B.08.03 - Solicitation Amendment 1.pdf
PDF 378 KB Posted
- Attached to
- Harlan County Lake Rip Rap
- Solicitation number
- W912DQ22B1012
About this file
This document is an amendment to a solicitation for the Harlan County Lake Rip Rap project. The project will consist of overlaying portions of the upstream face of the dam with bedding and riprap, construction of an access road, debris removal, and any other incidental work. The solicitation is being amended to update the field office overhead information and correct the table of maps and drawings. Offerors must acknowledge receipt of the amendment by the specified date and time or their offer may be rejected. The contracting agency is the U.S. Army Corps of Engineers Engineering District Kansas City.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment w ill update the Field Office Overhead (FOOH) information w ithin the solicitation and correct the table of maps and draw ings in clause 252.236-7001.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ22B1012
X 9B. DATED (SEE ITEM 11)
20-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2022
CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C +
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ22B1012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
A00001 The SOLICITATION is amended as follows:
NOTE: Deleted text is shown in RED with strikethrough. Added text is shown in GREEN with underline.
1. SPECIFICATIONS
Section 01 30 00, Paragraph 1.17
Delete first paragraph and Add the following paragraph in its place:
NOTICE TO OFFERORS: Declare below the single accounting practice that you will apply to this contract to calculate field office overhead for all change orders, modifications and requests for equitable adjustment.
Pursuant to Federal Acquisition Regulations (FAR) Parts 31.105(d)(3) and 31.203(c), an accounting practice that varies from modification to modification is not allowed. Select one of the following:
Section 01 30 00, Paragraph 1.29
Delete the following Subparts:
1.29.2 1.29.3 1.29.4
2. DRAWINGS:
N/A
3. CONTRACTING
Updated clause 252.236-7001 language:
Title File Drawing Cover Sheet General G-001 Index and Location Map General G-002 General Notes and Legend General G-003 Overall Site Plan General G-004 Staging/Stockpile & Disposal Area Plan ?? General GC101 Survey Control ?? Survey V-101 Survey Control ?? Survey V-102 Riprap Overlay Plan Option 1 ?? Civil CS101 Riprap Overlay Plan Cross Sections ?? Civil CS102 Cross Sections Civil CS301 Site Details ?? Civil CS501 CS302
Setion 00 72 00, Additional Information Subsection
FIELD OFFICE OVERHEAD PERCENTAGE MARKUP
If any change to the contract issued pursuant to the changes Clause, or otherwise, for which the Government is responsible, causes an increase or decrease in the Contractor’s cost, or in the time required for performance under the contract, the Contracting Officer shall make an equitable adjustment and modify the contract in writing.
Under such equitable adjustment, no per diem rate for field office overhead shall be allowed if the Contractor has elected a percentage markup in keeping with its standard accounting practices. In such a case, payment of field office overhead shall be allowed for any change on a percentage markup basis regardless of whether the completion of the contract is or is not extended by reason of the change, except for modifications issued pursuant to the Default Clause. The Contractor shall provide a detailed breakdown of its proposed increase or decrease of costs as required by Contract Clause DFARS 252.236-7000 MODIFICATION OF PROPOSALS –
PRICE BREAKDOWN.
FIELD OFFICE OVERHEAD PER DIEM RATE
If any change to the contract, issued pursuant to the Changes Clause or otherwise, for which the Government is responsible, causes an increase or decrease in the Contractor’s cost of, or the time required for, performance under the contract, the Contracting Officer shall make an equitable adjustment and modify the contract in writing.
Under such equitable adjustment, no payment of field office overhead shall be allowed for any changes when the completion of the contract is not extended by reason of the change, except the Contractor may be reimbursed any variable expense it incurs due to the change, provided it can substantiate the variables. The Contractor shall be reimbursed for field office overhead on a per diem basis when the completion of the contract is extended by reason of the change issued under any clause except the Default clause. Equitable adjustment shall be made for the costs that are incurred or are to be incurred due to the change. The Contractor shall provide a detailed breakdown of its proposed increase or decrease of costs as required by Contract Clause DFARS 252.236-7000 MODIFICATION OF
PROPOSALS – PRICE BREAKDOWN.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing Cover Sheet General G-001 Index and Location Map General G-002
General Notes and Legend General G-003 Overall Site Plan General G-004 Staging/Stockpile & Disposal Area Plan General GC101 Survey Control Survey V-101 Survey Control Survey V-102 Riprap Overlay Plan Civil CS101 Cross Sections Civil CS102 Cross Sections Civil CS301 Site Details Civil CS302
(End of clause)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .