B.08.03 Amendment 0002.pdf
PDF 402 KB Posted
- Attached to
- Miscellaneous Renovation Work at the Military Corrections Complex at Fort Leavenworth, Kansas
- Solicitation number
- W912DQ20R4024
About this file
This amendment modifies a solicitation for miscellaneous renovation work at the Military Corrections Complex at Fort Leavenworth, Kansas. The U.S. Army Corps of Engineers, Kansas City District will use a two-phase design-build acquisition process to award a firm fixed-price contract for repairs to showers, HVAC and controls, fire alarms, dining facility floors, and roof replacements. Phase 1 proposals are due July 24, 2020 and will be evaluated based on offerors' capabilities. The three highest rated firms will be invited to submit Phase 2 proposals including technical approaches, key personnel, pricing, and small business participation plans for final evaluation and award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08.03 Amendment 0001.pdf | ||
| B.08.02 Solicitation MCC_Miscellaneous Repairs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Military Correction Complex at Ft. Leavenw orth, Kansas
Proposal due date remains the same July 24, 2020 @ 11:00 am local time.
See continuation paage.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20R4024
X 9B. DATED (SEE ITEM 11)
24-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jul-2020
CODE
USACE, KANSAS CITY +
FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ20R4024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
The Solicitation is amended as follows:
NOTE: Added text is shown with underline. Deleted text is shown with strikethrough.
1. To correct the numbering in APPENDIX C RFP SECTION 00 22 16: PHASE SELECTION
PROCEDURES.
2. Proposal due date for Phase 1 is unchanged July 24, 2020 at 11:00 am local time.
3. Failure to acknowledge this amendment may cause rejections of the proposal. Offeror is required to acknowledge receipt of this amendment.
4. All other terms and conditions remain unchanged and in full force.
APPENDIX C
RFP SECTION 00 22 16: PHASE 1 OF 2 PHASE SELECTION PROCEDURES
1. OVERVIEW
a. This Request for Proposal (RFP) is for the Renovation of 474180 Military
Corrections Complex (MCC) at Fort Leavenworth, Kansas.
b. The construction contract for the MCC will utilize a DFARS 236.272 Design-Build prequalification two phase acquisition strategy and delivery method. The selected construction contractor must have the demonstrated capability to manage a complex construction effort;
plan and execute a secure work site. The general scope of the requirements will be furnishing all labor, equipment, materials, and transportation and performing all required work in accordance with the plans and specifications. The scope of the Design and Construction project includes the following:
Repair of USDB showers (buildings 1140, 1141, 1142) Repair JRCF housing HVAC and DDC controls (building 1147) Replace USDB fire alarms (buildings 1140, 1141, 1142, 1144) Repair JRCF showers (building 1147) Repair JRCF DFAC floor Repair USDB DFAC floor, including dining area Replace roofs (buildings 1140, 1141, 1142, 1144, and 1147).
Replace USDB underground hot and chilled water piping (buildings 1140, 1141, 1142, and
1144).
Repair USDB parking lot (OPTION) Replace DDC system, MCC battalion headquarters and company operations facilities
(buildings 322, 324,1148, 1151, 1155, 1149, 1150) (OPTIONS) Replace Trustee unit plumbing (buildings 1007, 1008) (OPTION) Replace USDB carpet/flooring in 1140; include JRCF flooring replacement as needed
(OPTION)
b. c. Firms formally organized as construction contractors that have associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. A construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized offeror may submit a proposal.
c. d. Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement.
d. e. Any Offeror submitting an offer in the name of a joint venture, shall include a fully executed copy of the joint venture agreement with the offer. Joint venture agreements which require SBA approval may be submitted absent the requisite SBA Servicing Agency approving authorities’ signature; however, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.
e f. In Phase 1 of the 2 Phase selection procedure, Offerors will submit certain specified performance capability proposals, demonstrating their capability to successfully execute the construction work under the contract resulting from this solicitation. The Government will evaluate the proposals and intends to invite a target of three most highly rated Phase 1 offerors to compete for the design-build renovations of the Military Corrections Complex.
f. g. Offerors must submit a complete Phase 1 proposal to be considered for Phase 2.
PHASE 1 DOES NOT REQUEST OR REQUIRE A PRICING SUBMISSION.
g. h. At the beginning of Phase 2, an amendment will be issued to only the selected offerors from Phase 1 inviting them to submit a technical approach, key personnel, small business participation plan, subcontracting plan (if applicable) and price proposals for consideration. In addition, Corporate Experience and Past Performance from Phase 1 will be brought forward to Phase 2.
The amendment will request additional information needed to complete the submission of Phase 2 proposals. In Phase 2, the Contracting Officer will award a single firm fixed price contract for the MCC renovations to the offeror whose proposal offers the Best Value- Trade-Off proposal to the Government, considering the price and non-price factors described in Phase 2. The Government intends to announce the names of Offerors selected for Phase 2 on the beta.SAM.gov website.
h. i. Offerors must submit a complete Phase 2 proposal to be considered for award. Failure to submit a complete proposal may result in the entire proposal being rejected.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .