ATT B-1 Site Map Revision 5-29-20.pdf

PDF 1 MB Posted

Attached to
Levee Rehab-Miami, Missouri
Solicitation number
W912DQ20B1052
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Miami Levee District No. 1- Item No. 60A ATT: B-1 Site Map

RiverSide Slope Erosion Stations

8+00 to 85+75 & 117+50 to 121+00

0 0.15 0.30.075 Miles

GENERAL NOTES:

Contractor will access site via

County Road then along from West then travel along dirt road to the landside toe of levee embankment.

Contractor will leave entire site of construction in a manner that still has positive drainage

"No Ponding Areas"

REPAIR DESCRIPTIONS:

Staging Area Will Be Within The Limits of 200' Of The Construction Site

BORROW AREAS: Construction Site The Hatched area indicates borrow material located riverward of the levee.

Excavation will be done in a manner over the entire area maintaining positive drainage away from the newly constructed levee and leaving no ponding areas.

Approximately 5.0, 1.0 & 1.0 AC

File details come from the government source that posted it. Updated .