W912DQ20B1041 Solicitation Amendment(s) - 0004 20200609.pdf

PDF 750 KB Posted

Attached to
Federal Levee Rehab, MRLS 246-L Levee Unit
Solicitation number
W912DQ20B1041-0004
Issued by

About this file

This amendment to a federal solicitation makes revisions to specifications, wage rates, and instructions for proposal submission. Changes include adding geotechnical investigation requirements to Section 35 41 00, revising dewatering language in Section 35 41 00, updating riprap specifications in Sections 33 40 00 and 35 31 19, and modifying topsoil and clearing depths in Sections 35 41 00 and 32 92 19. Bid opening was extended to June 16, 2020, with proposals now to be emailed to the contracting officer due to COVID-19 precautions. The amendment uploads revised drawings and geotechnical investigation requirements. Wage rates for Chariton County, Missouri were also updated.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment makes the follow ing changes; the bid opening has been extended, specif ications revised in Section 01.00.00, the w age rates have been updated, and the POC for delivery of BIDs has been Changed to, Contracting Officer Mr David Best at David.M.Best@usace.army.mil .

1. CONTRACT ID CODE PAGE OF PAGES

J 1 37

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20B1041

X 9B. DATED (SEE ITEM 11)

11-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jun-2020

CODE

USACE, KANSAS CITY +

FEDERAL BLDG CT-H 601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

G5CTXCWA

Highlight

G5CTXCWA

Highlight

W912DQ20B1041

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 05 - CERTIFICATION PAGE

The following have been modified:

CAUTION PAGE:

CAUTION!

Notice: Several changes have been made as a result of the COVID-19 virus and its impacts on the normal course of business regarding the request for proposal (RFP) and the proposal submission process. Those changes are reflected with “red letter” font

BEFORE SIGNING AND MAILING EMAILING YOUR BID, please take note of the following, as failure to perform any one of these actions may cause your bid to be rejected.

1. AMENDMENTS: Have you acknowledged receipt of ALL Amendments? If in doubt as to number of amendments issued, please contact our office.

2. SEALED BIDS: Sealed envelopes containing bids shall be marked to show the bidder’s name and address, the solicitation number, title of project, amendments received, and the date and time bids are due.

3. AMENDED BID PAGES: If any of the Amendments furnished amended bid pages, the amended bid page(s) must be used in submitting your bid.

4. LATE BIDS: In order for a late mailed bid to be considered, generally it must have been sent by either registered or certified mail not later than 5 calendar days before the receipt of bids due date.

5. BID GUARANTEE: Sufficient bid guarantee in proper form must be furnished with your bid, if your bid exceeds $150,000.

6. MISTAKE IN BID: Have you reviewed your bid prices for possible errors in calculations or work left out?

7. FACSIMILE BIDS AND MODIFICATIONS: Will not be considered. Facsimile withdrawals will be considered.

8. HAND-DELIVERED BID: If bids are hand-delivered, you must be aware of enhanced security requirements in effect in the Federal Building and allow for extra time to clear security. You must have a valid picture ID in order to enter the building. No additional time will be allowed due to security requirements. Please ensure that the solicitation number and title of project appear or can be identified on the outside of bid package.

EMAILED BID: INCLUDE A PROPOSAL COVERSHEET. WITH THE EMAILED PROPOSAL. The Coversheet will show the Contractor’s name, phone number, address, email address, and cage code, the solicitation number (W912DQ20B1041), title of project, amendments received, and the date and time bid’s are due. Mail in bid’s will not be accepted.

9. BUY AMERICAN ACT: All bidders are cautioned that, prior Government conduct notwithstanding, the Contractor's selection of a domestic construction material which would require the subsequent selection of a foreign construction material for compatibility is not a justification for waiver of the Buy American Act.

It is the Contractor's responsibility to verify, prior to submitting the materials for approval that each system can be built to meet the contract specifications without the use of foreign construction materials.

10. BOLLING FEDERAL BUILDING ENHANCED SECURITY: Due to enhanced security in the

Bolling Federal Building the Bid Opening Room S101, will open 30 minutes prior to bid opening and will remain open until all bids are opened and read. If bids are hand-delivered, you must be aware of enhanced security requirements in effect in the Federal Building and allow for extra time to clear security. You must have a valid picture ID in order to enter the building. No additional time will be allowed due to security requirements. Security Personnel may require you to be escorted to room S101. S101 is located at the end of the hall between the elevators on the first floor. Person(s) attending the bid opening, will no longer be allowed to remain on Corps of Engineers floors (4, 5 & 6) other than in the Bid Opening Room. The Bid Opening Room is available to all persons delivering bids or attending the bid opening. Bidders may wait in the Federal Building cafeteria on the Ground level or outside the building. Under The Federal Acquisition Regulations bids cannot be accepted after the time set for bid opening. Therefore, to ensure your bid is not late, all bidders are encouraged to complete their bids prior to arrival at the Bid Opening Room.

SUBMISSION OF BID: Due to the COVID-19 Global Pandemic, the Government is taking precautions to ensure the safety and health of all Contractors and Government employees. Therefore, ‘in person’ proposal submissions will not be accepted.

ELECTRONIC BID ARE REQUIRED. MAILED AND HAND-DELIVERED BID ARE NOT

ALLOWED.

The Contractor is required to ensure that the proposal package is legible and complete. Bid bonds shall be copied and scanned so that all required raised seals are legible.

