AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to change the bid submission and bid opening specifications in response to COVID-19. Deleted text is show n w ith red strikethrough and added text is show n w ith green underlined.

The w age reates have been updated.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 42

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Mar-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20B1032

X 9B. DATED (SEE ITEM 11)

06-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Mar-2020

CODE

USACE, KANSAS CITY +

FEDERAL BLDG CT-C 601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ20B1032

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 05 - CERTIFICATION PAGE

The following have been modified:

CAUTION PAGE

CAUTION!

BEFORE SIGNING AND EMAILING MAILING YOUR BID, please take note of the following, as failure to perform any one of these actions may cause your bid to be rejected.

1. AMENDMENTS: Have you acknowledged receipt of ALL Amendments? If in doubt as to number of amendments issued, please contact our office.

2. EMAILED SEALED BIDS: Sealed envelopes containing bids shall be marked to show the bidder’s name and address, the solicitation number, title of project, amendments received, and the date and time bids are due.

3. AMENDED BID PAGES: If any of the Amendments furnished amended bid pages, the amended bid page(s) must be used in submitting your bid.

4. LATE BIDS: Late bids will not be accepted. The date and time the bid is received by the Government will be used and not the time submitted. In order for a late mailed bid to be considered, generally it must have been sent by either registered or certified mail not later than 5 calendar days before the receipt of bids due date.

5. BID GUARANTEE: Sufficient bid guarantee in proper form must be furnished with your bid, if your bid exceeds $150,000.

6. MISTAKE IN BID: Have you reviewed your bid prices for possible errors in calculations or work left out?

7. FACSIMILE BIDS AND MODIFICATIONS: Will not be considered. Facsimile withdrawals will be considered.

8. HAND-DELIVERED BID: If bids are hand-delivered, you must be aware of enhanced security requirements in effect in the Federal Building and allow for extra time to clear security. You must have a valid picture ID in order to enter the building. No additional time will be allowed due to security requirements. Please ensure that the solicitation number and title of project appear or can be identified on the outside of bid package. At this time, only emailed bids will be accepted.

9. BUY AMERICAN ACT: All bidders are cautioned that, prior Government conduct notwithstanding, the

Contractor's selection of a domestic construction material which would require the subsequent selection of a foreign construction material for compatibility is not a justification for waiver of the Buy American Act.

It is the Contractor's responsibility to verify, prior to submitting the materials for approval that each system can be built to meet the contract specifications without the use of foreign construction materials.

10. BOLLING FEDERAL BUILDING ENHANCED SECURITY: Due to enhanced security in the

Bolling Federal Building the Bid Opening Room 0133, will open 30 minutes prior to bid opening and will remain open until all bids are opened and read. If bids are hand-delivered, you must be aware of enhanced security requirements in effect in the Federal Building and allow for extra time to clear security. You must have a valid picture ID in order to enter the building. No additional time will be allowed due to security requirements. Security Personnel may require you to be escorted to room 0133. Room 0133 is located past the bank off the 12th street entrance on the first floor. Person(s) attending the bid opening, will no longer be allowed to remain on Corps of Engineers floors (4, 5 & 6) other than in the Bid Opening Room. The Bid Opening Room is available to all persons delivering bids or attending the bid opening. Bidders may wait in the Federal Building cafeteria on the Ground level or outside the building. Under The Federal Acquisition Regulations bids cannot be accepted after the time set for bid opening. Therefore, to ensure your bid is not late, all bidders are encouraged to complete their bids prior to arrival at the Bid Opening Room.

11. SUBMISSION OF BIDS AND BID OPENING: Due to the COVID-19 Global Pandemic, the Government is taking precautions to ensure the safety and health of all Contractors and Government employees.

Electronic bids are REQUIRED. Mailed and hand-delivered bids are NOT ALLOWED. The Contractor is required to ensure that the bid package is legible and completed. Bid bonds shall be copied to where the seals are legible in the copy.

To Submit your bid electronically, email your bid to the Contract Officer Ines Necker at ines.necker@usace.army.mil. Keep in mind that due to email safeguards and the size of your bid package, emails may not be received immediately by the Government. Bids shall be received by the date and time specified for the bid opening. Refer to FAR 52.214-7 for how late bid packages are handled.

As another precaution, the conference room will be closed off to the public for viewing. In lieu of this, there will be a conference phone line available for all who are interested in attending the bid opening. The following information will be needed if you would like to call in for the bid opening:

Conference Line Number: (888) 398-2342 Access Code: 9725490# Security Code: 1234#

(END)

SYSTEM FOR AWARD MANAGEMENT

SAM:

In accordance with FAR 52.204-7: By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to bid opening, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.sam.gov/SAM/pages/public/index.jsf. It is highly encouraged that all prospective Offeror’s start the SAM’s registration process as soon as possible.

SAM.GOV REGISTRATION IS FREE OF CHARGE

OFFEROR MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT PRIOR TO THE

BID OPENING OR THE CONTRACT OFFICER MAY PROCEED WITH AWARD TO THE NEXT

SUCCESSFUL CONTRACTOR.

If you were not previously registered, please go to https://www.sam.gov. Instructions for new registration are also located at the following site: https://www.sam.gov/SAM/pages/public/help/samQUserGuides.jsf

If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to https://www.aptac-us.org/find-a-ptac/

THIS A FREE SERVICE BY A NON PROFIT PAID FOR BY THE US GOVERNMENT

(END)

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

USACE, KANSAS CITY +

FEDERAL BLDG, CT-C

601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

to

USACE, KANSAS CITY +

FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S

KANSAS CITY MO 64106-2896

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

BIDDER REQUIREMENTS SUBMISSION

All bids are due by the time specified in box 13 A.

