMS. DEMO ONE OF THE CLOSET
DOORS AS SHOWN ON PLAN IN DOOR ROOMS.
P. REFER TO PLUMBING SHEET P-110 KEYNOTES FOR
EXISTING FLUSH VALVE TOILET REPAIR REQUIREMENTS.
Q. REMOVE ALL CARPET TILES AND FLOORING
THROUGHOUT BUILDING. CONTRACTOR IS TO REMOVE
ALL ADHESIVE AND RESIDUE FROM THE FLOORS.
R. RECYCLE CARPET TILES.
S. REMOVE AND DISPOSE OF ALL DEMOLITION DEBRIS.
T. RE: ELECTRICAL SHEETS FOR DEMO INFORMATION.
U. REMOVE AND DISPOSE OF ALL EXISTING FURNITURE,
EQUIPMENT, AND DRAPERIES, EXCEPT AS NOTED.
V. PROTECT, STORE AND REINSTALL EXISTING BILLIARDS
TABLE IN RECREATION ROOM AND ALL FURNITURE IN
DORM MANAGER'S OFFICE.
W. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO
FURNITURE DURING ENTIRE LIFE OF PROJECT.
X. DORM ROOMS & STAIRWAY GYP CEILING TO REMAIN
UNLESS NOTED OTHERWISE ON THE REFLECTED CEILING
PLANS. PREP AND CLEAN EXISTING CEILING TO RECEIVE
NEW FINISH.
Y. DEMO ALL EXISTING CEILING TILES, GRID AND SYSTEMS
THROUGHOUT AS INDICATED.
Z. CONTRACTOR TO NOTE AND TRACK CEILING HEIGHTS OF
EXISTING CEILING TILE SYSTEM. NEW CEILING HEIGHTS
SHALL MATCH EXISTING UNLESS OTHERWISE NOTED ON
NEW WORK RCP'S.
AA. CONTRACTOR TO MEASURE AND RECORD EXISTING
ACCESS PANELS IN CEILING AND PROVIDED NEW ACCESS
PANELS AND CABLE BOXES IN THE CORRIDORS.
BB. DEMO ALL CEILING FANS.
CC. REMOVE ALL ROOM FINISHES AND PREP WALL FOR NEW
FINISHES. RE: IN600 FINISH SCHEDULE
DD. DEMOLISH AND REMOVE FROM SITE ALL GUTTERS AND
DOWN SPOUTS. COORDINATE REMOVAL OF GUTTERS
AND DOWNSPOUTS WITH ARRIVAL OF NEW GUTTERS AND
DOWNSPOUTS.
EE. BEDROOMS - REMOVE WALL DOOR STOP AND PROVIDE
FLOOR DOOR STOPS.
FF. REMOVE ALL EXISTING RESTROOM PORCELAIN WALL
TILES.
DEMO GENERAL NOTES
1. DEMO DOOR FRAME.
2. DEMO DOORS & FRAMES (TURN LOCK CORES OVER TO
BASE LOCKSMITH).
3. DEMO STORE FRONT. DOORS AND FRAMES (TURN LOCK
CORES OVER TO BASE LOCKSMITH).
4. DEMO BUILDING EXPANSION WALL AND CEILING JOINT
COVER AND PREP FOR NEW COVER.
5. DEMO ALL CASEWORK AND COUNTER TOPS.
6. NOT USED.
7. DEMO EXISTING WOOD BENCH AND PREP FOR NEW
BENCH.
8. DEMO STAIR TRAED AND RISER TRIMS.
9. DEMO WALL GUARD.
10. EXISTING DOOR AND FRAME TO REMAIN. PAINT TO MATCH
NEW METAL DOORS AND FRAMES.
11. DEMO EXISTING PATIO RE: CD100.
12. REPLACE CONCRETE BENCH CAP, BRICK VENEER, AND
CMU.
13. DEMO ALL WASHER AND DRYERS.
14. SEE SHEET AE410 FOR TYPICAL KEY NOTE CALL OUTS IN
BEDROOMS, VANITIES & RESTROOMS. APPLIES TO ALL
DORM ROOMS.
15. DEMO EXISTING WINDOWS, FRAMES AND GLAZING.
16. REMOVE THE EXISTING HOOD AND REPLACE IN KIND. SEE
SHEET M110.".
17. REFER TO KEYNOTES ON M-110-M130 FOR MECHANICAL
DEMO REQUIREMENT.
18. DEMO EXISTING DOOR AND FRAME. REPAIR DOOR AND
JAMB SURFACE AFTER REMOVING THE EXISTING DOOR
AND JAMB, AND MATCH ADJACENT WALL FINISH.
19. DEMO MASONRY WALL AND CONCRETE BENCH CAP. THE
BRICKS ARE TO BE REUSED. INFILL THE LAUNDRY ROOM
MECHANICAL OPENINGS WITH EXISTING BRICKS FROM
THE REMAINS OF MASONRY BENCH.
20. REMOVE UNUSABLE ABANDONED WALL ACCESS PANEL.
21. DEMO LAUNDRY ROOM GYP BD CEILING.
22. DEMO EXISTING CONCRETE CAP AND LEAVE THE
EXISTING MASONRY WALL.
23. DEMO ROLL-UP COUNTER SHUTTER
SHEET KEYNOTES
DEMO WINDOW AND PREP FOR
NEW ATFP COMPLIANT WINDOW
SHEET LEGEND
DEMO WALL (EXISTING PARTITION IS
STUD W/GWB ON BOTH SIDES
DEMO ITEMS; DOORS, FRAMES,
SINKS, SHOWERS, WALLS, ETC.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddeml\Documents\491289_DiscoveryReno_RVT18_AI_g5eddeml.rvt
11/30/2021 2:18:27 PM
AD130
DIS
TH
IR
D F
LO
O
R D
EM
O
LI
TI
O N
P
LA
N
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T E.
L
EM
M A
E.
L
EM
M
A
C . B
R O
W N
M . F
O
SH
E
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
D
IS
C O
VE
R
Y H
AL
L
BU
IL
D
IN
G
_D is cR en o_
R
VT
_A
I.r vt
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AN
SI
D
3/32" = 1'-0"A1 THIRD FLOOR DEMOLITION PLAN
Am en dm en t 0
/2
2/
KEY PLAN
SCALE: N.T.S.
A B
C
D
E
D1
A1
PLAN NORTH
16'8' 32'0
KEYNOTES LISTED MAY NOT APPLY TO EACH DEMO FLOOR
PLAN. REF. INDIVIDUAL DEMO PLANS FOR ACTUAL KEYNOTES.
1ST FLOOR LEVEL
100' - 0"
2ND FLOOR LEVEL
110' - 0"
3RD FLOOR LEVEL
120' - 0"
ATTIC LEVEL
129' - 4"
12345678910 8.5 5.1 4.2 4.1
AE412
D1
Sim
1 1
1 2
2 1
5 TYP5TYP
C C
A
1ST FLOOR LEVEL
100' - 0"
2ND FLOOR LEVEL
110' - 0"
3RD FLOOR LEVEL
120' - 0"
ATTIC LEVEL
129' - 4"
ABCDEG FHIJKLMNOP H.1H.2
2 2 22
1 1
5TYP
A. SEE AE110 FLOOR PLAN FOR OVERALL GENERAL SHEET
NOTES.
B. RE: AE410 FOR ENLARGED CANOPY PLANS AND NOTES
GENERAL SHEET NOTES
1. PRE-FINISHED METAL GUTTER
2. REPLACE DOWNSPOUT AND GUTTER IN KIND
3. NEW BUILDING EXPANSION JOINT COVER AT WALL
4. RE: STRUCTURAL SHEETS
5. RE: ELECTRICAL SHEETS
6. RE: MECHANICAL SHEETS
7. RE: PLUMBING SHEETS
8. INFILL WALL WITH EXISTING BRICK. REUSE EXISTING
BRICK FROM DEMO MASONRY WALL SEATING.
9. RELOCATE EXTERIOR LIGHT FIXTURES AS REQUIRED
FOR NEW CANOPY. RE: ELECTRICAL.
10. CLEAN EXTERIOR BRICK WALL PER SPEC 04 01 20.70
11. TYPICAL EXISTING BRICK SILL TO REMAIN U.N.O.
12. CLEAN AND PAINT HORIZONTAL METAL LOUVERS.
MATCH GUTTER AND DOWNPOUR FINISH COLOR.
13. RE: STRUCTURAL FOR NEW WINDOW LINTEL REPAIR
DETAIL.
14. DOWNSPOUT AND SPLASH BLOCK
SHEET KEYNOTES
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddeml\Documents\491289_DiscoveryReno_RVT18_AI_g5eddeml.rvt
11/30/2021 1:07:08 PM
AE200
DIS
EX
TE
R
IO
R E
LE
VA
TI
O
N S
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T E.
L
EM
M A
E.
L
EM
M
A
C . B
R O
W N
M . F
O
SH
E
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
D
IS
C O
VE
R
Y H
AL
L
BU
IL
D
IN
G
_D is cR en o_
R
VT
_A
I.r vt
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AN
SI
D
Am e n dm en t 0
/2 2/
3/32" = 1'-0"D1 WEST ELEVATION
3/32" = 1'-0"A1 SOUTH ELEVATION
16'8' 32'0
SCALE: 3/32" = 1'-0"
16'8' 32'0
SCALE: 3/32" = 1'-0"
R
EF
R
EF
J J
IJ
TYPICAL
BEDROOM
TYPICAL
BEDROOM
TYP. VANITY
148B
TYP. VANITY
146B
TYP. RESTROOM
TYP. CLOSET
148A
TYP. CLOSET
146A
2'
8"
4' - 0" A
RE: A6/AE510
K
BEDROOM
VESTIBULE
CORRIDOR
LOUNGE
STAIR
B-1
BEDROOM
BUILDING
EXPANSION
JOINT
BUILDING
EXPANSION
JOINT
EG F
MECHANICAL
LAUNDRY
CORR.
CORR.
BEDROOM
134 BUILDING
EXPANSION
JOINT
BUILDING
EXPANSION
JOINT
G FH
LOUNGE
ENTRY
VESTIBULE
CORR.
BUILDING
EXPANSION
JOINT
BUILDING
EXPANSION
JOINT
IJ
TYPICAL
BEDROOM
TYPICAL
BEDROOM
TYP. CLOSET
148A
TYP. VANITY
148B
TYP. RESTROOM
147 TYP. VANITY
146B
CORRIDOR
TYP. CLOSET
146A
PROVIDE ACCESS
PANEL AT EITHER
LOCATION. FIELD
VERIFY WHICH
LOCATION IS
APPLICABLE TO
ACCESS EXISTING
FCU STRAINER.
REPLACE IN KIND. TYPICAL
TO ALL THIRD-FLOOR LARGE
ACCESS PANELS.
IJ
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddeml\Documents\491289_DiscoveryReno_RVT18_AI_g5eddeml.rvt
11/30/2021 1:57:08 PM
AE410
DIS
EN
LA
R G
ED
P
LA
N
S
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T E.
L
EM
M A
E.
L
EM
M
A
C . B
R O
W N
M . F
O
SH
E
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
D
IS
C O
VE
R
Y H
AL
L
BU
IL
D
IN
G
_D is cR en o_
R
VT
_A
I.r vt
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AN
SI
D
Am e n dm en t 0
/0 1/
1/4" = 1'-0"A1 TYPICAL ENLARGED DORM ROOM PLAN
1/4" = 1'-0"B9 ENLARGED E. J. PLAN - AREA A & B
1/4" = 1'-0"E5 ENLARGED E. J. PLAN - AREA C
1/4" = 1'-0"F5 ENLARGED E. J. PLAN - AREA C & D
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
1/4" = 1'-0"E1 TYPICAL ENLARGED DORM ROOM RCP
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
1/4" = 1'-0"A5 TYPICAL ENLARGED DORM ROOM DEMO PLAN
PLAN NORTH
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0' - 2"
INSULATION
SHEET METAL WATER STOP,
BELLOWS TYPE, SECURE TO BRICK
BACKER ROD AND SEALANT
FACE BRICK
8" CMU
INSTALL INSULATION IN JOINT
INTERIOR EXPANSION
JOINT COVER
0' - 0 3/8"
CMU
INSULATION
FACE BRICK
SEALANT & PRE-MOLDER
FILLER STRIP
CMU
INSULATION
FACE BRICK
SEALANT & PRE-MOLDER
FILLER STRIP
0'
3/
8"
0' - 0 3/8"
SEALANT & PRE-MOLDER
FILLER STRIP
INTERSECTING CMU WALL
WHERE OCCURING
STOP WALL REINFORCING
A EACH SIDE OF JOINT
OMIT SEALANT
WHERE INTERSCTING
CMU WALL OCCURS
0' - 2"
INTERIOR EXPANSION
JOINT COVER
ANCHORED TO CMU
5/8" GYPSUM BOARD CEILING
7/8" HAT CHANEL
1 1/2" CEILING SUPPORT
0' - 2"
INTERIOR EXPANSION
JOINT COVER
CMU WALLS
0'
1/
8"
SET TOP OF COVER
1/8" ABOVE CONCRETE
WATERPROOF MEMBRANE
GRAVEL
INSTALL PERIMETER
INSULATION IN JOINT
CMU
ANCHOR TO CMU WALL
INTERIOR EXPANSION JOINT COVER
0' - 2"
EXISTING GRAVEL
CONTROL JOINT
TRANSITION STRIP
EXISTING WATERPROOF MEMBRANE
FLOOR FINISH.
RE: INTERIOR FINISH SCHEDULE
NOTE:
CONTROL JOINT WITH A TRANSITION STRIP.