To submit your proposal by electronic mail (email) submit it to Contract Specialist, Mr. Chris Anderson christopher.w.anderson@usace.army.mil Contracting Officer Mr David Best at David.M.Best@usace.army.mil .

Keep in mind that due to email safeguards and the size of your proposal package, emails may not be received immediately by the Government. The USACE email system will not accept attachments larger than 50MB. BID shall be received by the date and time specified in the solicitation document.

It is recommended you contact the contract specialist by phone or email to confirm receipt of your proposal. Due to possible delays in networks and email it is highly recommended that BID are submitted as early as possible. Do not wait until the last minute or your proposal may be late.

If the emailed proposal is not received due to technical issues or network issues, Refer to FAR 52.215-1 for how late BID are handled. If you have not confirmed receipt of your proposal please note: Per this clause it is recommended that proposers ensure;” …it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposal;…”

If you have any questions, or cannot gain access to the conference line, contact Contract Specialist Officer at (816) 389-3850 (816) 389-3404

(END)

SYSTEM FOR AWARD MANAGMENT (SAM):

In accordance with FAR 52.204-7(b)(1): By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to submitting an offer, award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://sam.gov/portal/SAM/#1 . It is highly encouraged that all prospective Offeror’s start the SAM’s registration process as soon as possible.

There are no fees or charges required to complete your SAM.gov registration.

‘52.204-7(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.”

OFFEROR MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT PRIOR TO THE

BID OPENING. OR THE CONTRACT OFFICER MAY PROCEED WITH AWARD TO THE NEXT

SUCCESSFUL CONTRACTOR.

If you were not previously registered, please go to https://www.sam.gov. Instructions for new registration are also located at the following link https://www.sam.gov/sam/transcript/Quick_Guide_for_Contract_Registrations_v1.7.pdf to register.

If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org/sam-registration/ THIS A FREE SERVICE BY A NON PROFIT PAID FOR BY THE US GOVERNMENT

SUPPLEMENTAL BID SCHEDULE

The contractor shall complete the attached Supplemental Bid Schedule in addition to the Bid Schedule. This Supplemental Bid Schedule is not contractually binding. The Government will use this Supplemental Bid Schedule to assist in the evaluation of prices. The individual supplemental bid items should add up to the prices for the bid schedule. In the event that the CLIN subtotal in the supplemental bid schedule does not match the CLIN total in the bid schedule, the CLIN bid schedule shall control and will be the price evaluated by the Government.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 11-Jun-2020 02:00 PM to 16-Jun-2020 02:00 PM.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

SUBMISSION REQUIREMENTS:

All bids are due by the time specified in box 13 A.

The public bid opening will begin at the time specified in Box 13 A, at the following address:

Bolling Federal Building US Army Corps of Engineers Civil Contracting Branch 601 E. 12th Street Kansas City, MO 64106 Room S101

Submit one (1) original and one (1) copy of the following:

a. Bid schedule - complete by fully entering all amounts in the supplemental bid schedule.

b. Ensure Bid is signed by a Principal of your company with authority to do so.

c. Ensure all Amendments are acknowledged.

d. Bid Bonds – (Original with raised seal) required with your submission. (See solicitation for details).

The virtual bid opening will begin at the time specified in Box 13 A Section 00 10 00 - Solicitation, via the call in information below:

Conference Line Number: 877-810-9415

Access Code: 9534451

Security Code: 1234#

Submit one (1) original and one (1) copy of the following:

a. Bid schedule - complete by fully entering all amounts in the supplemental bid schedule.

b. Ensure Bid is signed by a Principal of your company with authority to do so.

c. Ensure all Amendments are acknowledged.

d. Bid Bonds – Ensure the raised seals are legible in the electronic copy.

INQUIRIES/QUESTIONS:

Prospective Bidders shall submit contracting and technical inquiries and questions concerning this solicitation document via Bidder Inquiry in ProjNet at www.projnet.org/projnet.

a. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click continue.

b. From this page, you may view all bidder inquiries or add a new inquiry.

c. Bidders will receive an acknowledgement of their questions via email, followed by an answer to their questions after it has been processed by our technical team. ***Please Note: Bidders shall only submit one (1) Question per inquiry. All inquiries containing multiple questions shall be rejected***

d. The Solicitation Number is: W912DQ20B1041

e. The Plan Room Key is: PZ4ETZ-7364NR

f. The Bidder Inquiry Key is: Z7SU62-U87W2Z

The Bidder Inquiry System will be unavailable for new inquiries after 29 May 2020, 03 June 2020 at 5:00 PM local, Kansas City, time in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the Solicitation if necessary.

Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.

(End of Submission Requirements)

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been added by full text:

SPECIFICATIONS REVISIONS:

Specifications Revisions 09 June 2020

NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.

1. SPECIFICATIONS:

a. Add “Minimum Technical Requirements for Geotechnical Investigations” as attachment to section 35 41 00.

b. Section 35 41 00 Paragraph No. 3.2 Pre-Construction Survey and Investigations

3.2.3 Geotechnical Investigations

Contractor to provide 10 borings to a depth of 35ft. Boring shall be hollow stem auger with standard penetration test with 2ft sample intervals to 15ft and 5 ft sample intervals thereafter.

Additional samples shall be taken at material changes if more frequent than sampling interval.