The public bid opening will begin at the time specified in Box 13 A, at the following address through the following conference line:

Conference Line Number: (888) 398-2342

Access Code: 9725490#

Security Code: 1234#

Bolling Federal Building US Army Corps of Engineers Civil Contracting Branch 601 E. 12th Street Kansas City, MO 64106 Room 0133

Submit one (1) original and one (1) copy of the following:

a. Bid schedule - complete by fully entering all amounts in the supplemental bid schedule.

b. Ensure Bid is signed by a Principal of your company with authority to do so.

c. Ensure all Amendments are acknowledged.

d. Bid Bonds – (Original with raised seal) required with your submission. (See solicitation for details) (Ensure the raised seals are legible in the electronic copy).

INQUIRIES/QUESTIONS

Prospective Bidders shall submit contracting and technical inquiries and questions concerning this solicitation document via Bidder Inquiry in ProjNet at www.projnet.org/projnet. If a prospective Bidder needs any additional assistance or has questions please feel free to contact the Project Manager, Joseph Sciarra @ 816 289 3121 Joseph.M.Sciarra@usace.army.mil, or the Contracting Specialist, Jesse E. Daniel @ 816-389-3900 or jesse.e.daniel@usace.army.mil.

a. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click continue.

b. From this page, you may view all bidder inquiries or add a new inquiry.

c. Bidders will receive an acknowledgement of their questions via email, followed by an answer to their questions after it has been processed by our technical team. ***Please Note: Bidders shall only submit one (1) Question per inquiry. All inquiries containing multiple questions shall be rejected***

d. The Solicitation Number is: W912DQ20B1032

e. The Bidder Inquiry Key is: Y89NZE-YI8789

The Bidder Inquiry System will be unavailable for new inquiries after 26 March, 2020 at 1:00 P.M.

C.S.T. time in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the Solicitation if necessary.

Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.

(End of Submission Requirements)

The following were previously included by reference and are now included by full text:

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)

(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.

(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--

(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or

(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.

(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.

(End of provision)

SECTION 01 00 00 - GENERAL REQUIREMENTS

WAGE RATES

Wage Determinations Davis-Bacon Act WD # MO20200001

Modification # 4

Construction: Heavy, Highway

Last Revised Date Mar 13, 2020

State: Missouri

Counties:

Adair, Andrew, Atchison, Audrain, Barry, Barton, Bates, Benton, Bollinger, Boone, Buchanan, Butler, Caldwell, Callaway, Camden, Cape Girardeau, Carroll, Carter, Cass, Cedar, Chariton, Christian, Clark, Clay, Clinton, Cole, Cooper, Crawford, Dade, Dallas, Daviess, De Kalb, Dent, Douglas, Dunklin, Franklin, Gasconade, Gentry, Greene, Grundy, Harrison, Henry, Hickory, Holt, Howard, Howell, Iron, Jackson, Jasper, Jefferson, Johnson, Knox, Laclede, Lafayette, Lawrence, Lewis, Lincoln, Linn, Livingston, Macon, Madison, Maries, Marion, McDonald, Mercer, Miller, Mississippi, Moniteau, Monroe, Montgomery, Morgan, New Madrid, Newton, Nodaway, Oregon, Osage, Ozark, Pemiscot, Perry, Pettis, Phelps, Pike, Platte, Polk, Pulaski, Putnam, Ralls, Randolph, Ray, Reynolds, Ripley, Saline, Schuyler, Scotland, Scott, Shannon, Shelby, St Charles, St Clair, St Francois, St Louis, St Louis City, Ste Genevieve, Stoddard, Stone, Sullivan, Taney, Texas, Vernon, Warren, Washington, Wayne, Webster, Worth, Wright

"General Decision Number: MO20200001 03/13/2020

Superseded General Decision Number: MO20190001

State: Missouri

Construction Types: Heavy and Highway

Counties: Missouri Statewide.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/07/2020 3 02/14/2020 4 03/13/2020

CARP0002-002 05/01/2019

ST. LOUIS COUNTY AND CITY

Rates Fringes

Carpenters.......................$ 38.02 17.77

CARP0005-006 05/03/2015

CASS (Richards-Gebauer AFB ONLY), CLAY, JACKSON, PLATTE AND RAY

COUNTIES

Rates Fringes

Carpenters:

CARPENTERS & LATHERS........$ 36.34 15.55

MILLWRIGHTS & PILEDRIVERS...$ 36.34 15.55

CARP0011-001 05/01/2019

Rates Fringes

Carpenter and Piledriver ADAIR, AUDRAIN (West of Hwy 19), BOONE, CALLAWAY, CHARITON, COLE, COOPER, HOWARD, KNOX,LINN, MACON, MILLER, MONITEAU,MONROE, OSAGE, PUTNAM, RANDOLPH, SCHUYLER, SHELBY AND