REFER TO THE FIRST FLOOR PLAN ON SHEET
AE110 KEYNOTE #12
CONCRETE ON METAL DECK
SET TOP OF COVER
1/8" ABOVE CONCRETE
INTERIOR EXPANSION JOINT COVER
0'
1/
8"
0'
1/
8"
SET TOP OF COVER
1/8" ABOVE CONCRETE
CONCRETE ON METAL DECK
INSTALL PERIMETER
INSULATION IN JOINT
CMU
ANCHOR TO CMU WALL
INTERIOR EXPANSION JOINT COVER
0' - 2"66
AE510
A3
EXISITING CMU WALL
3 5/8" METAL STUD
5/8" GYPSUM BOARD
BULK HEAD
GYPSUM CEILING
EXPANISION JOINT
EXISTING CONCRETE FLOOR
EXPANSION JOINT
3 5/8" METAL STUD
5/8" GYSPUM BOARD
3 5/8" METAL STUD
CABINET RE:INTERIORS
0' - 1" 3 5/8" METAL STUD
5/8" GYPSUM WALL BOARD
ON ONE SIDE
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddeml\Documents\491289_DiscoveryReno_RVT18_AI_g5eddeml.rvt
11/22/2021 10:02:20 PM
AE510
DIS
IN
TE
R
IO
R D
ET
AI
LS
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T E.
L
EM
M A
E.
L
EM
M
A
C . B
R O
W N
M . F
O
SH
E
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
D
IS
C O
VE
R
Y H
AL
L
BU
IL
D
IN
G
_D is cR en o_
R
VT
_A
I.r vt
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AN
SI
D
Am e n dm en t 0
/2 2/
1 1/2" = 1'-0"F3 EXPANSION JOINT @ EXTERIOR WALL
1 1/2" = 1'-0"E1 CONTROL JOINT THROUGH BRICK
1 1/2" = 1'-0"A7 CONTROL JOINT THROUGH EXTERIOR WALL
1 1/2" = 1'-0"F1 EXP. JT. @ CEILING TO WALL
1 1/2" = 1'-0"F7 EXP. JOINT @ WALL
1 1/2" = 1'-0"C3 EXP. JT @ FLOOR SLAB ON GRADE TO WALL
1 1/2" = 1'-0"E7 1ST FLOOR SLAB CONTROL JOINT
1 1/2" = 1'-0"E3 EXP. JOINT IN FLOOR @ SECOND & THIRD FLOORS
1 1/2" = 1'-0"C7 EXP. JT.- FLOOR TO WALL @ 2ND & 3RD FLOORS
1/2" = 1'-0"A1 PARTY ROOM BULK HEAD SECTION
1" = 1'-0"A3 AE510 BULKHEAD DETAIL
1 1/2" = 1'-0"A6 PARTITION TYPE A
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'1' 4'0
SCALE: 1/2" = 1'-0"
DOOR SCHEDULE
DOOR ROOM NAME
DOOR FRAME DOOR SIZE
LABEL MIN. STC RATING
DETAILS
COMMENTS
EX
TE
R
IO
R E
N
TR
AN
C
ES
TYPE MAT. TYPE MAT. GLASS TYP. W H T HEAD JAMB SILL
E1 STAIR D-1 A ALUM M ALUM G1 - 3'-0" 7'-0" 1 3/4" - - C A/B A -
E2 VESTIBULE A ALUM R ALUM - 3'-0" 7'-0" 1 3/4" - - A B/C B1/B2 -
E3 RECEREATION A ALUM T ALUM - 3'-0" 6'-8" 1 3/4" - - B B B1/B2 -
E4 RECEREATION A ALUM T ALUM - 3'-0" 6'-8" 1 3/4" - - B B B1/B2 -
E5 VESTIBULE A ALUM K ALUM - 3'-0" 7'-0" 1 3/4" - - A A/B B1/B2 -
E6 STAIR A-1 A ALUM N ALUM - 3'-0" 7'-0" 1 3/4" - - A A/B A -
E7 STAIR B-1 A ALUM I ALUM - 3'-0" 7'-0" 1 3/4" - - A A A -
E8 MECHANICAL E ALUM U ALUM PR. 2'-6" 7'-0" 1 3/4" - - C A A -
E9 STAIR C-1 A ALUM I ALUM - 3'-0" 7'-0" 1 3/4" - - C A A -
IN
TE
R
IO
R S
TA
IR
S
S11 STAIR D-1 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S12 STAIR C-1 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S13 STAIR B-1 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S13A STAIR B-1 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S14 STAIR A-1 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S21 STAIR D-2 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - E E E -
S22 STAIR C-2 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S23 STAIR B-2 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S23A STAIR B-2 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S24 STAIR A-2 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S31 STAIR D-3 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - E E E -
S32 STAIR C-3 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S33 STAIR B-3 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S33A STAIR B-3 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
S34 STAIR A-3 B HM I HM G2 - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
400 ATTIC ACCESS F HM V HM 3'-0" 4'0" 1 3/4" H H H
AD
M
IN
IS
TR
AT
IO
N
, C O
R R
ID
O
R S
AN
D
M
IS
C
101 VESTIBULE A ALUM Q ALUM - 3'-0" 7'-0" 1 3/4" B LABEL - G C/G G -
117 OFFICE E HM I HM - 3'-0" 7'-0" 1 3/4" B LABEL - D D D -
121 OFFICE A HM S HM - 3'-0" 6'-8" 1 3/4" B LABEL - E F E -
126 JANITOR'S E HM I HM - 3'-0" 7'-0" 1 3/4" B LABEL - E E E -
127 TOILET E WD H HM - 3'-0" 6'-8" 1 3/4" B LABEL - E E E -
129 KITCHEN E WD H HM - 3'-0" 7'-0" 1 3/4" B LABEL - E E E -
131 LAUNDRY B HM O HM G2 - 3'-0" 7'-0" 1 3/4" C LABEL - E E/F E -
131A LAUNDRY B HM P HM G2 - 3'-0" 7'-0" 1 3/4" C LABEL - E E/F E -
133 ELECTRICAL D HM I HM - 3'-0" 7'-0" 1 3/4" - - A A A -
154 LOUNGE A HM K HM - 3'-0" 7'-0" 1 3/4" - - E F E -
229 JANITOR'S E HM I HM - 3'-0" 7'-0" 1 3/4" B LABEL - E E E -
230 STORAGE E HM G HM - 3'-0" 7'-0" 1 3/4" C LABEL - E E E -
236 PARTY ROOM (LOUNGE) C HM G HM - 3'-0" 7'-0" 1 3/4" 20 MINUTE - E E E -
329 JANITOR'S E HM I HM - 3'-0" 7'-0" 1 3/4" B LABEL - E E E -
330 STORAGE E HM G HM - 3'-0" 7'-0" 1 3/4" C LABEL - E E E
334 LOUNGE C HM G HM - 3'-0" 6'-8" 1 3/4" - - E E E -
SL
EE
PI
N
G R
O O
M S SEE COMMENT BEDROOM C WD G HM - 3'-0" 6'-8" 1 3/4" 20 MIN. 40 E E E SCHEDULE TYPICAL FOR ALL BEDROOM, RESTROOM AND CLOSET (2'X2'-6").