Borings shall be backfilled with tremie placed cement bentonite grout. Boring shall be completed in accordance with the attached "Minimum Technical Requirements for Geotechnical Investigations". Copies of filed logs with notes, jar samples, stamped final approved boring logs, and electronic GINT boring log files shall be submitted to USACE. A brief geotechnical report shall be submitted documenting only the process/techniques used and information obtained as discussed in the aforementioned minimum requirements. No technical analysis or testing is required.

c. Section 35 41 00 Paragraph No. 3.8 DEWATERING AND DIVERSION

Dewatering of scour areas will be necessary for survey and placement of fill. Exception will be made for placement of pervious fill in the Palmer Creek Breaches as shown on sheets CS309 and CS310 which may be completed underwater. The contractor is responsible for design of and is to assume the dewatering can be completed with use of sump pumps, diversion ditches and earthen cofferdams. Contractor should assume 4 pumps capable of 1,500 gpm each for dewatering efforts during work at each of the scour locations. Wells or other groundwater control are not required.

Periods of high river elevation or elevated groundwater will be treated as weather delays within the requirements of the contract and as determined by the COR. Extended periods longer than 2 weeks for which groundwater is an issue while the site is otherwise workable will constitute a modification to address design features to accommodate or add additional groundwater controls.

The contractor is responsible for whatever means are necessary to dewater and dry the scour holes prior to placement of fill in order to facilitate compaction. Accomplish surface and groundwater control in coordination with the required excavation and embankment construction. Surface and/or groundwater control may necessitate the use of temporary diversion ditches, cofferdams and/or dewatering by the use of pumping. Methods for care of surface water and for controlling the surface and groundwater levels will be subject to approval of the Contracting Officer. Borrow pits must be drained and kept dry during excavation, as excavation will not be permitted in water nor will excavated material be scraped, dragged or otherwise moved through water. Drain borrow areas by ditching, sump pumping, or other approved methods. Drain borrow areas excavated under this contract and flooded from rains or high river stages and allow to dry as quickly as practicable after the high river stage has passed.

Minimize surface runoff from entering the work areas. Complete the necessary ditching or earthwork shaping at the end of each workday or as necessary to prevent surface runoff from entering the work area. Drain excess precipitation that collects in the work areas and allow to dry as quickly as practicable before work resumes.

d. Section 33 40 00 Paragraph No. 2.6 EROSION CONTROL RIP RAP

Delete paragraph in its entirety

2.6 EROSION CONTROL RIP RAP

Provide non-erodible rock not exceeding 15 inches in its greatest dimension and choked with sufficient small rocks to provide a dense mass with a minimum thickness of 8 inches.

e. Section 35 31 19 Paragraph No. 2.2.2 RIPRAP AND QUARRY RUN ROCK

Quarry Run Rock

Quarry Run Rock shall be reasonably well graded with a maximum size of 18 IN (300 lbs) and no more than 15% passing the No. 100 Sieve.

f. Section 32 92 19 Paragraph No. 3.1.1. EXTENT OF WORK

Provide mowing, herbicide, fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces as required in all areas identified for overseeding or rehabilitation, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.

Provide mowing, herbicide, fertilizing, seeding and maintenance in all areas identified for overseeding on sheet CS501. See paragraph RENOVATION OF EXISTING TURF. Mulching is not required as sufficient natural mulch is assumed available from mowing operations in overseeding areas.

Provide mowing, herbicide, fertilizing, seeding, surface topdressing and maintenance in all areas within the levee footprint (including stability berms) and within a 15ft proximity of the levee toe on both land and riversides which the contractor disturbs. See paragraph SEEDING DISTURBED

AREAS.

Provide herbicide, fertilizing, seeding, surface topdressing of Borrow area 13 and haul routes located on berms associated with borrow areas 11, 12, 15, and 16. Remaining borrow areas to be left as discussed on the respective plan sheet for natural revegetation or agricultural use. Haul routes not within the seeding limits described above shall be returned to pre-construction condition unless otherwise stated on the plan sheets.

g. Section 32 92 19 Paragraph No. 3.1.1.1 TOPSOIL

Provide 4 inches of topsoil to meet indicated finish grade in disturbed areas. With exception of underseepage berms in agricultural areas, provide 6 inches of topsoil to meet indicated finish grade on the drawings. Underseepage berms shall receive 1 ft as discussed on the plan sheets.

Borrow areas do not require topsoil placement. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.

h. Section 35 41 00 Paragraph No. 3.5 STRIPPING

The entire area within the limits of existing ground to receive embankment and structures, together with strips 5 feet wide, beyond and contiguous thereto, existing levees to be degraded, ponding areas, and ditches shown on the drawing must be stripped to remove crops, weeds, grass, and other vegetative materials to the ground surface and topsoil to a depth of 4 6 inches. Exception is made to side slope erosion areas which are to be filled with topsoil and seeded in accordance with the specifications.

Borrow pits shall be stripped of available topsoil for incorporation into the levee. This excludes agricultural areas which are identified for utilization of pervious deposits from flooding.

Following completion of borrow activities, topsoil is NOT required to be replaced in borrow areas unless specifically noted on the drawings.

i. Section 35 41 00 Paragraph No 3.3 CLEARING

Accomplish clearing within the limits of existing ground to receive embankment and structures, together with strips 5 feet wide, beyond and contiguous thereto, existing levees to be degraded, ponding areas, ditches, structures, traverses, channels, riprap, revetment, borrow areas and ramps.