SULLIVAN COUNTIES...........$ 32.28 17.77

ATCHISON, ANDREW, BATES,

CALDWELL, CARROLL,DAVIESS,

DEKALB,GENTRY, GRUNDY,

HARRISON, HENRY, HOLT,

LIVINGSTON, MERCER,

NODAWAY,ST. CLAIR, SALINE

AND WORTH COUNTIES..........$ 30.76 17.77

AUDRAIN (East of Hwy.19), RALLS, MARION, LEWIS, CLARK AND SCOTLAND COUNTIES.$ 32.29 17.77

BARRY, BARTON, CAMDEN,

CEDAR, CHRISTIAN, DADE,

DALLAS, DOUGLAS, GREENE,

HICKORY,JASPER, LACLEDE,

LAWRENCE, MCDONALD,

NEWTON, OZARK, POLK,

STONE, TANEY, VERNON,

WEBSTER AND WRIGHT COUNTIES.$ 30.36 17.77

BENTON, MORGAN AND PETTIS...$ 30.81 17.77

BOLLINGER, BUTLER, CAPE

GIRARDEAU, DUNKLIN,

MISSISSIPPI, NEW MADRID,

PEMISCOT, PERRY, STE.

GENEVIEVE, SCOTT, STODDARD

AND WAYNE COUNTIES..........$ 32.14 17.77

BUCHANAN, CLINTON, JOHNSON

AND LAFAYETTE COUNTIES......$ 31.49 17.77

CARTER, HOWELL, OREGON AND

RIPLEY COUNTIES.............$ 31.09 17.77

CRAWFORD, DENT, GASCONADE,

IRON, MADISON, MARIES,

MONTGOMERY, PHELPS,

PULASKI, REYNOLDS, SHANNON

AND TEXAS COUNTIES..........$ 32.13 17.77

FRANKLIN COUNTY.............$ 35.56 17.77

JEFFERSON AND ST. CHARLES

COUNTIES....................$ 38.02 17.77

LINCOLN COUNTY..............$ 34.00 17.77

PIKE, ST. FRANCOIS AND

WASHINGTON COUNTIES.........$ 32.92 17.77

WARREN COUNTY...............$ 34.44 17.77

* ELEC0001-002 07/14/2019

BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, FRANKLIN,

IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW MADRID,

PEMISCOT, PERRY,REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,

ST. LOUIS (City and County), STE. GENEVIEVE, SCOTT, STODDARD, WARREN, WASHINGTON AND WAYNE COUNTIES

Electricians.....................$ 39.30 15.81

ELEC0002-001 09/01/2018

ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON,

CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE,

HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCON, LINN,

MACON, MARIES, MARION, MILLER, MONITEAU, MONROE, MONTGOMERY,

MORGAN, OREGON, OSAGE, PERRY, PHELPS, PIKE, PULASKI, PUTNAM,

RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,

ST. LOUIS (City and County), STE. GENEVIEVE, SCHUYLER, SCOTLAND, SHANNON, SHELBY, SULLIVAN, TEXAS, WARREN AND

WASHINGTON COUNTIES

Line Construction:

Equipment Operator..........$ 39.50 19.96 Groundman & Truck Driver....$ 30.36 16.67 Lineman & Cable Splicer.....$ 45.90 22.27

ELEC0053-004 12/01/2019

Rates Fringes

Line Construction: (ANDREW, ATCHINSON, BARRY, BARTON, BUCHANAN, CALDWELL, CEDAR, CHRISTIAN, CLINTON, DADE, DALLAS, DAVIES,, DEKALB, DOUGLAS, GENTRY, GREENE, GRUNDY, HARRISON, HICKORY, HOLT, JASPER, LACLEDE, LAWRENCE, LIVINGSTON, MCDONALD, MERCER, NEWTON, NODAWAY, OZARK, POLK, ST.

CLAIR, STONE, TANEY, VERNON,

WEBSTER, WORTH AND WRIGHT

COUNTIES)

Groundman Powderman.........$ 32.27 15.52 Groundman...................$ 30.12 14.88 Lineman Operator............$ 43.40 18.80 Lineman.....................$ 47.30 19.95 Line Construction; (BATES, BENTON, CARROLL, CASS, CLAY, HENRY, JACKSON, JOHNSON, LAFAYETTE, PETTIS, PLATTE, RAY AND SALINE COUNTIES)

Groundman Powderman.........$ 32.27 15.52 Groundman...................$ 30.12 14.88 Lineman Operator............$ 43.40 18.80 Lineman.....................$ 47.30 19.95

ELEC0095-001 06/01/2019

BARRY, BARTON, CEDAR, DADE, JASPER, LAWRENCE, MCDONALD, NEWTON,

ST CLAIR, AND VERNON COUNTIES

Electricians:

Cable Splicers..............$ 25.40 12.19 Electricians................$ 27.43 14.97

ELEC0124-007 08/26/2019

BATES, BENTON, CARROLL, CASS, CLAY, COOPER, HENRY, JACKSON,

JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY AND SALINE

COUNTIES:

Electricians.....................$ 40.79 22.92

ELEC0257-003 03/01/2019

AUDRAIN (Except Cuivre Township), BOONE, CALLAWAY, CAMDEN, CHARITON, COLE, CRAWFORD, DENT, GASCONADE, HOWARD, MARIES, MILLER, MONITEAU, OSAGE, PHELPS AND RANDOLPH COUNTIES

Electricians:

Cable Splicers..............$ 30.42 16.085 Electricians................$ 33.25 18.18

* ELEC0350-002 12/01/2019

ADAIR, AUDRAIN (East of Highway 19), CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, MONTGOMERY, PIKE, PUTNAM, RALLS, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES

Electricians.....................$ 32.50 17.65

ELEC0453-001 09/01/2019

Rates Fringes

Electricians:

