HC CMP Amendment 0001 Plans.pdf
PDF 3 MB Posted
- Attached to
- Harlan County Lake Culvert and CMP Repair
- Solicitation number
- W912DQ21B1020
About this file
This document contains plans and general notes for a federal construction contract to repair culverts and a corrugated metal pipe at Harlan County Lake in Nebraska. The solicitation was issued by the U.S. Army Corps of Engineers Engineering District Kansas City under number W912DQ21B1020. The work includes replacing a Gremlin Creek crossing and making repairs to drainage utilities, pavement, sidewalks and other site features. The contractor will be responsible for erosion control, dust control, disposal of debris, protecting existing conditions and survey monuments, securing temporary access as needed, and coordinating with utilities. Standard drawings and specifications take precedence over any conflicts. All work must be performed in accordance with permit requirements and applicable regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08.03 Amendment 0001 to Harlan County Culvert.pdf | ||
| B.08.02 HC GREMLIN CREEK RTA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:59:52 PM 8/25/2021
...\Projects\AEC_WS-001_ProjectTemplate\AEC_WS-001_ProjectTemplate\CAD_BIM\_Sheets\GENERAL NOTES & INDEX
F
IL
E N
A M
E
A N
S I
D
G-002
F P
R
IT
T
F P
R
IT
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
H
M
IL
D E
N B
E R
G E
R
S E
E C
O V
E R S
H E
E T
S E
E C
O V
E R S
H E
E T
H C
F Y
C M
P
G -0
.d g n
GENERAL
EROSION CONTROL
UTILITIES
SITE ACCESS
DAM STATIONING
SURVEY CONTROL
TEMPORARY ACCESS ROAD
KNOWN POINTS IN THE FIELD AND STATION EQUATIONS.
DAM STATIONING CAN BE FIELD IDENTIFIED AT EXISTING FEATURES (DRAINAGE STRUCTURES, RAMPS, ETC.) AS SHOWN FROM 1.
HAUL ROADS SHOULD BE LEFT IN A CONDITION EQUAL TO OR BETTER THAN THE PRE-EXISTING CONDITION.
ALL ACCESS AND HAUL ROADS SHALL BE MAINTAINED THROUGHOUT USE. UPON CONSTRUCTION COMPLETION, ACCESS AND 3.
CONDITION.
ALL ACCESS AND HAUL ROADS SHALL BE VIDEO SURVEYED BY CONTRACTOR BEFORE START OF CONSTRUCTION TO DOCUMENT 2.
GOVERNMENT.
PROTECT THE FEATURES FROM DAMAGE. DAMAGES SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE
AT NO ADDITIONAL COST TO THE GOVERNMENT. THE CONTRACTOR SHALL IDENTIFY THE FLOOD CONTROL FEATURES AND
LIMITS, AND PROVIDING THE NECESSARY ADJUSTMENT IN EQUIPMENT OR TEMPORARY MODIFICATIONS TO PREVENT DAMAGES
DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ALL JURISDICTIONAL LIMITATIONS, SUCH AS LOAD
CONTRACTOR ACCESS SHALL BE LIMITED TO PUBLIC ROADS AND WITHIN THE LIMITS SHOWN WITHIN THE CONTRACT 1.
AT NO COST TO THE GOVERNMENT.
OR STRUCTURE. WHERE TEMPORARY SUPPORT OR AN ALTERATION IS NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE
SHALL NOTIFY THE GOVERNMENT IF A PROJECT FEATURE OR ACCESS IS IN CONFLICT WITH A UTILITY, UNDERGROUND FACILITY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF DAMAGES AT NO COST TO THE GOVERNMENT. THE CONTRACTOR 2.
SHALL COORDINATE WITH UTILITY COMPANIES, OWNERS IN GENERAL, LOCATOR SERVICES, AND JURISDICTIONAL AGENCIES.
FACILITIES, AND STRUCTURES) AND PROVIDE ALL MEANS NECESSARY TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR
WITHIN THE PROJECT LIMITS, THE CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES (INCLUDING ABOVE GRADE, UNDERGROUND 1.
DOCUMENTATION TO FULFILL THE REQUIREMENTS OF THE NECESSARY PERMITS.
SPECIFICATIONS. ALSO, THE CONTRACTOR IS REQUIRED TO PREPARE ALL EROSION CONTROL CONSTRUCTION DRAWINGS AND
THE CONTRACTOR IS RESPONSIBLE TO OBTAIN ANY AND ALL EROSION CONTROL PERMITS, AS DESCRIBED WITHIN THE PROJECT 1.
G E
N E
R A
L N
O T
E S I
N D
E X
H A
R L
A N C
O U
N T
Y D
A M
R E
P U
B L
IC
A N C
IT
Y
N E
B R
A S
K A
A L
O E
W E
N
A U
G U
S T
G R
E M
L
IN
C
R E
E K C
R O
S S
IN
G R
E P
L A
C E
M E
N T
CONDITIONS ARE EXPECTED TO BE SIMILAR BUT MAY VARY. CONFIRM ANY DIFFERENCES WITH CONTRACTING OFFICER.
IMAGERY DATA SOURCED FROM DIGITAL GLOBE. THE IMAGES WERE SOURCED FROM NOVEMBER 2020 IMAGERY. GROUND 8.
ACTIVITIES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST AND EROSION CONTROL DURING ALL DEMOLITION AND CONSTRUCTION 7.
PUBLIC STREETS SHALL BE KEPT CLEAN AND CLEAR THROUGHOUT DEMOLITION AND CONSTRUCTION ACTIVITIES.6.
REGULATIONS GOVERNING SUCH OPERATIONS AND THE PROJECT SPECIFICATIONS.
CONSTRUCTION OPERATIONS. DISPOSAL OF ALL RUBBISH SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND/OR FEDERAL
CONTRACTOR IS TO REMOVE AND DISPOSE OF ALL DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION OR 5.
SURVEYOR IF DISTURBED BY CONSTRUCTION ACTIVITIES.
FOR RE-ESTABLISHMENT OF ANY PROPERTY CORNERS OR SURVEY MONUMENTS BY A PROFESSIONALLY REGISTERED LAND
CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PROPERTY CORNERS AND SURVEY MONUMENTS AND IS RESPONSIBLE 4.
EXISTING CONDITIONS.
TO: DRAINAGE UTILITIES, PAVEMENT, SIDEWALKS, STRIPING, CURB, ETC. REPAIRS SHALL BE EQUAL TO OR BETTER THAN
RESPONSIBLE FOR REPAIRS OR DAMAGE TO ANY EXISTING IMPROVEMENTS DURING CONSTRUCTION SUCH AS BUT NOT LIMITED
PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION OF THIS PROJECT. CONTRACTOR IS
THE CONTRACTOR SHALL BE HELD SOLELY RESPONSIBLE FOR AND SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID 3.
LAND USE AGREEMENTS.
SECURED BY THE CONTRACTOR BY PRIVATE AGREEMENT. THE CONTRACTING OFFICER SHALL BE INFORMED OF ANY PRIVATE
EMPLOYEE PARKING) SHALL BE RESTRICTED TO THE PROJECT LIMITS AS INDICATED ON THE DRAWINGS AND/OR OTHER AREAS
CONSTRUCTION ACTIVITY (INCLUDING DEMOLITION, CLEARING, STORAGE OF EQUIPMENT AND MATERIALS, INSTALLATION, AND 2.
PRECEDENCE.
CONFLICT BETWEEN STANDARD DRAWINGS AND COE SPECIFICATIONS, THE SPECIFICATION PROVISION(S) SHALL HAVE
ALL WORK ON THIS PLAN SHALL BE DONE IN STRICT ACCORDANCE WITH THE PROJECT SPECIFICATIONS. IN THE CASE OF A 1.
ROADS SHALL NOT BE CONSTRUCTED ON DAM EMBANKMENT.
TEMPORARY ACCESS ROADS MAY BE CONSTRUCTED WITHIN CONSTRUCTION LIMITS TO ACCESS REPAIRS. TEMPORARY ACCESS 1.
THE VERTICAL SHIFT FROM NGVD 29 TO NAVD 88 IS +0.57 FEET.3.
DATUM (NAD) 27. COORDINATES REFERENCE NEBRASKA STATE PLANE.
PLAN SHEETS SERIES RC1XX REFERENCES THE NATIONAL GEODETIC VERTICAL DATUM (NGVD) 29 AND THE NORTH AMERICAN 2.
DATUM (NAD) 83. COORDINATES REFERENCE NEBRASKA STATE PLANE.
PLAN SHEETS SERIES CS1XX REFERENCES THE NORTH AMERICAN VERTICAL DATUM (NAVD) 88 AND THE NORTH AMERICAN 1.
/2
/2
R E
M O
V E
D R
E F
E R
E N
C E T
O O
P T
IO
N C
L
IN
S
AMENDMENTS
| GENERAL NOTES & INDEX |
| OVERVIEW MAP |
File details come from the government source that posted it. Updated .