Section A – Solicitation/Contract Form
Synopsis/Solicitation
This is a combination synopsis/solicitation for commercial items prepared in accordance with the format in the
Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
The solicitation number for this acquisition is W912DQ19R1075 and it is being issued as a Request for
Proposal(RFP). The solicitation document and incorporated provisions and clauses are those in effect through
Federal Acquisition Circular (FAC) 2005-94 (effective 19 January 2017).
This acquisition is set aside 100% for small business concerns. The associated North American Industry
Classification System (NAICS) code is 561720- Janitorial Services and the associated small business size standard is $18 million.
A list of the contract line item numbers and items (CLINs), quantities, and units of measure are detailed in
Section B of this combined synopsis/solicitation.
A description of requirements (PWS/SOW) for the items to be acquired are detailed in Section C of this combined synopsis/solicitation.
The dates, places of delivery and acceptance are detailed in Sections E and F of this combined synopsis/solicitation.
FAR 52.212-1, Instructions to Offerors – Commercial, does apply to this acquisition with no addenda to the provision and is located in Section L of this combined synopsis/solicitation.
FAR 52.212-2, Evaluation -- Commercial Edited does apply to this acquisition with no addenda to the provision and is located in Section M of this combined synopsis/solicitation.
FAR 52.212-3, Offeror Representations and Certifications – Commercial Items, does apply to this acquisition with no addenda to the provision, and is located in Section K of this combined synopsis/solicitation. If the offeror has up-to-date representations and certifications in the System for Award Management (SAM) website, then this completed provision is not required to be submitted with the offeror’s proposal.
FAR 52.212-4, Contract Terms and Conditions – Commercial Items, does apply to this acquisition with no addenda to the provision, and the specific clauses required are located in Section I of this combined synopsis/solicitation.
System for Award Management
In accordance with FAR 52.212-1(k): By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://sam.gov/portal/SAM/#1 . It is highly encouraged that all prospective Offeror’s start the SAM registration process as soon as possible.
OFFEROR MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) WITHIN
7 DAYS OF THE CLOSE OF THE SOLICITATION OR THE CONTRACTING OFFICER MAY
PROCEED WITH AWARD TO THE NEXT SUCCESSFUL OFFEROR.
If you were not previously registered, please go to https://sam.gov. Instructions for new registration are also located at the following link:
https://www.sam.gov/sam/transcript/Quick_Guide_for_Contract_Registrations_v1.7.pdf
If you have questions about Federal Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help.
https://sam.gov/portal/SAM/#1 https://sam.gov/ https://www.sam.gov/sam/transcript/Quick_Guide_for_Contract_Registrations_v1.7.pdf
The PTAC was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Federal Government marketplace. To locate a PTAC near you, go to https://www.aptac-us.org/sam-registration/. THIS IS A FREE SERVICE BY A NON PROFIT PAID FOR BY THE US
GOVERNMENT
SAM UPDATE:
GSA has taken action to address alleged fraudulent activity in the System for Award Management (SAM). The measures GSA already has in place to help prevent improper activity in SAM include masking specific data elements in the entity registration even for authorized entity users; requiring “parent” approval of new registrations for their “child” entities; and requiring the formal appointment of the Entity Administrator by original, signed notarized letter.
Additional enhanced controls have been deployed. These controls include implementing multi-factor authentication using login.gov and notifying Entity Administrators when there is a change in the entity’s bank account information.
NOTARIZED LETTER PROCESS CHANGES
How has the notarized letter review process changed?
All non-Federal entities who create or update their registration in SAM.gov will no longer need to have an approved
Entity Administrator notarized letter on file before their registration is activated. This applies to you if your
SAM.gov Purpose of Registration is either Federal Assistance or All Awards. Check SAM.gov to find your Purpose of Registration. All non-Federal entities still must mail the original, signed copy of the notarized letter to the Federal
Service Desk.
Where can I find the notarized letter templates?
Read the instructions for domestic entities or instructions for international entities posted at the Federal Service
Desk.
Where do I send the notarized letter?