CHRISITAN, DALLAS,

DOUGLAS, GREENE, HICKORY,

HOWELL, LACLEDE, OREGON,

OZARK, POLK, SHANNON,

WEBSTER and WRIGHT COUNTIES.$ 27.88 14.99 PULASKI and TEXAS COUNTIES..$ 32.53 15.46 STONE and TANEY COUNTIES....$ 23.67 14.17

ELEC0545-003 06/01/2019

ANDREW, BUCHANAN, CLINTON, DEKALB, ATCHISON, HOLT, MERCER,

GENTRY, HARRISON, DAVIESS, GRUNDY, WORTH, LIVINGSTON, NODAWAY,

AND CALDWELL COUNTIES

Electricians:....................$ 32.00 17.30

ELEC0702-004 12/30/2019

BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON,

MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE

Line Construction:

Groundman - Class A.........$ 30.31 29% + 7.75 Groundman-Equipment Operator Class II (all other equipment)............$ 38.46 29% + 7.75 Heavy-Equipment Operator Class I (all crawler type equipment D-4 and larger)...$ 43.88 29% + 7.75 Lineman.....................$ 53.51 29% + 7.75

ENGI0101-001 05/01/2019

ANDREW, ATCHISON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL,

CHARITON, CLINTON, COOPER, DAVIESS, DEKALB, GENTRY, GRUNDY,

HARRISON, HENRY, HOLT, HOWARD, JOHNSON, LAFAYETTE, LINN,

LIVINGSTON, MERCER, NODAWAY, PETTIS, SALINE, SULLIVAN AND WORTH

COUNITES

Power equipment operators:

GROUP 1.....................$ 34.28 17.45

GROUP 2.....................$ 33.88 17.45

GROUP 3.....................$ 31.88 17.45

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers - 2; booster pump on dredge; bulldozer operator; boring machine (truck or crane mounted); clamshell operator;

concrete mixer paver; concrete plant operator; concrete pump operator; crane operator; derrick or derrick trucks;

ditching machine; dragline operator; dredge engineman;

dredge operator; drill cat with compressor mounted (self-contained) or similar type self- propelled rotary drill (not air tract); drilling or boring machine (rotary-self-propelled); finishing machine operator;

greaser; high loader-fork lift-skid loader (all types);

hoisting engineer (2 active drums); locomotive operator (standard guage); mechanics and welders (field and plants);

mucking machine operator; pile drive operator; pitman crane or boom truck (all types); push cat; quad track; scraper operators (all types); shovel operator; sideboom cats; side discharge spreader; skimmer scoop operators; slip form paver operator (CMI, Rex, Gomeco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane;

wood and log chippers (all types).

GROUP 2: A-frame truck operator; articulated dump truck;

back filler operator; boilers (1); chip spreader; churn drill operator; compressor; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator;

crusher operator; distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig;

float operator; form grade operator; hoisting engine (one drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra-hammer (or similar type);

paymill operator; power shield; pumps; roller operator (with or without blades); screening and washing plant;

self-propelled street broom or sweeper; siphons and jets;

straw blower; stump cutting machine; siphons and jets; tank car heater operator (combination boiler and booster);

welding machine; vibrating machine operator (not hand held); welding machine.

GROUP 3: (a) Oiler;

(b) Oiiler driver

(c) Mechanic.

HOURLY PREMIUMS:

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .25) ABOVE

GROUP 1 RATE: Dragline operator - 3 yds. & over; shovel 3 yds. & over; clamshell 3 yds. & over; Crane, rigs or piledrivers, 100' of boom or over (incl. jib.), hoist -each additional active drum over 2 drums

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .50) ABOVE

GROUP 1 RATE: Tandem scoop operator; crane, rigs or piledrivers 150' to 200' of boom (incl. jib.)

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .75) ABOVE

GROUP 1 RATE: Crane rigs, or piledrivers 200 ft. of boom or over (including jib.)

ENGI0101-005 04/01/2019

CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 36.62 18.74

GROUP 2.....................$ 35.58 18.74

GROUP 3.....................$ 31.11 18.74

GROUP 4.....................$ 34.46 18.74

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers-2;

booster pump on dredge; boring machine (truck or crane mounted); bulldozer operator; clamshell operator; concrete cleaning decontamination machine operator; concrete mixer paver; concrete plant operator; concrete pump operator;

crane operator; derrick or derrick trucks; ditching machine; dragline operator; dredge engineman; dredge operator; drillcat with compressor mounted (self-contained) or similar type self propelled rotary drill (not air tract); drilling or boring machine (rotary -self-propelled); finishing machine operator; greaser; heavy equipment robotics operator/mechanic; horizontal directional drill operator; horizontal directional drill locator; loader-forklift - skid loader (all types);

hoisting engineer (2 active drums); locomotive operator (standard guage); master environmental maintenance mechanic; mechanics and welders (field and plants);

mucking machine operator; piledrive operator; pitman crane or boom truck (all types); push cat; quad-track; scraper operators (all types); shovel operator; side discharge spreader; sideboom cats; skimmer scoop operator; slip-form paver (CMI, REX, Gomaco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane; ultra high perssure waterjet cutting tool system operator/mechanic;

vacuum blasting machine operator/mechanic; wood and log chippers (all types)

