Special Notice List of Selected Contractors 2021 07 16.docx

DOCX document 14 KB Posted

Attached to
2-Phase Design-Build Construction Contract for Electrical Substations located at Arnold, Missouri - Phase 1
Solicitation number
W912DQ21R7003
Issued by

About this file

This document provides details on a two-phase design-build construction contract solicitation for electrical substations located at Arnold, Missouri. The U.S. Army Corps of Engineers Kansas City District is seeking to repair and replace critical electrical power to the National Geospatial-Intelligence Agency facility through the construction of underground duct banks, a replacement substation, transformers, switchgear, and connections. The project value is estimated between $5 million to $10 million. Phase one will evaluate up to five offerors based on performance capability, advancing three to five contractors to phase two. Phase two contractors will provide technical solutions and pricing, with award based on best value. The North American Industry Classification System code is 236220 for commercial and institutional building construction. The performance period for construction completion is 540 calendar days from notice to proceed.

View the file

Other files

File Type Posted
W912DQ21R7003 Award Notice.pdf PDF
B.08.02 Phase 1 Solicitation 2021 05 12.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DQ21R7003-SN-01 Special Notice – List of Firms that Submitted Acceptable Proposals in Phase One

National Geospatial Agency (NGA) Arnold Substation Replacement located in Arnold, Missouri. The purpose of the requirement will be to repair by replacement critical electrical power to the site by providing duct banks and replacement substation for the primary distribution feeds to and on the site, including transformers and associated switchgear and connections for the National Geospatial-Intelligence Agency's Arnold Facility. Project phasing will be carefully designed and implemented to allow the NGA Arnold Facility to continue normal daily operations during the duration of construction.

The North American Industry Classification System (NAICS) Code is 236220, (Commercial and Institutional Building Construction).

Estimated Magnitude of Construction: Between $5,000,000.00 and $10,000,000.00

This solicitation and resulting contract is using a Two Phase Design-Build procurement method as described in FAR Part 36 and Part 15.

The following 4 firms in alphabetic order were selected as the most highly qualified Phase One firms and have advanced to Phase 2:

BRK Electrical Contractors, LLC 2232 Welsch Industrial Ct.

St. Louis, MO 63146

Kozeny-Wagner, Inc.

951 West Outer Road Arnold, MO 63010

Mantle-Plotcher JV, LLC 8117 Brickyard Hill Rd.

Worden, IL 62097

Southwind Construction Services, LLC 1701 S. State Street Edmond, OK 73013

File details come from the government source that posted it. Updated .