This document provides details on a federal contract opportunity for the Kansas City Levees, Argentine, Armourdale, and Central Industrial District Levee and Floodwall Raises project. The U.S. Army Corps of Engineers Kansas City District intends to issue a two-step sealed bid solicitation for a firm fixed-price construction contract estimated between $250-500 million. The scope of work involves raising approximately 90,000 feet of levee and floodwall along three levee units with a four to five foot raise using levee raises, floodwall replacements and modifications, gatewell modifications, utility relocations, and railroad closure structures. Additional features include underseepage improvements using berms and relief wells. The two-step solicitation process will include a step one request for technical proposals by October 2020 and step two sealed bids after discussions. Interested contractors must register in SAM and be able to bond a $300 million project. A site visit is scheduled for October 2020. Jay Denker of the U.S. Army Corps of Engineers is the point of contact.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS-CONSTRUCTION Page 1 of 1
Optional Form 1419 Abstract of Offers-Construction (automated equivalent) Solicitation Number: W912DQ20B7001 Date Issued (Step 2): 9-Feb-2021 Date Opened: April 20, 2021 at 2:00 P.M. CST
Issusing Office: Kansas City District Name, Date, and Title of Certifying Official:
David J. Walsh, Contracting Officer
Number of Amendments Issued: 7
BARNARD
CONSTRUCTION
COMPANY,
INCORPORATED
MICHELS
CORPORATION
AMES
CONSTRUCTION,
INC.
VAZQUEZ FORGEN
JV LLC
LANE
CONSTRUCTION
CORPORATION
Bid Guarantee: $3M Bond $3M Bond $3M Bond $3M Bond $3M Bond Amendments Acknowledged: Yes Yes Yes Yes Yes
CONTRACTOR TOTAL (BASE + OPTIONS): $478,853,000.00 $319,394,951.60 $314,816,000.00 $381,698,350.00 $257,651,650.00
CLIN CLIN DESCRIPTION CLIN TYPE PRICING DATA
1 ARG – Site Preparation, Demolition, and Restoration $13,500,000.00 13,409,559.34$ $5,000,000.00 $10,508,000.00 $10,500,000.00 2 ARG – Levee Improvements $46,300,000.00 15,233,615.77$ $31,000,000.00 $16,296,000.00 $18,500,000.00 3 ARG – Floodwall Improvements $26,400,000.00 12,088,393.56$ $21,000,000.00 $17,788,000.00 $19,680,000.00 4 ARG – Relief Well Improvements $10,150,000.00 8,347,481.76$ $5,200,000.00 $8,269,000.00 $7,200,000.00 5 ARG – Gatewell and Pump Station Improvements $2,550,000.00 1,096,687.78$ $1,500,000.00 $1,520,000.00 $1,100,000.00 6 ARG – Santa Fe Foothill Ditch Drainage Structure $6,300,000.00 3,096,313.72$ $6,475,000.00 $3,612,000.00 $3,500,000.00 7 ARG – Riprap and Bedding $7,900,000.00 4,552,771.97$ $7,500,000.00 $6,561,000.00 $5,880,000.00 8 ARG – Utility Relocations $2,125,000.00 296,073.96$ $450,000.00 $2,089,000.00 $470,000.00 9 ARG – Removal and Disposal of Contaminated Materials $1,170,000.00 970,580.00$ $1,950,000.00 $1,196,000.00 $1,560,000.00
10 ARG – Removal of Existing Riprap $2,465,000.00 1,462,760.00$ $725,000.00 $609,000.00 $725,000.00
11 ARM – Site Preparation, Demolition, and Restoration $18,300,000.00 18,029,690.15$ $7,500,000.00 $14,428,000.00 $7,300,000.00
12 ARM – Levee Improvements $22,200,000.00 24,748,166.62$ $12,000,000.00 $6,649,000.00 $11,100,000.00
13 ARM – Floodwall Improvements $116,500,000.00 67,237,862.65$ $78,750,000.00 $107,123,000.00 $75,256,900.00 14 ARM – Relief Well Improvements $13,780,000.00 9,042,612.01$ $7,300,000.00 $7,685,000.00 $2,830,000.00
15 ARM – Relief Well Pilot Hole Drilling and Sampling $500,000.00 84,507.15$ $300,000.00 $93,300.00 $373,000.00
16 ARM – Relief Well Screen $429,000.00 984,958.00$ $520,000.00 $1,092,000.00 $637,000.00
17 ARM – Relief Well Blank Riser $1,496,000.00 904,094.00$ $1,700,000.00 $986,000.00 $578,000.00
18 ARM – Relief Well Filter Pack $96,000.00 289,462.40$ $96,000.00 $320,000.00 $249,600.00
19 ARM – Gatewell and Pump Station Improvements $5,690,000.00 3,772,617.04$ $4,000,000.00 $3,843,000.00 $1,720,000.00