GROUP 2: ""A"" Frame truck operator; back filler operator;

boilers (1); chip spreader;churn drill operator; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator; crusher operator;

distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig; float operator;

form grader operator; hoisting engine (1 drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra- hammer (or similar type); power shield; paymill operator; pumps; siphons and jets; stump cutting machine; tank car heater operator (combination boiler and booster); compressor; roller operator (with or without blades); screening and washing plant;

self-propelled street broom or sweeper; straw blower; tank car heater operator (combination boiler and booster);

vibrating machine operator (not hand held)

GROUP 3: Oilers

GROUP 4: Oiler Driver (All Types)

FOOTNOTE:

HOURLY PREMIUMS FOLLOWING CLASSIFICATIONS SHALL RECEIVE

($1.00) ABOVE GROUP 1 RATE:

Clamshells - 3 yd. capacity or over; Cranes or rigs, 80 ft.

of boom or over (including jib); Draglines, 3 yd. capacity or over;

Piledrivers 80 ft. of boom or over (including jib);

Shovels & backhoes, 3 yd. capacity or over.

ENGI0101-022 05/01/2019

BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS,

GREENE, HICKORY, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON,

OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER AND

WRIGHT COUNTIES and CITY OF SPRINGFIELD

Power equipment operators:

GROUP 1.....................$ 31.72 14.88

GROUP 2.....................$ 31.37 14.88

GROUP 3.....................$ 31.17 14.88

GROUP 4.....................$ 29.12 14.88

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt finishing machine & trench widening spreader; asphalt plant console operator; autograder;

automatic slipform paver; backhoe; blade operator - all types; boat operator - tow; boilers-2; central mix concrete plant operator; clamshell operator; concrete mixer paver;

crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine - 2 active drums; launch hammer wheel; locomotive operator; -standard guage; mechanic and welders; mucking machine;

off-road trucks; piledriver operator; pitman crane operator; push cat operator; quad trac; scoop operator -all types; shovel operator; sideboom cats; skimmer scoop operators; trenching machine operator; truck crane.

GROUP 2: A-frame; asphalt hot-mix silo; asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant man; asphalt plant mixer operator; asphalt roller operator;

backfiller operator; barber-greene loader; boat operator (bridges and dams); chip spreader; concrete mixer operator

- skip loader; concrete plant operator; concrete pump operator; crusher operator; dredge oiler; elevating grader operator; fork lift; greaser-fleet; hoisting engine - 1;

locomotive operator - narrow gauge; multiple compactor;

pavement breaker; powerbroom - self-propelled; power shield; rooter; side discharge concrete spreader; slip form finishing machine; stumpcutter machine; throttle man;

tractor operator (over 50 h.p.); winch truck.

GROUP 3: Boilers - 1; chip spreader (front man); churn drill operator; clef plane operator; concrete saw operator (self-propelled); curb finishing machine; distributor operator;

finishing machine operator; flex plane operator; float operator; form grader operator; pugmill operator; roller operator, other than high type asphalt; screening & washing plant operator; siphons & jets; sub-grading machine operator; spreader box operator, self-propelled (not asphalt); tank car heater operator (combination boiler & booster); tractor operator (50 h.p. or less); Ulmac, Ulric or similar spreader; vibrating machine operator, not hand;

GROUP 4: Grade checker; Oiler; Oiler-Driver

HOURLY PREMIUMS:

The following classifications shall receive $ .25 above GROUP 1 rate:

Clamshells - 3 yds. or over; Cranes - Rigs or Piledrivers, 100 ft. of boom or over (including jib);

Draglines - 3 yds. or over; Hoists - each additional active drum over 2 drums; Shovels - 3 yds. or over;

The following classifications shall receive $ .50 above GROUP 1 rate:

Tandem scoop operator; Cranes - Rigs or Piledrivers, 150 ft.

to 200 ft. of boom (including jib); Tandem scoop.

The following classifications shall receive $ .75 above GROUP 1 rate:

Cranes - Rigs or Piledrivers, 200 ft. of boom or over (including jib.).

ENGI0513-004 05/06/2019

FRANKLIN, JEFFERSON, LINCOLN, ST CHARLES, AND WARREN COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 34.36 27.36

GROUP 2.....................$ 34.36 27.36

GROUP 3.....................$ 33.06 27.36

GROUP 4.....................$ 32.61 27.36

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Backhoe, Cable; Backhoe, Hydraulic (2 cu yds bucket and under regardless of attachment, one oiler for 2 or 3, two oilers for 4 through 6); Backhoe, Hydraulic over 2 cu yds; Cableway; Crane, Crawler or Truck; Crane, Hydraulic - Truck or Cruiser mounted, 16 tons and over; Crane, Locomotive; crane with boom including jib over 100 ft from pin to pin; Crane using rock socket tool; Derrick, Steam;

Derrick Car and Derrick Boat; Dragline, 7 cu yds and over;

Dredge; Gradall, Crawler or tire mounted; Locomotive, Gas, Steam & other powers; Pile Driver, Land or Floating; Scoop, Skimmer; Shovel, Power (Electric, Gas, Steam or other powers); Shovel, Power (7 cu yds and over); Switch Boat;

