This document is an amendment to a solicitation for repairs to levee systems and related features damaged during the 2019 flood event in Missouri. The work includes excavation, placement of fill materials, construction of quarried stone bank erosion protection features, temporary seeding for summer 2020, and permanent seeding in fall 2020. The required response date for offers was extended from April 7 to April 10, 2020 due to changes in specifications and drawings. Specification sections on exterior plants and quality control were revised. A drawing detail dimension was deleted. Offerors must acknowledge all amendments. The U.S. Army Corps of Engineers District in Kansas City is the issuing agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Page for details of this Amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20B1010
X 9B. DATED (SEE ITEM 11)
06-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Apr-2020
CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ-20-B-1010
32 93 00 - 2
W912DQ20B1010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION PAGE
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
1. The required response date/time has changed from 07-Apr-2020 02:00 PM to 10-Apr-2020 02:00 PM.
2. SPECIFICATIONS:
Add Specification Section 32 93 00 EXTERIOR PLANTS
Revise Specification Section 01 35 26 paragraph 1.6.1.1.1 to read:
The SSHO may also serve as the Quality Control Manager. The SSHO may not also serve as the Superintendent.
3. DRAWINGS:
CS502: Deleted dimension from detail A1.
4. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided. Failure to acknowledge all amendments may cause rejection of the proposal.
5. All other terms and conditions remain unchanged and in full force.
SECTION TABLE OF
CONTENTS DIVISION 32 -
EXTERIOR IMPROVEMENTS
SECTION 32
93 00
EXTERIOR
PLANTS
02/10
PART 1 GENERAL
1.1 SCOPE
1.2 DEFINITIONS
1.3 QUALIFICATIONS OF CONTRACTOR
1.4 PLANT MATERIAL REQUIREMENTS
1.5 SUBM
ITTALS PART
PROD
UCTS
2.1 SOURCE OF PLANT MATERIALS
2.2 PLANT MATERIALS
2.3 PLANT COLLECTION, DELIVERY, HANDLING, STORAGE AND PROTECTION
2.3.1 Collection
2.3.2 Delivery
2.3.3 Handling
32 93 00 - 3
2.3.4 Storage and Protection
2.4 SUBSTITUTION OF COMPONENTS OF PLANT
MATERIALS PART 3 EXECUTION
3.1 PLANT INSTALLATION WINDOWS
3.2 PLANT INSTALLATION LOCATIONS FOR THIS PROJECT
3.2.1 Willow
3.3 DORMANT LIVE STAKE INSTALLATION
3.4 PLANT MATERIAL MAINTENANCE
-- End of Section Table of Contents --
32 93 00 - 4
SECTION 32 93 00
EXTERIOR PLANTS
02/10
PART 1 GENERAL
1.1 SCOPE
This section covers all labor, equipment, live cut branches, and supplies needed for the installation of herbaceous and woody live and dormant plants to be installed as Plant Materials in the form of live stakes.
1.2 DEFINITIONS
a. Dormant Season
The non-growing season for woody species, when they have set their buds, and photosynthesis in the leaves has stopped (top growth is no longer occurring).
b. Harvesting Site
Approved existing, natural, native growing sites that lie within a 250-mile radius of the project site, or approved cultivated sites.
c. Installation Zone See plans.
1.3 QUALIFICATIONS OF CONTRACTOR
The Contractor shall have demonstrated experience in the installation of Plant Materials in similar projects in size and nature. The Contractor shall meet the requirements as specified elsewhere in the contract documents.
1.4 PLANT MATERIAL REQUIREMENTS
Plant Materials used for the project shall originate from local genotypes, and must be from a local source, as much as possible. Seed or plant parts used for propagation of Plant Materials shall have originated from a location within a 250-mile radius of the project.
Plant Materials to be used for the project shall be disease free, free of pests, and shall be alive and free of environmental stresses.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The "RO designation identifies the Resident Officer. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
32 93 00 - 5 stakes will be placed
Plant Materials; G, RO
The Contractor shall submit to the Contracting Officer the harvesting site of Plant Materials or original packing slips if obtained from a commercial source within 30 days of their expected use. Plant Materials shall be reviewed by the Contracting Officer.
Plant Materials not meeting the requirements of the project will be rejected, and shall be replaced with Plant Materials that do meet the requirements of the project. The Contractor shall replace rejected Plant Materials within 10 days of notification.