You must mail the original, notarized letter to:
FEDERAL SERVICE DESK
ATTN: SAM.GOV REGISTRATION PROCESSING
460 INDUSTRIAL BLVD
LONDON, KY 40741-7285
Please use the below address if you decide to mail in your proposal:
Dale Coleman
ATTN: CECT-NWK-C
647 Federal Building
601 E 12th Street, Room 647
Kansas City, Missouri 64106 dale.e.coleman@usace.army.mil
The Government reserves the right to cancel this combined synopsis/solicitation. All questions should be emailed to
Mr. Dale Coleman at dale.e.coleman@usace.army.mil .
https://www.aptac-us.org/sam-registration/ https://www.aptac-us.org/sam-registration/ mailto:dale.e.coleman@usace.army.mil mailto:dale.e.coleman@usace.army.mil
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
FY 2020 Base year Janitorial Services
FFP
Provide Janitorial Services for Wilson Lake. Services shall be provided in accordance with the attached performance work statement. The period of performance for these services is 01 OCT 2019 – 30 September 2020
NET AMT
0001AA 6 Months Admin/ Maint Shop Building, OCT-MAR
FFP
Perform ONCE per week on Sundays, OCT - MAR
FOB: Destination
0001AB 6 Months Admin, Maint / Shop Building, APR-SEP
FFP
Perform TWICE per week on Sundays & Wednesdays, APR - SEP
0001AC 2 Months Sylvan Shower Bldg & Sidewalks, OCT&APR
FFP
Perform TWICE per week on Sundays & Wednesdays, OCT &APR
0001AD 5 Months Sylvan Shower Bldg & Sidewalks, NOV-MAR
FFP
Perform ONCE per week on Sundays, NOV thru MAR
OPTION FY 2021 option year Janitorial Services
FFP
Provide Janitorial Services for Wilson Lake. Services shall be provided in performance for these services is 01 OCT 2020 – 30 September 2021
0002AA 6 Months OPTION Admin, Maint / Shop Building, OCT-MAR
FFP
Perform TWICE per week on Sundays & Wednesdays, OCT-MAR
0002AB 6 Months OPTION Admin, Maint / Shop Building, APR-SEP
FFP
0002AC 2 Months OPTION Admin, Maint / Shop Building, OCT & APR
FFP
Perform TWICE per week on Sundays & Wednesdays, OCT&APR
0002AD 5 Months OPTION Sylvan Shower Bldg & Sidewalks, NOV-MAR
FFP
OPTION FY 2022 option year Janitorial Services
FFP
Provide Janitorial Services for Wilson Lake. Services shall be provided in performance for these services is 01 OCT 2021 – 30 September 2022
0003AA 6 Months OPTION Admin, Maint / Shop Building, OCT-MAR
FFP
0003AB 6 Months OPTION Admin, Maint / Shop Building, APR-SEP
FFP
0003AC 2 Months OPTION Admin, Maint / Shop Building, OCT & APR
FFP
Perform TWICE per week on Sundays & Wednesdays, OCT & APR
0003AD 5 Months OPTION Sylvan Shower Bldg & Sidewalks, NOV-MAR
FFP
OPTION FY 2023 option year Janitorial Services
FFP
Provide Janitorial Services for Wilson Lake. Services shall be provided in performance for these services is 01 OCT 2022 – 30 September 2023
0004AA 6 Months OPTION Admin, Maint / Shop Building, OCT-MAR
FFP
0004AB 6 Months OPTION Admin, Maint / Shop Building, APR-SEP
FFP
0004AC 2 Months OPTION Admin, Maint / Shop Building, OCT & SEP
FFP
0004AD 5 Months OPTION Sylvan Shower Bldg & Sidewalks, NOV-MAR
FFP
OPTION FY 2024 option year Janitorial Services
FFP
Provide Janitorial Services for Wilson Lake. Services shall be provided in performance for these services is 01 OCT 2023 – 30 September 2024
0005AA 6 Months OPTION Admin, Maint / Shop Building, OCT-MAR
FFP
0005AB 6 Months OPTION Admin, Maint / Shop Building, APR-SEP
FFP
0005AC 2 Months OPTION Admin, Maint / Shop Building, OCT & APR
FFP
0005AD 5 Months OPTION Sylvan Shower Bldg & Sidewalks, NOV-MAR
FFP
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
STATEMENT OF WORK
JANITORIAL SERVICES
WILSON LAKE PROJECT
(5 year : FY 2020 – 2024)
SCOPE OF CONTENT:
Location: Wilson Lake Project U.S. Army Corps of Engineers 4860 Outlet Blvd Sylvan Grove, KS 67481
The services furnished under this contract shall consist of a pre-work conference, and furnishing labor, material and equipment, to maintain the facilities (listed below at the Wilson Lake Project, near Sylvan Grove, Kansas) in a clean and orderly conditions and in accordance with general commercial practices.
Services shall be performed in the facilities listed below, subject to the level of quality as establish in the terms of performance:
Administration Building Approximately 66’ X 73’ Main Maintenance Shop Approximately 32’ X 64’ Carpenters Shop Approximately 29’ X 32’ Sidewalks Approximately 1100 sq ft Sylvan Park Shower Building Approximately 26’ x 13’
PREWORK CONFERENCE:
After award, but prior to commencement of work, the Contractor shall contact the Natural Resource Manager to arrange a mutually agreeable time to meet at the Project Office. The purpose of this meeting will be to develop a mutual understanding of the details of the work to be performed.
DOCUMENTS AND CORRESPONDENCE:
After award, all documents and related correspondence shall be routed through the Contracting Officer’s Representative at the Project Office.
WORKMANSHIP:
a. Public buildings often form the visitor’s “first impression” of the Corps of Engineers, and janitorial services will be inspected against a very rigid standard.
Contractor will maintain serviced facilities in an overall clean condition and very few deficiencies will be permitted. This standard will be required in the
Administration Building, Main Maintenance Building, Carpenter Shop, Sylvan Park Shower Building and all corresponding sidewalks.
b. The Contractor shall designate, in writing, a responsible member of each work crew who shall serve as the contact for matters involving quality and performance or nonperformance of the required work assigned to that crew. The employee(s) designated in accordance with the above requirement shall be qualified and fully competent with full authority to act on behalf of the Contractor as necessary to insure that the required work is performed in strict accordance with the specifications and standards contained herein. The Contractor shall furnish the above written designation to the Contracting Officer’s Representative at the project no later than the first day of work.
c. The designation shall include the name(s), address(es), and telephone number
(s) of the responsible individual(s). The Contracting Officer reserves the right to disapprove any individual whom he considers to be incompetent to perform the work required. Such disapproval’s will be given to the Contractor by written notice, and the Contracting Officer’s decision shall represent a final decision.
d. All contractor personnel shall be fully clothed, at all times, while performing these services. “Fully clothed” shall be deemed to mean that a shirt (T-shirt), trousers and shoes shall be worn at all times. Clothing shall be clean and neat in appearance.
e. Contractor personnel shall utilize tact, diplomacy, and courtesy at all times during contact with the public.
f. To assist the visiting public in reclaiming lost articles, all property left by visitors and found during cleanup operation shall be turned in to the Project Office.
g. Any evidence of vandalism, instances of facilities not operating properly, or facilities in need of repair shall be reported to the Project personnel.
PERFORMANCE:
a. Building and fixtures, baseboards, door trim, furniture, etc., shall not be scratched or disfigured by tools utilized in cleaning. Furniture and other items moved during cleaning shall be returned to their proper locations. Upon completion, rooms shall appear orderly and well cared for.
b. Care shall be taken to insure that no staining of floors, baseboards, walls, furniture, woodwork or paper products will result due to water and cleaning supplies utilized by the contractor.
c. Janitorial service is directly related to public health and sanitation; therefore, it is essential that all facilities be serviced as specified. In the event that an area or items within a facility are missed or are not properly cleaned, the Contractor agrees to return and re-clean the area or affected items immediately upon receipt of such notice from the Contacting Officer or his authorized representative.
d. If it becomes apparent to the Government during the Contractor’s performance that the required services are unsatisfactory or may not be completed within the time required herein, the Contracting Officer may require the Contractor to provide additional labor at no additional cost to the Government. Such direction will be issued to insure that required services will be satisfactorily completed within the timeframe specified.
e. The Contractor shall establish a work schedule within the times set forth in , DELIVERIES OR PERFORMANCE, indicating the hours during which services will be Performed on a regular basis. The schedule shall be submitted in writing to the Natural Resource Manager for his approval no later than the first day of work. Changes in the approval schedule shall be submitted for approval to the Natural Resource Manager prior to implementation.
DUTIES:
a. The following listed duties shall be performed as indicated in the “Frequency” column. The following legend will be used to indicate the frequency of services to be performed. (See DELIVERIES OR PERFORMANCE, for detail.)
FLOOR CLEANING
FREQUENCY
1. CARPET, approx. 1400 sq. feet.
(a) Vacuum and remove spots Each Visit
2. TILE (ceramic or vinyl, approx. 600 sq. feet
(a) Sweep, damp mop and buff to maintain a clean and well cared for appearance. Each Visit
3. CONCRETE FLOORS, approx.2080 sq. feet. (utility room, 2 shops)
Sweep, remove dirt, and debris (use floor compound In accordance with project policy) Each Visit
NOTE: Care shall be taken on cleaning to prevent contamination of parts, tools, Disassembled machinery, etc., with dirt, dust, water or chemicals from cleaning agents. Contractor shall clean around machines, tools and equipment. Without out moving them.
4. FURNITURE (includes displays, cabinets, shelves, etc.)
Fabric
(a) Vacuum upholstery and dust exposed frame Monthly Vinyl Wash vinyl upholstery with wet or damp cloth using cleaners and vinyl preservatives as may be Appropriate.
Wash exposed frame and apply wax or Preservatives as may be appropriate for the type of frame Monthly Wooden
(a) Dust with dry cloth Each Visit
Metal
(a) dust with dry or dampened cloth Each Visit
(b) wash with cleansers Monthly
5. WINDOW ACCESSORIES(Shades and blinds)
Dust, Vacuum Monthly
6. GLASS CLEANING:
Both sides of interior door glass, glass dividers, display case Etc. and inside surface of exterior doors and windows approx.
270 sq. feet. Each Visit
Exterior windows and doors (when temperature is above freezing) Include both sides of storm windows and doors And exterior surface of all exterior windows and doors. Will require contractor to use their own provided ladder. Monthly
7. DOORS, DOOR FRAMES, WINDOW FRAMES, AND WALL CLEANING
Painted, papered, tiled and fabric covered, approx. 1500 sq. feet Spot clean, wipe down, dust or vacuum according to surface type.
Spot clean, wash down with damp cloth or scrub brush with cleanser, vacuum and shampoo, etc. Apply wax, or other surface preservatives, as appropriate for the type of surface, as directed by the Natural Resource Manager. Monthly
8. LIGHT FIXTURES (19)
Dust , wipe, etc. to remove dust and cobwebs Weekly
9. SINKS COUNTER TOPS AND APPLIANCES
Sinks and countertops shall be scrubbed clean and appliances Wiped down Each Visit
10. ELECTRONIC EQUIPMENT
Lightly dust all electronic phones, keyboards, monitors, computers, radios, calculators with a dry feather or cloth.
No cleaning agents shall be used on electronic equipment.
Monthly
11. WASTE REMOVAL
Waste baskets shall be emptied and wiped clean and plastic trash bag liners replaced in all building trash cans.
Each Visit
12. WATER FOUNTAINS AND RESTROOM FIXTURES
Water fountains, lavatories, stools, urinals, partitions, mirrors, chrome Fixtures, etc., shall be scrubbed clean, dried, and shiny surfaces buffed with a soft cloth to restore sheen Each Visit
13. CLEANUP OF KITCHENETTE
Kitchenette area to include stove, microwave, sink, outside of refrigerator, and countertop will be cleaned, dusted, and disinfected. Each Visit
14. CEILINGS
Check ceilings and clean as needed to remove spots, dust and cobwebs Each Visit
15. EXTERIOR BUILDING ROOF OVERHANG
Remove cobwebs, insect nests (wasp & mud dauber), bird nests, etc. Will require contractor to use their own provided ladder.
Weekly
16. SIDEWALKS in front and behind office and maintenance building.
(a) Sweep, pick up and deposit litter in trash receptacle. Weekly
(b) Hose off sidewalk (when temperature is above freezing). Weekly
17. MISCELLANEOUS
(a.) Toilet tissue, paper towels, soap and deodorant blocks shall be Each Visit restocked as needed. Antibacterial liquid hand soap will be required to be stocked and supplied as needed in the restrooms in the office and maintenance building. No soap required in shower building. Toilet tissue shall be minimum standard of quilted 2-ply.