Whirley; Air Tugger with air compressor; Anchor Placing Barge; Asphalt Spreaker; Athey Force Feeder Loader, self-propelled; Backfilling Machine; Boat Operator - Push Boat or Tow Boat (job site); Boiler, High Pressure Breaking in Period; Boom Truck, Placing or Erecting; Boring Machine, Footing Foundation; Bullfloat; Cherry Picker; Combination Concrete Hoist and Mixer (such as Mixermobile); Compressor, Two 125 CFM and under; Compressor, Two through Four over 125 CFM; Compressor when operator runs throttle; Concrete Breaker (Truck or Tractor mounted); Concrete Pump (such as Pumpcrete machine); Concrete Saw (self-propelled); Concrete Spreader; Conveyor, Large (not selfpropelled) hoisting or moving brick and concrete into, or into and on floor level, one or both; Crane, Cimbing (such as Linden); Crane, Hydraulic - Rough Terrain, self-propelled; Crane, Hydraulic

- Truck or Cruiser mounted - under 16 tons; Drilling machine - Self-powered, used for earth or rock drilling or boring (wagon drills and any hand drills obtaining power from other souces including concrete breakers, jackhammers and Barco equipmnet no engineer required); Elevating Grader; Engine Man, Dredge; Excavator or Powerbelt Machine;

Finishing Machine, self- propelled oscillating screed;

Forklift; Generators, Two through Six 30 KW or over;

Grader, Road with power blade; Greaser; Highlift; Hoist, Concrete and Brick (Brick cages or concrete skips operating or on tower, Towermobile, or similar equipment); Hoist, Three or more drums in use; Hoist, Stack; Hydro-Hammer;

Lad-A-Vator, hoisting brick or concrete; Loading Machine such as Barber-Greene; Mechanic on job site

GROUP 2: Air Tugger with plant air; Boiler (for power or heating shell of building or temporary enclosures in connection with construction work); Boiler, Temporary;

Compressor, One over 125 CFM; Compressor, truck mounted;

Conveyor, Large (not self- propelled); Conveyor, Large (not self- propelled) moving brick and concrete (distributing) on floor level; Curb Finishing Machine; Ditch Paving Machine; Elevator (outside); Endless Chain Hoist; Fireman (as required); Form Grader; Hoist, One Drum regardless of size (except brick or concrete); Lad-A-Vator, other hoisting; Manlift; Mixer, Asphalt, over 8 cu ft capacity;

Mixer, one bag capacity or less; Mixer, without side loader, two bag capacity or more; Mixer, with side loader, regardless of size, not Paver; Mud Jack (where mud jack is used in conjenction with an air compressor, operator shall be paid $ .55 per hour in addition to his basic hourly rate for covering both operations); Pug Mill operator; Pump, Sump - self powered, automatic controlled over 2""; Scissor Lift (used for hoisting); Skid Steer Loader; Sweeper, Street; Tractor, small wheel type 50 HP and under with grader blade and similar equipment; Welding Machine, One over 400 amp; Winch, operating from truck

GROUP 3: Boat operator - outboard motor, job site; Conveyors (such as Con-Vay-It) regardless of how used; Elevator (inside); Heater operator, 2 through 6; Sweeper, Floor

GROUP 4: Crane type

HOURLY PREMIUMS:

Backhoe, Hydraulic 2 cu yds or less without oiler - $2.00;

Crane,climbing (such as Linden) - $.50;

Crane, Pile Driving and Extracting - $ .50 Crane with boom (including job) over 100 ft from pin to pin - add $.01 per foot to maximum of $4.00);

Crane, using rock socket tool - $ .50;

Derrick, diesel, gas or electric hoisting material and erecting steel (150 ft or more above ground) - $ .50;

Dragline, 7 cu yds and over - $ .50;

Hoist, Three or more drums in use - $ .50;

Scoop, Tandem - $.50;

Shovel, Power - 7 cu yds and over - $ .50;

Tractor, Tandem Crawler - $ .50;

Tunnel, man assigned to work in tunnel or tunnel shaft - $ .50;

Wrecking, when machines are working on second floor or higher - $ .50

ENGI0513-006 05/01/2019

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 29.69 27.16

GROUP 2.....................$ 29.34 27.16

GROUP 3.....................$ 29.14 27.16

GROUP 4.....................$ 25.49 27.16

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt finishing machine & trench widening spreader, asphalt plant console operator; autograder;

automatic slipform paver; back hoe; blade operator - all types; boat operator tow; boiler two; central mix concrete plant operator; clam shell operator; concrete mixer paver;

crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine 2 active drums; launchhammer wheel; locomotive operator standrad guage; mechanics and welders; mucking machine; piledriver operator; pitman crane operator; push cat operator;

guad-trac; scoop operator; sideboom cats; skimmer scoop operator; trenching machine operator; truck crane, shovel operator.

GROUP 2: A-Frame; asphalt hot-mix silo; asphalt roller operator asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant mixer operator; backfiller operator; barber-greene loader; boat operator (bridge & dams); chip spreader; concrete mixer operator skip loader;

concrete plant operator; concrete pump operator; dredge oiler; elevating graded operator; fork lift; grease fleet;

hoisting engine one; locomotive operator narrow guage;

multiple compactor; pavement breaker; powerbroom self-propelled; power shield; rooter; slip-form finishing machine; stumpcutter machine; side discharge concrete spreader; throttleman; tractor operator (over 50 hp); winch truck; asphalt roller operator; crusher operator.

GROUP 3: Spreader box operator, self-propelled not asphalt;

tractor operator (50 h.p. or less); boilers one; chip spreader (front man); churn drill operator; compressor over 105 CFM 2-3 pumps 4"" & over; 2-3 light plant 7.5 KWA or any combination thereof; clef plane operator; compressor maintenance operator 2 or 3; concrete saw operator (self-propelled); curb finishing mancine; distributor operator; finishing machine operator; flex plane operator;

float operator; form grader operator; pugmill operator;

riller operator other than high type asphalt; screening & washing plant operator; siphons & jets; subgrading machine operator; tank car heater (combination boiler & booster);

ulmac, ulric or similar spreader; vibrating machine operator; hydrobroom.

GROUP 4: Oiler; grout machine; oiler driver; compressor over 105 CFM one; conveyor operator one; maintenance operator;

pump 4"" & over one.

FOOTNOTE: HOURLY PREMIUMS

Backhoe hydraulic, 2 cu. yds. or under Without oiler - $2.00 Certified Crane Operator - $1.50;

Certified Hazardous Material Operator $1.50;

Crane, climbing (such as Linden) - $0.50;

Crane, pile driving and extracting - $0.50;

Crane, with boom (including jib) over 100' from pin to pin add $0.01 per foot to maximum of $4.00;

Crane, using rock socket tool - $0.50;

Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above the ground) - $0.50;

Dragline, 7 cu. yds, and over - $0.50;

Hoist, three or more drums in use - $0.50; Scoop, Tandem - $0.50;

Shovel, power - 7 cu. yds. or more - $0.50;

Tractor, tandem crawler - $0.50;

Tunnel, man assigned to work in tunnel or tunnel shaft - $0.50;

Wrecking, when machine is working on second floor or higher - $0.50;

ENGI0513-007 05/06/2019

ST. LOUIS CITY AND COUNTY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 34.36 27.36

GROUP 2.....................$ 34.36 27.36

GROUP 3.....................$ 33.06 27.36

GROUP 4.....................$ 32.61 27.36

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Backhoe, cable or hydraulic; cableway; crane crawler or truck; crane, hydraulic-truck or cruiser mounted 16 tons & over; crane locomotive; derrick, steam; derrick car & derrick boat; dragline; dredge; gradall, crawler or tire mounted; locomotive, gas, steam & other powers; pile driver, land or floating; scoop, skimmer; shovel, power (steam, gas, electric or other powers); switch boat;

whirley.

GROUP 2: Air tugger w/air compressor; anchor-placing barge;

asphalt spreader; athey force feeder loader (self-propelled); backfilling machine; backhoe-loader; boat operator-push boat or tow boat (job site); boiler, high pressure breaking in period; boom truck, placing or erecting; boring machine, footing foundation; bull- float;

cherry picker; combination concrete hoist & mixer (such as mixer mobile); compressor (when operator runs throttle);

concrete breaker (truck or tractor mounted); concrete pump, such as pump-crete machine; concrete saw (self-propelled), concrete spreader; conveyor, large (not self-propelled), hoisting or moving brick and concrete into, or into and on floor level, one or both; crane, hydraulic-rough terrain, self-propelled; crane hydraulic-truck or cruiser mounted-under 16 tons; drilling machines, self-powered use for earth or rock drilling or boring (wagon drills nd any hand drills obtaining power from other sources including concrete breakers, jackhammers and barco equipment-no engineer required); elevating grader; engineman, dredge;

excavator or powerbelt machine; finishing machine, self-propelled oscillating screed; forklift; grader, road with power blade; highlift. greaser; hoist, stack, hydro-hammer; loading machine (such as barber-greene);

machanic, on job site; mixer, pipe wrapping machines; plant asphalt; plant, concrete producing or ready-mix job site;

plant heating-job site; plant mixing-job site; plant power, generating-job site; pumps, two through six self-powered over 2""; pumps, electric submersible, two through six, over 4""; quad-track; roller, asphalt, top or sub-grade; scoop, tractor drawn; spreader box; sub-grader; tie tamper;

tractor-crawler, or wheel type with or without power unit, power take-offs and attachments regardless of size;

trenching machine; tunnel boring machine; vibrating machine automatic, automatic propelled; welding machines (gasoline or diesel) two through six; well drilling machine

GROUP 3: Conveyor, large (not self-propelled); conveyor, large (not self-propelled) moving brick and concrete distributing) on floor level; mixer two or more mixers of one bag capacity or less; air tugger w/plant air; boiler, for power or heating on construction projects; boiler, temporary; compressor (mounted on truck; curb finishing machine; ditch paving machine; elevator; endless chain hoist; form grader; hoist, one drum regardless of size;

lad-a-vator; manlift; mixer, asphalt, over 8 cu. ft.

capacity, without side loader, 2 bag capacity or more;

mixer, with side loader, regardless of size; pug mill operator; pump, sump-self-powered, automatic controlled over 2"" during use in connection with construction work;

sweeper, street; welding machine, one over 400 amp.; winch operating from truck; scissor lift (used for hoisting);

tractor, small wheel type 50 h.p. & under with grader blade & similar equipment; Oiler on dredge and on truck crane.