Clear trees, downed timber, snags, slash, brush, garbage, trash, debris, fencing and other items flush with the existing ground surface. Protect trees and vegetation designated to be left standing or to remain from damage from construction operations. Limit clearing of borrow areas to the minimum area required for construction operations.

The levee district is responsible for removing the flood debris from the levee slopes. The contractor is responsible for removing debris from any other areas as required to complete the work including but not limited to the setback alignment, berm, and borrow locations. Debris shall be piled within the construction limits, in proximity to where it was deposited by the flood, and left for disposal by others.

j. Section 33 40 00 Paragraph No 3.3 PLACING PIPE

Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Lifting lugs in vertically elongated pipe shall be placed in the same vertical plane as the major axis of the pipe. Pipe shall not be laid in water, and pipe shall not be laid when trench conditions or weather are unsuitable for such work.

Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. Deflection of installed flexible pipe shall not exceed the following limits:

TYPE OF PIPE MAXIMUM ALLOWABLE DEFLECTION

(percent) Concrete N/A 5%

2. DRAWINGS:

a. Sheet CS106 - updated notes on riprap placement and clearing on levee embankment

b. Sheet CS501 - updated crown erosion and slough tables

c. Sheet CS505 - added note to require flap gate on outlet structure

3. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided. Failure to acknowledge all amendments may cause rejection of the proposal.

4. All other terms and conditions remain unchanged and in full force.

Revised Drawings:

See L246 Amendment 0004 – Attachment 01 in Beta SAMs

Minimum Geotechnical Investigation Requirements:

See L246 Amendment 0004 – Attachment 02 in Beta SAMs

WAGE RATES:

CHARITON COUNTY MISSOURI WAGE RATES:

"General Decision Number: MO20200001 06/05/2020

Superseded General Decision Number: MO20190001

State: Missouri

Construction Types: Heavy and Highway

Counties: Missouri Statewide.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on

G5CTXCWA

Highlight

G5CTXCWA

Highlight

G5CTXCWA

Highlight the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/07/2020 3 02/14/2020 4 03/13/2020 5 04/03/2020 6 04/24/2020 7 05/08/2020 8 05/15/2020 9 05/29/2020 10 06/05/2020

CARP0002-002 05/01/2019

ST. LOUIS COUNTY AND CITY

Rates Fringes

Carpenters.......................$ 38.02 17.77

CARP0005-006 05/03/2015

CASS (Richards-Gebauer AFB ONLY), CLAY, JACKSON, PLATTE AND RAY

COUNTIES

Rates Fringes

Carpenters:

CARPENTERS & LATHERS........$ 36.34 15.55

MILLWRIGHTS & PILEDRIVERS...$ 36.34 15.55

CARP0011-001 05/01/2019

Rates Fringes

Carpenter and Piledriver ADAIR, AUDRAIN (West of Hwy 19), BOONE, CALLAWAY, CHARITON, COLE, COOPER, HOWARD, KNOX,LINN, MACON, MILLER, MONITEAU,MONROE, OSAGE, PUTNAM, RANDOLPH, SCHUYLER, SHELBY AND

SULLIVAN COUNTIES...........$ 32.28 17.77

ATCHISON, ANDREW, BATES,

CALDWELL, CARROLL,DAVIESS,

DEKALB,GENTRY, GRUNDY,

HARRISON, HENRY, HOLT,

LIVINGSTON, MERCER,

NODAWAY,ST. CLAIR, SALINE

AND WORTH COUNTIES..........$ 30.76 17.77

AUDRAIN (East of Hwy.19), RALLS, MARION, LEWIS, CLARK AND SCOTLAND COUNTIES.$ 32.29 17.77

BARRY, BARTON, CAMDEN,

CEDAR, CHRISTIAN, DADE,

DALLAS, DOUGLAS, GREENE,

HICKORY,JASPER, LACLEDE,

LAWRENCE, MCDONALD,

NEWTON, OZARK, POLK,

STONE, TANEY, VERNON,

WEBSTER AND WRIGHT COUNTIES.$ 30.36 17.77

BENTON, MORGAN AND PETTIS...$ 30.81 17.77

BOLLINGER, BUTLER, CAPE

GIRARDEAU, DUNKLIN,

MISSISSIPPI, NEW MADRID,

PEMISCOT, PERRY, STE.

GENEVIEVE, SCOTT, STODDARD

AND WAYNE COUNTIES..........$ 32.14 17.77

BUCHANAN, CLINTON, JOHNSON

AND LAFAYETTE COUNTIES......$ 31.49 17.77

CARTER, HOWELL, OREGON AND

RIPLEY COUNTIES.............$ 31.09 17.77

CRAWFORD, DENT, GASCONADE,

IRON, MADISON, MARIES,

MONTGOMERY, PHELPS,

PULASKI, REYNOLDS, SHANNON

AND TEXAS COUNTIES..........$ 32.13 17.77

FRANKLIN COUNTY.............$ 35.56 17.77

JEFFERSON AND ST. CHARLES

COUNTIES....................$ 38.02 17.77

LINCOLN COUNTY..............$ 34.00 17.77

PIKE, ST. FRANCOIS AND

WASHINGTON COUNTIES.........$ 32.92 17.77

WARREN COUNTY...............$ 34.44 17.77

* ELEC0001-002 05/31/2020

BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, FRANKLIN,

IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW MADRID,

PEMISCOT, PERRY,REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,

ST. LOUIS (City and County), STE. GENEVIEVE, SCOTT, STODDARD, WARREN, WASHINGTON AND WAYNE COUNTIES

Electricians.....................$ 40.61 27.06

ELEC0002-001 09/01/2018

ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON,

CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE,

HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCON, LINN,

MACON, MARIES, MARION, MILLER, MONITEAU, MONROE, MONTGOMERY,

MORGAN, OREGON, OSAGE, PERRY, PHELPS, PIKE, PULASKI, PUTNAM,

RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,

ST. LOUIS (City and County), STE. GENEVIEVE, SCHUYLER, SCOTLAND, SHANNON, SHELBY, SULLIVAN, TEXAS, WARREN AND

WASHINGTON COUNTIES

Line Construction:

Equipment Operator..........$ 39.50 19.96 Groundman & Truck Driver....$ 30.36 16.67 Lineman & Cable Splicer.....$ 45.90 22.27

ELEC0053-004 01/01/2020

Line Construction: (ANDREW, ATCHINSON, BARRY, BARTON, BUCHANAN, CALDWELL, CEDAR, CHRISTIAN, CLINTON, DADE, DALLAS, DAVIES,, DEKALB, DOUGLAS, GENTRY, GREENE, GRUNDY, HARRISON, HICKORY, HOLT, JASPER, LACLEDE, LAWRENCE, LIVINGSTON, MCDONALD, MERCER, NEWTON, NODAWAY, OZARK, POLK, ST.

CLAIR, STONE, TANEY, VERNON,

WEBSTER, WORTH AND WRIGHT

COUNTIES)

Groundman Powderman.........$ 32.27 16.09 Groundman...................$ 30.12 15.38 Lineman Operator............$ 43.40 19.30 Lineman.....................$ 47.30 20.45 Line Construction; (BATES, BENTON, CARROLL, CASS, CLAY, HENRY, JACKSON, JOHNSON, LAFAYETTE, PETTIS, PLATTE, RAY AND SALINE COUNTIES)

Groundman Powderman.........$ 32.27 15.52 Groundman...................$ 30.12 14.88 Lineman Operator............$ 43.40 18.80 Lineman.....................$ 47.30 19.95

ELEC0095-001 06/01/2019

BARRY, BARTON, CEDAR, DADE, JASPER, LAWRENCE, MCDONALD, NEWTON,

ST CLAIR, AND VERNON COUNTIES

Electricians:

Cable Splicers..............$ 25.40 12.19 Electricians................$ 27.43 14.97

ELEC0124-007 08/26/2019

BATES, BENTON, CARROLL, CASS, CLAY, COOPER, HENRY, JACKSON,

JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY AND SALINE

COUNTIES:

Electricians.....................$ 40.79 22.92

ELEC0257-003 03/01/2020

AUDRAIN (Except Cuivre Township), BOONE, CALLAWAY, CAMDEN, CHARITON, COLE, CRAWFORD, DENT, GASCONADE, HOWARD, MARIES, MILLER, MONITEAU, OSAGE, PHELPS AND RANDOLPH COUNTIES

Electricians:

Cable Splicers..............$ 30.42 16.085 Electricians................$ 34.00 18.68

ELEC0350-002 12/01/2019

ADAIR, AUDRAIN (East of Highway 19), CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, MONTGOMERY, PIKE, PUTNAM, RALLS, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES

Electricians.....................$ 32.50 17.65

ELEC0453-001 09/01/2019

Rates Fringes

Electricians:

CHRISITAN, DALLAS,

DOUGLAS, GREENE, HICKORY,

HOWELL, LACLEDE, OREGON,

OZARK, POLK, SHANNON,

WEBSTER and WRIGHT COUNTIES.$ 27.88 14.99 PULASKI and TEXAS COUNTIES..$ 32.53 15.46 STONE and TANEY COUNTIES....$ 23.67 14.17

ELEC0545-003 06/01/2019

ANDREW, BUCHANAN, CLINTON, DEKALB, ATCHISON, HOLT, MERCER,

GENTRY, HARRISON, DAVIESS, GRUNDY, WORTH, LIVINGSTON, NODAWAY,

AND CALDWELL COUNTIES

Electricians:....................$ 32.00 17.30

ELEC0702-004 12/30/2019

BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON,

MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE

Line Construction:

Groundman - Class A.........$ 30.31 29% + 7.75 Groundman-Equipment Operator Class II (all other equipment)............$ 38.46 29% + 7.75 Heavy-Equipment Operator Class I (all crawler type equipment D-4 and larger)...$ 43.88 29% + 7.75 Lineman.....................$ 53.51 29% + 7.75

ENGI0101-001 05/01/2020

ANDREW, ATCHISON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL,

CHARITON, CLINTON, COOPER, DAVIESS, DEKALB, GENTRY, GRUNDY,

HARRISON, HENRY, HOLT, HOWARD, JOHNSON, LAFAYETTE, LINN,

LIVINGSTON, MERCER, NODAWAY, PETTIS, SALINE, SULLIVAN AND WORTH

COUNITES

Power equipment operators:

GROUP 1.....................$ 34.73 18.20

GROUP 2.....................$ 34.33 18.20

GROUP 3.....................$ 32.33 18.20

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers - 2; booster pump on dredge; bulldozer operator; boring machine (truck or crane mounted); clamshell operator;

concrete mixer paver; concrete plant operator; concrete pump operator; crane operator; derrick or derrick trucks;

ditching machine; dragline operator; dredge engineman;

dredge operator; drill cat with compressor mounted (self-contained) or similar type self- propelled rotary drill (not air tract); drilling or boring machine (rotary-self-propelled); finishing machine operator;

greaser; high loader-fork lift-skid loader (all types);

hoisting engineer (2 active drums); locomotive operator (standard guage); mechanics and welders (field and plants);

mucking machine operator; pile drive operator; pitman crane or boom truck (all types); push cat; quad track; scraper operators (all types); shovel operator; sideboom cats; side discharge spreader; skimmer scoop operators; slip form paver operator (CMI, Rex, Gomeco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane;

wood and log chippers (all types).

GROUP 2: A-frame truck operator; articulated dump truck;

back filler operator; boilers (1); chip spreader; churn drill operator; compressor; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator;

crusher operator; distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig;

float operator; form grade operator; hoisting engine (one drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra-hammer (or similar type);

paymill operator; power shield; pumps; roller operator (with or without blades); screening and washing plant;

self-propelled street broom or sweeper; siphons and jets;

straw blower; stump cutting machine; siphons and jets; tank car heater operator (combination boiler and booster);

welding machine; vibrating machine operator (not hand held); welding machine.

GROUP 3: (a) Oiler;

(b) Oiiler driver

(c) Mechanic.

HOURLY PREMIUMS:

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .25) ABOVE

GROUP 1 RATE: Dragline operator - 3 yds. & over; shovel 3 yds. & over; clamshell 3 yds. & over; Crane, rigs or piledrivers, 100' of boom or over (incl. jib.), hoist -each additional active drum over 2 drums

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .50) ABOVE

GROUP 1 RATE: Tandem scoop operator; crane, rigs or piledrivers 150' to 200' of boom (incl. jib.)

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .75) ABOVE

GROUP 1 RATE: Crane rigs, or piledrivers 200 ft. of boom or over (including jib.)

ENGI0101-005 04/01/2020

CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.02 19.89

GROUP 2.....................$ 35.98 19.89

GROUP 3.....................$ 31.51 19.89

GROUP 4.....................$ 34.86 19.89

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers-2;

booster pump on dredge; boring machine (truck or crane mounted); bulldozer operator; clamshell operator; concrete cleaning decontamination machine operator; concrete mixer paver; concrete plant operator; concrete pump operator;

crane operator; derrick or derrick trucks; ditching machine; dragline operator; dredge engineman; dredge operator; drillcat with compressor mounted (self-contained) or similar type self propelled rotary drill (not air tract); drilling or boring machine (rotary -self-propelled); finishing machine operator; greaser; heavy equipment robotics operator/mechanic; horizontal directional drill operator; horizontal directional drill locator; loader-forklift - skid loader (all types);

hoisting engineer (2 active drums); locomotive operator (standard guage); master environmental maintenance mechanic; mechanics and welders (field and plants);

mucking machine operator; piledrive operator; pitman crane or boom truck (all types); push cat; quad-track; scraper operators (all types); shovel operator; side discharge spreader; sideboom cats; skimmer scoop operator; slip-form paver (CMI, REX, Gomaco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane; ultra high perssure waterjet cutting tool system operator/mechanic;

vacuum blasting machine operator/mechanic; wood and log chippers (all types)

GROUP 2: ""A"" Frame truck operator; back filler operator;

boilers (1); chip spreader;churn drill operator; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator; crusher operator;

distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig; float operator;

form grader operator; hoisting engine (1 drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra- hammer (or similar type); power shield; paymill operator; pumps; siphons and jets; stump cutting machine; tank car heater operator (combination boiler and booster); compressor; roller operator (with or without blades); screening and washing plant;

self-propelled street broom or sweeper; straw blower; tank car heater operator (combination boiler and booster);

vibrating machine operator (not hand held)

GROUP 3: Oilers

GROUP 4: Oiler Driver (All Types)

FOOTNOTE:

HOURLY PREMIUMS FOLLOWING CLASSIFICATIONS SHALL RECEIVE

($1.00) ABOVE GROUP 1 RATE:

Clamshells - 3 yd. capacity or over; Cranes or rigs, 80 ft.

of boom or over (including jib); Draglines, 3 yd. capacity or over;

Piledrivers 80 ft. of boom or over (including jib);

Shovels & backhoes, 3 yd. capacity or over.

ENGI0101-022 05/01/2019

BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS,

GREENE, HICKORY, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON,

OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER AND

WRIGHT COUNTIES and CITY OF SPRINGFIELD

GROUP 1.....................$ 31.72 14.88

GROUP 2.....................$ 31.37 14.88

GROUP 3.....................$ 31.17 14.88

GROUP 4.....................$ 29.12 14.88

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt finishing machine & trench widening spreader; asphalt plant console operator; autograder;

automatic slipform paver; backhoe; blade operator - all types; boat operator - tow; boilers-2; central mix concrete plant operator; clamshell operator; concrete mixer paver;

crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine - 2 active drums; launch hammer wheel; locomotive operator; -standard guage; mechanic and welders; mucking machine;

off-road trucks; piledriver operator; pitman crane operator; push cat operator; quad trac; scoop operator -all types; shovel operator; sideboom cats; skimmer scoop operators; trenching machine operator; truck crane.

GROUP 2: A-frame; asphalt hot-mix silo; asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant man; asphalt plant mixer operator; asphalt roller operator;

backfiller operator; barber-greene loader; boat operator (bridges and dams); chip spreader; concrete mixer operator

- skip loader; concrete plant operator; concrete pump operator; crusher operator; dredge oiler; elevating grader operator; fork lift; greaser-fleet; hoisting engine - 1;

locomotive operator - narrow gauge; multiple compactor;

pavement breaker; powerbroom - self-propelled; power shield; rooter; side discharge concrete spreader; slip form finishing machine; stumpcutter machine; throttle man;

tractor operator (over 50 h.p.); winch truck.

GROUP 3: Boilers - 1; chip spreader (front man); churn drill operator; clef plane operator; concrete saw operator (self-propelled); curb finishing machine; distributor operator;

finishing machine operator; flex plane operator; float operator; form grader operator; pugmill operator; roller operator, other than high type asphalt; screening & washing plant operator; siphons & jets; sub-grading machine operator; spreader box operator, self-propelled (not asphalt); tank car heater operator (combination boiler & booster); tractor operator (50 h.p. or less); Ulmac, Ulric or similar spreader; vibrating machine operator, not hand;

GROUP 4: Grade checker; Oiler; Oiler-Driver

HOURLY PREMIUMS:

The following classifications shall receive $ .25 above GROUP 1 rate:

Clamshells - 3 yds. or over; Cranes - Rigs or Piledrivers, 100 ft. of boom or over (including jib);

Draglines - 3 yds. or over; Hoists - each additional active drum over 2 drums; Shovels - 3 yds. or over;

The following classifications shall receive $ .50 above GROUP 1 rate:

Tandem scoop operator; Cranes - Rigs or Piledrivers, 150 ft.

to 200 ft. of boom (including jib); Tandem scoop.

The following classifications shall receive $ .75 above GROUP 1 rate:

Cranes - Rigs or Piledrivers, 200 ft. of boom or over

(including jib.).

ENGI0513-004 05/06/2019

FRANKLIN, JEFFERSON, LINCOLN, ST CHARLES, AND WARREN COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 34.36 27.36

GROUP 2.....................$ 34.36 27.36

GROUP 3.....................$ 33.06 27.36

GROUP 4.....................$ 32.61 27.36

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Backhoe, Cable; Backhoe, Hydraulic (2 cu yds bucket and under regardless of attachment, one oiler for 2 or 3, two oilers for 4 through 6); Backhoe, Hydraulic over 2 cu yds; Cableway; Crane, Crawler or Truck; Crane, Hydraulic - Truck or Cruiser mounted, 16 tons and over; Crane, Locomotive; crane with boom including jib over 100 ft from pin to pin; Crane using rock socket tool; Derrick, Steam;

Derrick Car and Derrick Boat; Dragline, 7 cu yds and over;

Dredge; Gradall, Crawler or tire mounted; Locomotive, Gas, Steam & other powers; Pile Driver, Land or Floating; Scoop, Skimmer; Shovel, Power (Electric, Gas, Steam or other powers); Shovel, Power (7 cu yds and over); Switch Boat;

Whirley; Air Tugger with air compressor; Anchor Placing Barge; Asphalt Spreaker; Athey Force Feeder Loader, self-propelled; Backfilling Machine; Boat Operator - Push Boat or Tow Boat (job site); Boiler, High Pressure Breaking in Period; Boom Truck, Placing or Erecting; Boring Machine, Footing Foundation; Bullfloat; Cherry Picker; Combination Concrete Hoist and Mixer (such as Mixermobile); Compressor, Two 125 CFM and under; Compressor, Two through Four over 125 CFM; Compressor when operator runs throttle; Concrete Breaker (Truck or Tractor mounted); Concrete Pump (such as Pumpcrete machine); Concrete Saw (self-propelled); Concrete Spreader; Conveyor, Large (not selfpropelled) hoisting or moving brick and concrete into, or into and on floor level, one or both; Crane, Cimbing (such as Linden); Crane, Hydraulic - Rough Terrain, self-propelled; Crane, Hydraulic

- Truck or Cruiser mounted - under 16 tons; Drilling machine - Self-powered, used for earth or rock drilling or boring (wagon drills and any hand drills obtaining power from other souces including concrete breakers, jackhammers and Barco equipmnet no engineer required); Elevating Grader; Engine Man, Dredge; Excavator or Powerbelt Machine;

Finishing Machine, self- propelled oscillating screed;

Forklift; Generators, Two through Six 30 KW or over;

Grader, Road with power blade; Greaser; Highlift; Hoist, Concrete and Brick (Brick cages or concrete skips operating or on tower, Towermobile, or similar equipment); Hoist, Three or more drums in use; Hoist, Stack; Hydro-Hammer;

Lad-A-Vator, hoisting brick or concrete; Loading Machine such as Barber-Greene; Mechanic on job site

GROUP 2: Air Tugger with plant air; Boiler (for power or heating shell of building or temporary enclosures in connection with construction work); Boiler, Temporary;

Compressor, One over 125 CFM; Compressor, truck mounted;

Conveyor, Large (not self- propelled); Conveyor, Large (not self- propelled) moving brick and concrete (distributing) on floor level; Curb Finishing Machine; Ditch Paving Machine; Elevator (outside); Endless Chain Hoist; Fireman (as required); Form Grader; Hoist, One Drum regardless of size (except brick or concrete); Lad-A-Vator, other hoisting; Manlift; Mixer, Asphalt, over 8 cu ft capacity;

Mixer, one bag capacity or less; Mixer, without side loader, two bag capacity or more; Mixer, with side loader, regardless of size, not Paver; Mud Jack (where mud jack is used in conjenction with an air compressor, operator shall be paid $ .55 per hour in addition to his basic hourly rate for covering both operations); Pug Mill operator; Pump, Sump - self powered, automatic controlled over 2""; Scissor Lift (used for hoisting); Skid Steer Loader; Sweeper, Street; Tractor, small wheel type 50 HP and under with grader blade and similar equipment; Welding Machine, One over 400 amp; Winch, operating from truck

GROUP 3: Boat operator - outboard motor, job site; Conveyors (such as Con-Vay-It) regardless of how used; Elevator (inside); Heater operator, 2 through 6; Sweeper, Floor

GROUP 4: Crane type

HOURLY PREMIUMS:

Backhoe, Hydraulic 2 cu yds or less without oiler - $2.00;

Crane,climbing (such as Linden) - $.50;

Crane, Pile Driving and Extracting - $ .50 Crane with boom (including job) over 100 ft from pin to pin - add $.01 per foot to maximum of $4.00);

Crane, using rock socket tool - $ .50;

Derrick, diesel, gas or electric hoisting material and erecting steel (150 ft or more above ground) - $ .50;

Dragline, 7 cu yds and over - $ .50;

Hoist, Three or more drums in use - $ .50;

Scoop, Tandem - $.50;

Shovel, Power - 7 cu yds and over - $ .50;

Tractor, Tandem Crawler - $ .50;

Tunnel, man assigned to work in tunnel or tunnel shaft - $ .50;

Wrecking, when machines are working on second floor or higher - $ .50

ENGI0513-006 05/01/2019

ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY, CAPE

GIRARDEAU, CARTER, CLARK, COLE, CRAWFORD, DENT, DUNKLIN,

GASCONADE, HOWELL, IRON, KNOX, LEWIS, MACON, MADISON, MARIES,

MARION, MILLER, MISSISSIPPI, MONITEAU, MONROE, MONTGOMERY,

MORGAN, NEW MADRID, OREGON, OSAGE, PEMISCOT, PERRY, PHELPS,

PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST.

FRANCOIS, STE. GENEVIEVE, SCHUYLER, SCOTLAND, SCOTT, SHANNON,

SHELBY, STODDARD, TEXAS, WASHINGTON, AND WAYNE COUNTIES

GROUP 1.....................$ 29.69 27.16

GROUP 2.....................$ 29.34 27.16

GROUP 3.....................$ 29.14 27.16

GROUP 4.....................$ 25.49 27.16

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt finishing machine & trench widening spreader, asphalt plant console operator; autograder;

automatic slipform paver; back hoe; blade operator - all types; boat operator tow; boiler two; central mix concrete plant operator; clam shell operator; concrete mixer paver;

crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine 2 active drums; launchhammer wheel; locomotive operator standrad guage; mechanics and welders; mucking machine; piledriver operator; pitman crane operator; push cat operator;

guad-trac; scoop operator; sideboom cats; skimmer scoop operator; trenching machine operator; truck crane, shovel operator.

GROUP 2: A-Frame; asphalt hot-mix silo; asphalt roller operator asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant mixer operator; backfiller operator; barber-greene loader; boat operator (bridge & dams); chip spreader; concrete mixer operator skip loader;

concrete plant operator; concrete pump operator; dredge oiler; elevating graded operator; fork lift; grease fleet;

hoisting engine one; locomotive operator narrow guage;

multiple compactor; pavement breaker; powerbroom self-propelled; power shield; rooter; slip-form finishing machine; stumpcutter machine; side discharge concrete spreader; throttleman; tractor operator (over 50 hp); winch truck; asphalt roller operator; crusher operator.

GROUP 3: Spreader box operator, self-propelled not asphalt;

tractor operator (50 h.p. or less); boilers one; chip spreader (front man); churn drill operator; compressor over 105 CFM 2-3 pumps 4"" & over; 2-3 light plant 7.5 KWA or any combination thereof; clef plane operator; compressor maintenance operator 2 or 3; concrete saw operator (self-propelled); curb finishing mancine; distributor operator; finishing machine operator; flex plane operator;

float operator; form grader operator; pugmill operator;

riller operator other than high type asphalt; screening & washing plant operator; siphons & jets; subgrading machine operator; tank car heater (combination boiler & booster);

ulmac, ulric or similar spreader; vibrating machine operator; hydrobroom.

GROUP 4: Oiler; grout machine; oiler driver; compressor over 105 CFM one; conveyor operator one; maintenance operator;

pump 4"" & over one.

FOOTNOTE: HOURLY PREMIUMS

Backhoe hydraulic, 2 cu. yds. or under Without oiler - $2.00 Certified Crane Operator - $1.50;

Certified Hazardous Material Operator $1.50;

Crane, climbing (such as Linden) - $0.50;

Crane, pile driving and extracting - $0.50;

Crane, with boom…