(b.) The office drinking water cooler shall be stocked with Each Visit 4oz paper cone water cups as needed
(c.) All refuse and debris collected during performance of services shall be deposited in a Government furnished trash receptacle, as directed by the Natural Resource Manager. Each Visit
(d.) As each item of the work is accomplished, the Contractor’s Each Visit representative at the job, or his/her employee (s) performing the work, shall complete that portion of the Contractor’s Daily Worksheet indicating the time the task was completed.
Completed worksheets shall be signed and delivered each day services are performed, as directed by the Contracting Officer or his authorized representative.
18. SYLVAN PARK SHOWER BUILDING AND SIDEWALKS
(One time per week (Sunday) 1 November – 31 March)
(Two times per week (Sunday / Wednesday) Entire Month of October & April)
(a.) All bright surfaces (to include but not limited to chrome or bright metal, porcelain, ceramic tile, and glossy painted surfaces) shall provide a dried polished appearance free of dirt, cleaning solution, disinfectant, and water spots.
An adequate supply of paper products (toilet paper and paper towels) will be maintained at all times.
(b.) Ceilings - Clean ceilings on inside and overhang on outside of buildings and vents and grills to remove spider webs, dust, bird and insect nests, dirt, and insect spots. If soap or disinfectant is used, rinse with clean water and wipe dry.
(c.) Walls, shower stalls, benches, partitions, stools (flush-type), wash basins, doors and refuse containers – Clean and disinfect to ensure a condition free of all dirt, oil, lotions, soap residue, calcium deposits or other foreign matter. All surfaces including soap trays, faucets, stool lids, handicap bars, and plumbing fixtures shall present a dried polished appearance free of dirt, cleaning solution, disinfectant, and water spots. Exterior walls shall have spider webs, dust, bird and insect nests, debris and grass clippings removed.
(d.) Floors and floor drain plates – Shall be disinfected and free of all dirt, sand, foreign matter, trash, and excess water.
(e.) Mirrors – Shall be free of dirt, dust, smudges, water spots, and streaks.
(f.) Light Fixtures - Remove all dirt, dust, bugs, cobwebs, smudges, and streaks from fixtures, bulbs and grill. Reinstall grillwork and ensure light bulbs work.
(g.) Metal louvers – Maintain a clean appearance free of spider webs, bird and insect nests, bird droppings, dirt, dust, or other foreign matter.
NOTE: All quantities are estimated. The Contractor shall be responsible for determining exact quantities and conditions affecting performance of this work.
19. DELIVERIES OR PERFORMANCE
(a.) EFFECTIVE DATE OF THIS INSTRUMENT:
This Contract shall be effective on 1 October (or date of award, if later) and shall remain in full force and effect through 30 September.
Effective dates for full year renewal options (if included and exercised) shall be from 1 October through 30 September of the following year.
20. PERIOD OF REQUIRED SERVICES:
Services shall be performed in accordance with the schedules shown below, for the service period of 1 October through 30 September between the hours of 4 p.m. and 6 a.m. All cleaning services shall be performed any time between 4 p.m. and 6 a.m. except as otherwise provided for herein, at such times and in such manner as to not interfere with the office operations, as directed by the Natural Resource Manager. Services shall be performed as follows:
DAILY DUTIES:
April – September. Two times per week. Sunday and Wednesday.
October – March. One time per week. Sunday ONCE WEEKLY DUTIES: One time per week during first cleanup.
BIWEEKLY DUTIES: Second and Fourth weeks of each month.
MONTHLY DUTIES: Once during the first week of each month.
QUARTERLY DUTIES: Once during the first month of each quarter.
All work shall be accomplished within the timeframes specified above. Services rendered outside of the time periods specified will not be compensated unless specifically approved in writing by the Contracting Officer or his authorized representative.
21. GOVERNMENT FURNISHED EQUIPMENT, MATERIALS, SUPPLIES, AND
STORAGE CLOSET:
The Government will furnish keys to be used in performing the contract. When the keys are delivered, the Contractor shall verify the quantity in writing to the Contracting Officer or his authorized representative on Memorandum Receipt ENG Form 3067, within 48 hours of receipt.
The office furnace room will have 5 shelves set up and some floor space for contractors supply storage.
The following consumable items, exempt from accounting procedures will be furnished by the Government to be used for this contract.