SEE GENERAL SHEET NOTE I, J, AND K FOR FRAMES AT BEDROOM ENTRY
DOORS, CLOSET FRAME AND DOORS, AND RESTROOM DOORS. UNDERCUT
ALL RESTROOM DOORS 3/4".
SEE COMMENT RESTROOM C WD H HM - 2'-4" 6'-8" 1 3/4" - 40 E E E
SEE COMMENT CLOSET - WD - HM - 5'-0" 6'-8" 1 3/4" - - E E E
A. ALL HOLLOW METAL DOORS AND FRAMES TO BE PAINTED.
RE: INTERIORS.
B. ALL EXTERIOR HM DOORS TO HAVE WEATHER STRIPPING.
C. FOR DOOR ELEVATIONS & DETAILS RE: AE620 & AE621.
D. FIRE RATED DOORS AND FRAMES SHALL RECEIVE
HARDWARE THAT IS ALSO RATED.
E. ALL DORM ROOM DOORS ARE TO BE WOOD & 20MIN
RATED WITH AN STC 40.
F. CONTRACTOR TO VERIFY ALL DOORS AND FRAME SIZES.
G. GLASS TYPE G1 IS LAMINATED INSULATED. GLASS TYPE
G2 IS WIRED.
H. MOCK-UPS MUST BE APPROVED BEFORE PURCHASE AND
INSTALLATION OF ANY DORM ROOM OR RESTROOM
DOOR.
I. ON ALL OCCUPANT ENTRY DOOR FRAMES AND NEW
RESTROOM DOOR FRAMES PROVIDED A NEW 3-PIECE
KNOCK DOWN DOOR FRAME.
J. PROVIDED A SOLID CORE DOOR WITH WHITE OAK FINISH
FOR THE DORM ROOM ENTRANCE. CONTRACTOR TO
COORDINATE FINISH MATERIAL WITH COE.
K. DEMO ONLY ONE OF THE CLOSET DOOR AND FRAME AND
RESTORE THE SECOND EXITING CLOSET DOORS AND
FRAMES. RE: ARCH DEMO FLOOR PLANS.
L. B LABEL: 1 1/2 HOUR RATING (FOR A 2 HOUR WALL).
THESE DOORS ARE USUALLY USED FOR STAIRWELL
DOORS BUT ARE SOMETIMES USED AT ALL THE RATED
WALLS IN A BUILDING. 100 SQUARE INCHES OF EXPOSED
GLASS IS ALLOWED.
M. C LABEL: 3/4 HOUR RATING (FOR A 1 HOUR WALL). THESE
DOORS ARE USED FOR OPENINGS FROM A CORRIDOR
INTO ANOTHER ROOM IN THE SAME BUILDING. 1296
SQUARE INCHES OF EXPOSED GLASS IS ALLOWED.
N. REFER TO LIFE SAFETY PLANS F-101, F-111, F-112, AND
F-113.
GENERAL SHEET NOTES
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddeml\Documents\491289_DiscoveryReno_RVT18_AI_g5eddeml.rvt
11/22/2021 11:06:02 PM
AE600
DIS
D O
O R
S C
H
ED
U
LE
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T E.
L
EM
M A
E.
L
EM
M
A
C . B
R O
W N
M . F
O
SH
E
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
D
IS
C O
VE
R
Y H
AL
L
BU
IL
D
IN
G
_D is cR en o_
R
VT
_A
I.r vt
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AN
SI
D
Am e n dm en t 0
/2 2/
HM . HM .
E
HOLLOW METAL DOOR
A
ALUMINUM DOOR
0' - 5 1/2"0' - 5 1/2"
0'
8"
Q R (OPP. HAND)K
7'
4"
12' - 3"
0' - 2" 3' - 2"
0' - 2" 4' - 0"
0' - 2"
0'
4"
1'
3/
4"
0'
2"4'
1/
4"
0'
4"
0'
4" 1'
3/ 4"
0'
2"
4'
1/
4" 0'
4"
0' - 2"
EQ.
0' - 2"
EQ.
0' - 2"
EQ.
0' - 2" 3' - 0"
0' - 2"
7'
4"
U
0'
4" 7'
0"
0' - 2" 5' - 0"
0' - 2"
T
0' - 2" 3' - 0"
0' - 2" 3' - 11 1/2"
0' - 2" 3' - 11 1/2"
0' - 2" 3' - 0"
0' - 2"
2'
3/
4" 0'
2"
6'
8" 0'
2"
0'
0'
4"
M N (OPP. HAND)
7'
4"
0'
4" 4'
1/ 4"
0'
2" 1'
3/ 4"
0'
4"
0' - 2"
EQ
0' - 2"
EQ
0' - 2" 3' - 0"
0' - 2"
FIELD VERIFY (F.V.) MAS. OPNG.
I
0'
4" 7'
0"
0' - 2" 3' - 0" 0' - 2"
A. G1 LAMINATED INSULATED GLASS UNITS TO MEET AT/FP
UFC 4-010-01 REQUIREMENT AND SPECIFICATION 08 81 00.
B. G2 WIRED GLASS UNITS TO MEET NFPA 252 & NFPA 257
REQUIREMENTS AND SPECIFICATION 08 81 00.
C. CONTRACTOR TO FIELD VERIFY AND RECORD ALL DOOR
AND WINDOW SIZES AND OPENINGS PRIOR TO WORK AND
PURCHASE OF NEW ITEMS.
D. FRAME THICKNESS TO MATCH EXISTING. FIELD VERIFY
BEFORE REMOVAL OF DOORS.
GENERAL SHEET NOTES
A
GWB TO MATCH EXISTING
THICKNESS
DOOR, FRAME AND STORE
FRONT AS SCHEDULED
B
SEALANT BOTH SIDES OF
FRAME
EXISTING EXTERIOR WALL
GWB TO MATCH EXISTING
THICKNESS
PREFINISHED METAL
SOFFIT
DOOR AS SCHEDULED
SEALANT BOTH SIDES OF
FRAME
EXISTING EXTERIOR WALL
GWB TO MATCH EXISTING
THICKNESS
DOOR AS SCHEDULED
C
SEALANT BOTH SIDES OF
FRAME
EXISTING EXTERIOR WALL
A
EXISTING EXTERIOR
WALL
DOOR BOTTOM W/ RAIN
DRIP RE: HARDWARE
SCHEDULE
DOOR AND FRAME AS
SCHEDULED
FLOOR FINISH AS
SCHEDULED RE: IN600s
FOR FINISH SCHEDULE
EXISTING CONCRETE SLAB
A
GWB TO MATCH EXISTING
THICKNESS
DOOR, FRAME AND STORE
FRONT AS SCHEDULED
B
SEALANT BOTH SIDES OF
FRAME
EXISTING EXTERIOR WALL
GWB TO MATCH EXISTING
THICKNESS
DOOR AS SCHEDULED
SEALANT BOTH SIDES OF
FRAME
EXISTING EXTERIOR WALL
GWB TO MATCH EXISTING
THICKNESS
DOOR, FRAME AND STORE
FRONT AS SCHEDULED
C
SEALANT BOTH SIDES OF
FRAME
EXISTING EXTERIOR WALL
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddeml\Documents\491289_DiscoveryReno_RVT18_AI_g5eddeml.rvt
11/22/2021 10:15:49 PM
AE620
DIS
EX
TE
R
IO
R D
O O
R D
ET
AI
LS
E
LE
VA
TI
O N
S
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T E.
L
EM
M A
E.
L
EM
M
A
C . B
R O
W N
M . F
O
SH
E
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
D
IS
C O
VE
R
Y H
AL
L
BU
IL
D
IN
G
_D is cR en o_
R
VT
_A
I.r vt
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AN
SI
D
Am e n dm en t 0
/2 2/
1/4" = 1'-0"E8 EXTERIOR DOOR ELEVATIONS
1/4" = 1'-0"A1 EXTERIOR DOOR FRAME ELEVATIONS
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
1 1/2" = 1'-0"F1 HEAD DETAILS
1 1/2" = 1'-0"C1 SILL DETAILS
1 1/2" = 1'-0"D1 JAMB DETAILS
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
G1 GLAZING
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\G5EDDJLL\Documents\491289_DiscoveryReno_RVT18_E_G5EDDJLL.rvt
11/19/2021 11:45:57 AM
E-701
LI
G
H T
FI
XT
U R
E
SC
H
ED
U
LE
W H
IT
EM
AN
A
FB
, M
IS
SO
U R
I
KA
N
SA
S C
IT
Y
D
IS
TR
IC
T M
. B U
R G
J.
L
O C
KW
O
O D
B.
B
R
AC
K
O C
TO
BE
R
SE
E
C O
VE
R
P
AG
E
SE
E
C O
VE
R
P
AG
E
FI
LE
N
AM
E:
RTA
R
EP
AI
R
A N
D R
EN
O
VA
TE
D
IS
C O
VE
R
Y D
O R
M
BU
IL
D
IN
G
9_ D is cR en o_
R
VT
_E
.rv t
PRODUCTION DATA 4PRODUCTION DATA 3
E.
2T H
S
TR
EE
T
KA
N
SA
S
C
IT
Y, M
O
AM
D -0
- A D
D
ED
F
IX
TU
R
E
TY
PE
"W
" T O
S C
H
ED
U
LE
N O
V
1/4" PLYWD
CABINET BACK
CABINET REVEAL
PAINT SOFFIT;
PT-1
3 CM THICK QUARTZ
AGGLOMERATE
COUNTERTOP W/
SQUARE EDGE
1/4" PLYWD
CABINET BACK
2X WOOD BRACING
18" O.C.
BASE AS
SCHEDULED
ADJUSTABLE
SHELVES
0' - 11"
/2
DRAWER
3' - 0"
1/2" SOLID SURFACE
MATERIAL (SSM-1)
COUNTERTOP W/
SQUARE EDGE
UNDERMOUNT
S.S. DOUBLE BOWL
SINK; RE: MECH
SPEC 22 00 00
1/4" PLYWD
CABINET BACK
2X WOOD BRACING
18" O.C.
BASE AS
SCHEDULED
RE: ARCH DWGS
FOR WALL
CONSTRUCITON
1/2" THICK SOLID
SURFACE MATERIAL
COUNTERTOP W/
BUILT UP SQUARE
EDGE
PAINT; PT-3
INTEGRAL SOLID
SURFACE MATERIAL
BOWL; RE: 06 61 16
1/4" PLYWD
CABINET BACK
2X WOOD BRACING
18" O.C.
BASE AS
SCHEDULED
/2
RE: ARCH DWGS
FOR WALL
CONSTRUCITON
1/2" THICK SOLID
SURFACE MATERIAL
COUNTERTOP W/
BUILT UP SQUARE
EDGE
PORCELAIN WALL
TILE BACKSPLASH
AS SCHEDULED
1/4" PLYWD
CABINET BACK
2X WOOD BRACING
18" O.C.
BASE AS
SCHEDULED
/2
DRAWER
DRAWER
DRAWER
GENERAL SHEET NOTES
1. CABINETS & COUNTERS SHALL BE CONSTRUCTED OF MATERIALS &
METHODS TO MEET "PREMIUM QUALITY" STANDARDS IN
ACCORDANCE WITH ARCHITECTURAL WOODWORK INSTITUTE (AWI)
STANDARDS, SECTION 400 FOR LAMINATED CABINETS.
2. CABINET CONSTRUCTION TYPE SHALL BE "FLUSH OVERLAY" STYLE
IN ACCORDANCE WITH AWI STANDARDS.
3. CABINET HARDWARE SHALL BE AS LISTED & SPECIFIED IN SPEC
SECTION 06 41 16.00 10, LAMINATE CLAD ARCHITECTURAL
CASEWORK.
4. ALL CABINET COMPONENTS SHALL BE FABRICATED FROM 1/2"
MEDIUM DENSITY PARTICLE BOARD UNLESS OTHERWISE
INDICATED.
5. ALL INTERIOR CABINET DRAWER SURFACES SHALL BE FINISHED
WITH PLASTIC LAMINATE TO INCLUDE BOTTOM, SIDE, AND BACK
SURFACES.
6. ALL CABINET DOORS SHALL BE FINISHED BOTH SIDES WITH
PLASTIC LAMINATE.
7. ALL SHELVING SHALL BE FINISHED BOTH SIDES WITH PLASTIC
LAMINATE. ALL SHELF EDGES SHALL BE BANDED WITH .018" PVC.
8. EXPOSED BASE CABINET SIDES SHALL BE FINISHED WITH PLASTIC
LAMINATE TO MATCH CABINET FRONTS.
9. ALL SHELF STANDARDS SHALL BE MORTISED.
10. ALL EDGES OF ALL CABINET DOORS & DRAWER FRONTS SHALL BE
EDGE BANDED WITH .018" PVC EDGING UNLESS OTHERWISE
NOTED.
11. WALL CONSTRUCTION WILL VARY. SEE FLOOR PLAN FOR WALL
CONSTRUCTION AT EACH CASEWORK LOCATION.
12. CABINET INTERIOR TOP & WALL SURFACES SHALL BE FINISHED
WITH MELAMINE LAMINATE. CABINET BOTTOM INTERIOR SURFACES
SHALL BE FINISHED WITH GENERAL PURPOSE GRADE HDL PLASTIC
LAMINATE.
0' - 1"
1/2" THICK SOLID
POLYMER
MATERIAL (SSM)
w/BUILT-UP
BULLNOSE EDGE
PVC EDGE BANDING
(EB)
1/16" PL LAM.
3/4" PTLBD CABINET
DOOR OR DRAWER
FRONT
2' - 0"
E Q
E Q
E Q
E Q
EDGE BANDING
3/4" PARTICALEBOARD
PLASTIC LAMINATE
RE: ARCH FOR WALL
CONSTRUCTION U
.S A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddjm6\Documents\491289_DiscoveryReno_RVT18_AI_g5eddjm6.rvt
11/23/2021 7:15:40 AM
IN512
DIS
C A
S E
W O
R K
D E
T A
IL
S
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T C
G
A T
E W
O O
D
C G
A T
E W
O O
D
C F
O R
D
O C
T O
B E
R
S E
E C
O V
E R
P A
G E
S E
E C
O V
E R
P A
G E
F
IL
E N
A M
E
RTA
R E
P A
IR
D
IS
C
O V
E R
Y H
A L L
B U
IL
D
IN
G
D is c R e n o R
V T
A
I.
rv t
PRODUCTION DATA 4PRODUCTION DATA 3
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
A m e n d m e n t
/2
/2
1 1/2" = 1'-0"E1
TYP. SECTION @ VENT HOOD
1 1/2" = 1'-0"A1
TYP. SECTION @ PENNISULA
1 1/2" = 1'-0"A4
TYP. LAUNDRY CASEWORK SECTION
1 1/2" = 1'-0"A7
TYP. VANITY SINK SECTION
1 1/2" = 1'-0"E4
TYP. VANITY DRAWER SECTION
12" = 1'-0"F7
TYP SSM COUNTERTOP EDGE
1 1/2" = 1'-0"A9
SHELVING SECTION
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
1"1/2" 2"0
SCALE: 1" = 1"
1"1/2" 2"0
SCALE: 1" = 1"
1"1/2" 2"0
SCALE: 1" = 1"
A. REFERENCE INTERIOR FINISH MATERIALS LEGEND FOR
TYPES AND FINISHES.
B. REFERENCE SHEET IN701 FOR ENLARGED TYPICAL FINISH
PLAN FOR BEDROOM, CLOSET, VANITY AND BATHROOM.
THIS SHALL BE APPLIED TO ALL SIMILAR ROOMS AND
REVERSED OR MIRRORED AS APPLICABLE.
C. NORTH, SOUTH, EAST AND WEST AS NOTED ON THE
ROOM FINISHE SCHEDULE SHALL BE IN ACCORDANCE
WITH PLAN NORTH AS INDICATED ON THE FLOOR PLANS.
D. PAINT ALL INTERIOR WALL AND CEILING MOUNTED ITEMS,
SUCH AS VENTS, GRILL COVERS, FIRE EXTIINGUISHER
CABINET FACE AND FRAMES, ETC. TO MATCH THE
SURFACE COLOR ON WHICH THEY APPEAR.
E. PROVIDE AND INSTALL WINDOW BLINDS (WB) AS SHOWN
ON FIRST FLOOR ROOMS ONLY.
F. PROVIDE AND INSTALL WINDOW DRAPES (WD) FOR
WINDOWS AS LOCATED ON THE DRAWINGS. WD SHALL BE
WALL MOUNT.
G. CORNER GUARDS (CG) SHALL BE PROVIDED AS
INDICATED ON THE PLANS.
H. PAINT ALL METAL DOORS AND DOOR FRAMES PT-20
UNLESS OTHERWISE NOTED.
I. CONTRACTOR SHALL VERIFY AND CORRE CT FLOORS
AND WALLS TO BE LEVEL AND PLUMB PRIOR TO THE
INSTALLATION OF NEW FINISHES.
J. REMOVE ALL ACCESS PANELS IN DORM ROOMS WITH ANY
CLEAR DENT OR DAMAGE AND REPLACE, PAINT TO
MATCH ADJACENT SURFACE.
K. REMOVE POPCORN CEILING IN PARTY ROOM AND BRING
TO LEVEL 4 GYPSUM FINISH TO PAINT (PT-10).
L. FLOORING SELF LEVELER SHALL BE USED PRIOR TO
INSTALLATION OF ANY LVT FLOORING, FOR PLUMB AND
LEVEL FLOOR.
M. ANY GYPSUM WALL IN DORM ROOMS WITH VISIBLE
DAMAGE OR GOUGING SHALL BE REPAIRED AND ENTIRE
WALL BROUGHT TO A LEVEL 4 FINISH, PAINT AS
SCHEDULE.
N. IN HALLS AND COMMON ARANS ANY WALL PATCH SHALL
BE FEATHERED OUT TO REST OF WALL, PAINT AS
SCHEDULED.
O. ALL ACCESS PANEL NOTED TO BE REMOVED, RE: ARCH,
IN HALLWAYS SHALL BE PATCHED AND FEATHERED OUT
TO BLEND INTO EXISTING WALL, PAINT AS SCHEDULED.
P. PROVIDE AND INSTALL SOLID SURFACE MATERIAL
WINDOW SILLS (SSM-3).
GENERAL SHEET NOTES
1. PROVIDE AND INSTALL SOLID SURFACING MATERIAL (SSM)
SHOWER SURROUND PANELS AND COMPONENTS.
2. PROVIDE AND INSTALL ENTRANCE MAT (EM) AND
MODULAR WALK-OFF TILE (EMT) IN LOCATIONS SHOWN.
3. CONSTRUCT FABRICATE AND INSTALL CABINETS AND
COUNTERS TO DIMENSIONS AND FINISHES SHOWN ON
IN511 & IN512.
4. PAINT ALL EXPOSED NON-STAINLESS METAL STAIR
COMPONENTS AND STRINGERS PT-20.
5. CLEAN FLOORS, WALLS, CEILINGS IN JANITORS CLOSET,
COMPLETELY REMOVE ANY FLOORING, ADHESIVE AND
RESIDUE. SEAL THE FLOOR AS NOTED ON THE FINISH
SCHEDULE.
SHEET NOTES
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddjm6\Documents\491289_DiscoveryReno_RVT18_AI_g5eddjm6.rvt
11/23/2021 1:28:20 PM
IN600
DIS
IN
T
E R
IO
R
F
IN
IS
H
S C
H E
D U
L E
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T C
G
A T
E W
O O
D
C G
A T
E W
O O
D
C B
R O
W N
C F
O R
D
O C
T O
B E
R
S E
E C
O V
E R
P A
G E
S E
E C
O V
E R
P A
G E
F
IL
E N
A M
E
RTA
R E
P A
IR
D
IS
C
O V
E R
Y H
A L L
B U
IL
D
IN
G
D is c R e n o R
V T
A
I.
rv t
PRODUCTION DATA 4PRODUCTION DATA 3
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
A m e n d m e n t
/2
/2
INTERIOR FINISH SCHEDULE
ROOM
NO ROOM NAME
FLOOR BASE NORTH WALL EAST WALL SOUTH WALL WEST WALL CEILING SHEET
NOTESMAT. COL. COL. FIN. COL. FIN. COL. FIN. COL. FIN. COL. FIN.
