B.08.01_Solicitaion__Ammendment.pdf

PDF 61 KB Posted

Attached to
Contruct Well House Pressure Buildings- Stockton Lake, MO
Solicitation number
W912DQ19B1016
Issued by

About this file

Change to statement of work. Insertion of specification section 5.1.1. Existing Well Enclosure Demo and Conversion to Pitless Wellhead and Attachment 9 Example of Wellhead enclosure.

View the file

Other files

File Type Posted
Abstract_of_bids_FBO.pdf PDF
Solicitation_Q_&_As.pdf PDF
B.08.02_Stockton_Well_House_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendmenet reflects change in solicitation and statement of w ork. This adds section "5.1.1 Existing Well Enclosure Demo and Conversion to

Pitless Wellhead" and "Attachment 9 Example Existing Wellhead Enclousure".

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ19B1016

X 9B. DATED (SEE ITEM 11)

12-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Aug-2019

CODE

USACE, KANSAS CITY +

FEDERAL BLDG, CT-C

601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ19B1016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SPECIFICATION CHANGES

Insert the following specification section:

5.1.1 Existing Well Enclosure Demo and Conversion to Pitless Wellhead: The Contractor shall demo and dispose of the existing fiberglass covers, concrete, heat lamp components, risers, conduits, water piping, panel boxes and wiring, and drain structure located within the enclosure and furninsh and install all materials required to convert the existing well head to a pitless system. Contractor should anticipate removal of approximately 1 to 1 ½ cubic yards of concrete from around the well head. Care should be taken when removing concrete from around the well casing so as not to damage it. Any damage to the well casing, well piping etc. due to the negligance of the Contractor during demolition will be repaired at no additional cost to the Government. Coversion to the pitless wellhead will meet Missouri Department of Natural Resources 10 CSR 23-3 Well Installation and Water Well Construction Code standards.This should ease the tying of the new pressure building water piping and pump control wiring into the wellhead as well as allow for ease future maintenance by USACE personnel if required. See Attachment 9, Example Existing Well Enclosure for referance for this task.

The Following attachement has been added:

Attachment 9 (Page 17 of 17) Example Existing Wellhead Enclosure

(End of Summary of Changes)