PART 2 PRODUCTS
2.1 SOURCE OF PLANT MATERIALS
The Contractor shall make quantity adjustments as necessary to ensure an adequate supply and excess quantity of Plant Materials to fulfill the requirements of the contract. If willows are not obtained from a commercial source, the Contractor shall provide the Contracting Officer with a Letter of Agreement signed by the Contractor and landowner specifying terms of collection of cuttings. The Contracting Officer must approve the source of all cuttings, in writing. The Contracting Officer has the right of rejection of any woody plant cuttings. Additional plants may be needed during maintenance of the project throughout the warrantee / guarantee period. Such additional quantities shall be considered incidental and at no additional cost to the Contracting Officer.
2.2 PLANT MATERIALS
Common Name Latin Name Size/Type
Salix nigra Black Willow live stake
Salix interior Sandbar Willow live stake
All plant materials must be top quality stock. Plant materials shall be true to species. They shall be sound, healthy, specimens and first-class representatives of their species. Plant materials that have serious injuries, insect pests, diseases, or are shriveled, will be rejected.
Willow stakes are woody plant cuttings, capable of rooting, that are taken from trees and shrubs.
Willow stakes shall be cut using a clean, sanitized sharp tool or purchased from a commercial source. Live willow stakes shall be 6 to 8 feet in length with a bottom end of 0.5 to 1.5 inches in diameter. The top ends shall be blunt; bottom ends shall be angled at 45 degrees. Stakes shall be stripped of all stems and leaves, taking care to minimize scarring or bruising of the willow stakes. Buds shall be left in place. Immediately upon cutting, willow in water in a shaded area.
2.3 PLANT COLLECTION, DELIVERY, HANDLING, STORAGE AND PROTECTION
The Contractor shall provide for the proper collection, care, storage, and handling of plant materials before planting. During all stages, the plant materials shall be protected from exposure to wind and direct sunlight.
32 93 00 - 6
2.3.1 Collection
Willow stakes shall be purchased or collected. If collected, willow stakes shall be collected while dormant, preferably from October 1 through February 8. Willow stakes should be planted no later than May 31.
2.3.2 Delivery
The Contractor shall notify the Contracting Officer of the delivery schedule in advance so the plant materials may be inspected upon arrival at the job site. The Contracting Officer will inspect the cuttings for damage immediately upon receipt. Unacceptable cuttings will be removed from the job site immediately and disposed of at an authorized site.
2.3.3 Handling
Install willow stakes within 12 hours of collection. If planting does not occur within 6 hours, plant material must be properly stored according to guidelines provided in Section 2.3.4 of this specification.
2.3.4 Storage and Protection
All live stakes collected more than 12 hours prior to installation must be carefully bound, secured, and stored submerged in clean fresh water for a period of up to two weeks. If stored outdoors, outdoor temperatures must be less than 60 degrees F. If the willow stakes cannot be installed during the dormant season, cut during the dormant season and hold in cold storage at temperatures between 33 and 39 degrees F for up to 2 months.
2.4 SUBSTITUTION OF COMPONENTS OF PLANT MATERIALS
Willows (salix nigra and salix interior) are a relatively common plant species and generally readily available. It is not anticipated that there will be a need for a substitute species. The Contractor and Contracting Officer shall consult the Corps project biologist if any substitution is suggested. The Contracting Officer shall consider substitutions in Plant Materials in writing from the Contractor.
PART 3 EXECUTION
3.1 PLANT INSTALLATION WINDOWS
Planting shall be conducted as soon as practicable during and/or after construction.
3.2 PLANT INSTALLATION LOCATIONS FOR THIS PROJECT
3.2.1 Willow
Willows are to be planted as shown on the site plans. Willow planting shall be coordinated with the Contracting Officer
3.3 DORMANT LIVE STAKE INSTALLATION
The Contractor shall inform the Contracting Officer of the date that the stakes will be planted seven days prior to stake installation. The Contractor shall flag all plant material locations for approval. The Contracting Officer may require adjustments to plant material locations to meet field conditions. Actual planting shall be performed only when weather and soil conditions are suitable and in accordance with locally accepted practice, as approved by the Contracting Officer. Plant Materials shall be placed in staggered rows following the finished contour with a two foot average spacing. A stinger, auger, or other suitable tool may be used to facilitate stake installation.
Contractor shall follow other general planting practices considered normal and prudent by the industry. Eighty percent of the stake will be installed below ground, leaving only twenty percent of the willow extending above ground. Stakes shall be places deep enough to reach wet soil during dry summers. Stakes shall be planted with the buds facing up.
3.4 PLANT MATERIAL MAINTENANCE
The Contractor shall be responsible for the maintenance of 100% of Plant Materials throughout the duration of the construction project. All plants shall be alive and growing (or dormant) throughout the duration of the project until completion of the warrantee / guarantee period, and maintenance period, as determined elsewhere in the contract documents.
-- End of Section --
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 07-Apr-2020 02:00 PM to 10-Apr-2020 02:00 PM.