GROUP 4: Boat operator-outboard motor (job site); conveyor (such as con-vay-it) regardless of how used; sweeper, floor

HOURLY PREMIUMS:

Backhoe, hydraulic 2 cu. yds. or under without oiler $2.00 Certified Crane Operator 1.50 Certified Hazardous Material Operator 1.50 Crane, climbing (such as Linden) .50 Crane, pile driving and extracting .50 Crane, with boom (including jib) over 100' (from pin to pin) add $.01 per foot to maximum of 4.00 Crane, using rock socket tool .50 Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above ground) .50 Dragline, 7 cu. yds. and over .50 Hoist, three (3) or more drums in use .50 Scoop, Tandem .50 Shovel, power - 7 cu. yds. or more .50 Tractor, tandem crawler .50 Tunnel, man assigned to work in tunnel or tunnel shaft .50 Wrecking, when machine is working on second floor or higher .50

IRON0010-012 04/01/2019

Rates Fringes

Ironworkers:

ANDREW, BARTON, BENTON,

CAMDEN, CEDAR, CHARITON,

CHRISTIAN, COOPER, DADE,

DALLAS, DAVIESS, DE KALB,

GENTRY, GREENE, GRUNDY,

HARRISON, HICKORY, HOLT,

HOWARD, LACLEDE, LINN,

LIVINGSTON, MERCER,

MONITEAU, MORGAN, NODAWAY,

PETTIS, POLK, PUTNAM,

RANDLOPH, ST. CLAIR,

SULLIVAN, TANEY, VERNON,

WEBSTER, WRIGHT and WORTH Counties and portions of

ADAIR, BOONE, MACON,

MILLER and RANDOLPH Counties....................$ 30.55 30.44

ATCHISON, BATES, BUCHANAN,

CALDWELL, CARROLL, CASS,

CLAY, CLINTON, HENRY,

JACKSON, JOHNSON,

LAFAYETTE, PETTIS, PLATTE,

SALINE, AND RAY COUNTIES....$ 33.55 30.44

IRON0321-002 09/01/2019

DOUGLAS, HOWELL and OZARK COUNTIES

Rates Fringes

Ironworker.......................$ 21.10 19.01

IRON0396-004 08/07/2019

ST. LOUIS (City and County), ST. CHARLES, JEFFERSON, IRON, FRANKLIN, LINCOLN, WARREN, WASHINGTON, ST. FRANCOIS, STE.

GENEVIEVE, and REYNOLDS Counties; and portions of MADISON, PERRY, BOLLINGER, WAYNE, and CARTER Counties

Ironworker.......................$ 34.91 27.36

IRON0396-009 08/07/2019

AUDRAIN, CALLAWAY, COLE, CRAWFORD, DENT, GASCONADE, MARIES,

MONTGOMERY, OSAGE, PHELPS, PIKE, PULASKI, TEXAS and WRIGHT

Counties; and portions of BOONE, CAMDEN, DOUGLAS, HOWELL, LACLEDE, MILLER, MONROE, OREGON, SHANNON and RALLS Counties

Ironworker.......................$ 30.44 27.36

IRON0577-005 06/01/2019

ADAIR, CLARK, KNOX, LEWIS, MACON, MARION, MONROE, RALLS,

SCHUYLER, SCOTLAND, AND SHELBY COUNTIES

Ironworker.......................$ 26.60 24.00

IRON0584-004 06/01/2019

BARRY, JASPER, LAWRENCE, MCDONALD, NEWTON AND STONE Counties

Rates Fringes

Ironworkers:.....................$ 26.00 15.35

IRON0782-003 05/01/2019

CAPE GIRARDEAU, MISSISSIPPI, NEW MADRID, SCOTT, & STODDARD

Counties; and portions of BOLLINGER, BUTLER, CARTER, DUNKLIN, MADISON, PEMISCOT, PERRY, RIPLEY, and WAYNE Counties

Ironworkers:

Locks, Dams, Bridges and other major work on the Mississippi and Ohio River only........................$ 31.63 24.27 All Other Work..............$ 27.38 23.29

LABO0042-003 03/06/2019

ST. LOUIS (City and County)

Rates Fringes

LABORER

Plumber Laborer.............$ 33.22 15.67

LABO0042-005 03/06/2019

ST. LOUIS (City and County)

LABORER

Dynamiter, Powderman........$ 33.22 15.67 Laborers, Flaggers..........$ 33.22 15.67 Wrecking....................$ 33.22 15.67

LABO0424-002 05/01/2016

Rates Fringes

LABORER

ADAIR, AUDRAIN, BOONE,

CALLAWAY, CHARITON, CLARK,

COLE, COOPER, HOWARD,

IRON, KNOX, LEWIS, LINN,

MACON, MADISON, MARION,

MILLER, MONITEAU, MONROE,

PERRY, PIKE, PUTNAM,

RALLS, RANDOLPH, REYNOLDS,

ST. FRANCOIS, STE.

GENEVIEVE, SCHUYLER,

SCOTLAND, SHELBY AND

SULLIVAN COUNTIES

GROUP 1....................$ 27.96 13.17

GROUP 2....................$ 27.96 13.17

BOLLINGER, BUTLER, CAPE

GIRARDEAU, CARTER,

CRAWFORD, DENT, DUNKLIN,

GASCONADE, HOWELL, MARIES,

MISSISSIPPI, NEW MADRID,

OREGON, OSAGE, PEMISCOT,

PHELPS, PULASKI, RIPLEY,

SCOTT, SHANNON, STODDARD,

TEXAS, WASHINGTON AND

WAYNE COUNTIES

GROUP 1....................$ 27.96 13.17

GROUP 2....................$ 27.96 13.17

FRANKLIN COUNTY

GROUP 1....................$ 29.71 13.17

GROUP 2....................$ 30.31 13.17

JEFFERSON COUNTY

GROUP 1....................$ 29.76 13.17

GROUP 2....................$ 30.36 13.17

LINCOLN,…