20 ARM – Riprap and Bedding $12,000,000.00 8,159,159.00$ $24,000,000.00 $11,025,000.00 $8,610,000.00
21 ARM – Utility Relocations $3,250,000.00 754,004.25$ $3,000,000.00 $2,537,000.00 $745,000.00
22 ARM – Removal and Disposal of Contaminated Materials $1,296,000.00 1,005,480.00$ $2,160,000.00 $2,096,550.00 $1,620,000.00
23 ARM – Removal of Existing Riprap $2,166,000.00 2,322,560.00$ $950,000.00 $798,000.00 $950,000.00
24 CID – Site Preparation, Demolition, and Restoration $12,700,000.00 5,878,670.88$ $5,000,000.00 $10,703,000.00 $3,270,000.00
25 CID – Levee Improvements $11,800,000.00 5,584,107.62$ $7,500,000.00 $3,706,000.00 $5,255,000.00
26 CID – Floodwall Improvements $15,900,000.00 6,760,097.56$ $7,500,000.00 $12,811,000.00 $7,520,000.00
27 CID – Relief Well Improvements $1,400,000.00 2,840,833.94$ $1,600,000.00 $1,254,000.00 $572,000.00
28 Not Used – Removed in Amendment 0006CID NOT USED NOT USED NOT USED NOT USED NOT USED 29 Not Used – Removed in Amendment 0006 NOT USED NOT USED NOT USED NOT USED NOT USED 30 Not Used – Removed in Amendment 0006 NOT USED NOT USED NOT USED NOT USED NOT USED 31 CID – Gatewell and Pump Station Improvements $4,000,000.00 1,914,917.95$ $3,000,000.00 $1,785,000.00 $558,000.00
32 CID – Riprap and Bedding $1,900,000.00 3,017,203.99$ $5,000,000.00 $3,292,000.00 $3,345,000.00
33 CID – Utility Relocations $2,000,000.00 441,664.43$ $1,000,000.00 $1,712,000.00 $1,875,000.00
34 CID – Removal and Disposal of Contaminated Materials $1,500,000.00 1,114,200.00$ $2,400,000.00 $2,329,500.00 $1,650,000.00
35 CID – Removal of Existing Riprap $540,000.00 726,000.00$ $300,000.00 $240,000.00 $198,000.00
36 Borrow Site Preparation, Stockpiling, and Restoration $27,500,000.00 7,242,334.86$ $3,050,000.00 $9,655,000.00 $2,710,000.00
37 Replacement of Inland Drive $6,050,000.00 6,852,991.99$ $5,465,000.00 $5,617,000.00 $2,795,000.00
38 ARG – Stoplog Structure at Station 28+30 (BNSF) Option $4,800,000.00 5,385,962.67$ $2,800,000.00 $8,344,000.00 $2,392,000.00
39 ARG – Stoplog Structure and Floodwall at Station 283+00 (BNSF) Option $10,300,000.00 11,852,806.39$ $6,600,000.00 $14,496,000.00 $5,160,000.00
40 ARM – Stoplog Structure at Station 2+50 (UP) Option $9,800,000.00 6,905,866.79$ $4,700,000.00 $9,730,000.00 $3,790,000.00
41 ARM – Stoplog Structure at Station 233+00 (KCT) $7,300,000.00 6,109,350.00$ $5,000,000.00 $8,644,000.00 $5,092,000.00
42 ARM – Stoplog/Sandbag Structure at Station 282+00 (UP) Option $2,695,000.00 2,310,857.94$ $1,100,000.00 $4,262,000.00 $1,038,000.00
43 ARM – Sandbag Structure at Station 330+00 (UP) Option $220,000.00 120,739.83$ $100,000.00 $1,744,000.00 $21,650.00
44 CID – Stoplog Structures and Floodwalls at Station 143+00 (BNSF/KCT) Option $22,150,000.00 27,494,489.39$ $14,500,000.00 $25,276,000.00 $14,650,000.00
45 CID – Stoplog Structure at Station 134+00 (KCT) $3,575,000.00 3,726,140.96$ $3,500,000.00 $7,366,000.00 $2,920,000.00
46 CID – Floodwall Station 105+05 to Station 132+43 Option $10,350,000.00 9,380,577.73$ $7,100,000.00 $12,695,000.00 $7,250,000.00
47 CID – Stoplog/Sandbag Structure at Station 76+00 (UP) Option $2,025,000.00 2,277,935.48$ $1,300,000.00 $6,787,000.00 $1,090,000.00
48 Trail Upgrades Option $2,650,000.00 2,218,841.27$ $2,700,000.00 $1,527,000.00 $2,700,000.00
49 Sluice Gate Replacements Option $255,000.00 331,904.06$ $200,000.00 $82,000.00 $115,000.00 50 BPU Intake Tower Demolition Option $880,000.00 1,017,044.74$ $325,000.00 $517,000.00 $600,500.00
TOTAL BASE PLUS OPTIONAL CLINS: $478,853,000.00 $319,394,951.60 $314,816,000.00 $381,698,350.00 $257,651,650.00
I certify that I have opened, read, and recorded on the abstract all offers received in response to the solicitation.
Argentine, Armourdale, and Central Industrial District Levee Raises Kansas City, Kansas and Missouri
W912DQ20B7001
BID OPENING
Clins Vert
| 2021-04-23T10:41:00-0500 | |
| WALSH.DAVID.JOHN.1185827441 |