100 ENTRY --- --- --- --- --- --- --- --- --- --- ---
101 VESTIBULE EM / EMT --- --- --- --- --- --- --- --- --- --- PT-10 2
117 OFFICE CPT 1 RB-1 PT 1 PT 1 PT 1 PT 1 PT-10
120 CORRIDOR LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
121 OFFICE/COMM. CPT 1 RB-1 PT 3 PT 1 PT 1 PT 1 PT-10
122 LOUNGE CPT 1 RB-1 PT 3 PT 1 PT 1 PT 1 PT-10
123 MAILROOM LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 PT-10
124 RECREATION LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 PT-10
126 JANITOR'S SC --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 5
127 TLT PFT 1 PWT PWT 4 PWT 4 PWT 4 PWT 4 PT-10
128 SPRINKLER --- --- --- --- --- --- --- --- --- --- --- ---
129 KITCHEN PFT 1 PFTB-1 PWT 1 PWT 1 PT 2 PT 2 PT-10 3
130 CORR. LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
131 LAUNDRY --- --- --- PT 1 PT 1 PT 1 PT 1 ACT-1 3
132 MECHANICAL --- --- --- --- --- --- --- --- --- --- --- ---
133 ELECTRICAL --- --- --- --- --- --- --- --- --- --- --- ---
135 VESTIBULE EM / EMT --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10
146 TYPICAL BEDROOM CPT 1 RB-1 PT 3 PT 1 PT 1 PT 1 PT-10
146A TYP. CLOSET CPT 1 RB-1 PT 1 PT 1 PT 1 PT 1 PT-10
146B TYP. VANITY PFT 2 PFTB-2 PT 1 PT 1 PT 3 PT 1 PT-10 3
146C TYP. CLOSET CPT 1 RB-1 PT 1 PT 1 PT 1 PT 1 PT-10
147 TYP. RESTROOM PFT 2 PWT PT / PWT 1 / 2 PT / PWT 1 / 2 PT / PWT 1 / 2 PT / PWT 1 / 2 PT-10 1
148 TYPICAL BEDROOM CPT 1 RB-1 PT 3 PT 1 PT 1 PT 1 PT-10
148A TYP. CLOSET CPT 1 RB-1 PT 1 PT 1 PT 1 PT 1 PT-10
148B TYP. VANITY PFT 2 PFTB-2 PT 1 PT 1 PT 3 PT 1 PT-10 3
148C TYP. CLOSET CPT 1 RB-1 PT 1 PT 1 PT 1 PT 1 PT-10
152 CORRIDOR LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
154 LOUNGE LVT 1 RB-1 PT 2 PT 2 PT 2 PT 3 ACT-2
175 CORRIDOR LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
218 CORRIDOR LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
228 CORR. LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
229 JANITOR CLOSET SC --- RB-1 PT 1 PT 1 PT 1 PT 1 PT-10 5
230 STORAGE SC --- RB-1 PT 1 PT 1 PT 1 PT 1 PT-10
236 PARTY ROOM LVT / PFT 2 / 2 RB-1 PT 1 PWT 1 PT 1 PT 1 PT-10 3
255 CORRIDOR LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
256 LOUNGE LVT 1 RB-1 PT 2 PT 2 PT 2 PT 3 ACT-2
275 CORRIDOR LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
318 CORRIDOR LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
328 CORR. LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
329 JANITOR CLOSET SC --- RB-1 PT 1 PT 1 PT 1 PT 1 PT-10 5
330 GAME ROOM LVT 1 RB-1 PT 1 PT 1 PT 1 PT 1 PT-10
334 LOUNGE LVT 1 RB-1 PT 1 PT 1 PT 1 PT 1 PT-10
355 CORR. LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
356 LOUNGE LVT 1 RB-1 PT 2 PT 2 PT 2 PT 3 ACT-2
375 CORRIDOR LVT 1 RB-1 PT 2 PT 2 PT 2 PT 2 ACT-2
A-1 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
A-2 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
A-3 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
B-1 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
B-2 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
B-3 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
C-1 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
C-2 STAIR 2 --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
C-3 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
D-1 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
D-2 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
D-3 STAIR --- 1 / --- RB-1 PT 2 PT 2 PT 2 PT 2 PT-10 4
A. PRODUCTS LISTED BY MANUFACTURER ARE FOR
IDENTIFICATION AND AESTHETIC PURPOSES ONLY. THEY
ARE NOT INTENDED TO LIMIT THE SELECTION FROM
OTHER MANFACTURERS. HOWEVER COLORS, PATTERNS,
TEXTURES AND PROFLES MUST MATCH THOSE LISTED ON
THIS LEGEND IN ORDER TO MAINTAIN COLOR
COORDINATION AND VISUAL DESIGN INTEGRITY.
GENERAL SHEET NOTES
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\g5eddjm6\Documents\491289_DiscoveryReno_RVT18_AI_g5eddjm6.rvt
11/23/2021 1:28:20 PM
IN601
DIS
IN
T
E R
IO
R
F
IN
IS
H
M A
T E
R
IA
L S
L E
G E
N D
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T C
G
A T
E W
O O
D
C G
A T
E W
O O
D
C B
R O
W N
C F
O R
D
O C
T O
B E
R
S E
E C
O V
E R
P A
G E
S E
E C
O V
E R
P A
G E
F
IL
E N
A M
E
RTA
R E
P A
IR
D
IS
C
O V
E R
Y H
A L L
B U
IL
D
IN
G
D is c R e n o R
V T
A
I.
rv t
PRODUCTION DATA 4PRODUCTION DATA 3
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
A m e n d m e n t
/2
/2
INTERIOR FINISH MATERIALS LEGEND
Category
SPEC
SECTION ITEM DESCRIPTION MANUFACTURER NAME / COLOR NUMBER REMARKS
CASEWORK
CASEWORK 06 41 16.00 10 HPL-1 HIGH PRESSURE LAMINATE WILSONART UPTOWN WALNUT 7971K-12 SOFTGRAIN FINISH
CASEWORK 06 61 16 QTZ-1 QUARTZ CAMBRIA BIG SUR MIST MATTE --- KITCHEN / PARTY ROOM COUNTERS
CASEWORK 06 61 16 SSM-1 SOLID SURFACE MATERIAL WILSONART KIMBERLITE 9215CE VANITY COUNTERTOP
CASEWORK 06 61 16 SSM-3 SOLID SURFACE MATERIAL WILSONART YUKON RIVERSTONE 9196RS WINDOW SILLS
CEILING
CEILING 09 51 00 ACT-1 ACOUSTIC CEILING TILE ARMSTRONG OPTIMA HEALTHZONE / WHITE --- 24 X 24 SQUARE TILE (MOISTURE RESISTANT)
CEILING 09 51 00 ACT-2 ACOUSTIC CEILING TILE ARMSTRONG OPTIMA PB / WHITE --- 24 X 24 SQUARE TILE
CEILING 09 90 00 PT-10 PAINT SHERWIN WILLIAMS CEILING BRIGHT WHITE SW7007
DOORS AND DOOR FRAMES
DOORS AND
DOOR
FRAMES
09 90 00 PT-20 PAINT SHERWIN WILLIAMS ANONYMOUS SW7046 METAL DOOR AND FRAME COLOR
DOORS AND
DOOR
FRAMES
09 90 00 STN STAIN SHERWIN WILLIAMS --- --- TO MATCH WILSONART LAMINATE UPTOWN WALNUT
FLOORING
FLOORING 09 30 10 GRT-1 GROUT MAPEI COBBLESTONE 103 FOR PFT-1 & 2
FLOORING 09 30 10 PFT-1 PORCELAIN FLOOR TILE MARRAZZI MODERN FORMATION / SMOKY RIDGE MF05 KITCHEN / 12 x 24
FLOORING 09 30 10 PFT-2 PORCELAIN FLOOR TILE CROSSVILLE RETROACTIVE / SEAL TAUPE 3X12 UNPOLISHED
FLOORING 09 65 00 LVT-1 LUXURY VINYL TILE MOHAWK HOT AND HEAVY / SECOYA - ATWELL MILL 9" X 59"
FLOORING 09 65 00 LVT-2 LUXURY VINYL TILE MOHAWK HOT AND HEAVY / BOLDER - PEBBLE PARTY ROOM FLOORING / 9" X 59"
FLOORING 09 68 00 CPT-1 CARPET TILE J & J FLOORING CRAFTWORK / POTTER 2200 MONOLITHIC INSTALLATION
FLOORING 09 90 00 SC SEALED CONCRETE H&C HIGH PERFORMANCE INDUSTRIAL CLEAR CLEAR
FLOORING 12 48 13 EM ENTRANCE MAT CONSTRUCTION SPECIALTIES PEDIMAT M1 / WROUGHT IRON 7325 MONOLITHIC INSTALLATION
FLOORING 12 48 13 EMT ENTRANCE MAT WALKOFF TILE CONSTRUCTION SPECIALTIES DESIGNSTEP POWERPOINT / WROUGHT IRON 905 CARPET TILE
TRANSITIONS
TRANSITIONS 09 30 10 TR-1 TRANSITIONS SCHLUTER JOLLY / ALUMINUM
TRANSITIONS 09 30 10 TR-2 TRANSITIONS SCHLUTER RONDEC / ALUMINUM
TRANSITIONS 09 65 00 TR-3 TRANSITIONS SCHLUTER SCHIENE / BRUSHED STAINLESS STEEL CARPET TO TILE OR LVT TO TILE
TRANSITIONS 09 65 00 TR-4 TRANSITIONS JOHNSONITE SLIM LINE TRANSITIONS / SLT-XX-A / SHADED 197 LVT TO RUBBER
TRANSITIONS 09 65 00 TR-5 TRANSITIONS JOHNSONITE METALEDGE / STEEL 179 LVT TO CARPET
TRANSITIONS 09 65 00 TR-6 TRANSITIONS JOHNSONITE SLIM LINE TRANSITIONS / SLT-XX-L / SHADED 197 LVT TO CONCRETE
WALL BASE
WALL BASE 09 30 10 PFTB-1 PORCELAIN FLOOR TILE BASE MARAZZI MODERN FORMATION / SMOKY RIDGE MF05 WALL BASE
WALL BASE 09 30 10 PFTB-2 PORCELAIN FLOOR TILE BASE CROSSVILLE RETROACTIVE / SEAL TAUPE 4 X 12 BULLNOSE
WALL BASE 09 65 00 RB-1 RUBBER BASE JOHNSONITE BASEWORKS / SHADED 197
WALL PROTECTION
WALL
PROTECTION
10 26 00 CG CORNER GUARD CONSTRUCTION SPECIALTIES ACROVYN / PEARL 934 PEBBLE TEXTURE
WALLS
WALLS 06 61 16 SSM-2 SOLID SURFACE MATERIAL WILSONART DESIGNER WHITE D354SL SHOWER WALL PANEL
WALLS 09 30 10 GRT-2 GROUT MAPEI ALABASTER 01 FOR PWT-1, 2, & 3
WALLS 09 30 10 PWT-1 CERAMIC WALL TILE MARAZZI ZELLIGE / GESSO ZL11 4 X 4
WALLS 09 30 10 PWT-2 PORCELAIN WALL TILE CROSSVILLE RETRO ACTIVE 2.0 / EMPRESS WHITE 3 X 12
WALLS 09 30 10 PWT-4 PORCELAIN WALL TILE MARAZZI MODERN FORMATION / SMOKY RIDGE MF05 12 X 24
WALLS 09 90 00 PT-1 PAINT SHERWIN WILLIAMS PROMAR 200 HP ZERO VOC / HERON PLUME SW6070
WALLS 09 90 00 PT-2 PAINT SHERWIN WILLIAMS PROMAR 200 HP ZERO VOC / WORLDLY GRAY SW7043
WALLS 09 90 00 PT-3 PAINT SHERWIN WILLIAMS PROMAR 200 HP ZERO VOC / ROSEMARY SW6187
WALLS 09 90 00 PT-4 PAINT - MOLD & MILDEW PROOF - WATER PROOFING PAINT - USED ON BUBBLING WALLS AS INDICATED ON SHEETS
IN110-IN130
WINDOW COVERING
WINDOW
COVERING
12 21 00 WB WINDOW BLINDS HUNTER DOUGLAS ARCHITECTURAL CL BLIND / DOVE GRAY 180
WINDOW
COVERING
12 22 00 DR DRAPERIES CARNEGIE TUNE / 3 4594 WINDOWSILL LENGTH RIPPLEFOLD
| AD110 FIRST FLOOR DEMO PLAN |
| Sheets |
| AD110 - FIRST FLOOR DEMOLITION PLAN |
| AD120 SECOND FLOOR DEMO PLAN |
| Sheets |
| AD120 - SECOND FLOOR DEMOLITION PLAN |
| AD130 THIRD FLOOR DEMO PLAN |
| Sheets |
| AD130 - THIRD FLOOR DEMOLITION PLAN |
| AE200 EXTERIOR ELEVATION |
| Sheets |
| AE200 - EXTERIOR ELEVATIONS |
| AE410 ENLARGED PLANS |
| Sheets |
| AE410 - ENLARGED PLANS |
| AE510 |
| Sheets |
| AE510 - INTERIOR DETAILS |
| AE600 |
| Sheets |
| AE600 - DOOR SCHEDULE |
| AE620 |
| Sheets |
| AE620 - EXTERIOR DOOR DETAILS & ELEVATIONS |
| E-701 - LIGHT FIXTURE SCHEDULE |
| Sheets |
| E-701 - LIGHT FIXTURE SCHEDULE |
| IN512 - CASEWORK DETAILS |
| Sheets |
| IN512 - CASEWORK DETAILS |
| IN600 - INTERIOR FINISH SCHEDULE |
| IN601 - INTERIOR FINISH MATERIALS LEGEND |
| IN600 - INTERIOR FINISH SCHEDULE |
| Sheets |
| IN600 - INTERIOR FINISH SCHEDULE |
| IN601 - INTERIOR FINISH MATERIALS LEGEND |
| IN601 - INTERIOR FINISH MATERIALS LEGEND |
| Sheets |
| IN600 - INTERIOR FINISH SCHEDULE |
| IN601 - INTERIOR FINISH MATERIALS LEGEND |
File details come from the government source that posted it. Updated .