B.08.03_-_W912DQ-19-B-1012-0002.pdf

PDF 20 KB Posted

Attached to
Kanopolis Upper Pipe Replacement Federal contract opportunity
Solicitation number
W912DQ-19-B-1012
Issued by
Department of the Army Corps of Engineers Engineering District Kansas City

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Kanopolis Upper Pipe Replacement, newest first.
File Type Posted
OF_1419_-_Kanopolis_-_KO_Signed.pdf PDF
B.07.01_-_Site_Visit_Sign_In.pdf PDF
SF_30_-_Drawing_Summary.pdf PDF
B.08.03_-_Amendment_0001_Attachment.pdf PDF
W912DQ-19-B-1012-0001.pdf PDF
KA_As_Advertised_Specs_.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate revised sections:

Section 33 01 98 Slip Lining of Existing Pipe

Paragraph 1.3.2

Paragraph 3.1

All other Terms and Conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ19B1012

X 9B. DATED (SEE ITEM 11)

01-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Aug-2019

CODE

USACE, KANSAS CITY +

FEDERAL BLDG, CT-C

601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ19B1012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

The SOLICITATION is amended as follows:

NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.

1. SPECIFICATIONS:

a. Section 33 01 98 Slip Lining of Existing Piping

Para. 1.3.2 Detailed Work Plan, Narrative Changes

Submit a Detailed Work Plan not less than 30 days prior to commencement of pipe lining and following completion of pre-lining cleaning and inspection work. The plan shall include but is not limited to the following:

b. Section 33 01 98 Slip Lining of Existing Piping

Para. 3.1 PREPARATION AND INSPECTION, Narrative changes

The Contracting Officer makes no guarantee regarding the information, data, and physical condition of underground facilities or existing pipes. See Dr. Checks for historic video inspection of pipe. Before commencing with any work, or ordering any materials, physically measure the length and diameter and inspect the existing pipes designated to receive a pipe liner to verify that the rehabilitation plan is appropriate and meets the requirements of

EM 385-1-1. Inspect pipes using CCTV. The pipe inspection will include the entire length of pipe. The contractor will furnish all labor, materials, plant, and equipment to perform an internal visual examination, inspection, and color DVD or other electronic recording media to record the pipe lengths to be slip lined or replaced utilizing a crawler mounted color television system specifically designed for inspecting pipe line systems. The camera lens must be able to rotate. A monitor will be provided such that the Contracting Officer's Representative can view the inspection as the video is being taken. In addition, at each joint and at areas of the system that show damage or deterioration the inspection camera must rotate 360 degrees around the joint or observed deficiency. Each joint or deficiency will be photographed, identified as to the type of deficiency, and located by the distance from entry point.

Submit pipe inspection procedures to locate breaks, obstacles and connections in pre-construction submittals for approval. Note all connections and any conditions which may prevent proper installation of the liner. Correct these conditions prior to liner installation. Coordinate slip lining efforts with the Contracting Officer and the owner of the affected pipe. Submit the CCTV Recordings and Report Logs and/orwith photographs and Digital Photographs and

Report Logs prior to pipe liner installation. A snapshot photo with captions from the recorded video inspection should be included in the final report of each deficiency noted. Additionally, the final report will also include, but not be limited to, full documentation of actual inspection operations, documentation of conditions observed, and description of deficiencies, such as joint separation and width, section loss and size, and corrosion size.

Based on the CCTV Recordings and Report logs, include in the Detailed Work Plan the proposed plan for addressing any conditions which prevent proper pipe liner installation. the work plan on a thorough review of the inspection video and/or digital photographs and report logs.

W912DQ19B1012

(End of Summary of Changes)