Paper towels Vacuum Sweeper Water for cleaning Contractor’s Daily Worksheets
22. CONTRACTOR FURNISHED EQUIPMENT AND SUPPLIES:
All manpower necessary to accomplish the requirements of this contract as specified herein.
Cleansers, disinfectants and soaps. The contractor will provide the Natural Resource Manager with a complete list of all cleaning agents to be used during the term of the contract. The Natural Resource Manager retains approval authority for usage of cleaning agents and may request Material Safety Data Sheets for any or all products utilized.
Brooms, mops, brushes, squeegees, buckets, ladders, and all other equipment and supplies.
Toilet Tissue (minimum quilted 2 ply for office, maintenance restrooms) Plastic Liners for trash cans (13 gallon tall kitchen bags) Paper Water Cups (4 oz size) Urinal deodorant blocks Antibacterial liquid handsoap (office, maintenance restrooms)
The Contractor shall furnish to the Natural Resource Manager, a telephone number attended during normal business hours (7:30am to 4:00pm) CST, to which calls concerning the services, performance, or other contractual matters can be placed.
For the purpose of time and date, an answering machine or voicemail message will be deemed delivered to the Contractor, at such time as it is delivered to the number provided by the Contractor
23.
PERFORMANCE REQUIREMENTS SUMMARY (PRS):
Section Contract Requirement Performance ALP Method of (Para.) Standard (%) Surveillance
C.6 (1) Floors see note below 4% Routine
C.6 (2) Furniture see note below 4% Routine
C.6 (3) Window Accessories see note below 4% Routine
C.6 (4) Glass see note below 4% Routine
C.6 (5) Doors, Windows, Frames, Walls see note below 4% Routine
C.6 (6) Light Fixtures see note below 4% Routine
C.6 (7) Sinks, Countertops, Appliances see note below 4% Routine
C.6 (8) Electronics Equipment see note below 4% Routine
C.6 (9) Waste Removal see note below 4% Routine
C.6 (10) Fountains, Restroom Fixtures see note below 4% Routine
C.6 (11) Kitchenette see note below 4% Routine
C.6 (12) Ceilings see note below 4% Routine
C.6 (13) Exterior Roof Overhang see note below 4% Routine
C.6 (14) Sidewalks see note below 4% Routine
C.6 (15) Miscellaneous see note below 4% Routine
C.6 (16) Sylvan Shower Bldg & Walks see note below 4% Routine
NOTE: Performance Standard for the above is “free of foreign matter; free of stains; and clean, with performance in accordance with C.1 and C.5 for required services and duties.”
24. REQUIRED INSURANCE:
The Contractor is responsible for maintaining, at a minimum, the following prescribed amounts of insurance.
Workman’s Compensation In accordance with applicable State Statute
Employer’s Liability Minimum amount $100,000
General Liability/ bodily injury Minimum amount $500,000 occurrence
Automobile Liability In accordance with applicable State minimum standards.
25. ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS:
Applicable for all Service and Construction Contracts including the following:
Utility Contracts Mowing/Vegetative Management Law Enforcement Refuse Collection Janitor/Cleaning Park/Gate Attendant All Construction Contacts
All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award."
For Janitor/Cleaning services inside of projects offices in addition to the above.
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the http://www.dhs.gov/E http://www.dhs.gov/E
W912DQ19R1075
contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at ."
The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH, Corps Watch, or See Something, Say Something program (training standards provided by government representative). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after contract
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A N/A
0001AA Destination Government Destination Government
0001AB Destination Government Destination Government
0001AC Destination Government Destination Government
0001AD Destination Government Destination Government
0002 N/A N/A N/A N/A
0002AA Destination Government Destination Government
0002AB Destination Government Destination Government
0002AC Destination Government Destination Government
0002AD Destination Government Destination Government
0003 N/A N/A N/A N/A
0003AA Destination Government Destination Government
0003AB Destination Government Destination Government
0003AC Destination Government Destination Government
0003AD Destination Government Destination Government
0004 N/A N/A N/A N/A
0004AA Destination Government Destination Government
0004AB Destination Government Destination Government
0004AC Destination Government Destination Government
0004AD Destination Government Destination Government
0005 N/A N/A N/A N/A
0005AA Destination Government Destination Government
0005AB Destination Government Destination Government
0005AC Destination Government Destination Government
0005AD Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0001AA POP 01-OCT-2019 TO
30-SEP-2020
N/A USACE, KANSAS CITY +
NOLAN FISHER
WILSON LAKE PROJECT 4860 OUTLET
BLVD
SYLVAN GROVE KS 67481
816-389-3034
966214
0001AB POP 01-OCT-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
0001AC POP 01-OCT-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
0001AD POP 01-OCT-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
0002 N/A N/A N/A N/A
0002AA POP 01-OCT-2020 TO
30-SEP-2021
N/A USACE, KANSAS CITY +
NOLAN FISHER
WILSON LAKE PROJECT 4860 OUTLET
BLVD
SYLVAN GROVE KS 67481
816-389-3034
0002AB POP 01-APR-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
0002AC POP 01-OCT-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
0002AD POP 01-OCT-2020 TO
31-MAR-2021
N/A (SAME AS PREVIOUS LOCATION)
0003 N/A N/A N/A N/A
0003AA POP 01-OCT-2021 TO
30-OCT-2022
N/A USACE, KANSAS CITY +
NOLAN FISHER
WILSON LAKE PROJECT 4860 OUTLET
BLVD
SYLVAN GROVE KS 67481
816-389-3034
0003AB POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
0003AC POP 01-OCT-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0003AD POP 01-OCT-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 N/A N/A N/A N/A
0004AA POP 01-OCT-2022 TO
30-SEP-2023
N/A USACE, KANSAS CITY +
NOLAN FISHER
WILSON LAKE PROJECT 4860 OUTLET
BLVD
SYLVAN GROVE KS 67481
816-389-3034
0004AB POP 01-OCT-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0004AC POP 01-OCT-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0004AD POP 01-OCT-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 N/A N/A N/A N/A
0005AA POP 01-OCT-2023 TO
30-SEP-2024
N/A USACE, KANSAS CITY +
NOLAN FISHER
WILSON LAKE PROJECT 4860 OUTLET
BLVD
SYLVAN GROVE KS 67481
816-389-3034
0005AB POP 01-OCT-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
0005AC POP 01-OCT-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
0005AD POP 01-OCT-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-4 Recovered Material Certification MAY 2008
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.225-7048 Export-Controlled Items JUN 2013
252.232-7010 Levies on Contract Payments DEC 2006
252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.244-7000 Subcontracts for Commercial Items JUN 2013
252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2019)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(4) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(5) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19
U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995)
(41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June
2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment
Act of 2009.)
___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41
U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014)
(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Nov 2016) of 52.219-9.
____ (iii) Alternate II (Nov 2016) of 52.219-9.
____ (iv) Alternate III (Nov 2016) of 52.219-9.
____ (v) Alternate IV (Aug 2018) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.
657f).
____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-
Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns
Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
____(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).
X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
X (28)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
____ (ii) Alternate I (Feb 1999) of 52.222-26.
____ (29)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212).
____ (ii) Alternate I (July 2014) of 52.222-35.
____ (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
____ (ii) Alternate I (July 2014) of 52.222-36.
____ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.
13496).
____ (33)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in
22.1803.)
____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May
2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun
2016) (E.O. 13693).
____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(Jun 2016) (E.O. 13693).
____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and
13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-14.
____ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
____ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s
13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-16.
____ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O.
13513).
____ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).
____ (44) 52.223-21, Foams (Jun 2016) (E.O. 13693).
____ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
____ (47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter
83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (May 2014) of 52.225-3.
____ (iii) Alternate II (May 2014) of 52.225-3.
____ (iv) Alternate III (May 2014) of 52.225-3.
____ (48) 52.225-5, Trade Agreements (AUG 2018) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016)
(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
____ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.
5150).
____ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10
U.S.C. 2307(f)).
____ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) (31
U.S.C. 3332).
____ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July
2013) (31 U.S.C. 3332).
____ (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).
____ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.
Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
____ (iii) Alternate II (Feb 2006) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
X (2) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
X (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple
Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY
2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain
Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
_____ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
_____ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the
Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iv) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(v) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(viii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(x) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).
(xiii) _____ (A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain
Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xvi) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xvii)52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
(xviii) (A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
(B) Alternate I (JAN 2017) of 52.224-3.
(xix) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section
862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations.